This technical factors document outlines requirements for an airfield maintenance contract at Dyess AFB covering two main components: airfield markings and runway rubber removal.
For airfield markings, contractors must provide a detailed work plan covering marking installation per project drawings, with a 210-day performance period limited to weekend runway closures. Past performance requires completion of minimum 2 similar projects in past 3 years, including removal/painting of 200,000 square feet of pavement markings on an active airfield within a 5-day period. For runway rubber removal, contractors must submit a work plan for rubber removal and marking operations, also with a 210-day performance period limited to weekend closures. Past performance requires 3 similar projects in past 3 years, including successful completion of 348,000 SF of rubber removal in one weekend. Both components require detailed equipment lists, material submittals, phasing plans, and coordination with airfield management. All work must be performed during periods of minimal aircraft operations with prior coordination.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FNWZ 24-0129 Maintain Airfield Markings & Rubber Removal - Technical Factors (09-12-24)
A. AIRFIELD MARKINGS
The Contractor shall provide a detailed course of action and work plan for the following future work scenarios, which is in line with the scope of work that may be required under this contract:
A1. Contractor shall provide a detailed course of action and work plan describing the following: Provide airfield markings as shown in the attached project drawings. The work plan shall follow all the requirements specified in the contract specifications and drawings, coordination for runway closure, phasing plan, material submittals, and testing; it shall include a list of all equipment proposed to be used to accomplish all required tasks and the contract line items numbers (CLINs) and quantities that apply for each per the scope of work. Contractor shall include references to the contract specifications and drawings. Ensure schedule complies with runway working conditions. Performance period for this work is 210 days. Runway closures are limited to weekends when aircrafts operations are minimal and only prior coordination with the airfield manager.
A2. Past performance requirements:
The prime contractor and/or its sub-contractor shall have successfully completed a minimum of 2 projects within the past 3 years having similar scope of work per this contract and particularly have successfully removed and painted a minimum total of 200,000 square feet of pavement markings on an active airfield within a five day period; three of those days may be under a fully operational airfield environment in combination with weekend days of minimum operational airfield environment.
Contractor shall submit points of contact of previous contracts to verify project information.
B. RUNWAY RUBBER REMOVAL
The Contractor shall provide a detailed course of action and work plan for the scope of work submitted under this request for proposal:
B1. Contractor shall provide a detailed course of action and work plan describing the following tasks:
Provide rubber removal and airfield markings as shown in the attached project drawings. The work plan shall follow all the requirements specified in the contract specifications and drawings, coordination for runway closure, phasing plan and material submittals; it shall also include a list of all equipment proposed to be used to accomplish all required tasks and the quantities that apply for each per the scope of work. Contractor shall include references to the contract specifications and drawings. Ensure schedule complies with runway working conditions. Performance period for this work is 210 days.
Runway closures are limited to weekends when aircraft operations are minimal and only prior coordination with the airfield manager.
B2. Past performance requirements:
The prime contractor and/or its sub-contractor shall have successfully completed a minimum of 3 projects within the past 3 years having similar scope of work per this contract and particularly have successfully performed a minimum of 348,000 SF of rubber removal in one weekend. Contractor shall submit points of contact of previous contracts to verify project information.