Attachment II Price Proposal Form N6264926RA041.xlsx

XLSX spreadsheet 85 KB Posted

Attached to
6A1 Corrective Maintenance for Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95
Solicitation number
N6264926RA041
Issued by

About this file

This file is a Price Proposal Form template for Solicitation N6264926RA041, issued by NAVSUP Fleet Logistics Center Yokosuka for corrective maintenance work on two U.S. Navy barges at Puget Sound Naval Shipyard (PSNS). The form is designed to capture labor costs (in-house and subcontractor man-hours), material costs, and other direct costs (ODCs) for seven distinct work items across the two vessels: YR-85 and YR-95. Work items include repairs such as watertight hatch repair, break room conversion, structural member repair, HVAC modifications, and duct heater replacement, with pricing to be submitted in Japanese Yen (JPY).

The template requires offerors to input labor breakdowns by trade category (SFTR, INSL, WELD, SMTL, RGRS, PNTR, ELEC, PFTR, QA, and others), specify the number of personnel, hours per day, and number of days for both in-house and subcontractor labor, and provide total man-hours and cost per man-hour. The proposal deadline is 10 June 2026 at 10:00 AM Japan Standard Time, with a performance period from 21 July 2026 to 15 October 2026 at Yokosuka Naval Base. Eligibility is restricted to firms holding an active Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) with the U.S. Navy and authorized to operate in Japan. All pricing fields in the current template are blank, awaiting offeror input.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0410005 SF 30.pdf PDF
Solicitation Amendment N6264926RA0410004 SF 30.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Exhibit A - Contract Data Requirements List (CDRL)_IPMR.pdf PDF
Solicitation Amendment N6264926RA0410003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0410002 SF 30.pdf PDF
Attachment (IV) Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38HWC60001_A03_c0v0.pdf PDF
TGI_38HWC51408_A02_c0v0.pdf PDF
TGI_38HVC66501_A03_c0v1.pdf PDF
TGI_38HVC60001_A02_c0v0.pdf PDF
TGI_38HVC63102_A02_c0v0.pdf PDF
TGI_38HWC51205_A02_c0v0.pdf PDF
Exhibit A - Contract Data Requirements List (CDRL)_IPMR.pdf PDF
Solicitation Amendment N6264926RA0410001 SF 30.pdf PDF
TGI_38HVC16702_A02_c0v0.pdf PDF
Exhibit A - Contract Data Requirements List (CDRL)_GFM.pdf PDF
Solicitation - N6264926RA041.pdf PDF
Attachment (VIII) Contracts Data Sheet.pdf PDF
Att_N6264926RA041_Pre-Sol.pdf PDF
Attachment (VI) Source of Repair Instruction.pdf PDF
Attachment (VII) Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment (III) Request for Information Sheet.docx DOCX document
Attachment (V) Warranty Tracking Information.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA041CLIN 0001 (YR-85)0¥0¥0¥0¥0
VESSEL NAME:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95CLIN 0002 (YR-95)0¥0¥0¥0¥0
AVAILABILITY:FY26 Corrective MaintenanceTotal for All CLIN0¥0¥0¥0¥0

Total Work Item (Specify) 7 Total Evaluated Price ¥0

Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.HULL No. / TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
1YR-85_38HVC16702A02F/O - REPAIR WATERTIGHT HATCH 01-33-0000¥0¥0¥0¥0
2YR-85_38HVC60001A02F/O – SA YR-1116D, ACCOMPLISH CONVERSION OF BREAK ROOM IN 02-88-0-L000¥0¥0¥0¥0
3YR-85_38HVC63102A02F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR000¥0¥0¥0¥0
4YR-85_38HVC66501A03F/O - ACCOMPLISH S/A YR-1117D, INSTALL FOOT SHEAR MACH, BOX & PAN BRK 1-18-0-Q000¥0¥0¥0¥0
5YR-95_38HWC51205A02F/O – S/A 1142D, ACCOMPLISH HVAC MODIFICATION000¥0¥0¥0¥0
6YR-95_38HWC51408A02F/O – REPLACE DUCT HEATERS 03-18-2 AND 03-20-2000¥0¥0¥0¥0
7YR-95_38HWC60001A03F/O - S/A YR-1136D, ACCOMPLISH CONVERT PORT SIDE OF 2-6-0-Q TO MUSTER000¥0¥0¥0¥0

1_YR-85_38HVC16702A02

SHIP NAME/AVAILABILITY:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective MaintenanceTGI 1_YR-85_38HVC16702A02 SUMMARY
SOLICITATION #:N6264926RA041
SRF-JRMC TGI #:1_YR-85_38HVC16702A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPAIR WATERTIGHT HATCH 01-33-000¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

2_YR-85_38HVC60001A02

SHIP NAME/AVAILABILITY:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective MaintenanceTGI 2_YR-85_38HVC60001A02 SUMMARY
SOLICITATION #:N6264926RA041
SRF-JRMC TGI #:2_YR-85_38HVC60001A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – SA YR-1116D, ACCOMPLISH CONVERSION OF BREAK ROOM IN 02-88-0-L00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

3_YR-85_38HVC63102A02

SHIP NAME/AVAILABILITY:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective MaintenanceTGI 3_YR-85_38HVC63102A02 SUMMARY
SOLICITATION #:N6264926RA041
SRF-JRMC TGI #:3_YR-85_38HVC63102A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

4_YR-85_38HVC66501A03

SHIP NAME/AVAILABILITY:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective MaintenanceTGI 4_YR-85_38HVC66501A03 SUMMARY
SOLICITATION #:N6264926RA041
SRF-JRMC TGI #:4_YR-85_38HVC66501A03In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - ACCOMPLISH S/A YR-1117D, INSTALL FOOT SHEAR MACH, BOX & PAN BRK 1-18-0-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

5_YR-95_38HWC51205A02

SHIP NAME/AVAILABILITY:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective MaintenanceTGI 5_YR-95_38HWC51205A02 SUMMARY
SOLICITATION #:N6264926RA041
SRF-JRMC TGI #:5_YR-95_38HWC51205A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – S/A 1142D, ACCOMPLISH HVAC MODIFICATION00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

6_YR-95_38HWC51408A02

SHIP NAME/AVAILABILITY:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective MaintenanceTGI 6_YR-95_38HWC51408A02 SUMMARY
SOLICITATION #:N6264926RA041
SRF-JRMC TGI #:6_YR-95_38HWC51408A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – REPLACE DUCT HEATERS 03-18-2 AND 03-20-200¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

7_YR-95_38HWC60001A03

SHIP NAME/AVAILABILITY:Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective MaintenanceTGI 7_YR-95_38HWC60001A03 SUMMARY
SOLICITATION #:N6264926RA041
SRF-JRMC TGI #:7_YR-95_38HWC60001A03In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - S/A YR-1136D, ACCOMPLISH CONVERT PORT SIDE OF 2-6-0-Q TO MUSTER00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .