Technical Exhibit D - Asbestos Survey Report Solicitation 26-B-A002 Repair Barracks B29019-22.pdf
PDF 638 KB Posted
- Attached to
- Repair Barracks Buildings 29019-29022
- Solicitation number
- W91151-26-B-A002
About this file
This file is a compilation of four asbestos survey reports for buildings at Fort Hood, Texas, prepared by Radian International LLC for the U.S. Army Corps of Engineers in September 1997.
Buildings Surveyed and ACM Findings:
The reports cover Buildings 29019, 29020, 29021, and 29022 (all Enlisted Barracks constructed in 1975). Building 29019 (31,698 sq ft) identified asbestos-containing material (ACM) in ceiling texture (2,718 m²) and presumed ACM (PACM) in building caulkings/putties (3 m²), with total abatement costs estimated at $150,985. Building 29020 (42,264 sq ft) identified ACM in floor tile (3,930 m²), wallboard (418 m²), and ceiling texture (3,930 m²), plus PACM in caulkings/putties (3.9 m²), totaling $385,098 in abatement costs. Building 29021 (31,698 sq ft) contained ACM in ceiling surfacing (2,000 m²) and wallboard (470 m²), with PACM in caulkings/putties (2.9 m²), estimated at $122,164 for abatement. Building 29022 (42,264 sq ft) had ACM in floor tile (3,120 m²), wallboard (246 m²), and ceiling texture (3,928 m²), plus PACM in caulkings/putties (3.9 m²), with estimated abatement costs of $349,029.
Risk Assessment and Methodology:
All identified asbestos materials received Priority 4 ratings (no immediate action required) using the modified Air Force Guidance for Rating Damage and Exposure (GRADE) system. Materials were classified as non-friable with no physical damage, and risk ratings ranged from 9.16 to 10.17, indicating suitability for operations and maintenance programs rather than immediate removal. Samples were analyzed using polarized light microscopy and dispersion staining methods per EPA-approved protocols, with testing conducted by RJ Lee Group laboratory in Houston. The surveys included physical inspections, bulk material sampling (three samples per homogeneous area), detailed analytical results, floor plans, representative photographs, and risk assessment data. No air monitoring was required based on risk assessment models for any of the buildings.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS SURVEY REPORT
BUILDING 29019
FORT HOOD, TEXAS
Submitted to:
U.S. Army Corps of Engineers, Fort Worth District
For:
Tulsa District
Prepared by:
Radian International LLC
8501 N. Mopac Blvd.
P.O. Box 201088
Austin, Texas 78720-1088
September 1997
Asbestos Survey, Fort Hood, Texas ii September 1997
Building 29019 f_29019.doc
Table of Contents
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
APPENDIX A: HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS
FOR BUILDING 29019 SURVEY
APPENDIX B: BUILDING 29019 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 29019
APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING
29019
List of Figures
B-1 Building 29019 Floor Plan—First Floor .................................................................... B-1
B-2 Building 29019 Floor Plan—Second Floor ............................................................... B-2
B-3 Building 29019 Floor Plan—Third Floor .................................................................. B-3
B-4 Building 29019 Floor Plan—Roof ............................................................................. B-4
List of Tables
3-1 Summary of ACM and PACM in Building 29019
4-1 Priority Rating Table for Recommended Response Actions
4-2 Building 29019 Risk Assessment Results
5-1 Building 29019 Abatement and Replacement Cost Estimates
5-2 Building 29019 Repair Cost Estimates
A-1 Building 29019 Summary of Homogeneous Areas ................................................... A-1
A-2 Building 29019 Asbestos Survey Analytical Results ................................................. A-2
B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29019 ................... B-5
D-1 Damage/Risk Values for Inspection Observations .................................................... D-2
D-2 Exposure Values for Inspection Observations ........................................................... D-2
D-3 Damage/Risk Observations for ACM and PACM in Bldg. 29019 ............................ D-3
D-4 Exposure Observations for ACM and PACM in Bldg. 29019 ................................... D-3
Asbestos Survey, Fort Hood, Texas iii September 1997
List of Photographs (Appendix C)
Photo 29019-1-B: Ceiling texture; throughout building except restrooms and mechanical rooms
Photo 29019-1-D: Building caulkings and putties; door and window frames
Asbestos Survey, Fort Hood, Texas iv September 1997
Acronyms and Abbreviations
ACM Asbestos-containing material
Act. Actinolite
Am. Amosite
Anth. Anthophyllite
Cell. Cellulose
Chry. Chrysotile
COR Contracting Officer’s Representative
Croc. Crocidolite
D Damage/risk factor
DS Dispersion staining
E Exposure factor
EPA United States Environmental Protection Agency
Fib. Fiberglass
GRADE Air Force Guidance for Rating Damage and Exposure
ID Identification
LLC Limited liability company m Meter m2 Square meter
M.W. Mineral wool
N/A Not analyzed
NA Not applicable
ND Not detected
O&M Operations and maintenance
PACM Presumed asbestos-containing material
PLM Polarized light microscopy
QA Quality assurance
QC Quality control
R Risk rating
RPD Relative percent difference
SACM Suspect asbestos-containing material
SWD Southwest Division (Laboratory)
Syn. Synthetics
T Total
TDH Texas Department of Health
Trem. Tremolite
TSI Thermal systems insulation
USACE United States Army Corps of Engineers
Asbestos Survey, Fort Hood, Texas September 1997
1.0 INTRODUCTION
Radian International LLC, under contract with the United States Army Corps of Engineers
(USACE), Contract DACA56-94-D-0015, performed a facility-wide asbestos survey at Fort
Hood, Texas, to meet the following project objectives:
Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-containing materials (SACM);
Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
Identify and quantify material which is presumed to contain asbestos;
Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
Conduct air monitoring where necessary according to risk assessment models; and
Prepare an Operations and Maintenance (O&M) program (under separate cover) for all
ACM and PACM.
The survey included base buildings and approximately 10% of the family housing buildings at
Fort Hood. Mr. Emmet Gray, Directorate of Public Works, is the post contact for this project.
This report presents the findings from the asbestos survey at Building 29019.
1.1 Physical Inspections
Survey teams visually inspected the accessible areas of the interior and exterior of each building, including interior and exterior rooms, mechanical spaces, storage areas, crawl spaces, attics, and roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based on the visual inspection of the remainder of the building and interviews with the building occupants.
The following steps were taken to complete physical inspections.
1. Obtain a copy of the building floor plan.
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and conditions present at the time of the survey.
e) Define the bulk sample locations.
1.2 Bulk Sampling and Analysis
Homogeneous materials were categorized by the survey teams as surfacing materials, thermal systems insulation (TSI), or miscellaneous materials. Building age, use, and size were taken into consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:
1. Mark sample locations on the floor plan using a unique identification number.
2. Record SACM sample information on a field data sheet, including:
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
4. Repair any damage caused by sampling using sealants and methods approved by the
Contracting Officer’s Representative (COR).
Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental
Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August
1996, point-counting was not performed. In order to meet quality assurance/quality control
(QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ
Lee Group laboratory. The third sample is the QA sample that was sent to the USACE
Southwestern Division Laboratory (SWD) in Dallas, Texas.
1.3 Sample Numbering Scheme
Unique identification numbers were assigned to each sample using the following numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal sample
8 = field duplicate (QC sample)
9 = QA sample d identifies the sample number (1,2, or 3)
[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular building. When necessary, “e” is used by the laboratory to identify additional layers of material not separated in the field (e.g., tile and mastic associated with flooring materials.)]
2.0 FACILITY DESCRIPTION
Building 29019, encompassing an area of 31,698 sq ft, is an Enlisted Barracks (without dining area) built in 1975. A building floor plan is presented in Appendix B.
3.0 DISCUSSION OF RESULTS
Building 29019 was inspected during December 1996. During this inspection, 5 homogeneous areas were identified and 12 normal samples were collected. Table 3-1 presents a summary of
ACM and PACM identified during the survey of Building 29019. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29019. Sample and photograph locations are presented in the Building 29019 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 29019.
Table 3-1
Summary of ACM and PACM in Building 290191
Homogeneous Area Area/Length Physical ACM
ID Description & Location Estimate Units Damage Friability Type
1-B Ceiling texture; throughout building except restrooms and mechanical rooms
2,718 m2 None None ACM
1-D Building caulkings and putties; door and window frames
3 m2 None None PACM
1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
m2 = Square meter
Homogeneous areas 1-B and 1-D were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. All areas of this building were accessible to the field inspection team. Interior and incoming electrical wiring appeared to be non-ACM.
No field duplicate (QC) samples were collected from materials in this building.
4.0 RISK ASSESSMENT
A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and
Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D) and exposure factors (E). These factors are summed and placed in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)].
Table 4-1 was used to establish a priority rating for each homogeneous area, based on the risk rating or “R” value.
Table 4-1
Priority Rating Table for Recommended Response Actions
Risk Rating (R) Priority Recommended Response Action
R < 6 1 Immediate removal/repair
6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program
R 10 4 No action required; place in O&M program as a precaution 1 If material is repaired, it will remain in the O&M program until it is removed.
O&M = Operations and maintenance
R = Risk Rating
Risk assessments for the homogeneous areas identified as ACM or PACM in Building 29019 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these factors is also provided in Appendix D. No air sampling was required in this building based on risk assessment models.
Table 4-2
Building 29019 Risk Assessment Results
Homogeneous Area ACM Risk
ID Description & Location Type Rating (R) Priority
1-B Ceiling texture; throughout building except restrooms and mechanical rooms
ACM 9.16 4a
1-D Building caulkings and putties; door and window frames PACM 10.17 4a a Priority rating is 4 because material is not friable.
5.0 ABATEMENT COST ESTIMATES
Abatement cost estimates are based on professional experience and costs from 1996 Fort Hood asbestos abatement contracts. Cost estimates were developed using the unit costs for abatement of the general category of material and the estimated area of identified ACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.
Cost estimates were developed using the assumption that all materials within a building would be abated concurrently. In addition, costs are based on the assumption that all ACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM in Building 29019 are presented in
Tables 5-1 and 5-2.
Table 5-1
Building 29019 Abatement and Replacement Cost Estimates
Homogeneous Area Area/Length Unit Cost for Total Cost
ID Description & Location Estimate Units Abatement ($)
1-B Ceiling texture; throughout building except restrooms and mechanical rooms
2,700 m2 $37.66/m2 $101,682
1-D Building caulkings and putties; door and window frames
3 m2 $107.60/m2 $323
Subtotal $102,005
Design Fee (6%) $6,120
Air Monitoring Cost (10%) $10,200
Materials Replacement $21,857
Off-site Disposal Cost $10,803
TOTAL ESTIMATED ABATEMENT COST $150,985
Table 5-2
Building 29019 Repair Cost Estimates
Homogeneous Area
Approximate
Damaged
Area/Length
Unit Cost for
Total Cost
ID Description & Location Estimate Units Repair ($)
1-B Ceiling texture; throughout building except restrooms and mechanical rooms
14 m2 $37.66/m2 $527
1-D Building caulkings and putties; door and window frames
3 m2 $107.60/m2 $323
Subtotal $850
Design Fee (6%) $51
Air Monitoring Cost (10%) $85
Materials Replacement $181
Off-site Disposal Cost $59
TOTAL ESTIMATED REPAIR COST $1,226
APPENDIX A
HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS FOR
BUILDING 29019 SURVEY
A-1
Table A-1
Building 29019 Homogeneous Areas 1
Homogeneous Area ACM
ID Description & Location Type 2
1-A 12x12 floor tile; throughout building, except restrooms and mechanical room None
1-B Ceiling texture; throughout building except restrooms and mechanical rooms ACM
1-C Wallboard and joint compound; furrdowns in each room and hall None
1-D Building caulkings and putties; door and window frames PACM
R-A Roof shingles and underlayment None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and
ACM are shown in Appendix C.
2 ACM types include:
ACM = Materials containing >1% asbestos;
None = Materials containing 1% asbestos; and
PACM = Materials presumed to contain >1% asbestos.
ACM = Asbestos-containing material
ID = Identification
PACM = Presumed asbestos-containing material
Table A-2
Building 29019 Asbestos Survey Analytical Results1
Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)
Area
ID
Sample ID
Layer
Layer Description
(from Laboratory)
Total
Act
Am
Anth
Chry
Croc
Trem
Cell
Fib
M.W.
Synth
ACM
Type
1-A 29019-1-A-01 NA Wht Floor Tile ND ND ND ND ND ND ND 5 ND ND ND None
29019-1-A-02 NA Wht Floor Tile ND ND ND ND ND ND ND 8 ND ND ND None
29019-1-A-03 NA Wht Floor Tile ND ND ND ND ND ND ND 10 ND ND ND None
1-B 29019-1-B-01 NA Wht Texture 15.00 ND ND ND 15 ND ND 2 ND ND ND ACM
29019-1-B-02 NA Wht Texture 15.00 ND ND ND 15 ND ND 1 ND ND ND ACM
29019-1-B-03 NA Wht Texture 20.00 ND ND ND 20 ND ND 2 ND ND ND ACM
1-C 29019-1-C-01 a Wht Drywall/Brn Paper ND ND ND ND ND ND ND 20 ND ND ND None
29019-1-C-01 b Wht Jt Cmpnd/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None
29019-1-C-01 NA Total ND None
29019-1-C-02 a Wht Drywall/Brn Paper ND ND ND ND ND ND ND 20 ND ND ND None
29019-1-C-02 b Wht Jt Cmpnd/Wht Paint ND ND ND ND ND ND ND ND ND ND ND None
29019-1-C-02 NA Total ND None
29019-1-C-03 a Wht Drywall/Brn Paper ND ND ND ND ND ND ND 15 ND ND ND None
29019-1-C-03 b Wht Jt Cmpnd/Wht Paint 0.90 ND ND ND 0.9 ND ND 5 ND ND ND None
29019-1-C-03 NA Total 0.01 None
R-A 29019-R-A-01 a Blk Tar ND ND ND ND ND ND ND 8 12 ND ND None
29019-R-A-01 b Tan Fibers ND ND ND ND ND ND ND 80 ND ND ND None
29019-R-A-01 c Wht Frit ND ND ND ND ND ND ND ND ND ND ND None
29019-R-A-01 NA Total ND None
29019-R-A-02 a Blk Tar ND ND ND ND ND ND ND 5 10 ND ND None
29019-R-A-02 b Tan Fibers ND ND ND ND ND ND ND 90 ND ND ND None
29019-R-A-02 c Wht Frit ND ND ND ND ND ND ND ND ND ND ND None
29019-R-A-02 NA Total ND None
29019-R-A-03 a Blk Tar ND ND ND ND ND ND ND 6 15 ND ND None
29019-R-A-03 b Tan Fibers ND ND ND ND ND ND ND 75 ND ND ND None
29019-R-A-03 c Wht Frit ND ND ND ND ND ND ND ND ND ND ND None
29019-R-A-03 NA Total ND None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, than that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.
Act. = Actinolite
Am. = Amosite
Anth. = Anthophyllite
Cell. = Cellulose
Chry. = Chrysotile
Croc. = Crocidolite
Fib. = Fiberglass
ID = Identification
M.W. = Mineral wool
NA = Not applicable
ND = Not detected (<1% asbestos)
Synth. = Synthetics
T = Total
Trem. = Tremolite
APPENDIX B
BUILDING 29019 FLOOR PLAN
Asbestos Survey, Fort Hood, Texas B-5 September 1997
Table B-1
Inspector, Risk Assessor, and Laboratory Licenses for Building 29019
Building and Analytical Laboratory Building Inspector/Risk Assessor Date
Homogeneous
Area ID1
Name
TDH
License #
License
Exp. Date
License #
License
Exp. Date
Inspected/
Sampled
29019-1-A RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 12/9/96
29019-1-B RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 12/9/96
29019-1-C RJ Lee Group 30-0051 02/26/97 Jody Bass 60-1096 10/9/97 12/9/96
29019-1-D NA NA NA Jody Bass 60-1096 10/9/97 12/9/96
29019-R-A RJ Lee Group 30-0051 02/26/97 Dave Stoetzel 60-1100 10/15/97 12/11/96 1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal bulk material sample
6 = normal personnel air monitoring sample
7 = normal environmental air monitoring sample
8 = field duplicate bulk material (QC sample)
9 = QA bulk material sample d identifies the sample number (1, 2, or 3);
[Note: “b-c” represents the unique homogeneous area ID for a particular building.]
NA = Not applicable. (PACM was not sampled.)
PACM = Presumed asbestos-containing material
QA = Quality assurance
QC = Quality control
TDH = Texas Department of Health
APPENDIX C
REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN BUILDING
29019
APPENDIX D
RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 29019
Asbestos Survey, Fort Hood, Texas D-1 September 1997
Appendix D
Risk Assessment Data and Methodology identified within the building using a modified version of the Air Force Guideline for
Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D), and exposure factors (E). These factors are summed and used in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)];
Where D = the sum of the values for the following damage/risk observations:
Material type
Potential for contact
Physical damage
Water damage
Potential for damage by repair/maintenance activities
Asbestos content;
And E = the sum of the values for the following exposure observations:
Area of damaged material
Material friability
Population
Activity/vibration
Ventilation
Air movement
Floors
Walls
Barriers
A further breakdown of the values for the subunits under each category is provided in
Tables D-1 and D-2. Summaries of the inspection observations for damage/risk and exposure for the ACM and PACM in Building 29019 are presented in Tables D-3 and D-
4.
Table D-1
Damage/Risk Values for Inspection Observations 1
Material Type
Potential for Contact
Physical
Damage
Water Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos Content
Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) >1-30% (1)
TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)
TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)
Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)
Misc., Undamaged (0) >10 ft, Medium (3) High (5)
>10 ft, High (5) 1 The value assigned to each category is shown in italics.
TSI = Thermal systems insulation
Table D-2
Exposure Values for Inspection Observations 1
Area of
Material
(m or m2)
Friability
Population
Activity/
Vibration
Interior
Ventilation
Air
Movement
Floors
<3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Smooth (1) Permanent (1)
3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)
31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)
>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)
501-1,000 (4)
>1,000 (5)
Table D-3
Summary of Damage/Risk Observations for ACM and PACM in Building 29019
Potential for
Contact
Physical Damage
Water
Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos
Content
29019-1-B Surfacing (4) <10 ft, Low (2) None (0) No (0) Low (1) 1-30% (1)
29019-1-D Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)
Table D-4
Summary of Exposure Observations for ACM and PACM in Building 29019
Area of
Damaged
Activity
29019-1-B 3-30 (1) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)
29019-1-D < 3 (0) None (0) 10-200 (2) Low (0) None (0) None (0) Smooth (1) Smooth (1) None (4)
BUILDING 29020
Building 29020 f_29020.doc
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
FOR BUILDING 29020 SURVEY
APPENDIX B: BUILDING 29020 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 29020
APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR
B-1 Building 29020 Floor Plan--First Floor ..................................................................... B-1
B-2 Building 29020 Floor Plan--Second Floor ................................................................. B-2 B-3 Building 29020 Floor Plan--Third Floor .................................................................... B-3
B-4 Building 29020 Roof Plan ......................................................................................... B-4
3-1 Summary of ACM and PACM in Building 29020
4-1 Priority Rating Table for Recommended Response Actions 4-2 Building 29020 Risk Assessment Results 5-1 Building 29020 Abatement and Replacement Cost Estimates
5-2 Building 29020 Repair Cost Estimates A-1 Building 29020 Homogeneous Areas ........................................................................ A-1
A-2 Building 29020 Asbestos Survey Analytical Results ................................................ A-2 B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29020 ................... B-5 D-1 Damage/Risk Values for Inspection Observations .................................................... D-2
D-2 Exposure Values for Inspection Observations ........................................................... D-2 D-3 Summary of Damage/Risk Observations for ACM and PACM in Bldg. 29020 ...... D-3
D-4 Summary of Exposure Observations for ACM and PACM in Bldg. 29020 ............. D-3
Photo 29020-1-A: 12x12 floor tile (beige with brown specks) Photo 29020-1-B: Building caulkings and putties
Photo 29020-1-C: Wallboard Photo 29020-1-D: Textured ceiling materials
Am. Amosite Anth. Anthophyllite Cell. Cellulose
Chry. Chrysotile COR Contracting Officer’s Representative
Croc. Crocidolite D Damage/risk factor DS Dispersion staining
E Exposure factor EPA United States Environmental Protection Agency
Fib. Fiberglass GRADE Air Force Guidance for Rating Damage and Exposure ID Identification
LLC Limited liability company m Meter m2 Square meter M.W. Mineral wool N/A Not analyzed
NA Not applicable ND Not detected
O&M Operations and maintenance PACM Presumed asbestos-containing material PLM Polarized light microscopy
QA Quality assurance QC Quality control
R Risk rating RPD Relative percent difference SACM Suspect asbestos-containing material
SWD Southwest Division (Laboratory) Syn. Synthetics
T Total TDH Texas Department of Health Trem. Tremolite
• Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-
• Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
• Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
• Identify and quantify material which is presumed to contain asbestos;
• Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
• Conduct air monitoring where necessary according to risk assessment models; and
• Prepare an Operations and Maintenance (O&M) program (under separate cover) for all
This report presents the findings from the asbestos survey at Building 29020.
roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:
1. Mark sample locations on the floor plan using a unique identification number.
2. Record SACM sample information on a field data sheet, including:
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for
Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August 1996, point-counting was not performed. In order to meet quality assurance/quality control (QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ Lee Group laboratory. The third sample is the QA sample that was sent to the USACE Southwestern Division Laboratory (SWD) in Dallas, Texas.
x identifies the sample type, where:
0 = normal sample
8 = field duplicate (QC sample)
9 = QA sample d identifies the sample number (1,2, or 3)
[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular not separated in the field (e.g., tile and mastic associated with flooring materials)].
Building 29020, encompassing an area of 42,264 sq ft, is an Enlisted Barracks (without Dining) built in 1975. A building floor plan is presented in Appendix B.
Building 29020 was inspected during January 1997. During this inspection, 5 homogeneous
ACM and PACM identified during the survey of Building 29020. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29020. Sample and photograph locations are presented in the Building 29020 floor plan (see Appendix B). Table B-1 contains information regarding representative photographs of each ACM and PACM identified in Building 29020.
Summary of ACM and PACM in Building 290201
1-A 12x12 floor tile (beige with brown specks) 3930 m2 None None ACM
1-B Building caulkings and putties 3.9 m2 None None PACM
1-C Wallboard 418 m2 None Low ACM
1-D Textured ceiling materials 3930 m2 None None ACM 1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
Homogeneous areas 1-A, 1-B, 1-C, and 1-D were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. All areas of this building were accessible to the inspection team. No interior or incoming electrical wiring was observed during the building inspection.
A field duplicate (QC) sample was collected at location 29020-1-C-01. The QC sample and normal sample yielded different asbestos results, but these are a result of different layers being found in each sample. The results of analysis for the QC sample indicated asbestos levels less than 1% (non-detect) in the brown paper and white plaster. The white plaster analyzed in the normal sample (29020-1-C-01) also did not have asbestos levels greater than 1 percent. Brown paper was not found in the normal sample, but brown paper was found in the sample collected at
29020-1-C-03. Analytical results for the brown paper in this sample also did not have asbestos levels greater than 1 percent.
The normal sample (29020-1-C-01) also had tan paint and white joint compound, which was not analyzed in the QC sample. The tan paint did not have asbestos levels greater than 1 percent, but the white joint compound had asbestos levels of 5 percent. These results are consistent with the analytical results for the other samples collected from this homogeneous area.
identified within the building using a modified version of the Air Force Guidance for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk
6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program
Risk assessments for the homogeneous areas identified as ACM or PACM in Building 29020 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these
Building 29020 Risk Assessment Results
1-A 12x12 floor tile (beige with brown specks) ACM 10.17 4a
1-B Building caulkings and putties PACM 10.17 4a
1-C Wallboard ACM 10 4
1-D Textured ceiling materials ACM 9.5 4a of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.
abated concurrently. In addition, costs are based on the assumption that all ACM and/or PACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM and/or PACM in Building 29020 are presented in Tables 5-1 and 5-2.
Building 29020 Abatement and Replacement Cost Estimates
1-A 12x12 floor tile (beige with brown specks) 3930 m2 $18.83/m2 $74,002
1-B Building caulkings and putties 3.9 m2 $107.60/m2 $420
1-C Wallboard 418 m2 $10.76/m2 $4,498
1-D Textured ceiling materials 3930 m2 $37.66/m2 $148,004
Subtotal $226,924
Design Fee (6%) $13,615
Air Monitoring Cost (10%) $22,692
Materials Replacement $96,611
Off-site Disposal Cost $25,256
TOTAL ESTIMATED ABATEMENT COST $385,098
Building 29020 Repair Cost Estimates
1-A 12x12 floor tile (beige with brown specks) 3 m2 $18.83/m2 $56
1-B Building caulkings and putties 3 m2 $107.60/m2 $323
1-C Wallboard 3 m2 $10.76/m2 $32
1-D Textured ceiling materials 3 m2 $37.66/m2 $113
Subtotal $524
Design Fee (6%) $31
Air Monitoring Cost (10%) $52
Materials Replacement $156
Off-site Disposal Cost $33
TOTAL ESTIMATED REPAIR COST $796
BUILDING 29020 SURVEY
A-1
Building 29020 Homogeneous Areas 1
1-A 12x12 floor tile (beige with brown specks) ACM
1-B Building caulkings and putties PACM
1-C Wallboard ACM
1-D Textured ceiling materials ACM
R-A Roof shingles and underlayment None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and
ACM are shown in Appendix C.
2 ACM types include:
ACM = Materials containing >1% asbestos;
Building 29020 Asbestos Survey Analytical Results1
Type
1-A 29020-1-A-01 a Yellow Mastic ND ND ND ND ND ND ND ND ND ND ND None
29020-1-A-01 b Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None
29020-1-A-01 NA Total ND None
29020-1-A-02 NA Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None
29020-1-A-03 a Tan Floor Tile ND ND ND ND ND ND ND 2 ND ND ND None
29020-1-A-03 b Blk Mastic 5.00 ND ND ND 5 ND ND ND ND ND ND ACM
29020-1-A-03 NA Total 0.1 None
1-C 29020-1-C-01 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29020-1-C-01 b Wht Jt Cmpnd 5.00 ND ND ND 5 ND ND ND ND ND ND ACM
29020-1-C-01 c Wht Plaster ND ND ND ND ND ND ND 5 ND ND ND None
29020-1-C-01 NA Total 1.5 ACM
29020-1-C-02 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29020-1-C-02 b Wht Jt Cmpnd 5.00 ND ND ND 5 ND ND ND ND ND ND ACM
29020-1-C-02 NA Total 3 ACM
29020-1-C-03 a TanGrnWht Paint ND ND ND ND ND ND ND ND ND ND ND None
29020-1-C-03 b Brn Paper ND ND ND ND ND ND ND 100 ND ND ND None
29020-1-C-03 c Wht Plaster ND ND ND ND ND ND ND 5 ND ND ND None
29020-1-C-03 NA Total ND None
29020-1-C-81 a Brn Paper ND ND ND ND ND ND ND 100 ND ND ND None
29020-1-C-81 b Wht Plaster ND ND ND ND ND ND ND 5 ND ND ND None
29020-1-C-81 NA Total ND None
1-D 29020-1-D-01 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29020-1-D-01 b Wht Jt Cmpnd ND ND ND ND ND ND ND 2 ND ND ND None
29020-1-D-01 NA Total ND None
29020-1-D-02 a Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
29020-1-D-02 b Wht Jt Cmpnd 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29020-1-D-02 c Tan Paint/Tan Jt Cmpnd ND ND ND ND ND ND ND ND ND ND ND None
29020-1-D-02 NA Total 0.75 None
29020-1-D-03 a Wht Paint ND ND ND ND ND ND ND ND ND ND ND None
29020-1-D-03 b Wht Textured Plaster 3.00 ND ND ND 3 ND ND ND ND ND ND ACM
29020-1-D-03 NA Total 1.95 ACM
R-A 29020-R-A-01 a Wht Frit/Blk Roofing ND ND ND ND ND ND ND 10 10 ND ND None
29020-R-A-01 b Brn Insltn ND ND ND ND ND ND ND 100 ND ND ND None
29020-R-A-01 NA Total ND None
29020-R-A-02 a Wht Frit/Blk Roofing ND ND ND ND ND ND ND 10 10 ND ND None
29020-R-A-02 b Brn Insltn ND ND ND ND ND ND ND 100 ND ND ND None
29020-R-A-02 NA Total ND None
29020-R-A-03 a Wht Frit/Blk Roofing ND ND ND ND ND ND ND 10 10 ND ND None
29020-R-A-03 b Brn Insltn ND ND ND ND ND ND ND 100 ND ND ND None
29020-R-A-03 NA Total ND None
1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, then that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with a ll layers containing >1% asbestos.
Am. = Amosite
Anth. = Anthophyllite
Cell. = Cellulose
Chry. = Chrysotile
Croc. = Crocidolite
Fib. = Fiberglass
ID = Identification
M.W. = Mineral wool
NA = Not applicable (sample contained single layer)
ND = Not detected (<1% asbestos)
Synth. = Synthetics
BUILDING 29020 FLOOR PLAN
Inspector, Risk Assessor, and Laboratory Licenses for Building 29020
License #
License #
License
Exp. Date
Inspected/
Sampled
29020-1-A RJ Lee Group 30-0051 02/26/98 Dave Stoetzel 60-1100 10/15/97 1/6/97
29020-1-B NA NA NA Dave Stoetzel 60-1100 10/15/97 1/6/97
29020-1-C RJ Lee Group 30-0051 02/26/98 Dave Stoetzel 60-1100 10/15/97 1/6/97
29020-1-D RJ Lee Group 30-0051 02/26/98 Dave Stoetzel 60-1100 10/15/97 1/6/97
29020-R-A RJ Lee Group 30-0051 02/26/98 Robert Saenz 60-1037 4/8/97 1/23/97
The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering sch eme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal bulk material sample 6 = normal personnel air monitoring sample 7 = normal environmental air monitoring sample 8 = field duplicate bulk material (QC sample)
9 = QA bulk material sample
NA = Not applicable. (PACM was not sampled.)
PACM = Presumed asbestos-containing material QA = Quality assurance
REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 29020
Risk Assessment Methodology and Data
Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two
Potential for contact Physical damage
Water damage Potential for damage by repair/maintenance activities
Asbestos content;
And E = the sum of the values for the following exposure observations:
Area of damaged material Material friability Population
Activity/vibration Ventilation
Air movement Floors exposure for the ACM and PACM in Building 29020 are presented in Tables D-3 and D-
4.
TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)
TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)
Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)
Misc., Undamaged (0) >10 ft, Medium (3) High (5)
>10 ft, High (5)
3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)
31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)
>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)
501-1,000 (4)
Summary of Damage/Risk Observations for ACM and PACM in Building 29020
Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos
Content
29020-1-A Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1)
29020-1-B Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)
29020-1-C Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) Low (1) 1-30% (1)
29020-1-D Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) 1-30% (1)
Summary of Exposure Observations for ACM and PACM in Building 29020
Area of
Damaged
29020-1-A < 3 (0) None (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent
(1)
29020-1-B < 3 (0) None (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent
(1)
29020-1-C < 3 (0) Low (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent
(1)
29020-1-D < 3 (0) None (0) 201-500 (3) Low (0) None (0) None (0) Smooth (1) Pitted (3) Permanent
(1)
BUILDING 29021
Building 29021 f_29021.doc
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
FOR BUILDING 29021 SURVEY
APPENDIX B: BUILDING 29021 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 29021
29021
B-1 Building 29021 Floor Plan--First Floor ..................................................................... B-1 B-2 Building 29021 Floor Plan--Second Floor ................................................................. B-2
B-3 Building 29021 Floor Plan--Third Floor .................................................................... B-3 B-4 Building 29021 Roof Plan ......................................................................................... B-4
3-1 Summary of ACM and PACM in Building 29021 4-1 Priority Rating Table for Recommended Response Actions 4-2 Building 29021 Risk Assessment Results
5-1 Building 29021 Abatement and Replacement Cost Estimates 5-2 Building 29021 Repair Cost Estimates
A-1 Building 29021 Summary of Homogeneous Areas ................................................... A-1 A-2 Building 29021 Asbestos Survey Analytical Results ................................................ A-2 B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 29021 ................... B-5
D-1 Damage/Risk Values for Inspection Observations .................................................... D-2 D-2 Exposure Values for Inspection Observations ........................................................... D-2
D-3 Damage/Risk Observations for ACM and PACM in Bldg. 29021 ........................... D-3 D-4 Exposure Observations for ACM and PACM in Bldg. 29021 .................................. D-3
Photo 29021-1-B: Surfacing material; concrete ceiling throughout building except bathrooms, mechanical room, and laundry facility
Photo 29021-1-C: Wallboard and joint compound; air conditioning duct furrdowns Photo 29021-1-D: Building caulkings and putties; door and window frames
Am. Amosite Anth. Anthophyllite Cell. Cellulose
Chry. Chrysotile COR Contracting Officer’s Representative
Croc. Crocidolite D Damage/risk factor DS Dispersion staining
E Exposure factor EPA United States Environmental Protection Agency
Fib. Fiberglass GRADE Air Force Guidance for Rating Damage and Exposure ID Identification
LLC Limited liability company m Meter m2 Square meter M.W. Mineral wool N/A Not analyzed
NA Not applicable ND Not detected
O&M Operations and maintenance PACM Presumed asbestos-containing material PLM Polarized light microscopy
QA Quality assurance QC Quality control
R Risk rating RPD Relative percent difference SACM Suspect asbestos-containing material
SWD Southwest Division (Laboratory) Syn. Synthetics
T Total TDH Texas Department of Health Trem. Tremolite
• Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
• Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
• Identify and quantify material which is presumed to contain asbestos;
• Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
• Conduct air monitoring where necessary according to risk assessment models; and
This report presents the findings from the asbestos survey at Building 29021.
roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:
1. Mark sample locations on the floor plan using a unique identification number.
2. Record SACM sample information on a field data sheet, including:
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
Environmental Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for
Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August 1996, point-counting was not performed. In order to meet quality assurance/quality control (QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate
8 = field duplicate (QC sample)
9 = QA sample d identifies the sample number (1,2, or 3)
[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular not separated in the field (e.g., tile and mastic associated with flooring materials.)]
Building 29021, encompassing an area of 31,698 sq ft, is an Enlisted Barracks Building built in 1975. A building floor plan is presented in Appendix B.
Building 29021 was inspected during December 1996. During this inspection, 5 homogeneous
ACM and PACM identified during the survey of Building 29021. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 29021. Sample and photograph locations are presented in the Building 29021 floor plan (see Appendix B). Table B-1 contains information regarding representative photographs of each ACM and PACM identified in Building 29021.
Summary of ACM and PACM in Building 290211
1-B Surfacing material; concrete ceiling throughout building except bathrooms, mechanical room, and laundry facility
2,000 m2 None None ACM
1-C Wallboard and joint compound; air conditioning duct furrdowns
470 m2 None None ACM
1-D Building caulkings and putties; door and window frames
2.9 m2 None None PACM
1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
Homogeneous areas 1-B, 1-C, and 1-D were identified as containing ACM or PACM. The risk assessment and abatement cost estimates for these materials are further discussed in Sections 4 and 5. All areas of this building were accessible to the inspection team. Incoming electrical wiring appeared to be non-ACM. Interior electrical wiring appeared to be ACM.
No field duplicate (QC) samples were collected from materials in Building 29021.
A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk
6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program
Risk assessments for the…