TECHNICAL EXHIBITS.pdf

PDF 13 MB Posted

Attached to
Portable Latrines W9124G-27-Q-A004 (Fort Rucker)
Solicitation number
PANROC-27-Q-0000-023204
Issued by

About this file

This is a Performance Work Statement (PWS) for Standard Portable Toilet Services at Fort Novosel, Alabama. The contractor is required to deliver, service, and remove portable latrines (toilets) and handwash units at multiple training ranges and facilities across the installation. The contract encompasses 25 distinct service locations including ranges such as TE 6.1.1 Range, ARF Range, TA G Bivouac Freedom/Warrior, CBRN, CPQC Range, EZ-BC Range, Gate 24, HEAT Trainer, HG Qual, LandNav, LRC, MPMG Range, POW Range, Range 27, RT-9, South Range, UOS locations, and Clark Range G2 FP, requiring between 1 and 4 latrines per location depending on the facility.

Key service requirements include delivery and removal of equipment per specified dates, weekly servicing of portable latrines and handwash units, submission of a cleaning schedule within five days of contract award, emergency notification procedures for unsafe conditions or medical incidents, provision of iWatch training certificates within 30 days of contract start, and submission of permits, licenses, and safety data sheets. The contractor must maintain an approved chemical list and spill response plan, notify the Contracting Officer immediately of any hazardous material releases, and comply with Alabama Department of Environmental Management regulations. Deliverables must be submitted to the Contract Contracting Officer (KO) and Contracting Officer Representative/Alternate (COR/ACOR), with emergency delays and medical treatments reported verbally within 30 minutes, accident reports submitted within one hour verbally and five business days in writing, and a proposed cleaning schedule approved within 30 days of award. The PWS specifies 100% inspection of equipment delivery and removal, with periodic inspections of servicing quality.

OTHER

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 3

3 3

3 3

3 3

3 3

3 3

Parcours Lake

Ech Lake

La ke

T ho lo cc o

Beaver Lake

TA 14-1

TA 14-9

BIG FOX LN

SHORT CHARLIE LN

MATTESON RIFF TR

RANGE RD

(BAILEY RD)

TA 16-9

BIG DELTA LN

HOTEL ACCESS

K1

K

AC

C

ES

S R

D

SHORT ECHO LN

GOLF ACCESS

H

IG

H W

AY O

N

E

TA 14-3

TA

4-

KILO LN

TA 18-3

TA 21-11

TA 15-8

TA 16-14

JULIET 2 ACCESS

SHORT BRAVO LN

27 N M

AN

EU

VER

TR

TA 21-6

BAYLOCK RD

TA 21-1

TA 18-2

JOHNSTON RD

TA E-6

JULIET 1

ACCESS

HI

G

HW

AY

O

NE

TA 21-5

N

M

AN

EU

VE

R

TR

RAVENELL RD

FAFP 27

ACCESS

SHORT DELTA LN

SHORT FOX LN

W

AT

ER

S

TR

AI

L

TA 38-16

TA 14-8

TA

E

-3

ALP

HA A

CCESS

TA 25-1

TA

6-

TA 14-11

TAB LN

ECH RD

TA

1-

TA 21-4

COWELL RD

TA H-2

TA

1-

TA

8-

TA 15-7

TA 16-8

TA 13-2

ECP-2 ACCESS

(FP-2)

SHORT JU

LIET

TA

TA 16-2

ALPH

A AC

C

ESS

TA 21-9

RED CLOUD RD

TA 14-12

TA E-5

TA 20-1

TA E-2

ECH LAKE

ACCESS

TA 14-7

TATE RD EXT

NO-NAME RD

TA

8-

TA 15-3

ECH FIELD RD

27 N MANEUVER TR

TA 16-4

27 N MANEUVER TR

TA

6-

A

-4

TA 14-2

TA 20-2

TA

2-

COWELL RD EXT

TA

4-

TA 18-4

27 N M

ANEUVER TR 27 N MANEUVER TR

TA 21-10

BACKRO

AD

TA 15-5

TA 18-5

HOOPER RD.

TA 17-1

TA

I-

TA 18-1

TA 13-1

TA E-1

TA 21-2

TA 16-3

27 N MANEUVER TR

TA 1

18TH ST

O

LS

EN

DR

PET CEM

ETERY

RD

RUF

AV

E

NOVOSEL S

T

BLUE MAX

ST

NIGHTHAWK ST

DIVISION RD

DUSTOFF ST

KIRBY

ST

SHERIDAN ST

ENTERPRISE RD

GRIFFIN

AVE

<NULL>

HARTELL WAY

KINGSMAN ST

H

AR

R

IS

DR

KILO

AC

C

ESS

EPPS

ST

BAKERST

JO

HNST

ON R

D

FI

FT

H

ST

CRUSADER ST

DEAN ST

LO

W

E

RD

BRADY

LN.

TH

OR

NE

S

T

M

AY

FI

EL

D

AV

E

KYLE W

AY

C R

DIAMOND AVE

CAMP ENG RD

TH

S T

TH

S T

TH

S T

33R D

ST

TH

S T

BOXCAR ST

GHOST RIDER ST

COWBOY ST.

OUTLAW ST

CAREY ST

BLACKWELL ST

DUKE ST

TRACEY CIR

EN

GIN

EE

R

RD

HATCH RD

W PERIMETER RD

KNOX RD

W

PER

IM

ETER

R D

AIRPORT RD

RED CLOUD RD

AN

D

R

EW

S AVE

LAKESHORE DR

DILLY BRANCH RD

CHRISTIAN RD

FARREL RD

CHRISTIAN RD

CO

M

BA

T

RD

W

HI

TT

AK

ER

R

D

E

PE

R

IM

ET

ER

R D

W

ES T BEAC

H R

D

E PERIMETER RD

HATCH RD

LO

W

E R

D

ANDREWS AVE

RANGE RD

JOHNSTON RD

AL

H

W Y

BILL DELONEY RD

AL HWY 27

AL

H

W Y

F

C

G

H

19E

A2

D

E

A1 I

B

19W

CPQC Range

QTY: 3

MPMG Range

QTY: 2

EZ-BC Range

QTY: 4

UOS-TA 10

QTY: 1

ARF

QTY: 2

Range 27

QTY: 2

POW Range

QTY: 3

South Range

QTY: 2

LRC-TA 16

QTY: 1

LandNav-TA 16

LRC-TA G

QTY: 2

UOS-TA G

QTY: 3

Bivouac Warrior

QTY: 1

Overhead Shelter - TA 32

QTY: 2

HG Qual-TA 32

QTY: 1

CBRN-TA 16

QTY: 2

RT-9

QTY: 2

Bivouac Freedom

QTY: 4

HEAT Trainer

QTY: 1

Gate 24

QTY: 1

CDFC

QTY: 1

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:65,000 WGS 84 ALABAMA

1:65,000 0 1 2 3 40.5

Miles

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................18 OCTOBER 2024.

Legend

Document Name: FortNovosel_Portolets_65k_11x17_20241018

SAMPLE 1,000 METER GRID SQUARE

20 21 x

SAMPLE

POINT

100,000 M. SQUARE IDENTIFICATION

FV

GRID ZONE DESIGNATION

16R

100 METER REFERENCE

1.

2.

Read large numbers labeling the VERTICAL grid line left of point and estimate tenths (100 meters) from grid line to

Read large numbers labeling the HORIZONTAL grid line below point and estimate tenths (100 meters) from grid line to point. 20 3 point. 74 6

WHEN REPORTING ACROSS A 100,000 METER LINE, PREFIX

THE 100,000 METER SQUARE IDENTIFICATION IN WHICH THE

WHEN REPORTING OUTSIDE THE GRID ZONE DESIGNATION

Example: 203746

POINT LIES.

Example: FV203746

AREA. PREFIX THE GRID ZONE DESIGNATION.

Example: 16RFV203746

Installation Boundary

Runway

Training Area

Lake

Building

Pole BarnPortalet Location

Portalet Route

Road (On-/Off-Post)

Railroad

Bridge33

N

0m

Distance from Range Operations Shown

E000m.106

RANGE

OPERATIONS

2524232221191817161514131211

2524232221191817161514131211

206106

61.06 Miles Round-Trip from

Range Operations and Return

CLARK RANGE

QTTY: 2

Q

T

TY: 1

TE 6.1.1 Range Standard Portable Toilet

Maxar, Microsoft

ARF Range (qty 2)

1:3,000 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 200 400 600 800100 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:3,000 WGS 84 ALABAMA

Latrines (qty: 2)

16R FV 1542 7761

TE 6.1.2 Detailed RANGE Individual Portable Toilet Locations at FT RUCKER

TA G Bivouac Freedom (qty 1)

1:900̄

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 75 150 225 30037.5 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:900 WGS 84 ALABAMA

Latrines (qty: 1)

16R FV 2419 7149

TA G Bivouac Warrior (qty 4)

1:700̄

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 50 100 150 20025 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:700 WGS 84 ALABAMA

Latrines (qty: 2)

16R FV 2415 7144

Latrines (qty: 2)

16R FV 2418 7148

1:500̄

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

FORT RUCKER PORTALET CONTRACT SUPPORT MAP

CBRN (qty 2)1:500 WGS 84 ALABAMA

Latrines (qty: 2)

16R FV 1589 7597

0 25 50 75 10012.5 Feet

CDFC (qty 1)

1:1,700 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 150 300 450 60075 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:1,700 WGS 84 ALABAMA

16R FV 2560 7256

CPQC Range (qty 3)

1:1.250 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 100 200 300 40050 Feet

FORT RCKER PORTALET CONTRACT SUPPORT MAP1:1,250 WGS 84 ALABAMA

Latrines (qty: 3)

16R FV 0994 8193

EZ-BC Range (qty 4)

1:800̄

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 50 100 150 20025 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:800 WGS 84 ALABAMA

Latrines (qty: 4)

16R FV 1007 8065

Gate 24 (qty 1)

1:2,000 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

7005253501750 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:2,000 WGS 84 ALABAMA

Latrine (qty: 1)

16R FV 1594 8321

HEAT Trainer (qty 1)

1:800̄

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

300225150750 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:800 WGS 84 ALABAMA

Latrines (qty: 1)

16R FV 2426 7170

TRAINING AREA G

HG Qual - TA 32 (qty 1)

1:625̄

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 40 80 120 16020 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:625 WGS 84 ALABAMA

Latrine (qty: 1)

16R FV 2399 7184

Maxar

LandNav - TA 16 (qty 2)

1:18,000 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

4,0003,0002,0001,0000 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:18,000 WGS 84 ALABAMA

16R FV 1603 7663

LRC - TA 16 (qty 1)

1:1,300 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 100 200 300 40050 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:1,300 WGS 84 ALABAMA

16R FV 1546 7714

LRC - TA G (qty 2)

1:2,100 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

7005253501750 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:2,100 WGS 84 ALABAMA

16R FV 2387 7133

MPMG Range (qty 2)

1:7,500 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 750 1,500 2,250 3,000375 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:7,500 WGS 84 ALABAMA

16R FV 1005 8176

Overhead Shelter - TA 32 (qty 2)

1:2,000̄

HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 200 400 600 800100 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:2,000 WGS 84 ALABAMA

Latrines (qty: 2)

16R FV 2503 7146

TRAINING AREA 32

TRAINING AREA G

TRAINING AREA 34

POW Range (qty 3)

1:2,000 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 150 300 450 60075 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:2,000 WGS 84 ALABAMA

Standard Latrines (qty:2) ADA Compliant (qty:1)

16R FV 1561 7763

Range 27 (qty 2)

1:1,300 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 100 200 300 40050 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:1,300 WGS 84 ALABAMA

16R FV 1519 7733

1:3,500 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 250 500 750 1,000125 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP

RT-9 (qty 2)1:3,500 WGS 84 ALABAMA

16R FV 2005 7263

South Range (qty 2)

1:1,300 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 100 200 300 40050 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:1,300 WGS 84 ALABAMA

16R FV 1597 7764

UOS - TA 10 (qty 1)

1:1,300 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 100 200 300 40050 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:1,300 WGS 84 ALABAMA

16R FV 1911 7999

UOS - TA G (qty 3)

1:1,000 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 75 150 225 30037.5 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:1,000 WGS 84 ALABAMA

Latrines (qty: 3)

16R FV 2398 7146

CLARK RANGE - G2 FP (qty 1)

1:1,000 ¯HORIZONTAL DATUM....................................................................................WGS84 ZONE 16N

GRID...............................................................................................................1,000 METER UTM PROJECTION..................................................................................TRANSVERSE MERCATOR PRINTED BY..........................TRAINING DIVISION, RANGE BRANCH, FORT RUCKER ITAM DATE...............................................................................................................3 FEBRUARY 2025

0 150 300 450 60075 Feet

FORT RUCKER PORTALET CONTRACT SUPPORT MAP1:1,000 WGS 84 ALABAMA

PERFORMANCE WORK STATEMENT

FORT NOVOSEL STANDARD PORTABLE TOILET SERVICES

Standard Portable Toilet Services TE-6.5 - 1 Fort Novosel, Al.

TE 6.5 Performance requirements Summery- (PRS)

Performance

Objective

Standard

Acceptable Quality

Level

Surveillance

Method and

Frequency

Delivery of equipment

PWS Paragraph 5.2, 5.3.1, 5.3.2, 5.4.1 and

5.4.2.

IAW PWS Provide items on required date per

PWS.

100% Inspection

Removal of equipment

PWS Paragraph 5.2, 5.3.1, 5.3.2, 5.4.1 and

5.4.2.

IAW PWS Removed items on required date IAW

PWS.

Servicing Portable

Latrines and

Handwash units

Schedule.

PWS section 5.2.22 and 5.3.1.3.

IAW PWS section

5.2.22 and 5.3.1.3.

Servicing Schedule provided within 5 days after contract award.

Servicing Portable

Latrines and

Handwash Units.

PWS section 5.1 and

5.3.1.

IAW PWS section

5.1 Servicing

Standard Portable

Latrines and

Handwash Units, Range

Requirements, and

PWS section 5.3.1

MWR – Long Term

(Monthly) requirement.

Cleaned per date

Scheduled with all items being acceptable.

Periodic inspection

ARFRange_3k_8-5x11
BivouacFreedom_900_8-5x11
BivouacWarrior_700_8-5x11
CBRN_500_8-5x11
CDFC_1700_8-5x11
CPQCRange_1250_8-5x11
EZ-BCRange_800_8-5x11
Gate24_2k_8-5x11
HEATtrainer_800_8-5x11
HGQual-TA32_625_8-5x11
LandNav-TA16_18k_8-5x11
LRC-TA16_1300_8-5x11
LRC-TAG_2100_8-5x11
MPMGRange_7500_8-5x11
OverheadShelter-TA32_2k_8-5x11
POWRange_2k_8-5x11
Range27_1300_8-5x11
RT-9_3500_8-5x11
SouthRange_1300_8-5x11
UOS-TA10_1300_8-5x11
UOS-TAG_1k_8-5x11
Blank Page

File details come from the government source that posted it. Updated .