This file is a Price Proposal Form template for Solicitation N6264926RA041, issued by NAVSUP Fleet Logistics Center Yokosuka for corrective maintenance work on two U.S. Navy barges at Puget Sound Naval Shipyard (PSNS). The form is designed to capture labor costs (in-house and subcontractor man-hours), material costs, and other direct costs (ODCs) for seven distinct work items across the two vessels: YR-85 and YR-95. Work items include repairs such as watertight hatch repair, break room conversion, structural member repair, HVAC modifications, and duct heater replacement, with pricing to be submitted in Japanese Yen (JPY).
The template requires offerors to input labor breakdowns by trade category (SFTR, INSL, WELD, SMTL, RGRS, PNTR, ELEC, PFTR, QA, and others), specify the number of personnel, hours per day, and number of days for both in-house and subcontractor labor, and provide total man-hours and cost per man-hour. The proposal deadline is 10 June 2026 at 10:00 AM Japan Standard Time, with a performance period from 21 July 2026 to 15 October 2026 at Yokosuka Naval Base. Eligibility is restricted to firms holding an active Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) with the U.S. Navy and authorized to operate in Japan. All pricing fields in the current template are blank, awaiting offeror input.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | N6264926RA041 | CLIN 0001 (YR-85) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| VESSEL NAME: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 | CLIN 0002 (YR-95) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| AVAILABILITY: | FY26 Corrective Maintenance | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
Total Work Item (Specify) 7 Total Evaluated Price ¥0
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | HULL No. / TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | YR-85_38HVC16702A02 | F/O - REPAIR WATERTIGHT HATCH 01-33-0 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | YR-85_38HVC60001A02 | F/O – SA YR-1116D, ACCOMPLISH CONVERSION OF BREAK ROOM IN 02-88-0-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | YR-85_38HVC63102A02 | F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | YR-85_38HVC66501A03 | F/O - ACCOMPLISH S/A YR-1117D, INSTALL FOOT SHEAR MACH, BOX & PAN BRK 1-18-0-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | YR-95_38HWC51205A02 | F/O – S/A 1142D, ACCOMPLISH HVAC MODIFICATION | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | YR-95_38HWC51408A02 | F/O – REPLACE DUCT HEATERS 03-18-2 AND 03-20-2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | YR-95_38HWC60001A03 | F/O - S/A YR-1136D, ACCOMPLISH CONVERT PORT SIDE OF 2-6-0-Q TO MUSTER | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
1_YR-85_38HVC16702A02
| SHIP NAME/AVAILABILITY: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective Maintenance | TGI 1_YR-85_38HVC16702A02 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA041 | ||||||||||
| SRF-JRMC TGI #: | 1_YR-85_38HVC16702A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - REPAIR WATERTIGHT HATCH 01-33-0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_YR-85_38HVC60001A02
| SHIP NAME/AVAILABILITY: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective Maintenance | TGI 2_YR-85_38HVC60001A02 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA041 | ||||||||||
| SRF-JRMC TGI #: | 2_YR-85_38HVC60001A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – SA YR-1116D, ACCOMPLISH CONVERSION OF BREAK ROOM IN 02-88-0-L | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_YR-85_38HVC63102A02
| SHIP NAME/AVAILABILITY: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective Maintenance | TGI 3_YR-85_38HVC63102A02 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA041 | ||||||||||
| SRF-JRMC TGI #: | 3_YR-85_38HVC63102A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – REPAIR STRL MBR AND REPLACE STUD IN MAIN LEVEL THROUGH 03 LEVEL EXTERIOR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_YR-85_38HVC66501A03
| SHIP NAME/AVAILABILITY: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective Maintenance | TGI 4_YR-85_38HVC66501A03 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA041 | ||||||||||
| SRF-JRMC TGI #: | 4_YR-85_38HVC66501A03 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - ACCOMPLISH S/A YR-1117D, INSTALL FOOT SHEAR MACH, BOX & PAN BRK 1-18-0-Q | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_YR-95_38HWC51205A02
| SHIP NAME/AVAILABILITY: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective Maintenance | TGI 5_YR-95_38HWC51205A02 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA041 | ||||||||||
| SRF-JRMC TGI #: | 5_YR-95_38HWC51205A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – S/A 1142D, ACCOMPLISH HVAC MODIFICATION | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_YR-95_38HWC51408A02
| SHIP NAME/AVAILABILITY: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective Maintenance | TGI 6_YR-95_38HWC51408A02 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA041 | ||||||||||
| SRF-JRMC TGI #: | 6_YR-95_38HWC51408A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – REPLACE DUCT HEATERS 03-18-2 AND 03-20-2 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_YR-95_38HWC60001A03
| SHIP NAME/AVAILABILITY: | Puget Sound Naval Shipyard (PSNS) Barge YR-85 and YR-95 - FY26 Corrective Maintenance | TGI 7_YR-95_38HWC60001A03 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA041 | ||||||||||
| SRF-JRMC TGI #: | 7_YR-95_38HWC60001A03 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - S/A YR-1136D, ACCOMPLISH CONVERT PORT SIDE OF 2-6-0-Q TO MUSTER | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0