This file is a compilation of four asbestos survey reports for buildings at Fort Hood, Texas, prepared by Radian International LLC for the U.S. Army Corps of Engineers in September 1997.

Buildings Surveyed and ACM Findings:

The reports cover Buildings 29019, 29020, 29021, and 29022 (all Enlisted Barracks constructed in 1975). Building 29019 (31,698 sq ft) identified asbestos-containing material (ACM) in ceiling texture (2,718 m²) and presumed ACM (PACM) in building caulkings/putties (3 m²), with total abatement costs estimated at $150,985. Building 29020 (42,264 sq ft) identified ACM in floor tile (3,930 m²), wallboard (418 m²), and ceiling texture (3,930 m²), plus PACM in caulkings/putties (3.9 m²), totaling $385,098 in abatement costs. Building 29021 (31,698 sq ft) contained ACM in ceiling surfacing (2,000 m²) and wallboard (470 m²), with PACM in caulkings/putties (2.9 m²), estimated at $122,164 for abatement. Building 29022 (42,264 sq ft) had ACM in floor tile (3,120 m²), wallboard (246 m²), and ceiling texture (3,928 m²), plus PACM in caulkings/putties (3.9 m²), with estimated abatement costs of $349,029.

Risk Assessment and Methodology:

All identified asbestos materials received Priority 4 ratings (no immediate action required) using the modified Air Force Guidance for Rating Damage and Exposure (GRADE) system. Materials were classified as non-friable with no physical damage, and risk ratings ranged from 9.16 to 10.17, indicating suitability for operations and maintenance programs rather than immediate removal. Samples were analyzed using polarized light microscopy and dispersion staining methods per EPA-approved protocols, with testing conducted by RJ Lee Group laboratory in Houston. The surveys included physical inspections, bulk material sampling (three samples per homogeneous area), detailed analytical results, floor plans, representative photographs, and risk assessment data. No air monitoring was required based on risk assessment models for any of the buildings.

View the file

Other files

File Type Posted
W9115126BA002 Repair Barracks 29019-22 and 24 - Abstract of Offers.pdf PDF
W9115126BA002 Repair Barracks 29019-22 and 24 - Bid Opening Sign In Roster.pdf PDF
Amendment 02 Solicitation W9115126BA0020001 Repair Barracks 29019-29024.pdf PDF
Attachment 4 - RFI Responses W9115126BA002 Repair Barracls B29019-29022 and 29024.pdf PDF
W9115126BA002 - Site Visit Sign In Roster 24 Mar 26.pdf PDF
W9115126BA002 - Site Visit Agenda 24 March 2026.pdf PDF
Attachment 2 - Revised Project Synopsis Solicitation 26-B-A002 Repair Barracks B29019 20 2122 24.pdf PDF
Amendment 01 Solicitation W9115126BA0020001 Repair Barracks 29019-29024.pdf PDF
Technical Exhibit B - Revised Drawings Solicitation 26-B-A002 Repair Barracks B29019-24.pdf PDF
Technical Exhibit B - Drawings Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Attachment 2 - Project Synopsis Solicitation 26-B-A002 Repair Barracks B29019 - B29022.pdf PDF
Attachment 1-Appendix A Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Technical Exhibit A - Specifications Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Solicitation W9115126BA002 Repair Barracks B29019-22.pdf PDF
Technical Exhibit C - AS-BUILTS Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Attachment 3 - Wage Determination Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS SURVEY REPORT

BUILDING 29019

FORT HOOD, TEXAS

Submitted to:

U.S. Army Corps of Engineers, Fort Worth District

For:

Tulsa District

Prepared by:

Radian International LLC

8501 N. Mopac Blvd.

P.O. Box 201088

Austin, Texas 78720-1088

September 1997

Asbestos Survey, Fort Hood, Texas ii September 1997

Building 29019 f_29019.doc

Table of Contents

1.0 INTRODUCTION

1.1 Physical Inspections

1.2 Bulk Sampling and Analysis

1.3 Sample Numbering Scheme

2.0 FACILITY DESCRIPTION

3.0 DISCUSSION OF RESULTS

4.0 RISK ASSESSMENT

5.0 ABATEMENT COST ESTIMATES

APPENDIX A: HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS

FOR BUILDING 29019 SURVEY

APPENDIX B: BUILDING 29019 FLOOR PLAN

APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN

BUILDING 29019

APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING

29019

List of Figures

B-1 Building 29019 Floor Plan—First Floor .................................................................... B-1

B-2 Building 29019 Floor Plan—Second Floor ............................................................... B-2

B-3 Building 29019 Floor Plan—Third Floor .................................................................. B-3

B-4 Building 29019 Floor Plan—Roof ............................................................................. B-4

List of Tables

3-1 Summary of ACM and PACM in Building 29019

4-1 Priority Rating Table for Recommended Response Actions

4-2 Building 29019 Risk Assessment Results

5-1 Building 29019 Abatement and Replacement Cost Estimates

5-2 Building 29019 Repair Cost Estimates

A-1 Building 29019 Summary of Homogeneous Areas ................................................... A-1

A-2 Building 29019 Asbestos Survey Analytical Results ................................................. A-2

B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29019 ................... B-5

D-1 Damage/Risk Values for Inspection Observations .................................................... D-2

D-2 Exposure Values for Inspection Observations ........................................................... D-2

D-3 Damage/Risk Observations for ACM and PACM in Bldg. 29019 ............................ D-3

D-4 Exposure Observations for ACM and PACM in Bldg. 29019 ................................... D-3

Asbestos Survey, Fort Hood, Texas iii September 1997

List of Photographs (Appendix C)

Photo 29019-1-B: Ceiling texture; throughout building except restrooms and mechanical rooms

Photo 29019-1-D: Building caulkings and putties; door and window frames

Asbestos Survey, Fort Hood, Texas iv September 1997

Acronyms and Abbreviations

ACM Asbestos-containing material

Act. Actinolite

Am. Amosite

Anth. Anthophyllite

Cell. Cellulose

Chry. Chrysotile

COR Contracting Officer’s Representative

Croc. Crocidolite

D Damage/risk factor

DS Dispersion staining

E Exposure factor

EPA United States Environmental Protection Agency

Fib. Fiberglass

GRADE Air Force Guidance for Rating Damage and Exposure

ID Identification

LLC Limited liability company m Meter m2 Square meter

M.W. Mineral wool

N/A Not analyzed

NA Not applicable

ND Not detected

O&M Operations and maintenance

PACM Presumed asbestos-containing material

PLM Polarized light microscopy

QA Quality assurance

QC Quality control

R Risk rating

RPD Relative percent difference

SACM Suspect asbestos-containing material

SWD Southwest Division (Laboratory)

Syn. Synthetics

T Total

TDH Texas Department of Health

Trem. Tremolite

TSI Thermal systems insulation

USACE United States Army Corps of Engineers

Asbestos Survey, Fort Hood, Texas September 1997

1.0 INTRODUCTION

Radian International LLC, under contract with the United States Army Corps of Engineers

(USACE), Contract DACA56-94-D-0015, performed a facility-wide asbestos survey at Fort

Hood, Texas, to meet the following project objectives:

Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-containing materials (SACM);

Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;

Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;

Identify and quantify material which is presumed to contain asbestos;

Conduct risk assessments for all asbestos-containing materials (ACM) and presumed

ACM (PACM);

Conduct air monitoring where necessary according to risk assessment models; and

Prepare an Operations and Maintenance (O&M) program (under separate cover) for all

ACM and PACM.

The survey included base buildings and approximately 10% of the family housing buildings at

Fort Hood. Mr. Emmet Gray, Directorate of Public Works, is the post contact for this project.

This report presents the findings from the asbestos survey at Building 29019.

1.1 Physical Inspections

Survey teams visually inspected the accessible areas of the interior and exterior of each building, including interior and exterior rooms, mechanical spaces, storage areas, crawl spaces, attics, and roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based on the visual inspection of the remainder of the building and interviews with the building occupants.

The following steps were taken to complete physical inspections.

1. Obtain a copy of the building floor plan.

2. Perform an initial building walk-through.

a) Note fire doors/walls on the floor plan.

b) Identify homogeneous areas.

c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.

d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and conditions present at the time of the survey.

e) Define the bulk sample locations.

1.2 Bulk Sampling and Analysis

Homogeneous materials were categorized by the survey teams as surfacing materials, thermal systems insulation (TSI), or miscellaneous materials. Building age, use, and size were taken into consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:

1. Mark sample locations on the floor plan using a unique identification number.

2. Record SACM sample information on a field data sheet, including:

a) Building number and room number/area description;

b) Typical occupancy and population;

c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);

d) Estimated quantity of SACM (i.e., area or length);

e) Friability;

f) Physical damage;

g) Potential for damage or disturbance during maintenance;

h) Potential cause of damage or disturbance; and

i) Unique sample identification number.

3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.

4. Repair any damage caused by sampling using sealants and methods approved by the

Contracting Officer’s Representative (COR).

Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental

Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August

1996, point-counting was not performed. In order to meet quality assurance/quality control

(QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ

Lee Group laboratory. The third sample is the QA sample that was sent to the USACE

Southwestern Division Laboratory (SWD) in Dallas, Texas.

1.3 Sample Numbering Scheme

Unique identification numbers were assigned to each sample using the following numbering scheme:

aaaaa-b-c-xd, where:

aaaaa identifies the five-digit building number;

b identifies the subdivision within that building;

c identifies the homogeneous area;

x identifies the sample type, where:

0 = normal sample

8 = field duplicate (QC sample)

9 = QA sample d identifies the sample number (1,2, or 3)

[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular building. When necessary, “e” is used by the laboratory to identify additional layers of material not separated in the field (e.g., tile and mastic associated with flooring materials.)]

2.0 FACILITY DESCRIPTION

Building 29019, encompassing an area of 31,698 sq ft, is an Enlisted Barracks (without dining area) built in 1975. A building floor plan is presented in Appendix B.

3.0 DISCUSSION OF RESULTS

Building 29019 was inspected during December 1996. During this inspection, 5 homogeneous areas were identified and 12 normal samples were collected. Table 3-1 presents a summary of

ACM and PACM identified during the survey of Building 29019. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29019. Sample and photograph locations are presented in the Building 29019 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 29019.

Table 3-1

Summary of ACM and PACM in Building 290191

Homogeneous Area Area/Length Physical ACM

ID Description & Location Estimate Units Damage Friability Type

1-B Ceiling texture; throughout building except restrooms and mechanical rooms

2,718 m2 None None ACM

1-D Building caulkings and putties; door and window frames

3 m2 None None PACM

1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.

m2 = Square meter

Homogeneous areas 1-B and 1-D were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. All areas of this building were accessible to the field inspection team. Interior and incoming electrical wiring appeared to be non-ACM.

No field duplicate (QC) samples were collected from materials in this building.

4.0 RISK ASSESSMENT

A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and

Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D) and exposure factors (E). These factors are summed and placed in the following equation:

R = 12.0324 - [(0.1683 x D) + (0.1693 x E)].

Table 4-1 was used to establish a priority rating for each homogeneous area, based on the risk rating or “R” value.

Table 4-1

Priority Rating Table for Recommended Response Actions

Risk Rating (R) Priority Recommended Response Action

R < 6 1 Immediate removal/repair

6 R < 8 2 Planned removal/repair; place in O&M program in interim 1

8 R < 10 3 Place in O&M program

R 10 4 No action required; place in O&M program as a precaution 1 If material is repaired, it will remain in the O&M program until it is removed.

O&M = Operations and maintenance

R = Risk Rating

Risk assessments for the homogeneous areas identified as ACM or PACM in Building 29019 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these factors is also provided in Appendix D. No air sampling was required in this building based on risk assessment models.

Table 4-2

Building 29019 Risk Assessment Results

Homogeneous Area ACM Risk

ID Description & Location Type Rating (R) Priority

1-B Ceiling texture; throughout building except restrooms and mechanical rooms

ACM 9.16 4a

1-D Building caulkings and putties; door and window frames PACM 10.17 4a a Priority rating is 4 because material is not friable.

5.0 ABATEMENT COST ESTIMATES

Abatement cost estimates are based on professional experience and costs from 1996 Fort Hood asbestos abatement contracts. Cost estimates were developed using the unit costs for abatement of the general category of material and the estimated area of identified ACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.

Cost estimates were developed using the assumption that all materials within a building would be abated concurrently. In addition, costs are based on the assumption that all ACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM in Building 29019 are presented in

Tables 5-1 and 5-2.

Table 5-1

Building 29019 Abatement and Replacement Cost Estimates

Homogeneous Area Area/Length Unit Cost for Total Cost

ID Description & Location Estimate Units Abatement ($)

1-B Ceiling texture; throughout building except restrooms and mechanical rooms

2,700 m2 $37.66/m2 $101,682

1-D Building caulkings and putties; door and window frames

3 m2 $107.60/m2 $323

Subtotal $102,005

Design Fee (6%) $6,120

Air Monitoring Cost (10%) $10,200

Materials Replacement $21,857

Off-site Disposal Cost $10,803

TOTAL ESTIMATED ABATEMENT COST $150,985

Table 5-2

Building 29019 Repair Cost Estimates

Homogeneous Area

Approximate

Damaged

Area/Length

Unit Cost for

Total Cost

ID Description & Location Estimate Units Repair ($)

1-B Ceiling texture; throughout building except restrooms and mechanical rooms

14 m2 $37.66/m2 $527

1-D Building caulkings and putties; door and window frames

3 m2 $107.60/m2 $323

Subtotal $850

Design Fee (6%) $51

Air Monitoring Cost (10%) $85

Materials Replacement $181

Off-site Disposal Cost $59

TOTAL ESTIMATED REPAIR COST $1,226

APPENDIX A

HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS FOR

BUILDING 29019 SURVEY

A-1

Table A-1

Building 29019 Homogeneous Areas 1

Homogeneous Area ACM

ID Description & Location Type 2

1-A 12x12 floor tile; throughout building, except restrooms and mechanical room None

1-B Ceiling texture; throughout building except restrooms and mechanical rooms ACM

1-C Wallboard and joint compound; furrdowns in each room and hall None

1-D Building caulkings and putties; door and window frames PACM

R-A Roof shingles and underlayment None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and

ACM are shown in Appendix C.

2 ACM types include:

ACM = Materials containing >1% asbestos;

None = Materials containing 1% asbestos; and

PACM = Materials presumed to contain >1% asbestos.

ACM = Asbestos-containing material

ID = Identification

PACM = Presumed asbestos-containing material

Table A-2

Building 29019 Asbestos Survey Analytical Results1

Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)

Area

ID

Sample ID

Layer

Layer Description

(from Laboratory)

Total

Act

Am

Anth

Chry

Croc

Trem

Cell

Fib

M.W.

Synth

ACM

Type

1-A 29019-1-A-01 NA Wht Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None

29019-1-A-02 NA Wht Floor Tile ND ND ND ND ND ND ND 8 ND ND ND None

29019-1-A-03 NA Wht Floor Tile ND ND ND ND ND ND ND 10 ND ND ND None

1-B 29019-1-B-01 NA Wht Texture 15.00 ND ND ND 15 ND ND 2 ND ND ND ACM

29019-1-B-02 NA Wht Texture 15.00 ND ND ND 15 ND ND 1 ND ND ND ACM

29019-1-B-03 NA Wht Texture 20.00 ND ND ND 20 ND ND 2 ND ND ND ACM

1-C 29019-1-C-01 a Wht Drywall/Brn Paper ND ND ND ND ND ND ND 20 ND ND ND None

29019-1-C-01 b Wht Jt Cmpnd/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None

29019-1-C-01 NA Total ND None

29019-1-C-02 a Wht Drywall/Brn Paper ND ND ND ND ND ND ND 20 ND ND ND None

29019-1-C-02 b Wht Jt Cmpnd/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None

29019-1-C-02 NA Total ND None

29019-1-C-03 a Wht Drywall/Brn Paper ND ND ND ND ND ND ND 15 ND ND ND None

29019-1-C-03 b Wht Jt Cmpnd/Wht Paint 0.90 ND ND ND 0.9 ND ND 5 ND ND ND None

29019-1-C-03 NA Total 0.01 None

R-A 29019-R-A-01 a Blk Tar ND ND ND ND ND ND ND 8 12 ND ND None

29019-R-A-01 b Tan Fibers ND ND ND ND ND ND ND 80 ND ND ND None

29019-R-A-01 c Wht Frit ND ND ND ND ND ND ND ND ND ND ND None

29019-R-A-01 NA Total ND None

29019-R-A-02 a Blk Tar ND ND ND ND ND ND ND 5 10 ND ND None

29019-R-A-02 b Tan Fibers ND ND ND ND ND ND ND 90 ND ND ND None

29019-R-A-02 c Wht Frit ND ND ND ND ND ND ND ND ND ND ND None

29019-R-A-02 NA Total ND None

29019-R-A-03 a Blk Tar ND ND ND ND ND ND ND 6 15 ND ND None

29019-R-A-03 b Tan Fibers ND ND ND ND ND ND ND 75 ND ND ND None

29019-R-A-03 c Wht Frit ND ND ND ND ND ND ND ND ND ND ND None

29019-R-A-03 NA Total ND None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, than that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.

Act. = Actinolite

Am. = Amosite

Anth. = Anthophyllite

Cell. = Cellulose

Chry. = Chrysotile

Croc. = Crocidolite

Fib. = Fiberglass

ID = Identification

M.W. = Mineral wool

NA = Not applicable

ND = Not detected (<1% asbestos)

Synth. = Synthetics

T = Total

Trem. = Tremolite

APPENDIX B

BUILDING 29019 FLOOR PLAN

Asbestos Survey, Fort Hood, Texas B-5 September 1997

Table B-1

Inspector, Risk Assessor, and Laboratory Licenses for Building 29019

Building and Analytical Laboratory Building Inspector/Risk Assessor Date

Homogeneous

Area ID1

Name

TDH

License #

License

Exp. Date

License #

License

Exp. Date

Inspected/

Sampled

29019-1-A RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 12/9/96

29019-1-B RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 12/9/96

29019-1-C RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 12/9/96

29019-1-D NA NA NA Jody Bass 60-1096 10/9/97 12/9/96

29019-R-A RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 12/11/96 1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:

aaaaa-b-c-xd, where:

aaaaa identifies the five-digit building number;

b identifies the subdivision within that building;

c identifies the homogeneous area;

x identifies the sample type, where:

0 = normal bulk material sample

6 = normal personnel air monitoring sample

7 = normal environmental air monitoring sample

8 = field duplicate bulk material (QC sample)

9 = QA bulk material sample d identifies the sample number (1, 2, or 3);

[Note: “b-c” represents the unique homogeneous area ID for a particular building.]

NA = Not applicable. (PACM was not sampled.)

PACM = Presumed asbestos-containing material

QA = Quality assurance

QC = Quality control

TDH = Texas Department of Health

APPENDIX C

REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN BUILDING

29019

APPENDIX D

RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 29019

Asbestos Survey, Fort Hood, Texas D-1 September 1997

Appendix D

Risk Assessment Data and Methodology identified within the building using a modified version of the Air Force Guideline for

Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D), and exposure factors (E). These factors are summed and used in the following equation:

R = 12.0324 - [(0.1683 x D) + (0.1693 x E)];

Where D = the sum of the values for the following damage/risk observations:

Material type

Potential for contact

Physical damage

Water damage

Potential for damage by repair/maintenance activities

Asbestos content;

And E = the sum of the values for the following exposure observations:

Area of damaged material

Material friability

Population

Activity/vibration

Ventilation

Air movement

Floors

Walls

Barriers

A further breakdown of the values for the subunits under each category is provided in

Tables D-1 and D-2. Summaries of the inspection observations for damage/risk and exposure for the ACM and PACM in Building 29019 are presented in Tables D-3 and D-

4.

Table D-1

Damage/Risk Values for Inspection Observations 1

Material Type

Potential for Contact

Physical

Damage

Water Damage

Potential for Damage by

Repair/Maintenance Activities

Asbestos Content

Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) >1-30% (1)

TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)

TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)

Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)

Misc., Undamaged (0) >10 ft, Medium (3) High (5)

>10 ft, High (5) 1 The value assigned to each category is shown in italics.

TSI = Thermal systems insulation

Table D-2

Exposure Values for Inspection Observations 1

Area of

Material

(m or m2)

Friability

Population

Activity/

Vibration

Interior

Ventilation

Air

Movement

Floors

<3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Smooth (1) Permanent (1)

3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)

31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)

>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)

501-1,000 (4)

>1,000 (5)

Table D-3

Summary of Damage/Risk Observations for ACM and PACM in Building 29019

Potential for

Contact

Physical Damage

Water

Damage

Potential for Damage by

Repair/Maintenance Activities

Asbestos

Content

29019-1-B Surfacing (4) <10 ft, Low (2) None (0) No (0) Low (1) 1-30% (1)

29019-1-D Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)

Table D-4

Summary of Exposure Observations for ACM and PACM in Building 29019

Area of

Damaged

Activity

29019-1-B 3-30 (1) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)

29019-1-D < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)

BUILDING 29020

Building 29020 f_29020.doc

1.0 INTRODUCTION

1.1 Physical Inspections

1.2 Bulk Sampling and Analysis

1.3 Sample Numbering Scheme

2.0 FACILITY DESCRIPTION

3.0 DISCUSSION OF RESULTS

4.0 RISK ASSESSMENT

5.0 ABATEMENT COST ESTIMATES

FOR BUILDING 29020 SURVEY

APPENDIX B: BUILDING 29020 FLOOR PLAN

APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN

BUILDING 29020

APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR

B-1 Building 29020 Floor Plan--First Floor ..................................................................... B-1

B-2 Building 29020 Floor Plan--Second Floor ................................................................. B-2 B-3 Building 29020 Floor Plan--Third Floor .................................................................... B-3

B-4 Building 29020 Roof Plan ......................................................................................... B-4

3-1 Summary of ACM and PACM in Building 29020

4-1 Priority Rating Table for Recommended Response Actions 4-2 Building 29020 Risk Assessment Results 5-1 Building 29020 Abatement and Replacement Cost Estimates

5-2 Building 29020 Repair Cost Estimates A-1 Building 29020 Homogeneous Areas ........................................................................ A-1

A-2 Building 29020 Asbestos Survey Analytical Results ................................................ A-2 B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29020 ................... B-5 D-1 Damage/Risk Values for Inspection Observations .................................................... D-2

D-2 Exposure Values for Inspection Observations ........................................................... D-2 D-3 Summary of Damage/Risk Observations for ACM and PACM in Bldg. 29020 ...... D-3

D-4 Summary of Exposure Observations for ACM and PACM in Bldg. 29020 ............. D-3

Photo 29020-1-A: 12x12 floor tile (beige with brown specks) Photo 29020-1-B: Building caulkings and putties

Photo 29020-1-C: Wallboard Photo 29020-1-D: Textured ceiling materials

Am. Amosite Anth. Anthophyllite Cell. Cellulose

Chry. Chrysotile COR Contracting Officer’s Representative

Croc. Crocidolite D Damage/risk factor DS Dispersion staining

E Exposure factor EPA United States Environmental Protection Agency

Fib. Fiberglass GRADE Air Force Guidance for Rating Damage and Exposure ID Identification

LLC Limited liability company m Meter m2 Square meter M.W. Mineral wool N/A Not analyzed

NA Not applicable ND Not detected

O&M Operations and maintenance PACM Presumed asbestos-containing material PLM Polarized light microscopy

QA Quality assurance QC Quality control

R Risk rating RPD Relative percent difference SACM Suspect asbestos-containing material

SWD Southwest Division (Laboratory) Syn. Synthetics

T Total TDH Texas Department of Health Trem. Tremolite

• Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-

• Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;

• Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;

• Identify and quantify material which is presumed to contain asbestos;

• Conduct risk assessments for all asbestos-containing materials (ACM) and presumed

ACM (PACM);

• Conduct air monitoring where necessary according to risk assessment models; and

• Prepare an Operations and Maintenance (O&M) program (under separate cover) for all

This report presents the findings from the asbestos survey at Building 29020.

roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based

2. Perform an initial building walk-through.

a) Note fire doors/walls on the floor plan.

b) Identify homogeneous areas.

c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.

d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:

1. Mark sample locations on the floor plan using a unique identification number.

2. Record SACM sample information on a field data sheet, including:

a) Building number and room number/area description;

b) Typical occupancy and population;

c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);

d) Estimated quantity of SACM (i.e., area or length);

e) Friability;

f) Physical damage;

g) Potential for damage or disturbance during maintenance;

h) Potential cause of damage or disturbance; and

i) Unique sample identification number.

3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.

Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for

Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August 1996, point-counting was not performed. In order to meet quality assurance/quality control (QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ Lee Group laboratory. The third sample is the QA sample that was sent to the USACE Southwestern Division Laboratory (SWD) in Dallas, Texas.

x identifies the sample type, where:

0 = normal sample

8 = field duplicate (QC sample)

9 = QA sample d identifies the sample number (1,2, or 3)

[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular not separated in the field (e.g., tile and mastic associated with flooring materials)].

Building 29020, encompassing an area of 42,264 sq ft, is an Enlisted Barracks (without Dining) built in 1975. A building floor plan is presented in Appendix B.

Building 29020 was inspected during January 1997. During this inspection, 5 homogeneous

ACM and PACM identified during the survey of Building 29020. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29020. Sample and photograph locations are presented in the Building 29020 floor plan (see Appendix B). Table B-1 contains information regarding representative photographs of each ACM and PACM identified in Building 29020.

Summary of ACM and PACM in Building 290201

1-A 12x12 floor tile (beige with brown specks) 3930 m2 None None ACM

1-B Building caulkings and putties 3.9 m2 None None PACM

1-C Wallboard 418 m2 None Low ACM

1-D Textured ceiling materials 3930 m2 None None ACM 1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.

Homogeneous areas 1-A, 1-B, 1-C, and 1-D were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. All areas of this building were accessible to the inspection team. No interior or incoming electrical wiring was observed during the building inspection.

A field duplicate (QC) sample was collected at location 29020-1-C-01. The QC sample and normal sample yielded different asbestos results, but these are a result of different layers being found in each sample. The results of analysis for the QC sample indicated asbestos levels less than 1% (non-detect) in the brown paper and white plaster. The white plaster analyzed in the normal sample (29020-1-C-01) also did not have asbestos levels greater than 1 percent. Brown paper was not found in the normal sample, but brown paper was found in the sample collected at

29020-1-C-03. Analytical results for the brown paper in this sample also did not have asbestos levels greater than 1 percent.

The normal sample (29020-1-C-01) also had tan paint and white joint compound, which was not analyzed in the QC sample. The tan paint did not have asbestos levels greater than 1 percent, but the white joint compound had asbestos levels of 5 percent. These results are consistent with the analytical results for the other samples collected from this homogeneous area.

identified within the building using a modified version of the Air Force Guidance for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk

6 R < 8 2 Planned removal/repair; place in O&M program in interim 1

8 R < 10 3 Place in O&M program

Risk assessments for the homogeneous areas identified as ACM or PACM in Building 29020 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these

Building 29020 Risk Assessment Results

1-A 12x12 floor tile (beige with brown specks) ACM 10.17 4a

1-B Building caulkings and putties PACM 10.17 4a

1-C Wallboard ACM 10 4

1-D Textured ceiling materials ACM 9.5 4a of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.

abated concurrently. In addition, costs are based on the assumption that all ACM and/or PACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM and/or PACM in Building 29020 are presented in Tables 5-1 and 5-2.

Building 29020 Abatement and Replacement Cost Estimates

1-A 12x12 floor tile (beige with brown specks) 3930 m2 $18.83/m2 $74,002

1-B Building caulkings and putties 3.9 m2 $107.60/m2 $420

1-C Wallboard 418 m2 $10.76/m2 $4,498

1-D Textured ceiling materials 3930 m2 $37.66/m2 $148,004

Subtotal $226,924

Design Fee (6%) $13,615

Air Monitoring Cost (10%) $22,692

Materials Replacement $96,611

Off-site Disposal Cost $25,256

TOTAL ESTIMATED ABATEMENT COST $385,098

Building 29020 Repair Cost Estimates

1-A 12x12 floor tile (beige with brown specks) 3 m2 $18.83/m2 $56

1-B Building caulkings and putties 3 m2 $107.60/m2 $323

1-C Wallboard 3 m2 $10.76/m2 $32

1-D Textured ceiling materials 3 m2 $37.66/m2 $113

Subtotal $524

Design Fee (6%) $31

Air Monitoring Cost (10%) $52

Materials Replacement $156

Off-site Disposal Cost $33

TOTAL ESTIMATED REPAIR COST $796

BUILDING 29020 SURVEY

A-1

Building 29020 Homogeneous Areas 1

1-A 12x12 floor tile (beige with brown specks) ACM

1-B Building caulkings and putties PACM

1-C Wallboard ACM

1-D Textured ceiling materials ACM

R-A Roof shingles and underlayment None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and

ACM are shown in Appendix C.

2 ACM types include:

ACM = Materials containing >1% asbestos;

Building 29020 Asbestos Survey Analytical Results1

Type

1-A 29020-1-A-01 a Yellow Mastic ND ND ND ND ND ND ND ND ND ND ND None

29020-1-A-01 b Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None

29020-1-A-01 NA Total ND None

29020-1-A-02 NA Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None

29020-1-A-03 a Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None

29020-1-A-03 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM

29020-1-A-03 NA Total 0.1 None

1-C 29020-1-C-01 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None

29020-1-C-01 b Wht Jt Cmpnd 5.00 ND ND ND 5 ND ND ND ND ND ND ACM

29020-1-C-01 c Wht Plaster ND ND ND ND ND ND ND 5 ND ND ND None

29020-1-C-01 NA Total 1.5 ACM

29020-1-C-02 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None

29020-1-C-02 b Wht Jt Cmpnd 5.00 ND ND ND 5 ND ND ND ND ND ND ACM

29020-1-C-02 NA Total 3 ACM

29020-1-C-03 a TanGrnWht Paint ND ND ND ND ND ND ND ND ND ND ND None

29020-1-C-03 b Brn Paper ND ND ND ND ND ND ND 100 ND ND ND None

29020-1-C-03 c Wht Plaster ND ND ND ND ND ND ND 5 ND ND ND None

29020-1-C-03 NA Total ND None

29020-1-C-81 a Brn Paper ND ND ND ND ND ND ND 100 ND ND ND None

29020-1-C-81 b Wht Plaster ND ND ND ND ND ND ND 5 ND ND ND None

29020-1-C-81 NA Total ND None

1-D 29020-1-D-01 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None

29020-1-D-01 b Wht Jt Cmpnd ND ND ND ND ND ND ND 2 ND ND ND None

29020-1-D-01 NA Total ND None

29020-1-D-02 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None

29020-1-D-02 b Wht Jt Cmpnd 3.00 ND ND ND 3 ND ND ND ND ND ND ACM

29020-1-D-02 c Tan Paint/Tan Jt Cmpnd ND ND ND ND ND ND ND ND ND ND ND None

29020-1-D-02 NA Total 0.75 None

29020-1-D-03 a Wht Paint ND ND ND ND ND ND ND ND ND ND ND None

29020-1-D-03 b Wht Textured Plaster 3.00 ND ND ND 3 ND ND ND ND ND ND ACM

29020-1-D-03 NA Total 1.95 ACM

R-A 29020-R-A-01 a Wht Frit/Blk Roofing ND ND ND ND ND ND ND 10 10 ND ND None

29020-R-A-01 b Brn Insltn ND ND ND ND ND ND ND 100 ND ND ND None

29020-R-A-01 NA Total ND None

29020-R-A-02 a Wht Frit/Blk Roofing ND ND ND ND ND ND ND 10 10 ND ND None

29020-R-A-02 b Brn Insltn ND ND ND ND ND ND ND 100 ND ND ND None

29020-R-A-02 NA Total ND None

29020-R-A-03 a Wht Frit/Blk Roofing ND ND ND ND ND ND ND 10 10 ND ND None

29020-R-A-03 b Brn Insltn ND ND ND ND ND ND ND 100 ND ND ND None

29020-R-A-03 NA Total ND None

1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, then that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with a ll layers containing >1% asbestos.

Am. = Amosite

Anth. = Anthophyllite

Cell. = Cellulose

Chry. = Chrysotile

Croc. = Crocidolite

Fib. = Fiberglass

ID = Identification

M.W. = Mineral wool

NA = Not applicable (sample contained single layer)

ND = Not detected (<1% asbestos)

Synth. = Synthetics

BUILDING 29020 FLOOR PLAN

Inspector, Risk Assessor, and Laboratory Licenses for Building 29020

License #

License #

License

Exp. Date

Inspected/

Sampled

29020-1-A RJ Lee Group 30-0051 02/26/98 Dave Stoetzel 60-1100 10/15/97 1/6/97

29020-1-B NA NA NA Dave Stoetzel 60-1100 10/15/97 1/6/97

29020-1-C RJ Lee Group 30-0051 02/26/98 Dave Stoetzel 60-1100 10/15/97 1/6/97

29020-1-D RJ Lee Group 30-0051 02/26/98 Dave Stoetzel 60-1100 10/15/97 1/6/97

29020-R-A RJ Lee Group 30-0051 02/26/98 Robert Saenz 60-1037 4/8/97 1/23/97

The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering sch eme:

aaaaa-b-c-xd, where:

aaaaa identifies the five-digit building number;

b identifies the subdivision within that building;

c identifies the homogeneous area;

x identifies the sample type, where:

0 = normal bulk material sample 6 = normal personnel air monitoring sample 7 = normal environmental air monitoring sample 8 = field duplicate bulk material (QC sample)

9 = QA bulk material sample

NA = Not applicable. (PACM was not sampled.)

PACM = Presumed asbestos-containing material QA = Quality assurance

REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN

RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 29020

Risk Assessment Methodology and Data

Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two

Potential for contact Physical damage

Water damage Potential for damage by repair/maintenance activities

Asbestos content;

And E = the sum of the values for the following exposure observations:

Area of damaged material Material friability Population

Activity/vibration Ventilation

Air movement Floors exposure for the ACM and PACM in Building 29020 are presented in Tables D-3 and D-

4.

TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)

TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)

Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)

Misc., Undamaged (0) >10 ft, Medium (3) High (5)

>10 ft, High (5)

3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)

31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)

>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)

501-1,000 (4)

Summary of Damage/Risk Observations for ACM and PACM in Building 29020

Damage

Potential for Damage by

Repair/Maintenance Activities

Asbestos

Content

29020-1-A Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1)

29020-1-B Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)

29020-1-C Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) Low (1) 1-30% (1)

29020-1-D Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1)

Summary of Exposure Observations for ACM and PACM in Building 29020

Area of

Damaged

29020-1-A < 3 (0) None (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent

(1)

29020-1-B < 3 (0) None (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent

(1)

29020-1-C < 3 (0) Low (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent

(1)

29020-1-D < 3 (0) None (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent

(1)

BUILDING 29021

Building 29021 f_29021.doc

1.0 INTRODUCTION

1.1 Physical Inspections

1.2 Bulk Sampling and Analysis

1.3 Sample Numbering Scheme

2.0 FACILITY DESCRIPTION

3.0 DISCUSSION OF RESULTS

4.0 RISK ASSESSMENT

5.0 ABATEMENT COST ESTIMATES

FOR BUILDING 29021 SURVEY

APPENDIX B: BUILDING 29021 FLOOR PLAN

APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN

BUILDING 29021

29021

B-1 Building 29021 Floor Plan--First Floor ..................................................................... B-1 B-2 Building 29021 Floor Plan--Second Floor ................................................................. B-2

B-3 Building 29021 Floor Plan--Third Floor .................................................................... B-3 B-4 Building 29021 Roof Plan ......................................................................................... B-4

3-1 Summary of ACM and PACM in Building 29021 4-1 Priority Rating Table for Recommended Response Actions 4-2 Building 29021 Risk Assessment Results

5-1 Building 29021 Abatement and Replacement Cost Estimates 5-2 Building 29021 Repair Cost Estimates

A-1 Building 29021 Summary of Homogeneous Areas ................................................... A-1 A-2 Building 29021 Asbestos Survey Analytical Results ................................................ A-2 B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29021 ................... B-5

D-1 Damage/Risk Values for Inspection Observations .................................................... D-2 D-2 Exposure Values for Inspection Observations ........................................................... D-2

D-3 Damage/Risk Observations for ACM and PACM in Bldg. 29021 ........................... D-3 D-4 Exposure Observations for ACM and PACM in Bldg. 29021 .................................. D-3

Photo 29021-1-B: Surfacing material; concrete ceiling throughout building except bathrooms, mechanical room, and laundry facility

Photo 29021-1-C: Wallboard and joint compound; air conditioning duct furrdowns Photo 29021-1-D: Building caulkings and putties; door and window frames

Am. Amosite Anth. Anthophyllite Cell. Cellulose

Chry. Chrysotile COR Contracting Officer’s Representative

Croc. Crocidolite D Damage/risk factor DS Dispersion staining

E Exposure factor EPA United States Environmental Protection Agency

Fib. Fiberglass GRADE Air Force Guidance for Rating Damage and Exposure ID Identification

LLC Limited liability company m Meter m2 Square meter M.W. Mineral wool N/A Not analyzed

NA Not applicable ND Not detected

O&M Operations and maintenance PACM Presumed asbestos-containing material PLM Polarized light microscopy

QA Quality assurance QC Quality control

R Risk rating RPD Relative percent difference SACM Suspect asbestos-containing material

SWD Southwest Division (Laboratory) Syn. Synthetics

T Total TDH Texas Department of Health Trem. Tremolite

• Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;

• Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;

• Identify and quantify material which is presumed to contain asbestos;

• Conduct risk assessments for all asbestos-containing materials (ACM) and presumed

ACM (PACM);

• Conduct air monitoring where necessary according to risk assessment models; and

This report presents the findings from the asbestos survey at Building 29021.

roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based

2. Perform an initial building walk-through.

a) Note fire doors/walls on the floor plan.

b) Identify homogeneous areas.

c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.

d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:

1. Mark sample locations on the floor plan using a unique identification number.

2. Record SACM sample information on a field data sheet, including:

a) Building number and room number/area description;

b) Typical occupancy and population;

c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);

d) Estimated quantity of SACM (i.e., area or length);

e) Friability;

f) Physical damage;

g) Potential for damage or disturbance during maintenance;

h) Potential cause of damage or disturbance; and

i) Unique sample identification number.

3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.

Environmental Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for

Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August 1996, point-counting was not performed. In order to meet quality assurance/quality control (QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate

8 = field duplicate (QC sample)

9 = QA sample d identifies the sample number (1,2, or 3)

[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular not separated in the field (e.g., tile and mastic associated with flooring materials.)]

Building 29021, encompassing an area of 31,698 sq ft, is an Enlisted Barracks Building built in 1975. A building floor plan is presented in Appendix B.

Building 29021 was inspected during December 1996. During this inspection, 5 homogeneous

ACM and PACM identified during the survey of Building 29021. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29021. Sample and photograph locations are presented in the Building 29021 floor plan (see Appendix B). Table B-1 contains information regarding representative photographs of each ACM and PACM identified in Building 29021.

Summary of ACM and PACM in Building 290211

1-B Surfacing material; concrete ceiling throughout building except bathrooms, mechanical room, and laundry facility

2,000 m2 None None ACM

1-C Wallboard and joint compound; air conditioning duct furrdowns

470 m2 None None ACM

1-D Building caulkings and putties; door and window frames

2.9 m2 None None PACM

1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.

Homogeneous areas 1-B, 1-C, and 1-D were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. All areas of this building were accessible to the inspection team. Incoming electrical wiring appeared to be non-ACM. Interior electrical wiring appeared to be ACM.

No field duplicate (QC) samples were collected from materials in Building 29021.

A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk

6 R < 8 2 Planned removal/repair; place in O&M program in interim 1

8 R < 10 3 Place in O&M program

Risk assessments for the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .