Template-AE SoS-Attachment-4_Template-Attachment A-Design Certification and Transmittal Letter.docx
DOCX document 27 KB Posted
- Solicitation number
- W9128F-21-R-0057
About this file
This solicitation requests demolition services at two fueling stations located at Fort Pickett Army National Guard Maneuver Training Center. The contractor will demolish fueling equipment including underground storage tanks, fuel dispensers, canopies, and truck fillstands at POL-2 and POL-3. Additional requirements include returning facilities and roads at each location to the installation. The solicitation closes on September 20, 2021 and is restricted to women-owned small businesses. The selected contractor must begin work within 10 days of notice to proceed and complete the project within 330 calendar days. Performance and payment bonds are mandatory. The estimated cost range for the construction is between $500,000 to $1,000,000. All questions must be directed to the specified Army Corps of Engineers contract specialist by email.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A - DESIGN CERTIFICATION AND TRANSMITTAL LETTER
[Contractor's Letterhead]
[Date: __________________] [Contract No. ____________]
[Reviewing Component Address]
Subj: DESIGN CERTIFICATION AND TRANSMITTAL LETTER [Project Title ____________________] [Project Location _________________] [Contract No. _____________________]
Gentlemen
Enclosed are the following documents, which we hereby certify are in compliance with the RFP requirements of the subject construction contract and can be used to commence construction subject to Government Conformance Review:
1. Design Drawings
2. Project Specification
3. Design Analysis (As Applicable)
a. Civil
b. Water Supply and Wastewater Collection
c. Architectural
d. Interior Design
e. Structural
f. Mechanical
g. Fire Protection
h. Electrical
i. Environmental Protection, Compliance and Permits
j. Health and Safety
k. Sustainable Design
4. Submittals Register
5. All other Design Deliverables
6. Deviations (List of Deviations with Justification Attached)
[Typed Name, Date and Signature of an Officer of the Contractor's Company]
[Typed Name, date, and Signature of the Contractor Quality Control (CQC) System Manager along with Stamp of Approval]
[Typed Name, date, and Signature of the Designer of Record (Registered Professional Engineer) along with PE Stamp of Approval]
Copy to:
[As standard with the Contractor]
Attachment A
File details come from the government source that posted it. Updated .