About this file

This document contains a solicitation for a single award Indefinite Delivery Indefinite Quantity Job Order Contract for construction services at Military Ocean Terminal Concord in California. The solicitation seeks a small business contractor to perform sustainment, restoration, and modernization projects ranging from $2,000 to $2,000,000 at the 115-acre inland and 7,630-acre tidal area installation. Work includes site work, demolition and rebuild, mechanical system replacement and controls upgrades, infrastructure preservation, finish renovation, and some vertical construction. The North American Industry Classification System code is 236220 and the small business size standard is $45 million. The estimated value of task orders to be issued under the contract is between $25-100 million. Bids are to be hand delivered by July 25, 2023 and the procurement is reserved 100% for small businesses. The U.S. Army Corps of Engineers Sacramento District will award the indefinite delivery indefinite quantity job order contract.

View the file

Other files

File Type Posted
Abstract of Offerors OF_1419 W9123823B0021 2 OF 3.pdf PDF
Abstract of Offerors OF_1419 W9123823B0021 1 OF 3 Signed 31 July 2023.pdf PDF
POM-MOTCO Sign In Sheets W9123823B0017 AND W9123823B0021.pdf PDF
Abstract of Offerors OF_1419 W9123823B0021 3 OF 3.pdf PDF
Attachment C-Responses to RFIs MOTCO JOC 30 June 2023.pdf PDF
Conform Copy Amendment Solicitation W9123823B0021-0001 5 July 2023.pdf PDF
Amendment Solicitation W9123823B0021-0001 5 July 2023.pdf PDF
Attachment B-Wage Decision Number CA20230018 09 June 2023.pdf PDF
Technical Exhibit F-Div 05 METALS 23 May 2023.pdf PDF
Technical Exhibit H-Div 07 THERMAL AND MOISTURE PROTECTION 23 May 2023.pdf PDF
Technical Exhibit V-Div 31 EARTHWORK 23 May 2023.pdf PDF
Technical Exhibit G-Div 06 WOOD-PLASTICS-AND COMPOSITES 23 May 2023.pdf PDF
Technical Exhibit O-Div 21 FIRE SUPPRESSION 23 May 2023.pdf PDF
Technical Exhibit M-Div 12 FURNISHINGS 23 May 2023.pdf PDF
Technical Exhibit Q-Div 23 HEATING-VENTILATING-AND AIR CONDITIONING (HVAC) 23 May 2023.pdf PDF
Technical Exhibit B-Div 01 GENERAL REQUIREMENTS 14 June 2023.pdf PDF
Technical Exhibit S-Div 26 ELECTRICAL 23 May 2023.pdf PDF
Technical Exhibit U-Div 28 ELECTRONIC SAFETY AND SECURITY 23 May 2023.pdf PDF
Technical Exhibit N-Div 13 SPECIAL CONSTRUCTION 23 May 2023.pdf PDF
Technical Exhibit P-Div 22 PLUMBING 23 May 2023.pdf PDF
Technical Exhibit C-Div 02 EXISTING CONDITIONS 23 May 2023.pdf PDF
Attachment A- JOC Bid Schedule 7 June 2023.xlsx XLSX spreadsheet
Attachment B-Wage Decision Number CA20230018 21 April 2023.pdf PDF
Technical Exhibit W-Div 32 EXTERIOR IMPROVEMENTS 23 May 2023.pdf PDF
Technical Exhibit E- Div 04 MASONRY 23 May 2023.pdf PDF
Technical Exhibit K-Div 10 SPECIALTIES 23 May 2023.pdf PDF
SOLICITATION W9123823B0021 15 June 2023.pdf PDF
Technical Exhibit L-Div 11 EQUIPMENT 23 May 2023.pdf PDF
Technical Exhibit J-Div 09 FINISHES 23 May 2023.pdf PDF
Technical Exhibit X-Div 33 UTILITIES 23 May 2023.pdf PDF
Technical Exhibit D-Div 03 CONCRETE 23 May 2032.pdf PDF
Technical Exhibit R-Div 25 INTEGRATED AUTOMATION 23 May 2023.pdf PDF
Technical Exhibit T-Div 27 COMMUNICATIONS 23 May 2023.pdf PDF
Technical Exhibit I-Div 08 OPENINGS 23 May 2023.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOTCO Job Order Contracting

(SATOC)

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 08/21, CHG 9: 04/22 GENERAL REQUIREMENTS

01 10 00 JOC STATEMENT OF WORK

01 32 01 02/15, CHG 4: 09/22 PROJECT SCHEDULE

01 33 00 08/18, CHG 7: 10/22 SUBMITTAL PROCEDURES

01 35 26 11/20, CHG 5: 08/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19, CHG 1: 03/22 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 11/16, CHG 5: 06/22 QUALITY CONTROL

01 45 00.15 11/16, CHG 2: 1/22 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 9: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 12/18, CHG 6: 12/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 23.01 09/14, CHG 2: 06/22 SMALL PROJECT TEMPORARY STORM WATER

POLLUTION CONTROL

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 71 10 05/10 MOBILIZATION AND DEMOBILIZATION

01 72 00 09/11 ALTERATIONS TO EXISTING FACILITIES

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 6: 08/22 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 78 24 05/18, CHG 2: 09/22 FACILITY DATA REQUIREMENTS

01 91 00.15 05/19, CHG 3: 05/22 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION AND DECONSTRUCTION

02 42 51 11/19 CARPET REMOVAL AND RECLAMATION

11/18

02/10, CHG

1:

02/21

REMOVAL AND SALVAGE OF HISTORIC

CONSTRUCTION MATERIALS

EXCAVATION AND HANDLING OF

11/18

CONTAMINATED MATERIAL

TRANSPORTATION AND DISPOSAL OF

11/18, 11/19

HAZARDOUS MATERIALS

ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

05/20

11/18, 05/22

HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

MOLD REMEDIATION

DIVISION

- CONCRETE

03 30 53

05/14

MISCELLANEOUS CAST-IN-PLACE CONCRETE

03 37 13 02/18 SHOTCRETE

DIVISION 04 - MASONRY

04 20 00

11/15, CHG 2: 05/19 UNIT MASONRY

04 23 00 11/15 GLASS UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16

08/18

STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

PROJECT TABLE OF CONTENTS Page 2

05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00 02/17, CHG 1: 05/17 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING

07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING

07 17 00 02/16 BENTONITE WATERPROOFING

07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 21 23 05/11, CHG 4: 08/18 LOOSE FILL THERMAL INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION AND FINISH SYSTEMS

07 31 13 08/16, CHG 2: 08/18 ASPHALT SHINGLES

07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING

07 55 00 08/09, CHG 1: 05/14 PROTECTED MEMBRANE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 72 20 08/09 GRAVITY-TYPE ROOF VENTILATORS

07 81 00 02/11 SPRAY-APPLIED FIREPROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 01 52 08/09 OPERATION AND MAINTENANCE OF WOOD

WINDOWS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 73 08/20 SLIDING FIRE DOORS

08 13 73 02/11 SLIDING METAL DOORS

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 36 13 08/20 SECTIONAL OVERHEAD DOORS

08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 51 23 08/20, CHG 1: 02/22 STEEL WINDOWS

08 51 69.10 08/20 ALUMINUM STORM WINDOWS

08 52 00 08/20, CHG 1: 02/22 WOOD WINDOWS

PROJECT TABLE OF CONTENTS Page 3

08 56 53 08/20 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 01/08, CHG 2: 11/18 LATH

09 23 00 08/16, CHG 1: 11/18 GYPSUM PLASTERING

09 23 82 11/19 FIREPROOF GYPSUM PLASTERING

09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO

09 26 00 08/16, CHG 1: 08/18 VENEER PLASTER

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 35 16 08/16, CHG 1: 08/18 CHEMICAL-RESISTANT QUARRY TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 64 00 08/16, CHG 1: 08/18 PORTABLE (DEMOUNTABLE) WOOD FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 67 23.14 08/16, CHG 1: 08/18 CHEMICAL RESISTANT RESINOUS FLOORING

09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE

10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS

10 22 19 08/17, CHG 1: 08/18 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 39 08/20 FOLDING PANEL PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 34 17 08/20, CHG 1: 02/21 PRE-ENGINEERED METAL CANOPY

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

10 56 13 04/06 STEEL SHELVING

DIVISION 11 - EQUIPMENT

11 11 37 11/18 ELECTRIC VEHICLE SUPPLY EQUIPMENT

11 47 00 08/17, CHG 1: 08/18 ICE MACHINES

DIVISION 12 - FURNISHINGS

12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS

12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS

13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS

PROJECT TABLE OF CONTENTS Page 4

EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 12 00 05/11 STANDPIPE SYSTEMS

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

03.00

08/20

02/09

DRY PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

WET CHEMICAL FIRE EXTINGUISHING SYSTEM

21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR

KITCHEN CABINET

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES

22 05 83.63 08/22 CURED-IN-PLACE PIPE (CIPP) LINING FOR

PLUMBING APPLICATIONS

22 33 30.00 10 08/20 SOLAR WATER HEATING EQUIPMENT

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 01 30.41 05/22 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22 COMMON PIPING FOR HVAC

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 35 16.17 10 05/20 MECHANICAL ENGINE EXHAUST SYSTEMS

23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS

23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING

WATER AND STEAM HEAT EXCHANGERS

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 65 00 11/16, CHG 2: 08/18 COOLING TOWERS AND REMOTE

EVAPORATIVELY-COOLED CONDENSERS

23 76 00 08/21 EVAPORATIVE COOLING SYSTEMS

23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

23 81 29 02/20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS

23 81 47 08/08, CHG 4: 08/18 WATER-LOOP AND GROUND-LOOP HEAT PUMP

SYSTEMS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

PROJECT TABLE OF CONTENTS Page 5

DIVISION 26 - ELECTRICAL

26 05 19.10 10 05/16 INSULATED WIRE AND CABLE

26 05 33 02/22 DOCKSIDE POWER CONNECTION STATIONS

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 12 21 05/17, CHG 2: 11/19 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR

26 24 13 08/21 SWITCHBOARDS

26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS

26 27 29 05/21 MARINA ELECTRICAL WORK

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL

INDUCTION TYPE

26 29 02.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL

SYNCHRONOUS TYPE

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)

SYSTEMS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY

(UPS)

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC

PROTECTION (GACP) SYSTEM

26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE

INTERIOR OF STEEL WATER TANKS

26 42 17 05/21 IMPRESSED CURRENT CATHODIC PROTECTION

(ICCP) SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 29.00 10 08/11 PROTECTIVE DISTRIBUTION SYSTEM (PDS)

FOR SIPRNET COMMUNICATION SYSTEMS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 41 00 11/21 AUDIO-VISUAL SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

PROJECT TABLE OF CONTENTS Page 6

31 00 00 08/08, CHG 2: 02/21 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 13.62 05/18 ASPHALT SURFACE TREATMENT

32 01 16.71 11/22 COLD MILLING ASPHALT PAVING

32 01 17.61 05/22 SEALING CRACKS IN ASPHALT PAVING

32 01 17.62 05/20 PAVING FABRIC INTERLAYER

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 20 05/22 SUBBASE COURSE

32 11 23 05/22 AGGREGATE BASE COURSE

32 12 13 05/17 BITUMINOUS TACK COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 12 36.13 05/17 ASPHALTIC SEAL AND FOG COATS

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13 11/21 CHAIN LINK FENCES AND GATES

32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND

ORNAMENTAL) AND GATES

32 31 26 11/21 WIRE FENCES AND GATES

32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 84 23 02/21 UNDERGROUND SPRINKLERS

32 84 24 08/11, CHG 1: 05/17 IRRIGATION SPRINKLER SYSTEMS

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 92 23 04/06, CHG 1: 08/21 SODDING

DIVISION 33 - UTILITIES

33 01 30.16 11/21 TV INSPECTION OF SEWER LINES

33 01 30.72 11/21 RELINING SEWERS

33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION

33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING

33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 16 15 11/20 WATER STORAGE STEEL TANKS

33 30 00 05/18 SANITARY SEWERAGE

33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING

33 34 56.00 10 08/18 DRAINAGE FIELD DOSING CHAMBERS

33 40 00 11/21 STORMWATER UTILITIES

33 46 13 05/20 FOUNDATION DRAINAGE

33 46 16 05/18 SUBDRAINAGE PIPING

33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS

DISTRIBUTION PIPELINES

33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)