Technical Exhibit Q-Div 23 HEATING-VENTILATING-AND AIR CONDITIONING (HVAC) 23 May 2023.pdf
PDF 2 MB Posted
- Solicitation number
- W9123823B0021
About this file
This is a solicitation for a single award Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contract (JOC) for Real Property Sustainment, Restoration and Modernization (SRM) minor construction projects at Military Ocean Terminal Concord in California. The contract has an estimated value between $25-100 million and will involve multiple construction trades such as site work, demolition and rebuild, mechanical system replacements and controls, infrastructure preservation, renovation, and finish replacements. Task orders will range from $2,000 to $2 million. The North American Industry Classification System code is 236220 and it is set aside for small businesses with less than $45 million in annual revenue. The U.S. Army Corps of Engineers Sacramento District will accept hand delivered bids by July 25, 2023; no mail-in bids are allowed.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOTCO Job Order Contract (SATOC) 2487
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
SECTION 23 01 30.41
HVAC SYSTEM CLEANING
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 NADCA Standards
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.4.1 NADCA Firm
1.4.2 Experience
1.4.3 Equipment, Materials and Labor
1.4.4 Licensing
1.4.5 Health And Safety
1.4.5.1 Safety Standards
1.4.5.2 Occupant Safety
1.4.5.3 Disposal of Debris
1.5 PROJECT/SITE CONDITIONS
1.5.1 Mechanical Drawings
1.5.2 Site Conditions
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 HVAC System Inspections And Site Preparations
3.1.1.1 HVAC System Evaluation
3.1.1.2 Site Evaluation and Preparations
3.2 APPLICATION
3.2.1 General HVAC System Cleaning Requirements
3.2.1.1 Containment
3.2.1.2 Particulate Collection
3.2.1.3 Controlling Odors
3.2.1.4 Component Cleaning
3.2.1.5 Air-Volume Control Devices
3.2.1.6 Service Openings
3.2.1.7 Ceiling Sections (Tile)
3.2.1.8 Air Distribution Devices (Registers, Grilles and Diffusers)
3.2.1.9 Air Handling Units, Terminal Units, Blowers and Exhaust
Fans
3.2.1.10 Duct Systems
3.2.2 Mechanical Cleaning Methodology
3.2.2.1 Source Removal Cleaning Methods
3.2.2.2 Methods of Cleaning Fibrous Glass Insulated Components
3.2.2.3 Damaged Fibrous Glass Material
3.2.2.4 Replacement Material
SECTION 23 01 30.41 Page 1
3.2.2.5 Cleaning of Coils
3.2.2.6 Antimicrobial Agents and Coatings
3.3 FIELD QUALITY CONTROL
3.3.1 CLEANLINESS VERIFICATION
3.3.1.1 General
3.3.1.2 Visual Inspection
3.3.1.3 Gravimetric Analysis
3.3.1.4 Verification of Coil Cleaning
3.3.2 Post-Project Report
-- End of Section Table of Contents --
SECTION 23 01 30.41 Page 2
SECTION 23 01 30.41
HVAC SYSTEM CLEANING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 62.1 (2022) Ventilation for Acceptable Indoor Air Quality
INSTITUTE OF INSPECTION, CLEANING, AND RESTORATION CERTIFICATION
(IICRC)
ANSI/IICRC S520 (2015) Standard and Reference Guide for Professional Mold Remediation
NATIONAL AIR DUCT CLEANERS ASSOCIATION (NADCA)
NADCA (2005) Introduction to HVAC System Cleaning Services
NADCA ACR (2013) Standard for Assessment, Cleaning, and Restoration of HVAC Systems
NADCA ASCS (2013) Air Systems Cleaning Specialist to the NADCA Standard ACR
NADCA HVAC Inspection Manual (2021) Procedures for Assessing the Cleanliness of Commercial HVAC Systems
NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA)
NAIMA AH112 (1993) Cleaning Fibrous Glass or Lined Sheet Metal Ducts
NAIMA AH122 (2006) Cleaning Fibrous Insulated Duct Systems - Recommended Practices
NAIMA AH127 (1999) Facts About the Impact of Duct Cleaning on Internal Duct Insulation
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1966 (2020) HVAC Duct Construction Standards Metal and Flexible, 4th Edition
SECTION 23 01 30.41 Page 3
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 402-C-01-001 (2001) IAQ Building Education and Assessment Tool (I-BEAM)
EPA 402-F-91-102 (1991) Building Air Quality: A Guide for Building Owners and Facility Managers
UNDERWRITERS LABORATORIES (UL)
UL 181 (2013; Reprint Dec 2021) UL Standard for Safety Factory-Made Air Ducts and Air Connectors
UL 181A (2013; Reprint Dec 2021) Standard for Safety Closure Systems for Use with Rigid Air Ducts
UL 181B (2013; Reprint Dec 2021) UL Standard for Safety Closure Systems for Use with Flexible Air Ducts and Air Connectors
1.2 DEFINITIONS
1.2.1 NADCA Standards
Perform the services specified here in accordance with the current published standards of the National Air Duct Cleaners Association ( NADCA, NADCA ASCS, NADCA ACR and NADCA HVAC Inspection Manual ).
a. All terms in this specification are defined as stated in the NADCA Standards.
b. Follow NADCA Standards without modification or deviation.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Record of Existing Conditions; G
Coordination Plan; G
NADCA Firm; G
NADCA Team Assistants; G
SECTION 23 01 30.41 Page 4
NADCA Air System Cleaning Specialist (ASCS); G
NADCA Supervisor Qualifications; G
Records of Experience in the Field of HVAC System Cleaning; G
NADCA Work Execution Schedule; G
SD-03 Product Data
Safety Data Sheets (SDS); G
SD-06 Test Reports
Testing Procedures Summary; G
Gravimetric Analysis; G
Post-Project Report; G
1.4 QUALITY CONTROL
1.4.1 NADCA Firm
Submit information certifying that the NADCA firm is a first tier subcontractor who is not affiliated with any other company participating in work on this contract, including furnishing equipment. Further, submit the following, for the firm, to Contracting Officer for approval:
a. Independent NADCA firm:
NADCA Firm: NADCA registration number and expiration date of current certification;
NADCA Supervisor Qualifications: Name and copy of NADCA supervisor certificate and expiration date of current certification.
NADCA Air System Cleaning Specialist (ASCS): Name and documented evidence that the team field leader has satisfactorily performed full-time supervision of HVAC cleaning work in the field for not less than 3 years immediately preceding this contract's bid opening date.
NADCA Team Assistants: Names and documented evidence that each field technician has satisfactorily assisted a NADCA team field leader in performance of HVAC cleaning work in the field for not less than one year immediately preceding this contract's bid opening date.
Current Certificates: Ensure registrations and certifications are current, and valid for the duration of this contract. Renew Certifications which expire prior to completion of the HVAC cleaning work, in a timely manner so that there is no lapse in registration or certification. NADCA agency or NADCA team personnel without a current registration or current certification are not to perform HVAC cleaning work on this contract.
b. TAB Team Members: NADCA team approved to accomplish work on this contract are full-time employees of the NADCA firm. No other personnel is allowed to do HVAC cleaning work on this contract.
SECTION 23 01 30.41 Page 5
c. Replacement of NADCA Team Members: Replacement of members may occur if each new member complies with the applicable personnel qualifications and each is approved by the Contracting Officer.
1.4.2 Experience
Submit records of experience in the field of HVAC system cleaning. Bids will only be considered from firms which are regularly engaged in HVAC system maintenance with an emphasis on HVAC system cleaning and decontamination.
1.4.3 Equipment, Materials and Labor
Possess and furnish all necessary equipment, materials and labor to adequately perform the specified services and comply with the applicable provisions of NADCA General Specifications for the Cleaning of Commercial HVAC Systems and ASHRAE 62.1 .
a. Assure that all employees have received safety equipment training, medical surveillance programs, individual health protection measures, and manufacturer's product and Safety Data Sheets (SDS) as required for the work by the U.S. Occupational Safety and Health Administration, and as described by this specification. For work performed in countries outside of the U.S.A., comply with applicable national safety codes and standards.
b. Maintain a copy of all current SDS documentation and safety certifications at the site at all times, as well as comply with all other site documentation requirements of applicable OSHA programs and this specification.
c. Submit all Safety Data Sheets (SDS) for all chemical products proposed used in the cleaning process, including all VOC ratings.
1.4.4 Licensing
Provide proof of maintaining the proper license(s), if any, as required to do work in the state of California. Comply with all Federal, State and local rules, regulations, and licensing requirements.
1.4.5 Health And Safety
1.4.5.1 Safety Standards
Comply with all applicable Federal, State, and local requirements for protecting the safety of the contractors' employees, building occupants, and the environment. In particular, follow all applicable standards of the Occupational Safety and Health Administration (OSHA) when working in accordance with this specification, and EM 385-1-1 .
1.4.5.2 Occupant Safety
Employ no processes or materials in such a manner that introduce additional hazards into occupied spaces.
1.4.5.3 Disposal of Debris
Dispose of all debris removed from the HVAC System in accordance with applicable Federal, State and local requirements.
SECTION 23 01 30.41 Page 6
1.5 PROJECT/SITE CONDITIONS
1.5.1 Mechanical Drawings
Obtain one copy of the following documents:
a. Project drawings and specifications
b. Approved construction revisions pertaining to the HVAC system
c. Any existing indoor air quality (IAQ) assessments or environmental reports prepared for the facility.
Submit a NADCA Work Execution Schedule to the Contracting Officer within 10 working days of the contract award.
1.5.2 Site Conditions
The HVAC system includes any interior surface of the facility's air distribution system for conditioned spaces and/or occupied zones. This includes the entire heating, air-conditioning and ventilation system from the points where the air enters the system to the points where the air is discharged from the system. The return air grilles, return air ducts (except ceiling plenums and mechanical room) to the air handling unit (AHU), the interior surfaces of the AHU, mixing box, coil compartment, condensate drain pans, humidifiers and dehumidifiers, supply air ducts, fans, fan housing, fan blades, air wash systems, spray eliminators, turning vanes, filters, filter housings, reheat coils, and supply diffusers are all considered part of the HVAC system. The HVAC system may also include other components such as dedicated exhaust and ventilation components and make-up air systems.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Perform the services specified here in accordance with the current published standards of the National Air Duct Cleaners Association ( NADCA, NADCA ASCS, NADCA ACR and NADCA HVAC Inspection Manual ).
a. All terms in this specification have their meaning defined as stated in the NADCA Standards.
b. Follow NADCA Standards with no modifications or deviations being allowed. Remove visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications.
3.1 PREPARATION
3.1.1 HVAC System Inspections And Site Preparations
3.1.1.1 HVAC System Evaluation
Prior to the commencement of any cleaning work, perform a visual inspection of the HVAC system in the presence of the Contracting Officer to determine appropriate methods, tools, and equipment required to
SECTION 23 01 30.41 Page 7 satisfactorily complete this project. Cleanliness inspection should include air handling units and representative areas of HVAC system components and ductwork. In HVAC systems that include multiple air handling units, a representative sample of units should be inspected.
Notify the Contracting Officer 10 days prior to the planned inspection.
As part of evaluation, record photographs and videos of each inspection location to document the "as found" condition prior to cleaning.
Document damaged system components found during the inspection and submit to the Contracting Officer, clearly labeled "Record of Existing Conditions."
3.1.1.2 Site Evaluation and Preparations
HVAC System Evaluation shall be conducted without negatively impacting indoor environment through excessive disruption of settled dust, microbial amplification or other debris. In cases where contamination is suspected, and/or in sensitive environments where even small amounts of contaminant may be of concern, implement environmental engineering control measures.
Conduct a site evaluation, and establish a specific, coordination plan which details how each area of the building is protected during the various phases of the project.
3.2 APPLICATION
3.2.1 General HVAC System Cleaning Requirements
3.2.1.1 Containment
Collect debris removed during cleaning and take precautions to ensure that debris is not otherwise dispersed outside the HVAC system during the cleaning process.
3.2.1.2 Particulate Collection
Where the Particulate Collection Equipment (PCE) is exhausting inside the building, use HEPA filtration with 99.97 percent collection efficiency for 0.3-micron size (or greater). When the PCE is exhausting outside the building, undertake mechanical cleaning operations only with PCE, including adequate filtration to contain debris removed from the HVAC system. When the PCE is exhausting outside the building, take precautions to locate the equipment down wind and away from all air intakes and other points of entry into the building.
3.2.1.3 Controlling Odors
Take all reasonable measures to control offensive odors and/or mist vapors during the cleaning process.
3.2.1.4 Component Cleaning
Employ cleaning methods such that all HVAC system components are Visibly Clean as defined in applicable standards. Upon completion, return all components to those settings recorded just prior to cleaning operations.
3.2.1.5 Air-Volume Control Devices
Mark the position of dampers and any air-directional mechanical devices inside the HVAC system prior to cleaning and, upon completion, restore to
SECTION 23 01 30.41 Page 8 their marked position.
3.2.1.6 Service Openings
Utilize service openings, as required for proper cleaning, at various points of the HVAC system for physical and mechanical entry, and inspection. Utilize the existing service openings already installed in the HVAC system where possible.
Create other openings where needed, created and resealed in conformance with NADCA Standard 05. Place closures so they do not significantly hinder, restrict, alter the air-flow within the system, or compromise the structural integrity of the system. Properly insulate closures to prevent heat loss/gain or condensation on surfaces within the system. Conform construction techniques used in the creation of openings to requirements of applicable building and fire codes, and applicable NFPA, SMACNA and NADCA Standards. Cutting service openings into flexible duct is not permitted. Disconnect flexible duct at the ends as needed for proper cleaning and inspection.
Reseal rigid fiber glass ductboard duct systems in accordance with NAIMA recommended practices; NAIMA AH112, NAIMA AH122, and NAIMA AH127. Only closure techniques which comply with UL 181 , UL 181A , or UL 181B are suitable for fiber glass duct system closures.
Provide access doors for openings that need to be re-opened for future inspection or remediation. Clearly mark all service openings, capable of being re-opened for future inspection or remediation, and report their location in project report documents.
3.2.1.7 Ceiling Sections (Tile)
Carefully remove and reinstall ceiling sections to gain access to HVAC systems during the cleaning process. Replace any damaged ceiling sections caused by the removal at no cost to the Government.
3.2.1.8 Air Distribution Devices (Registers, Grilles and Diffusers)
Clean all air distribution devices.
3.2.1.9 Air Handling Units, Terminal Units, Blowers and Exhaust Fans
Ensure that supply, return, and exhaust fans and blowers are thoroughly cleaned. Areas for cleaning include blowers, fan housings, plenums (except ceiling supply and return plenums), scrolls, blades, or vanes, shafts, baffles, dampers and drive assemblies. Remove all visible surface contamination deposits in accordance with NADCA Standards.
a. Clean all air handling unit (AHU) internal surfaces, components and condensate collectors and drains.
b. Assure that a suitable operative drainage system is in place prior to beginning wash down procedures.
c. Clean all coils and related components, including evaporator fins.
3.2.1.10 Duct Systems
a. Create service openings in the system as necessary in order to
SECTION 23 01 30.41 Page 9 accommodate cleaning of otherwise inaccessible areas.
b. Mechanically clean all duct systems to remove all visible contaminants, such that the systems are capable of passing NADCA Cleaning Verification Testings Standards.
c. Any exposed edges in internal duct lining within duct, including but not limited to interfaces with externally insulated duct, shall be fully protected, sealed and encapsulated to prevent future erosion.
3.2.2 Mechanical Cleaning Methodology
3.2.2.1 Source Removal Cleaning Methods
Clean the HVAC system using Source Removal mechanical cleaning methods designed to extract contaminants from within the HVAC system and safely remove contaminants from the facility. Select Source Removal methods which will render the HVAC System Visibly Clean and capable of passing NADCA cleaning verification methods Standards and other specified standards and tests, in accordance with all general requirements. Use no cleaning method, or combination of methods, which could potentially damage components of the HVAC system or negatively alter the integrity of the system.
Incorporate the use of vacuum collection devices that are operated continuously during cleaning for all methods used. Connect a vacuum device to the downstream end of the section being cleaned through a predetermined opening. Use a vacuum collection device of sufficient power to render all areas being cleaned under negative pressure, such that containment of debris and the protection of the indoor environment is assured.
Equip all vacuum devices exhausting air inside the building, including hand-held vacuums and wet-vacuums, with HEPA filters (minimum efficiency).
Equip all vacuum devices exhausting air outside the facility with Particulate Collection including adequate filtration to contain Debris removed from the HVAC system, in a manner that does not allow contaminants to re-enter the facility. Release of debris outdoors which violates any outdoor environmental standards, codes or regulations is not allowed.
All methods require mechanical agitation devices to dislodge debris adhered to interior HVAC system surfaces, such that debris may be safely conveyed to vacuum collection devices. Acceptable methods include those which will not potentially damage the integrity of the ductwork, nor damage porous surface materials such as liners inside the ductwork or system components.
3.2.2.2 Methods of Cleaning Fibrous Glass Insulated Components
Thoroughly clean glass thermal insulation elements present in any equipment or ductwork with HEPA vacuuming equipment. Clean while the HVAC system is under constant negative pressure, and not permitted to get wet in accordance with applicable NADCA and NAIMA standards and recommendations.
Do not use cleaning methods that cause damage to fibrous glass components or renders the system capable of passing Cleaning Verification Tests NADCA Standards.
SECTION 23 01 30.41 Page 10
Provide surface treatment for insulation for sections of internally-lined duct. Select and apply encapsulants, coatings, and insulation repair products to completely restore surface integrity of fibrous glass surfaces in accordance with applicable standards and manufacturer's installation instructions.
3.2.2.3 Damaged Fibrous Glass Material
If there is any evidence of damage, deterioration, delamination, friable material, mold or fungus growth, or moisture such that fibrous glass materials cannot be restored by cleaning or resurfacing with an acceptable insulation repair coating, identify them to the Contracting Officer for replacement.
When requested or specified, remediate exposed damaged insulation in air handlers and/or ductwork requiring replacement.
If insulation is damaged as a result of this work under this specification, notify Contracting Officer and initiate a meeting with same to determine options for repair or replacement of insulation.
3.2.2.4 Replacement Material
If replacement of fiber glass materials is required, conform all materials to applicable industry codes and standards, including those of UL and
SMACNA 1966.
Replacement of damaged insulation is not covered by this specification.
Refer to Section 23 07 00 - Thermal Insulation for Mechanical Systems.
3.2.2.5 Cleaning of Coils
Use any cleaning method which renders the coil visibly clean and capable of passing NADCA Coil Cleaning Verification Standards. Coil drain pans are subject to Non-Porous Surfaces Cleaning Verification. Maintain operability of the drain for the condensate at all times. Do not damage, displace, inhibit heat transfer, or cause erosion of the coil surface or fins, and conform to coil manufacturer recommendations when available.
Thoroughly rinse coils with clean water to remove any latent residues.
3.2.2.6 Antimicrobial Agents and Coatings
Perform application of antimicrobial agents used to control the growth of fungal or bacteriological contaminants after the removal of surface deposits and debris. Perform mold remediation in accordance with
ANSI/IICRC S520 .
Use only antimicrobial agents registered by the U.S. Environmental Protection Agency ( EPA 402-F-91-102 )( EPA 402-C-01-001 ) specifically for use within HVAC system.
Apply antimicrobial agents in strict accordance with manufacturer's instructions.
Use only antimicrobial coating products, for both porous and non-porous surfaces, which are EPA registered, water soluble solutions with supporting efficacy data and SDS records.
SECTION 23 01 30.41 Page 11
Apply antimicrobial coatings according to manufacturer's instructions.
Spray coatings directly onto interior ductwork surfaces, rather than "fog" downstream onto surfaces. Achieve a continuous film on the surface treated by the coating application, and apply in strict accordance with manufacturer's minimum millage surface application rate standards for effectiveness.
3.3 FIELD QUALITY CONTROL
3.3.1 CLEANLINESS VERIFICATION
3.3.1.1 General
Verification of HVAC System cleanliness is determined after mechanical cleaning and before the application of any treatment or introduction of any treatment-related substance to the HVAC system, including antimicrobial agents and coatings.
3.3.1.2 Visual Inspection
Visually inspect the HVAC system to ensure that no visible contaminants are present.
If no contaminants are evident through visual inspection, consider the HVAC system clean; however, further verification of the system cleanliness through gravimetric or wipe testing analysis testing may be requested at the discretion of the Contracting Officer.
If visible contaminants are evident through visual inspection, re-clean those portions of the system where contaminants are visible, and subject to re-inspection for cleanliness.
As part of inspection, record photographs and videos of inspection locations to document post-cleaning condition.
3.3.1.3 Gravimetric Analysis
At the expense of the Contractor , test sections of the HVAC system for cleanliness using the NADCA Vacuum Test (gravimetric analysis) as specified in applicable NADCA Standards. Ensure levels of debris collected are equal to or less than acceptable levels defined in applicable NADCA Standards.
If gravimetric analysis determines that levels of debris are equal to or lower than those levels specified, the system is considered clean and to have passed cleanliness verification.
If gravimetric analysis determines that levels of debris exceed those specified in applicable NADCA standards, the system will not be considered clean, and re-cleaning of those sections of the system which failed cleanliness verification will be required at the expense of the HVAC system cleaning contractor.
Perform cleanliness verification immediately after mechanical cleaning and before the HVAC system is restored to normal operation.
SECTION 23 01 30.41 Page 12
3.3.1.4 Verification of Coil Cleaning
Cleaning is to restore the coil pressure drop to within 10 percent of the pressure drop measured when the coil was first installed. If the original pressure drop is not known, the coil will be considered clean only if the coil is free of foreign matter and chemical residue, based on a thorough visual inspection (see NADCA HVAC Inspection Manual Standards).
3.3.2 Post-Project Report
At the conclusion of the project, provide a Testing Procedures Summary and Post-Project Report indicating the following:
a. Success of the cleaning project, as verified through visual inspection or gravimetric analysis.
b. Areas of the system found to be damaged and/or in need of repair.
-- End of Section --
SECTION 23 01 30.41 Page 13
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
SECTION 23 03 00.00 20
BASIC MECHANICAL MATERIALS AND METHODS
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 QUALITY ASSURANCE
1.3.1 Material and Equipment Qualifications
1.3.2 Alternative Qualifications
1.3.3 Service Support
1.3.4 Manufacturer's Nameplate
1.3.5 Modification of References
1.3.5.1 Definitions
1.3.5.2 Administrative Interpretations
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 ELECTRICAL REQUIREMENTS
1.6 ELECTRICAL INSTALLATION REQUIREMENTS
1.6.1 New Work
1.6.2 Modifications to Existing Systems
1.6.3 High Efficiency Motors
1.6.3.1 High Efficiency Single-Phase Motors
1.6.3.2 High Efficiency Polyphase Motors
1.6.4 Three-Phase Motor Protection
1.7 INSTRUCTION TO GOVERNMENT PERSONNEL
1.8 ACCESSIBILITY
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 PAINTING OF NEW EQUIPMENT
3.1.1 Factory Painting Systems
3.1.2 Shop Painting Systems for Metal Surfaces
SECTION 23 03 00.00 20 Page 1
SECTION 23 03 00.00 20
BASIC MECHANICAL MATERIALS AND METHODS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2023) National Electrical Safety Code
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2021) Motors and Generators
NEMA MG 10 (2017) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; TIA 22-1; ERTA 1 2022) National Electrical Code
1.2 RELATED REQUIREMENTS
This section applies to all sections of Divisions: 21, FIRE SUPPRESSION;
22, PLUMBING; and 23, HEATING, VENTILATING, AND AIR CONDITIONING of this project specification, unless specified otherwise in the individual section.
1.3 QUALITY ASSURANCE
1.3.1 Material and Equipment Qualifications
Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, SECTION 23 03 00.00 20 Page 2 manufacturers' catalogs, or brochures during the 2 year period.
1.3.2 Alternative Qualifications
Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.3.3 Service Support
The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.3.4 Manufacturer's Nameplate
For each item of equipment, provide a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
1.3.5 Modification of References
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.
1.3.5.1 Definitions
For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions must be considered mandatory, the word "should" is interpreted as "must." Reference to the "code official" must be interpreted to mean the "Contracting Officer." For Navy owned property, references to the "owner" must be interpreted to mean the "Contracting Officer." For leased facilities, references to the "owner" must be interpreted to mean the "lessor." References to the "permit holder" must be interpreted to mean the "Contractor."
1.3.5.2 Administrative Interpretations
For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, must be applied appropriately by the Contracting Officer as authorized by his administrative cognizance and the FAR.
1.4 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's
SECTION 23 03 00.00 20 Page 3 recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.
1.5 ELECTRICAL REQUIREMENTS
Furnish motors, controllers, disconnects and contactors with their respective pieces of equipment. Motors, controllers, disconnects and contactors must conform to and have electrical connections provided under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Furnish internal wiring for components of packaged equipment as an integral part of the equipment.
Extended voltage range motors will not be permitted. Controllers and contactors shall have a maximum of 120 volt control circuits, and must have auxiliary contacts for use with the controls furnished. When motors and equipment furnished are larger than sizes indicated, the cost of additional electrical service and related work must be included under the section that specified that motor or equipment. Power wiring and conduit for field installed equipment must be provided under and conform to the requirements of Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
1.6 ELECTRICAL INSTALLATION REQUIREMENTS
Electrical installations must conform to IEEE C2 , NFPA 70 , and requirements specified herein.
1.6.1 New Work
Provide electrical components of mechanical equipment, such as motors, motor starters (except starters/controllers which are indicated as part of a motor control center), control or push-button stations, float or pressure switches, solenoid valves, integral disconnects, and other devices functioning to control mechanical equipment, as well as control wiring and conduit for circuits rated 100 volts or less, to conform with the requirements of the section covering the mechanical equipment.
Extended voltage range motors are not to be permitted. The interconnecting power wiring and conduit, control wiring rated 120 volts (nominal) and conduit, the motor control equipment forming a part of motor control centers, and the electrical power circuits must be provided under Division 26, except internal wiring for components of package equipment must be provided as an integral part of the equipment. When motors and equipment furnished are larger than sizes indicated, provide any required changes to the electrical service as may be necessary and related work as a part of the work for the section specifying that motor or equipment.
1.6.2 Modifications to Existing Systems
Where existing mechanical systems and motor-operated equipment require modifications, provide electrical components under Division 26.
1.6.3 High Efficiency Motors
1.6.3.1 High Efficiency Single-Phase Motors
Unless otherwise specified, single-phase fractional-horsepower alternating-current motors must be high efficiency types corresponding to the applications listed in NEMA MG 11.
1.6.3.2 High Efficiency Polyphase Motors
Unless otherwise specified, polyphase motors must be selected based on
SECTION 23 03 00.00 20 Page 4 high efficiency characteristics relative to the applications as listed in NEMA MG 10. Additionally, polyphase squirrel-cage medium induction motors with continuous ratings must meet or exceed energy efficient ratings in accordance with Table 12-6C of NEMA MG 1.
1.6.4 Three-Phase Motor Protection
Provide controllers for motors rated one 1 horsepower and larger with electronic phase-voltage monitors designed to protect motors from phase-loss, undervoltage, and overvoltage. Provide protection for motors from immediate restart by a time adjustable restart relay.
1.7 INSTRUCTION TO GOVERNMENT PERSONNEL
When specified in other sections, furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system.
Instructors must be thoroughly familiar with all parts of the installation and must be trained in operating theory as well as practical operation and maintenance work.
Instruction must be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished must be as specified in the individual section.
When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.
When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
1.8 ACCESSIBILITY
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 PAINTING OF NEW EQUIPMENT
New equipment painting must be factory applied or shop applied, and must be as specified herein, and provided under each individual section.
3.1.1 Factory Painting Systems
Manufacturer's standard factory painting systems may be provided subject to certification that the factory painting system applied will withstand 125 hours in a salt-spray fog test, except that equipment located outdoors must withstand 500 hours in a salt-spray fog test. Salt-spray fog test must be in accordance with ASTM B117, and for that test the acceptance
SECTION 23 03 00.00 20 Page 5 criteria must be as follows: immediately after completion of the test, the paint must show no signs of blistering, wrinkling, or cracking, and no loss of adhesion; and the specimen must show no signs of rust creepage beyond 0.125 inch on either side of the scratch mark.
The film thickness of the factory painting system applied on the equipment must not be less than the film thickness used on the test specimen. If manufacturer's standard factory painting system is being proposed for use on surfaces subject to temperatures above 120 degrees F, the factory painting system must be designed for the temperature service.
3.1.2 Shop Painting Systems for Metal Surfaces
Clean, pretreat, prime and paint metal surfaces; except aluminum surfaces need not be painted. Apply coatings to clean dry surfaces. Clean the surfaces to remove dust, dirt, rust, oil and grease by wire brushing and solvent degreasing prior to application of paint, except metal surfaces subject to temperatures in excess of 120 degrees F must be cleaned to bare metal.
Where more than one coat of paint is specified, apply the second coat after the preceding coat is thoroughly dry. Lightly sand damaged painting and retouch before applying the succeeding coat. Color of finish coat must be aluminum or light gray.
a. Temperatures Less Than 120 Degrees F: Immediately after cleaning, the metal surfaces subject to temperatures less than 120 degrees F must receive one coat of pretreatment primer applied to a minimum dry film thickness of 0.3 mil, one coat of primer applied to a minimum dry film thickness of 1 mil; and two coats of enamel applied to a minimum dry film thickness of 1 mil per coat.
b. Temperatures Between 120 and 400 Degrees F: Metal surfaces subject to temperatures between 120 and 400 degrees F must receive two coats of 400 degrees F heat-resisting enamel applied to a total minimum thickness of 2 mils.
c. Temperatures Greater Than 400 Degrees F: Metal surfaces subject to temperatures greater than 400 degrees F must receive two coats of 600 degrees F heat-resisting paint applied to a total minimum dry film thickness of 2 mils.
-- End of Section --
SECTION 23 03 00.00 20 Page 6
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
SECTION 23 05 15
COMMON PIPING FOR HVAC
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Material and Equipment Qualifications
1.4.2 Alternative Qualifications
1.4.3 Service Support
1.4.4 Manufacturer's Nameplate
1.4.5 Modification of References
1.4.5.1 Definitions
1.4.5.2 Administrative Interpretations
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 ELECTRICAL REQUIREMENTS
1.7 ELECTRICAL INSTALLATION REQUIREMENTS
1.7.1 New Work
1.7.2 Modifications to Existing Systems
1.7.3 High Efficiency Motors
1.7.3.1 High Efficiency Single-Phase Motors
1.7.3.2 High Efficiency Polyphase Motors
1.7.4 Three-Phase Motor Protection
1.8 INSTRUCTION TO GOVERNMENT PERSONNEL
1.9 ACCESSIBILITY
PART 2 PRODUCTS
2.1 ELECTRICAL HEAT TRACING
2.2 PIPE AND FITTINGS
2.2.1 Type BCS, Black Carbon Steel
2.2.2 Type BCS-125, 125-psi Service
2.2.3 Type CPR, Copper
2.2.3.1 Type CPR-A, Copper Above Ground
2.2.3.2 Type CPR-U, Copper Under Ground
2.2.3.3 Type CPR-INS, Copper Under Ground Insulated
2.2.4 Polypropylene Pipe
2.2.5 Grooved Pipe Couplings and Fittings
2.3 PIPING SPECIALTIES
2.3.1 Air Separator
2.3.2 Air Vents
2.3.3 Compression Tank
2.3.4 Dielectric Connections
2.3.5 Expansion Vibration Isolation Joints
2.3.6 Flexible Pipe
2.3.7 Flexible Metallic Pipe
2.3.8 Metallic Expansion Joints
SECTION 23 05 15 Page 1
2.3.9 Hose Faucets
2.3.10 Pressure Gages
2.3.11 Sight-Flow Indicators
2.3.12 Sleeve Couplings
2.3.13 Thermometers
2.3.14 Pump Suction Strainers
2.3.15 Line Strainers, Water Service
2.3.16 Line Strainers, Steam Service
2.4 VALVES
2.4.1 Ball and Butterfly Valves
2.4.2 Drain, Vent, and Gage Cocks
2.4.3 Gate Valves (GAV)
2.4.4 Globe and Angle Valves (GLV-ANV)
2.4.5 Standard Check Valves (SCV)
2.4.6 Nonslam Check Valves (NSV)
2.5 MISCELLANEOUS MATERIALS
2.5.1 Bituminous Coating
2.5.2 Bolting
2.5.3 Elastomer Caulk
2.5.4 Escutcheons
2.5.5 Flashing
2.5.6 Flange Gaskets
2.5.7 Grout
2.5.8 Pipe Thread Compounds
2.6 SUPPORTING ELEMENTS
2.6.1 Building Structure Attachments
2.6.1.1 Anchor Devices, Concrete and Masonry
2.6.1.2 Beam Clamps
2.6.1.3 C-Clamps
2.6.1.4 Inserts, Concrete
2.6.2 Horizontal Pipe Attachments
2.6.2.1 Single Pipes
2.6.2.2 Parallel Pipes
2.6.3 Vertical Pipe Attachments
2.6.4 Hanger Rods and Fixtures
2.6.5 Supplementary Steel
PART 3 EXECUTION
3.1 PIPE INSTALLATION
3.2 VALVES
3.3 SUPPORTING ELEMENTS INSTALLATION
3.4 PENETRATIONS
3.5 SLEEVES
3.6 ESCUTCHEONS
3.7 FLASHINGS
3.8 UNDERGROUND PIPING INSTALLATION
3.9 HEAT TRACE CABLE INSTALLATION
3.10 DISINFECTION
3.11 HEAT TRACE CABLE TESTS
3.12 OPERATION AND MAINTENANCE
3.13 PAINTING OF NEW EQUIPMENT
3.13.1 Factory Painting Systems
3.13.2 Shop Painting Systems for Metal Surfaces
SECTION 23 05 15 Page 2
SECTION 23 05 15
COMMON PIPING FOR HVAC
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2017) Steel Construction Manual
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME A112.18.1/CSA B125.1 (2018) Plumbing Supply Fittings
ASME A112.19.2/CSA B45.1 (2018; ERTA 2018) Standard for Vitreous China Plumbing Fixtures and Hydraulic Requirements for Water Closets and Urinals
ASME B1.20.7 (1991; R 2013) Standard for Hose Coupling Screw Threads (Inch)
ASME B16.1 (2020) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.3 (2021) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.5 (2020) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings
ASME B16.22 (2021) Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.25 (2017) Buttwelding Ends
ASME B16.26 (2018) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B16.34 (2021) Valves - Flanged, Threaded and Welding End
ASME B16.39 (2020) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
ASME B31.3 (2020) Process Piping
SECTION 23 05 15 Page 3
ASME B36.10M (2022) Welded and Seamless Wrought Steel Pipe
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
ASME BPVC SEC IX (2017; Errata 2018) BPVC Section IX-Welding, Brazing and Fusing Qualifications
ASME BPVC SEC VIII D1 (2019) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
AMERICAN WELDING SOCIETY (AWS)
AWS WHB-2.9 (2004) Welding Handbook; Volume 2, Welding Processes, Part 1
ASTM INTERNATIONAL (ASTM)
ASTM A6/A6M (2021) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
ASTM A53/A53M (2022) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A126 (2004; R 2019) Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings
ASTM A183 (2014; R 2020) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A197/A197M (2000; R 2019) Standard Specification for Cupola Malleable Iron
ASTM A216/A216M (2021) Standard Specification for Steel Castings, Carbon, Suitable for Fusion Welding, for High-Temperature Service
ASTM A234/A234M (2019) Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM A276/A276M (2017) Standard Specification for Stainless Steel Bars and Shapes
ASTM A307 (2021) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM B32 (2020) Standard Specification for Solder Metal
SECTION 23 05 15 Page 4
ASTM B62 (2017) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B88 (2020) Standard Specification for Seamless Copper Water Tube
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B370 (2022) Standard Specification for Copper Sheet and Strip for Building Construction
ASTM B749 (2020) Standard Specification for Lead and Lead Alloy Strip, Sheet and Plate Products
ASTM C67/C67M (2021) Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
ASTM C109/C109M (2021) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)
ASTM C404 (2018) Standard Specification for Aggregates for Masonry Grout
ASTM C476 (2020) Standard Specification for Grout for Masonry
ASTM C553 (2013; R 2019) Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM D2000 (2018) Standard Classification System for Rubber Products in Automotive Applications
ASTM D2308 (2007; R 2013) Standard Specification for Thermoplastic Polyethylene Jacket for Electrical Wire and Cable
ASTM E1 (2014) Standard Specification for ASTM Liquid-in-Glass Thermometers
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E814 (2013a; R 2017) Standard Test Method for Fire Tests of Penetration Firestop Systems
ASTM F104 (2011; R 2020) Standard Classification System for Nonmetallic Gasket Materials
ASTM F2389 (2021) Standard Specification for Pressure-rated Polypropylene (PP) Piping
SECTION 23 05 15 Page 5
Systems
FLUID SEALING ASSOCIATION (FSA)
FSA-0017 (1995e6) Standard for Non-Metallic Expansion Joints and Flexible Pipe Connectors Technical Handbook
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 515 (2017) Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Industrial Applications
IEEE C2 (2023) National Electrical Safety Code
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
MSS SP-67 (2022) Butterfly Valves
MSS SP-70 (2011) Gray Iron Gate Valves, Flanged and Threaded Ends
MSS SP-72 (2010a) Ball Valves with Flanged or Butt-Welding Ends for General Service
MSS SP-80 (2019) Bronze Gate, Globe, Angle and Check Valves
MSS SP-110 (2010) Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends
MSS SP-125 (2010) Gray Iron and Ductile Iron In-Line, Spring-Loaded, Center-Guided Check Valves
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2021) Motors and Generators
NEMA MG 10 (2017) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; TIA 22-1; ERTA 1 2022) National Electrical Code
SECTION 23 05 15 Page 6
NSF INTERNATIONAL (NSF)
NSF/ANSI 14 (2021) Plastics Piping System Components and Related Materials
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-C-18480 (1982; Rev B; Notice 2 2009; Notice 3 2022) Coating Compound, Bituminous, Solvent, Coal-Tar Base
MIL-DTL-17813 (2009; Rev H; Supp 1 2009; Notice 1 2013) Expansion Joints, Pipe, Metallic Bellows, General Specification for
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-1922 (Rev A; Notice 3) Shield, Expansion (Caulking Anchors, Single Lead)
CID A-A-1923 (Rev A; Notice 3) Shield, Expansion (Lag, Machine and Externally Threaded Wedge Bolt Anchors)
CID A-A-1924 (Rev A; Notice 3) Shield, Expansion (Self Drilling Tubular Expansion Shell Bolt Anchors
CID A-A-1925 (Rev A; Notice 3) Shield Expansion (Nail Anchors)
CID A-A-55614 (Basic; Notice 2) Shield, Expansion (Non-Drilling Expansion Anchors)
CID A-A-55615 (Basic; Notice 3) Shield, Expansion (Wood Screw and Lag Bolt Self-Threading Anchors
UNDERWRITERS LABORATORIES (UL)
UL 1479 (2015; Reprint May 2021) Fire Tests of Through-Penetration Firestops
1.2 GENERAL REQUIREMENTS
Section 23 30 00 HVAC AIR DISTRIBUTION applies to work specified in this section
Submit Records of Existing Conditions consisting of the results of Contractor's survey of work area conditions and features of existing structures and facilities within and adjacent to the jobsite.
Commencement of work constitutes acceptance of the existing conditions.
Include with Equipment Foundation Data for piping systems all plan dimensions of foundations and relative elevations, equipment weight and operating loads, horizontal and vertical loads, horizontal and vertical clearances for installation, and size and location of anchor bolts.
Submit Fabrication Drawings for pipes, valves and specialties consisting of fabrication and assembly details to be performed in the factory.
SECTION 23 05 15 Page 7
Submit Material, Equipment, and Fixture Lists for pipes, valves and specialties including manufacturer's style or catalog numbers, specification and drawing reference numbers, warranty information, and fabrication site information. Provide a complete list of construction equipment to be used.
Submit Manufacturer's Standard Color Charts for pipes, valves and specialties showing the manufacturer's recommended color and finish selections.
Include with Listing of Product Installations for piping systems identification of at least 5 units, similar to those proposed for use, that have been in successful service for a minimum period of 5 years.
Include in the list purchaser, address of installation, service organization, and date of installation.
Submit Record Drawings for pipes, valves and accessories providing current factual information including deviations and amendments to the drawings, and concealed and visible changes in the work.
Submit Connection Diagrams for pipes, valves and specialties indicating the relations and connections of devices and apparatus by showing the general physical layout of all controls, the interconnection of one system (or portion of system) with another, and internal tubing, wiring, and other devices.
Submit Coordination Drawings for pipes, valves and specialties showing coordination of work between different trades and with the structural and architectural elements of work.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .