Technical Exhibit U-Div 28 ELECTRONIC SAFETY AND SECURITY 23 May 2023.pdf
PDF 445 KB Posted
- Solicitation number
- W9123823B0021
About this file
This solicitation is for a single-award Indefinite Delivery Indefinite Quantity Job Order Contract to provide real property sustainment, restoration, and modernization minor construction services at Military Ocean Terminal Concord in California. Work includes site work, demolition and rebuild, mechanical system replacement and controls upgrades, infrastructure preservation, renovation, and finishes replacement. Some vertical construction is also included. The contract is set aside for small businesses and has a North American Industry Classification System code of 236220. The estimated value is between $25-100 million to be issued through firm-fixed-price task orders ranging from $2,000 to $2 million. Proposals are due on July 25, 2023 and will only be accepted via hand delivery to the specified address.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOTCO Job Order Contract (SATOC) 2487
SECTION TABLE OF CONTENTS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
SECTION 28 08 10
ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
PART 1 GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.1.1 General
1.4.1.2 Test Director
1.4.1.3 Operator
1.4.1.4 Technician
1.4.1.5 Test Intruder
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 TEST PLAN
3.1.1 Personnel
3.1.2 Equipment
3.1.3 Procedures
3.1.4 Special Provisions
3.1.5 Test Logs
3.1.6 Schedule
3.2 PRE-ACCEPTANCE TESTING
3.2.1 Phased Testing
3.2.1.1 Functional Testing Phase
3.2.1.2 Burn-In Testing Phase
3.2.2 Draft Test Report
3.3 SYSTEM ACCEPTANCE
3.3.1 Preparation
3.3.2 Personnel
3.3.3 Visual Inspection
3.3.4 Functional Testing
3.3.5 System Activity Reports
3.3.6 Corrective Actions
3.4 FINAL TEST REPORT
3.4.1 Summary
3.4.2 Personnel
3.4.3 Test Logs
-- End of Section Table of Contents --
SECTION 28 08 10 Page 1
SECTION 28 08 10
ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
PART 1 GENERAL
1.1 SUMMARY
This specification defines the process and procedures for initial acceptance testing of electronic security systems (ESS) to include intrusion detection, access control and video as well as associated power and communications. Requirements to plan, conduct, and document all testing activities are covered along with the Government responsibility to witness testing and review and approve submittals. During the course of the acceptance test, demonstrate that, without exception, the completed and integrated ESS complies with the contract requirements.
1.2 DEFINITIONS
The Government Representative is a qualified individual given specific authority to witness system acceptance testing and evaluate the results.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-05 Design Data
Test Plan; G
SD-06 Test Reports
Draft Test Report
Final Test Report; G
SD-07 Certificates
Qualifications
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.1.1 General
The Test Director, Operator, and Technician must have prior experience with the specific equipment, hardware and software installed under the contract.
SECTION 28 08 10 Page 2
1.4.1.2 Test Director
The Test Director must have at least five years of hands-on ESS experience to include any combination of design, installation, testing and maintenance.
1.4.1.3 Operator
The Operator must have at least two years of hands-on experience installing and maintaining ESS workstations to include both hardware and software. The Operator must be capable of demonstrating all workstation features and capabilities.
1.4.1.4 Technician
The technician must have at least two years of hands-on experience installing and maintaining ESS field equipment to include sensors, card readers, cameras, local processors, and communications equipment. The Technician must be capable of demonstrating all features and capabilities of ESS field equipment. Qualifications may be met by the individual experience of one technician or by the combined experience of a team of technicians.
1.4.1.5 Test Intruder
The purpose of the test intruder is to activate intrusion sensors in a realistic and repeatable manner. The test intruder must be between 70 and 72 inches tall and weigh between 175 and 190 pounds. The test intruder must possess sufficient physical strength, agility, and endurance to perform movements required for intrusion testing. These movements may include, but are not limited to, walking, running, crawling, jumping, and climbing.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 TEST PLAN
Clearly establish the scope for ESS testing prior to beginning testing.
Submit a Test Plan that addresses the following topics:
3.1.1 Personnel
Identify the Test Director, Operator, Technician, Test Intruder, and any other personnel that will be performing test activities.
3.1.2 Equipment
List all equipment that is required to support testing. State the purpose of each piece of equipment. Describe equipment that will be used to enable voice communications between the monitoring location and the field.
3.1.3 Procedures
Provide a step-by-step procedure for conducting each functional test.
Describe actions and expected results. Ensure that functional test
SECTION 28 08 10 Page 3 procedures address performance standards described in contract specifications.
Download example procedures from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example procedures to meet specific project requirements and develop additional ones as needed. Follow TEST-MASTERTP0023-005 for Air Force projects.
3.1.4 Special Provisions
Discuss any special test provisions such as facility access, safety, integration with existing systems, and coordination with other work.
3.1.5 Test Logs
Provide logs for recording all data from functional testing and burn-in testing.
Download example logs from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example logs to meet specific project requirements and develop additional ones as needed.
3.1.6 Schedule
Provide an overall schedule that includes all testing milestones.
3.2 PRE-ACCEPTANCE TESTING
Conduct a complete test of all field equipment, workstations, and central system hardware and software in accordance with the approved Test Plan.
The Test Director must be on site to conduct a pre-test inspection and oversee all testing activities. Prior to testing, visually inspect all ESS components and correct workmanship and neatness deficiencies as needed. During the pre-test inspection, verify the accuracy of redline drawings and update drawings as needed. Conduct testing in two phases -functional testing followed by burn-in testing.
3.2.1 Phased Testing
3.2.1.1 Functional Testing Phase
During the functional testing phase, verify system performance in accordance with approved Test Plan. Record results in approved Test Logs, and provide a written explanation of each failure to include cause, corrective action, and retest result. Continue functional testing until all tests have been successfully completed with no unresolved failures.
3.2.1.2 Burn-In Testing Phase
Begin burn-in testing after successful completion of all functional testing.During the burn-in testing phase, place the ESS in normal operating mode and evaluate system performance for a continuous [24-hour] [72-hour] [120-hour] [_____-hour] period. During this time, the ESS must be fully functional and programmed such that all features can be exercised and evaluated through normal use. Record all system anomalies in approved Test Logs. Include a description of each anomaly along with any actions taken in response. Immediately correct minor deficiencies observed during
SECTION 28 08 10 Page 4 the course of testing and continue with burn-in testing. Determine the root cause of any failures and make necessary repairs or modifications to restore full functionality. After a failure is corrected repeat functional tests for components and features associated with the failure, and repeat the entire burn-in testing phase .
3.2.2 Draft Test Report
Prepare and submit a Draft Test Report detailing the results of the testing. Refer to paragraph FINAL TEST REPORT for required content.
Include a cover letter signed by the Test Director stating that pre-acceptance testing has been completed and that the system is ready for acceptance testing.
3.3 SYSTEM ACCEPTANCE
Test the ESS in accordance with the approved Test Plan in the presence of the Government Representative to certify acceptable performance. Verify that the total system meets all requirements of the specification and complies with the specified standards.
Begin acceptance testing upon arrival of the Government Representative at the project site. Place the ESS in normal operating mode and evaluate system performance during the testing period. Immediately report any deficiencies observed during testing to the Government Representative and discuss possible causes and corrective measures. Obtain Government approval prior to making any adjustments, repairs or modifications. The Government retains the right to terminate testing at any time the ESS is found to be incomplete or fails to perform as specified. Such termination of acceptance testing constitutes a FAILED system acceptance test.
3.3.1 Preparation
Nofity the Contracting Officer of system readiness 15 days prior to the expected start date of acceptance testing. Prior to acceptance testing, complete all clean-up and patch work requirements. Ensure that security equipment closets and similar areas are free of accumulation of waste materials or rubbish caused by prior installation work.
3.3.2 Personnel
Ensure that the following personnel are on site to perform test activities: Test Director, Operator, Technician, and Test Intruder.
Ensure that the Quality Control Manager is on site during acceptance testing.
3.3.3 Visual Inspection
Assist the Government Representative in conducting a visual inspection of ESS equipment and wiring. This inspection will focus on the general neatness and quality of workmanship and compliance with applicable codes and manufacturers' recommended installation methods. Provide a comprehensive listing of installed equipment and software along with a complete set of ESS red line drawings to be used during the inspection.
Document deficiencies identified during the inspection.
3.3.4 Functional Testing
Comply with requests from the Government Representative to repeat
SECTION 28 08 10 Page 5 functional tests performed previously during pre-acceptance testing. The Government reserves the right to request the Contractor to repeat all functional tests or a representative sampling thereof as a means of performance verification. Add all test results to approved Test Logs.
3.3.5 System Activity Reports
Retrieve archived data from the system and provide activity reports as requested by the Government Representative. Reports may address any type of activity to include alarms, portal transactions, and video archives.
Assist with analyzing reports to identify trends and anomalies.
3.3.6 Corrective Actions
Correct any deficiencies in coordination with the Government Representative. Maintain a punch list and review status at the end of each day. Work diligently to complete corrective actions the same day that deficiencies are observed. Add deficiencies not corrected on the same day to the rework items list maintained by the Quality Control Manager. Failure to resolve punch list items to the satisfaction of the Government constitutes a FAILED system acceptance test.
3.4 FINAL TEST REPORT
Submit a Final Test Report following the successful completion of acceptance testing to include resolution of all punch list items. Address the following topics in the Final Test Report:
3.4.1 Summary
Provide a chronological summary of all testing. Describe test activities and results in narrative form.
3.4.2 Personnel
Provide a list of all Contractor and Government personnel who participated in the testing.
3.4.3 Test Logs
Provide all completed test logs along with a test log verification signed by the Test Director.
-- End of Section --
SECTION 28 08 10 Page 6
SECTION TABLE OF CONTENTS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
SECTION 28 10 05
ELECTRONIC SECURITY SYSTEMS (ESS)
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Regulatory Requirements
1.3.2 Standard Products
1.3.2.1 Alternative Qualifications
1.3.2.2 Material and Equipment Manufacturing Date
1.3.2.3 Product Safety
1.3.3 Shop Drawings
1.3.3.1 ESS Components
1.3.3.2 Overall System Schematic
1.3.4 Evidence of Experience and Qualifications
1.3.4.1 Contractor Qualifications
1.3.4.2 Instructor Qualifications
1.4 Environmental Conditions
1.4.1 Interior Conditions
1.4.1.1 Temperature
1.4.1.2 Pressure
1.4.1.3 Relative Humidity
1.4.1.4 Fungus
1.4.1.5 Acoustical Noise
1.4.2 Exterior Conditions
1.4.2.1 Temperature
1.4.2.2 Pressure
1.4.2.3 Solar Radiation
1.4.2.4 Sand and Dust
1.4.2.5 Rain
1.4.2.6 Humidity
1.4.2.7 Fungus
1.4.2.8 Salt Fog
1.4.2.9 Snow
1.4.2.10 Ice Accretion
1.4.2.11 Wind
1.4.2.12 Acoustical Noise
1.5 SYSTEM CALCULATIONS AND ANALYSIS
1.5.1 Backup Battery Capacity Calculations
1.5.2 CCTV Storage Calculations
1.6 ESS SOFTWARE, DATA PACKAGE 4
1.7 AS-BUILT DRAWINGS
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 PERFORMANCE REQUIREMENTS
SECTION 28 10 05 Page 1
2.2.1 Growth Capability
2.2.2 Hazardous Locations
2.2.3 Network Certification
2.2.4 Maintainability
2.2.5 Availability
2.2.6 Fail-Safe Capability
2.2.7 Line Supervision
2.2.8 Power Loss Detection
2.2.9 Controls and Designations
2.2.10 Special Test Equipment
2.2.11 Electromagnetic Interference (EMI)
2.2.12 Electromagnetic Radiation (EMR)
2.2.13 Interchangeability
2.3 INTRUSION DETECTION SYSTEM (IDS)
2.3.1 IDS Components
2.3.2 Detection Sensitivity
2.3.3 Detection Alarm and Reporting Capacity
2.3.4 False Alarm Rate
2.3.5 Nuisance Alarm Rate
2.3.6 Premise Control Unit (PCU)
2.3.6.1 PCU Capabilities
2.3.6.2 Overcurrent Protection and Indication
2.3.6.3 Manual and Self-Test
2.3.7 Detection Sensors
2.3.7.1 Interior Sensors
2.3.7.1.1 High Security Balanced Magnetic Switch (BMS)
2.3.7.1.1.1 Level 1 Switch
2.3.7.1.1.2 Level 2 Switch
2.3.7.1.2 Glass Break Detection
2.3.7.1.2.1 Window-Mounted Glass Break Shock Sensor
2.3.7.1.2.2 Ceiling Or Wall-Mounted Dual Technology Glass
Break Sensor
2.3.7.1.2.3 Ceiling or Wall-Mounted Recessed Glass Break Sensor
2.3.7.1.3 Vibration Vault Sensor
2.3.7.1.4 Fiber Optic Mesh Sensors
2.3.7.1.5 Utility Inlet Opening Protection
2.3.7.1.6 Passive Infrared Sensors
2.3.7.1.7 Microwave Sensors
2.3.7.1.8 Dual Technology Sensors
2.3.7.1.9 Photoelectric Sensors
2.3.7.2 Exterior Sensors
2.3.7.2.1 Fence Mounted Sensors
2.3.7.2.1.1 Fiber Optic Sensor
2.3.7.2.1.2 Strain-Sensitive
2.3.7.2.1.3 Gas Units
2.3.7.2.2 Electrostatic Field Sensors
2.3.7.2.3 Taut-Wire Sensors
2.3.7.2.4 Dual Technology Sensors
2.3.7.2.5 Bistatic Microwave Sensor
2.3.7.2.6 Monostatic Microwave Sensor
2.3.7.2.7 Passive Infrared Sensor (Exterior)
2.3.7.2.8 Buried Ported Cable
2.3.7.2.9 Active Infrared Sensor (Exterior)
2.3.7.2.10 Video Motion Sensor (Exterior)
2.3.7.2.11 Radar
2.3.7.3 Duress Alarms (Hold Up Switch)
2.3.7.3.1 Hardwire Duress Alarms
2.3.7.3.2 Wireless Duress Alarms
2.3.7.4 Tamper Switches
SECTION 28 10 05 Page 2
2.3.7.4.1 Tamper Switch Performance Requirements
2.4 ACCESS CONTROL SYSTEM (ACS)
2.4.1 ACS Programming
2.4.1.1 Time Schedules
2.4.1.2 Special Days
2.4.1.3 ACU Daylight Savings Time Adjustment
2.4.1.4 Scheduled Events
2.4.1.5 Maximum User Capability
2.4.1.6 Access Groups
2.4.1.7 Active and Expire Dates
2.4.1.8 Maximum Use Settings
2.4.1.9 Door Outputs
2.4.1.10 Anti-Passback
2.4.1.11 Two Person Rule
2.4.1.12 User List or Who's In (Muster Reports)
2.4.1.13 Crisis Mode
2.4.1.14 Door Groups
2.4.1.15 Door Interlocking
2.4.1.16 PIN Required
2.4.1.17 Remote Door Control
2.4.1.18 Key Control
2.4.1.19 Guard Tour
2.4.1.20 Reader Disable
2.4.1.21 Disable Event Messages
2.4.1.22 Input and Output Groups
2.4.1.23 Delays
2.4.1.24 Output Configuration
2.4.1.25 Remote Output Control
2.4.1.26 Remote Reset Command
2.4.1.27 Time Zone
2.4.1.28 User-Selected LED Behavior
2.4.1.29 Traced Cards
2.4.2 Error and Throughput Rates
2.4.3 Access Control System Central Processing
2.4.4 Access Control Unit(ACU)
2.4.5 Access Control Devices
2.4.5.1 Card Readers
2.4.5.1.1 Contact Card Readers
2.4.5.1.2 Contactless Card Readers
2.4.5.1.3 Card Reader Display
2.4.5.1.4 Card Reader Response Time
2.4.5.1.5 Card Reader Power
2.4.5.1.6 Card Reader Mounting Method
2.4.5.2 Keypads
2.4.5.2.1 Keypad Display
2.4.5.2.2 Keypad Response Time
2.4.5.2.3 Keypad Power
2.4.5.2.4 Keypad Mounting Method
2.4.5.2.5 Keypad Duress Codes
2.4.5.3 Card Readers with Integral Keypad
2.4.5.4 Access Control Cards
2.4.5.4.1 Credential Card Modification
2.4.5.4.2 Card Size and Dimensional Stability
2.4.5.4.3 Card Materials and Physical Characteristics
2.4.5.4.4 Card Construction
2.4.5.4.5 Card Durability and Maintainability
2.4.5.4.6 Warranty
2.4.5.5 Personal Identity Verification Equipment
2.4.5.5.1 Hand Geometry
SECTION 28 10 05 Page 3
2.4.5.5.1.1 Template Update and Acceptance Tolerances
2.4.5.5.1.2 Average Verification Time
2.4.5.5.1.3 Modes
2.4.5.5.1.4 Reports
2.4.5.5.1.5 Electrical
2.4.5.5.1.6 Mounting Method
2.4.5.5.1.7 Communications Protocol
2.4.5.5.2 Fingerprint Analysis Scanner
2.4.5.5.2.1 Template Update and Acceptance Tolerances
2.4.5.5.2.2 Average Verification Time
2.4.5.5.2.3 Modes
2.4.5.5.2.4 Reports
2.4.5.5.2.5 Electrical
2.4.5.5.2.6 Mounting Method
2.4.5.5.2.7 Communications Protocol
2.4.5.5.3 Iris Scan Device
2.4.5.5.3.1 Display Type
2.4.5.5.3.2 Template Update and Acceptance Tolerances
2.4.5.5.3.3 Average Verification Time
2.4.5.5.3.4 Modes
2.4.5.5.3.5 Reports
2.4.5.5.3.6 Electrical
2.4.5.5.3.7 Mounting Method
2.4.5.6 Portal Control Devices
2.4.5.6.1 Push-Button Switches
2.4.5.6.2 Panic Bar
2.4.5.6.2.1 Emergency Egress With Alarm
2.4.5.6.2.2 Normal Egress
2.4.5.6.2.3 Delay Egress With Alarm
2.4.5.6.3 Electric Door Strikes and Bolts
2.4.5.6.3.1 Solenoid
2.4.5.6.3.2 Signal Switches
2.4.5.6.3.3 Tamper Resistance
2.4.5.6.3.4 Size and Weight
2.4.5.6.3.5 Mounting Method
2.4.5.6.3.6 Astragals
2.4.5.6.4 Electrified Mortise Lock
2.4.5.6.4.1 Solenoid
2.4.5.6.4.2 Signal Switches
2.4.5.6.4.3 Hinge
2.4.5.6.4.4 Size and Weight
2.4.5.6.4.5 Mounting Method
2.4.5.6.5 Electromagnetic Lock
2.4.5.6.5.1 Armature
2.4.5.6.5.2 Tamper Resistance
2.4.5.6.5.3 Mounting Method
2.4.5.6.6 Entry Booth
2.4.5.6.6.1 Local Alarm Annunciation
2.4.5.6.6.2 Terminal and Facility Interface Device Support
2.4.5.6.6.3 Response Times
2.4.5.6.6.4 Autonomous Local Control
2.4.5.6.6.5 Entry Booth Local Processor Subsystem Capacities
2.4.5.6.6.6 Diagnostics
2.4.5.6.6.7 Memory Type and Size
2.4.5.6.6.8 Tamper Protection
2.4.5.6.6.9 Entry Booth Configuration
2.4.5.6.6.10 Entry Booth Operation
2.4.5.6.6.11 Display Type
2.4.5.6.6.12 Lighting
SECTION 28 10 05 Page 4
2.4.5.6.6.13 Heating and Ventilation Equipment
2.4.5.6.6.14 Entry Booth Wall and Frame Construction
2.4.5.6.6.15 Entry Booth Doors
2.4.5.6.6.16 Entry Booth Floor Construction
2.4.5.6.6.17 Electrical Requirements
2.4.5.6.6.18 CCTV Camera
2.4.5.6.6.19 Weight Check Monitor
2.4.5.6.6.20 Double Occupancy Sensor
2.4.5.6.6.21 Intercom
2.4.5.6.6.22 Voice Prompts
2.4.5.6.7 Vehicle Gate Operator
2.4.5.6.7.1 Input Power
2.4.5.6.7.2 Audible Warning
2.4.5.6.7.3 Maximum Run Timer
2.4.5.6.7.4 Adjustable Load Monitor for Obstruction Sensing
2.4.5.6.7.5 Operator Override Controls
2.4.5.6.7.6 Limit Switches
2.4.5.6.7.7 Type of Gate
2.4.5.6.7.8 Safety
2.4.6 Elevator Control
2.4.6.1 Control Elevator Operation with Entry Control Terminal
Devices
2.4.6.2 Floor Tracking
2.5 CLOSED-CIRCUIT TELEVISION (CCTV) SYSTEM
2.5.1 Cameras
2.5.1.1 CCTV Camera
2.5.1.1.1 Sensitivity
2.5.1.1.2 Signal-To-Noise Ratio
2.5.1.1.3 Resolution
2.5.1.1.4 Synchronization
2.5.1.1.5 Low Light Level
2.5.1.2 Camera Lenses
2.5.1.3 Camera Housing and Mounts
2.5.1.3.1 Environmentally Sealed Camera Housing
2.5.1.3.2 Indoor Camera Housing
2.5.1.3.3 Interior Mount
2.5.1.3.4 Low Profile Ceiling Mount
2.5.1.3.5 Interior Dome Housing
2.5.1.3.6 Exterior Dome Housing
2.5.1.3.7 Exterior Wall Mount
2.5.1.3.8 Pan-Tilt Mount
2.5.1.3.9 Explosion Proof Housing
2.5.2 Thermal Imaging System
2.5.3 Video Analytics (VA)
2.5.3.1 Software
2.5.3.1.1 Basic Motion Detection
2.5.3.1.2 Advanced VA
2.5.3.1.2.1 Intruder Identification
2.5.3.1.2.2 Environmental Compensation
2.5.3.1.2.3 Counting
2.5.3.1.2.4 Directional Identification
2.5.3.1.2.5 Item Recognition
2.5.3.1.2.6 Subject Tracking
2.5.3.1.2.7 Multiple Subject Tracking
2.5.3.2 Embedded VA
2.5.3.2.1 Intelligent Video Analysis
2.5.3.2.2 Motion Tracking with PTZ Cameras
2.5.4 Color Video Monitors
2.5.4.1 Mounting and Identification
SECTION 28 10 05 Page 5
2.5.4.2 Video and Signal Input
2.5.5 Ancillary Equipment
2.5.5.1 Video Date and Time Generator
2.5.5.2 Camera Identifiers
2.5.5.3 Video Recording
2.5.5.3.1 Digital Video Recorder (DVR)
2.5.5.3.2 Hybrid Video Recorder (HVR)
2.5.5.3.3 Network Video Recorder (NVR)
2.5.5.3.4 Video Recording Performance
2.5.5.4 Camera Control
2.5.6 Camera Mounting Structures
2.6 SECURITY COMMAND CENTER (SCC)
2.6.1 ESS Software
2.6.1.1 Alarm Call up
2.6.1.2 Programming
2.6.1.2.1 Daylight Savings Time Adjustment
2.6.1.2.2 Operator Privileges
2.6.1.2.3 Alarm Priorities
2.6.1.2.4 Reports
2.6.1.2.5 User Interface
2.6.1.2.6 Messages
2.6.1.2.7 Graphics
2.6.1.2.8 Device Status
2.6.1.2.9 Diagnostics
2.6.1.2.10 Mandatory Data Fields
2.6.1.2.11 User Defined Data Fields
2.6.1.2.12 Archive Database
2.6.1.2.13 Programmable Database Backup
2.6.1.2.14 Programmable Database Purging
2.6.1.2.15 Database Importing
2.6.1.2.16 Data Exporting
2.6.1.2.17 Event Log Output
2.6.1.2.18 Data Audit Trail
2.6.2 ESS Monitor Display Software
2.6.3 Graphical Map Software
2.6.4 Printers
2.6.4.1 Report Printer
2.6.4.2 Alarm Printer
2.6.5 Control and Display Integration
2.6.6 Enrollment Center Equipment
2.6.6.1 Enrollment Center Accessories
2.6.6.2 Enrollment Center I.D. Production
2.6.6.3 Enrollment Center Software
2.7 COMMUNICATIONS
2.7.1 Link Supervision
2.7.1.1 Hardwire Direct Current Line Supervision
2.7.1.2 Hardwire Alternating Current Supervision
2.7.1.3 Hardwire Digital Supervision
2.7.2 Hardwire
2.7.2.1 Electrical Conductor Lines
2.7.2.2 Communication Link
2.7.3 Radio Frequency Link
2.7.4 Data Encryption
2.7.5 Network Switch
2.7.5.1 Inside Plant
2.7.5.2 Outside Plant
2.7.6 Video and ESS Transmission
2.7.7 Wire and Cable
2.7.8 Digital Data Interconnection Wiring
SECTION 28 10 05 Page 6
2.7.9 Aboveground Sensor Wiring
2.7.10 Direct Burial Sensor Wiring
2.7.11 Local Area Network (LAN) Cabling
2.7.12 Cable Construction
2.8 SECURITY LIGHTING INTERFACE
2.9 MEDICAL FACILITY SYSTEM
2.9.1 Infant Protection Alarm System (IPAS) Performance Requirements
2.9.2 IPAS Major Components
2.9.3 Infant Protection Operator Workstations
2.9.4 Remote Display Unit
2.9.5 Operator Interface
2.9.6 Alarm Management
2.9.6.1 Tamper Alarm
2.9.6.2 Near Exit Alarm
2.9.6.3 Battery Alarm
2.9.6.4 Failed Communications Alarm
2.9.6.5 Lost Alarm
2.9.7 IPAS Area Wireless Tag Readers
2.9.8 IPAS Door Wireless Reader
2.9.9 Infant Tags and Straps
2.9.9.1 Tag Characteristics
2.9.9.2 Tag Features
2.9.10 IPAS Dome Lights
2.9.11 Radio Page Interface
2.10 SURVEILLANCE AND DETECTION EQUIPMENT
2.10.1 Article Surveillance and X-Ray
2.10.1.1 Size and Weight
2.10.1.2 Local Audible Alarms
2.10.1.3 Maximum Package Size
2.10.1.4 X-Ray Tube
2.10.1.5 Electrical
2.10.1.6 Safety
2.10.1.7 Display
2.10.1.8 Conveyor
2.10.1.9 Material Identification and Resolution
2.10.2 Metal Detector
2.10.2.1 Size and Weight
2.10.2.2 Local Alarms
2.10.2.3 Material Identification and Sensitivity
2.10.2.4 Traffic Counter
2.10.2.5 Electrical
2.11 BACKUP POWER
2.11.1 Uninterruptible Power Supply (UPS)
2.11.2 Batteries
2.12 SURGE SUPPRESSION DEVICES
2.13 COMPONENT ENCLOSURE
2.13.1 Interior Sensor
2.13.2 Exterior Sensor
2.13.3 Interior Enclosures
2.13.4 Exposed-to-Weather Enclosures
2.13.5 Corrosion-Resistant Enclosures
2.13.6 Hazardous Environment Equipment
2.13.7 Metal Thickness
2.13.8 Doors and Covers
2.13.9 Ventilation
2.13.10 Mounting
2.13.11 Labels
2.13.12 Test Points
2.14 EQUIPMENT RACK
SECTION 28 10 05 Page 7
2.14.1 Labels
2.15 LOCKS AND KEY LOCK
2.15.1 Lock
2.15.2 Key-Lock Operated Switches
2.15.3 Construction Locks
2.16 FIELD FABRICATED NAMEPLATES
2.16.1 Manufacturer's Nameplate
2.17 FACTORY APPLIED FINISH
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Existing Equipment
3.1.2 Software Installation
3.1.3 Enclosure Penetrations
3.1.4 Cable and Wire Runs
3.1.5 Soldering
3.1.6 Galvanizing
3.1.7 Conduits
3.1.8 Underground Cable Installation
3.1.9 Exterior Fences
3.1.10 Camera Housings, Mounts, and Poles
3.1.11 Field Applied Painting
3.2 ADJUSTMENT, ALIGNMENT, SYNCHRONIZATION, AND CLEANING
3.3 SYSTEM STARTUP
3.4 SUPPLEMENTAL CONTRACTOR QUALITY CONTROL
3.5 ESS SYSTEM TESTING
3.6 ESS TRAINING
3.6.1 ESS Training Outline
3.6.2 Typical Training Day
3.6.3 ESS Administrator Training
3.6.4 ESS Operator Training
3.6.5 Maintenance Personnel Training
3.6.6 Follow-up Training
3.7 NAMEPLATE MOUNTING
-- End of Section Table of Contents --
SECTION 28 10 05 Page 8
SECTION 28 10 05
ELECTRONIC SECURITY SYSTEMS (ESS)
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ASC/X9 X9.52 (1998) Triple Data Encryption Algorithm Modes of Operation
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM B32 (2020) Standard Specification for Solder Metal
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.23 (2010) Electromagnetic Locks
ELECTRONIC COMPONENTS INDUSTRY ASSOCIATION (ECIA)
ECIA EIA/ECA 310-E (2005) Cabinets, Racks, Panels, and Associated Equipment
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 802.3 (2022) Ethernet
IEEE C2 (2023) National Electrical Safety Code
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 (2010) Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
SECTION 28 10 05 Page 9
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ANSI ISO/IEC 7816 (R 2009) Identification Cards - Integrated Circuit Cards
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2020) Enclosures for Electrical Equipment (1000 Volts Maximum)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 2 (2000; R 2020) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; TIA 22-1; ERTA 1 2022) National Electrical Code
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST FIPS 140-2 (2001) Security Requirements for Cryptographic Modules
NIST FIPS 197 (2001) Advance Encryption Standard
NIST FIPS 201-2 (2013) Personal Identity Verification (PIV) of Federal Employees and Contractors
OPEN NETWORK VIDEO INTERFACE FORUM (ONVIF)
ONVIF (2017) Core Specification Version 17.06
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-222 (2018H; Add 1 2019) Structural Standard for Antenna Supporting Structures and Antennas and Small Wind Turbine Support Structures
TIA-568.2 (2018d) Balanced Twisted-Pair Telecommunications Cabling and Components Standards
TIA-606 (2021d) Administration Standard for Telecommunications Infrastructure
U.S. DEPARTMENT OF DEFENSE (DOD)
DODI 8500.01 (2014) Cybersecurity
SECTION 28 10 05 Page 10
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
21 CFR 1020 Performance Standards for Ionizing Radiation Emitting Products
47 CFR 15 Radio Frequency Devices
UNDERWRITERS LABORATORIES (UL)
UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 294 (2018; Reprint Oct 2018) UL Standard for Safety Access Control System Units
UL 437 (2013; Reprint Oct 2017) UL Standard for Safety Key Locks
UL 634 (2007; Reprint Mar 2015) Connectors and Switches for Use with Burglar-Alarm Systems
UL 636 (2018) UL Standard for Safety Holdup Alarm Units and Systems
UL 639 (2007; Reprint Nov 2019) Standard for Intrusion Detection Units
UL 681 (2014; Reprint Jan 2021) UL Standard for Safety Installation and Classification of Burglar and Holdup Alarm Systems
UL 796 (2020; Reprint Mar 2022) UL Standard for Safety Printed Wiring Boards
UL 969 (2017; Reprint Mar 2018) UL Standard for Safety Marking and Labeling Systems
UL 972 (2006; Reprint Nov 2020) UL Standard for Safety Burglary Resisting Glazing Material Type
UL 1037 (2016; Reprint Sep 2017) UL Standard for Safety Antitheft Alarms and Devices
UL 1076 (2018; Reprint Feb 2021) UL Standard for Safety Proprietary Burglar Alarm Units and Systems
UL 1610 (2016; Reprint Apr 2021) UL Standard for Safety Central-Station Burglar-Alarm Units
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 28 10 05 Page 11
SD-02 Shop Drawings
ESS Components; G
Overall System Schematic; G
SD-03 Product Data
Premise Control Unit; G
Detection Sensors; G
Access Control Unit; G
Access Control Devices; G
Cameras; G
Camera Lenses; G
Camera Housing and Mounts; G
Thermal Imaging System; G
Video Recording; G
Printers; G
Communications Interface Devices; G
Radio Frequency Link; G
Network Switch; G
Video and ESS Transmission; G
Infant Protection Alarm System (IPAS); G
Uninterruptible Power Supply (UPS); G
Batteries; G
Component Enclosure; G
Equipment Rack; G
SD-05 Design Data
Backup Battery Capacity Calculations; G
Access Control Throughput Rates; G
CCTV Storage Calculations
SD-07 Certificates
Contractor Qualifications; G
Instructor Qualifications; G
SECTION 28 10 05 Page 12
Data Encryption; G
SD-10 Operation and Maintenance Data
Training Plan; G
Training Content; G
ESS Components and ESS Software: Data Package 4; G
ESS Software and ESS Components: Data Package 4; G
Submit data package in accordance with Section 01 78 23
OPERATION AND MAINTENANCE DATA
SD-11 Closeout Submittals
As-Built Drawings; G
1.3 QUALITY ASSURANCE
1.3.1 Regulatory Requirements
The advisory provisions in each of the publications referred to in this specification are mandatory. Interpret these publications as though the word "must" has been substituted for "should" wherever it appears.
Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer.
Equipment, materials, installation, and workmanship must be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.3.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening, and have been utilized in applications of equipment and materials under similar circumstances and of similar size.
b. Have been available on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer.
d. Provide commercial off-the-shelf (COTS) products in which the manufacturer allows a network of qualified distributors to sell, install, integrate, maintain, and repair the hardware and software products that make up the system.
SECTION 28 10 05 Page 13
1.3.2.1 Alternative Qualifications
Products having less than a 2 year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.3.2.2 Material and Equipment Manufacturing Date
Products manufactured more than one year prior to date of delivery to the site are not acceptable.
1.3.2.3 Product Safety
System components are to conform to applicable rules and requirements of NFPA 70 . Equip system components with instruction stickers including warnings and cautions describing physical safety, and special or important procedures to be followed in operating and servicing system equipment.
1.3.3 Shop Drawings
1.3.3.1 ESS Components
Submit the ESS Components, Data Package 4 with the ESS Software submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.Submit drawings that clearly and completely indicate each ESS component function that includes:
a. Termination device points
b. Interconnections required for system operation
c. Interconnections between modules and devices
d. Proposed wireway or conduit systems to be used including:
(1) Locations
(2) Sizes
(3) Types
e. Drawings showing:
(1) Device locations and spacing
(2) Mounting and positioning details
(3) Riser Diagrams with cable sizes and types
(4) Bill of Materials (Device make, model and quantities)
(5) Alarm and access control zones
(6) CCTV and sensor coverage areas
(7) Spare capacity
SECTION 28 10 05 Page 14
1.3.3.2 Overall System Schematic
Indicate the relationship of integrated components on one-line diagram and show:
a. Power source
b. System controls
c. Impedance matches
d. Interconnecting wire data including:
(1) Number
(2) Size
(3) Identification
(4) Maximum lengths
1.3.4 Evidence of Experience and Qualifications
1.3.4.1 Contractor Qualifications
Submit experience and certified qualifications data prior to installation. Show that specific installers who will perform the work have a minimum of 2 years of experience successfully installing ESS of the same type and similar design as specified. Include the names, locations, and points of contact of at least two installations of similar type and design as specified in this document where the installer has installed such systems. Indicate the type of each system installed. Certify that each system has performed satisfactorily in the manner intended for a period of at least 12 months.
1.3.4.2 Instructor Qualifications
Submit the instructor's experience and certified qualifications data prior to installation. Show that the instructor has received a minimum of 24 hours of ESS training from a technical organization such as the National Burglar and Fire Alarm Association, and 2 years experience in installing the specified ESS type.
1.4 Environmental Conditions
1.4.1 Interior Conditions
Equipment installed in environmentally protected interior areas must meet performance requirements specified for the following ambient conditions:
1.4.1.1 Temperature
32 to 120 degrees F. Components installed in unheated security protected areas must meet performance requirements for temperatures as low as 0 degrees F
1.4.1.2 Pressure
Sea level to 15,000 feet above sea level
SECTION 28 10 05 Page 15
1.4.1.3 Relative Humidity
5 to 95 percent
1.4.1.4 Fungus
Components must be constructed of non fungus nutrient materials or be treated to inhibit fungus growth
1.4.1.5 Acoustical Noise
Components must be suitable for use in high noise areas above 100 dB, without adversely affecting their performance
1.4.2 Exterior Conditions
Components in enclosures must meet performance requirements when exposed to the following ambient conditions:
1.4.2.1 Temperature
Minus 25 to 140 degrees F
1.4.2.2 Pressure
Sea level to 15,000 feet above sea level
1.4.2.3 Solar Radiation
Six hours of solar radiation per day at dry bulb temperature of 120 degrees F including 4 hours of solar radiation at 104 watts per square foot
1.4.2.4 Sand and Dust
Wind driven for up to 6 miles per hour (mph)
1.4.2.5 Rain
2 inches per hour and 5 inches per hour cyclic with wind plus one period of 12 inches per hour
1.4.2.6 Humidity
5 to 95 percent
1.4.2.7 Fungus
Warm, humid atmosphere conducive to the growth of heterotrophic plants
1.4.2.8 Salt Fog
Salt atmosphere with 5 percent salinity
1.4.2.9 Snow
Snow loading of 48 (psf) per hour; blowing snow of 4.6 psf per hour
SECTION 28 10 05 Page 16
1.4.2.10 Ice Accretion
Up to 1/2 inches of radial ice
1.4.2.11 Wind
Continual velocity up to 50 mph with gusts to 66 mph, except that fence sensors must detect intrusions up to 35 mph
1.4.2.12 Acoustical Noise
Components must be suitable for use in high noise areas above 110 dB without adversely affecting their performance. Examples areas include flight lines, run-up pads, and generator sites.
1.5 SYSTEM CALCULATIONS AND ANALYSIS
1.5.1 Backup Battery Capacity Calculations
Submit calculations showing that backup battery capacity exceeds sensor operation, communications supervision, and alarm annunciation power requirements for proposed equipment plus 25 percent spare capacity.
1.5.2 CCTV Storage Calculations
Submit calculations showing the required storage capacity for each video storage device.
1.6 ESS SOFTWARE, DATA PACKAGE 4
Submit the ESS software, Data Package 4 with the ESS Components submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. Describe the functions of all software in the software manual and include:
a. All information necessary to enable proper loading, testing, and operation
b. Terms and functions definitions
c. Use of system and application software
d. Procedures for system initialization, start-up and shutdown
e. Alarm reports
f. Reports generation
g. Database format and data entry requirements
h. Directory of all files
i. All communication protocol descriptions, including data formats, command characters, and a sample of each type of data transfer
j. Interface definition
k. List of software keys
SECTION 28 10 05 Page 17
1.7 AS-BUILT DRAWINGS
Maintain a separate set of drawings, elementary diagrams, and wiring diagrams of the system to be used for as-built drawings. Keep this set accurately and neatly up-to-date with all changes and additions. This set is not to be used for installation purposes.
Finish the final drawings submitted with the endurance test report in accordance with Section 01 78 00 CLOSEOUT SUBMITTALS for as-built requirements.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide a complete and integrated electronic security system (ESS) that the meet requirements of [_____]. ESS must be compatible with the Installation's central monitoring system and monitored within the secure/protected area and at the Installation central monitoring station.
[Installation's][_____] central monitoring system is manufactured by [______], model number [_____]. ESS consisting of the following subsystems and features:
a. Intrusion Detection System (IDS)
b. Access Control System (ACS)
c. Closed-circuit Television System (CCTV)
d. Security Command Center (SCC)
e. Communications System
f. Security Lighting Systems
g. Medical Facility Systems
Include materials not normally furnished by the manufacturer with the ESS equipment as specified in:
a. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
b. Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
c. Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM
2.2 PERFORMANCE REQUIREMENTS
Integrate the installed and operating subsystems into the overall ESS system to detect intrusion, control access, provide CCTV surveillance, provide visual verification, and perform as an entity, as specified below. Provide electronic equipment that complies with 47 CFR 15 and are suitable for the environment where they will be installed.
2.2.1 Growth Capability
Provide capability for modular ESS expansion of inputs, outputs, card readers, and remote control stations with minimal equipment modification.
Software must be able to handle design requirements plus 25 percent spare
SECTION 28 10 05 Page 18 capacity. Growth capability is not to be limited by the provided products.
2.2.2 Hazardous Locations
When located in areas where fire or explosion hazards exist, provide system components rated and installed according to Chapter 5 of NFPA 70 .
2.2.3 Network Certification
Certify all Platform Information Technology (PIT) in accordance with DODI 8500.01 and the individual service implementation policy.
2.2.4 Maintainability
Provide components that can be maintained using commercially available tools and equipment. Arrange and assemble components to be readily accessible to maintenance personnel without compromising system defeat resistance and with no degradation in tamper protection, structural integrity, EMI or RFI attenuation, or line supervision after maintenance when it is performed in accordance with manufacturer's instructions.
2.2.5 Availability
Provide components rated for continuous operation. Provide solid-state electronic components mounted on printed circuit boards, conforming to UL 796 . Provide boards that are plug-in, quick-disconnect type. Do not impede maintenance with densely packed circuitry. Provide power-dissipating components with safety margins of not less than 25 percent with respect to dissipation ratings, maximum voltages, and current-carrying capacity. Provide solid-state type or hermetically sealed electromechanical type light duty relays and similar switching devices.
2.2.6 Fail-Safe Capability
Provide fail-safe capability in critical elements of the ESS including, but not be limited to, the capability to monitor communication link integrity and to provide self-test. Provide fault annunciation when diminished functional capabilities are detected. Annunciate fail-safe alarms to clearly distinguish from other types of alarms.
2.2.7 Line Supervision
Provide the same geographic resolution for fault isolation at the systems level as provided for intrusion detection. Provide either a static or dynamic system with active mode for line supervision of communication links of the ESS.
a. The static system must represent "no-alarm" always by the same signal, which is different than the originally transmitted signal.
b. The dynamic system must represent "no-alarm" with a signal which continually changes with time.
2.2.8 Power Loss Detection
Detect AC and DC power loss and generate an alarm when a critical component of the system experiences temporary or permanent loss of power.
Annunciate the alarm in the Secured Area and the Security Command Center
SECTION 28 10 05 Page 19 to clearly identify the component experiencing power loss.
2.2.9 Controls and Designations
Provide controls and designations as specified in NEMA ICS 1 .
2.2.10 Special Test Equipment
Provide all special test equipment, special hardware, software, tools, and programming or initialization equipment needed to start or maintain any part of the system and its components. Special test equipment is defined as any test equipment not normally used in an electronics maintenance facility.
2.2.11 Electromagnetic Interference (EMI)
Configure and provide ESS components employing electromagnetic radiation constructed to provide minimal vulnerability to electronic countermeasures.
2.2.12 Electromagnetic Radiation (EMR)
Provide only ESS communication components which are Federal Communications Commission (FCC) licensed and approved. Provide system components which are electromagnetically compatible.
2.2.13 Interchangeability
Use off-the-shelf components which are physically, electrically, and functionally interchangeable with equivalent components as complete items. Equivalent, replacement components must not require new or other component modification. Do not use custom designed or one-of-a-kind items. Interchangeable components or modules must not require trial and error matching in order to meet integrated system requirements, system accuracy, or restore complete system functionality.
2.3 INTRUSION DETECTION SYSTEM (IDS)
The IDS primary function is to detect intrusion into secured areas.
Utilize a single database for all IDS programming data that seamlessly integrates with the ESS under a single operating environment. The IDS events must be viewable as separate or as a combined list of all ESS events. Control the IDS alarm monitoring through software control from the ESS.
a. Provide both supervised and non-supervised alarm point monitoring.
b. [Arm or disarm] [Secure or access] alarm points both manually and automatically by time of day, day of week or by operator command.
2.3.1 IDS Components
Provide components:
a. Premise Control Units (PCU)
b. Detection Sensors
c. Tamper Switches
SECTION 28 10 05 Page 20
2.3.2 Detection Sensitivity
The sensitivity of the IDS must allow for the following:
a. Locating intrusions [within 300 [______] feet zones along a line or perimeter] [to one side of the [facility] [building]]
b. Locating intrusions at individually protected assets or at an individual portal
c. Locating intrusions within the coverage on a single volumetric sensor
d. Locating failures or tampering at individual sensors
2.3.3 Detection Alarm and Reporting Capacity
Collect, communicate, and display up to 256 sensor zone alarms and to enable control of card reader with integral keypad for [arming and disarming] [secure and access] [inside of the protected area with a delayed alarm] [outside of the protected area with instant alarm].
Identify individual sensors in alarm if the sensor zone is a multiple alarm source combination. Annunciate a single alarm within [1] [2] [_____] seconds maximum, after sensor transducer or other detection device activation except that alarms transmitted by radio frequency signaling must communicate in less than 3 seconds.
2.3.4 False Alarm Rate
The false alarm rate for each interior IDS zone must not exceed one false alarm per 30-day period. The false alarm rate for each exterior IDS zone must not exceed one false alarm per 24-hour period.
2.3.5 Nuisance Alarm Rate
The nuisance alarm rate for each interior IDS zone must not exceed three nuisance alarms per 30-day period. The nuisance alarm rate for each exterior IDS zone must not exceed three nuisance alarms per 24-hour period.
2.3.6 Premise Control Unit (PCU)
Install the PCU command processor in a tamper resistant enclosure that is specified in paragraph "Component Enclosure". Package the following with the PCU:
a. Power transformer
b. Battery(s)
c. Network connection cable
d. Keypad(s)
e. Keypad connection cable(s)
f. Additional components as required for full functionality
SECTION 28 10 05 Page 21
2.3.6.1 PCU Capabilities
Provide the PCU at a minimum but not limited to, the following capabilities;
a. Expansion to a total of at least 10,000 user codes with 99 user profile definitions.
b. Support 16 keypads with alphanumeric display. Each keypad must be capable of [arming and disarming] [securing and accessing] any system area based on a pass code or access control card and or key FOB authorization. Provide keypad alphanumeric display with complete prompt messages during all stages of operation and system programming and display all relevant operating and test data.
c. Four 4 shift schedules per area.
d. A total of at least 100 programmable output relay schedules.
e. 64 individual reporting areas.
f. Data line supervision or two separate lines of communication.
g. Two-man access code or credentials.
h. Support programming to require the same or different access code entered within a programmed delay time of 1 to 15 minutes after disarming before activating a silent ambush alarm.
i. Support area programming that disables schedule and time-of-day changes while system is armed so that area can only be disarmed during scheduled times.
j. Provide a minimum of a 4,000 event log buffer per PCU. Record and hold alarm activity information in the log buffer until the ESS is connected and receives the information. Provide a software-configurable warning log buffer filling notification for PCU(s) configured with network switch capabilities.
k. Support a Network Interface Card (NIC) plug-in module with built in network router capable of 128 Bit AES Rijndael Encryption process certified by NIST (National Institute of Standards and Technology).
2.3.6.2 Overcurrent Protection and Indication
When overcurrent more than it is rated for is detected by the PCU, communication bus(es) and keypad(s) are to be shut down and an overcurrent notification LED lit to indicate the situation.
2.3.6.3 Manual and Self-Test
All testing from any alphanumeric keypad include testing for: standby battery, alarm bell or siren, and communication to the Security Command Center (SCC). Include provisions for an automatic, daily, weekly, 30 day, or up to 60 day communication link test from the PCU installation site to the SCC. Include a provision for displaying the internal system power and wiring conditions.
Include the following for internal monitoring points:
SECTION 28 10 05 Page 22
a. The bell circuit
b. AC power
c. Battery voltage level
d. Charging voltage
e. Panel box tamper
f. Phone trouble line 1
g. Phone trouble line 2
h. Transmit trouble
i. Network trouble
A battery test must be automatically performed to test the integrity of the standby battery by disconnecting the standby battery from the charging circuit and placing a load on the battery. Perform this test at an interval no greater than 180 days.
2.3.7 Detection Sensors
a. Sensors are to detect facility perimeter or protected zone penetrations by unauthorized personnel or intruders and transmit an alarm signal to the alarm annunciation system upon change detection.
Accomplish this with a probability of detection (PD) of 0.9 with a 95 percent confidence level and conforming to UL 639 where applicable.
b. Required sensor power is 12 VDC unless otherwise specified.
c. An interior IDS zone is a room or space within a building that can be [armed and disarmed] [secured and accessed] independently from all other zones.
d. Provide line supervision for all sensors with an end-of-line resistor at the sensor or within a tampered junction box with conduit from the junction box to the sensor.
d. Provide sensors and components rated for operation in the installed environment. The sensors must transmit an alarm signal to the alarm annunciation system upon change detection. Provide all sensors with a tamper switch and elements housed in a tamper-alarmed enclosure in accordance of paragraph "Component Enclosure".
2.3.7.1 Interior Sensors
2.3.7.1.1 High Security Balanced Magnetic Switch (BMS)
Mount the BMS inside the secure location and on the opening side of the door. BMS sensors do not have the capability to incorporate an end-of-line (EOL) resistor.
2.3.7.1.1.1 Level 1 Switch
UL 634 . Level 1 High Security
SECTION 28 10 05 Page 23
2.3.7.1.1.2 Level 2 Switch
UL 634 . Level 2 High Security
2.3.7.1.2 Glass Break Detection
UL 639 .
2.3.7.1.2.1 Window-Mounted Glass Break Shock Sensor
Provide sensors with an LED for adjusting sensitivity.
Provide sensor with an exterior label to protect tape from direct sunlight. Seismic vibrations or other ambient stimuli are not to initiate an alarm. Test glass breakage sensors by using test units supplied by the manufacturer which simulate glass breakage.
2.3.7.1.2.2 Ceiling Or Wall-Mounted Dual Technology Glass Break Sensor
Provide a…
This is the start of the file's text. The full file is on GovTribe.