Repair Barracks Buildings 29019-29022
Solicitation number
W91151-26-B-A002
Issued by

About this file

This is a Project Synopsis for a barracks repair contract at Fort Hood, Texas, involving four multi-story residential buildings (29019, 29020, 29021, and 29022) located at 166 N Pleiku Drive. The project requires comprehensive repairs to sustainment items including walls, painting, ceiling fans, sinks, faucets, showerheads, tubs, toilet seals, cabinets, light fixtures, cover plates, and surface repairs to walls and floors. The performance period is 210 calendar days, with buildings remaining unoccupied during the 180-day on-site work requirement. The contractor must obtain all necessary permits, provide equipment, materials, tools, labor, and supervision, and survey existing conditions prior to proposal development. Specific tasks include adjusting doors, removing and replacing door signs, prepping and painting all suites, demolishing and installing approximately 25 square feet of flooring, removing and replacing approximately 25 linear feet of cove base, repairing formica laminate countertops, and machine cleaning grout in restrooms and laundry areas.

The electrical scope requires removing and replacing LED lighting, with ivory cover plates for switches and receptacles, and installation of 75 ceiling fans, 35 kitchen vanity lights, and 75 closet lights (revisions from original contract drawings). Additional requirements include cleaning all HVAC grilles and registers, mold remediation consisting of drywall demolition and replacement with matching materials, and comprehensive site cleanup including deep cleaning of latrines and interior windows. The contractor must coordinate with the Contracting Officer's Representative and Site Point of Contact, maintain a clean work area with daily debris removal, and complete final inspections before project conclusion. The contract is a firm fixed-price arrangement with the Contracting Officer as the sole authority to obligate the Government.

View the file

Other files

File Type Posted
W9115126BA002 Repair Barracks 29019-22 and 24 - Abstract of Offers.pdf PDF
W9115126BA002 Repair Barracks 29019-22 and 24 - Bid Opening Sign In Roster.pdf PDF
Attachment 4 - RFI Responses W9115126BA002 Repair Barracls B29019-29022 and 29024.pdf PDF
Amendment 02 Solicitation W9115126BA0020001 Repair Barracks 29019-29024.pdf PDF
W9115126BA002 - Site Visit Sign In Roster 24 Mar 26.pdf PDF
W9115126BA002 - Site Visit Agenda 24 March 2026.pdf PDF
Amendment 01 Solicitation W9115126BA0020001 Repair Barracks 29019-29024.pdf PDF
Attachment 2 - Revised Project Synopsis Solicitation 26-B-A002 Repair Barracks B29019 20 2122 24.pdf PDF
Technical Exhibit B - Revised Drawings Solicitation 26-B-A002 Repair Barracks B29019-24.pdf PDF
Technical Exhibit A - Specifications Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Technical Exhibit D - Asbestos Survey Report Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Solicitation W9115126BA002 Repair Barracks B29019-22.pdf PDF
Attachment 1-Appendix A Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Technical Exhibit C - AS-BUILTS Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Attachment 3 - Wage Determination Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Technical Exhibit B - Drawings Solicitation 26-B-A002 Repair Barracks B29019-22.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SYNOPSIS

REPAIR BARRACKS

Buildings 29019, 29020, 29021, and 29022 Project No. AD211395J

DESCRIPTION OF WORK:

The work shall be located at Buildings 29019, 29020, 29021, and 29022, located at 166 N Pleiku Drive, Fort Hood Texas. The building/area will not be occupied during the 180 days of on-site performance of work under this Contract.

The purpose of this project is to repair sustainment items in barracks while soldiers are deployed to include but not limited to: walls, painting, ceiling fans, sinks, faucets, showerheads, tubs, toilet seals, cabinets, light fixtures, cover plates, surfaces repair to walls and floors, etc.

The following drawings are included as part of the Solicitation.

G-101 COVER SHEET

A-101 BLDG. 29019 1ST FLOOR SECTION I

A-102 BLDG. 29019 1ST FLOOR SECTION II

A-103 BLDG. 29019 2ND FLOOR SECTION I

A-104 BLDG. 29019 2ND FLOOR SECTION II

A-105 BLDG. 29019 3RD FLOOR SECTION I

A-106 BLDG. 29019 3RD FLOOR SECTION II

A-107 BLDG. 29020 1ST FLOOR SECTION I

A-108 BLDG. 29020 1ST FLOOR SECTION II

A-109 BLDG. 29020 2ND FLOOR SECTION I

A-110 BLDG. 29020 2ND FLOOR SECTION II

A-111 BLDG. 29020 3RD FLOOR SECTION I

A-112 BLDG. 29020 3RD FLOOR SECTION II

A-113 BLDG. 29021 1ST FLOOR SECTION I

A-114 BLDG. 29021 1ST FLOOR SECTION II

A-115 BLDG. 29021 2ND FLOOR SECTION I

A-116 BLDG. 29021 2ND FLOOR SECTION II

A-117 BLDG. 29021 3RD FLOOR SECTION I

A-118 BLDG. 29021 3RD FLOOR SECTION II

A-119 BLDG. 29022 1ST FLOOR SECTION I

A-120 BLDG. 29022 1st FLOOR SECTION II A-121 BLDG. 29022 2nd FLOOR SECTION I A-122 BLDG. 29022 2nd FLOOR SECTION II A-123 BLDG. 29022 3rd FLOOR SECTION I A-124 BLDG. 29022 3rd FLOOR SECTION II

E-101 LIGHTING FIXTURE SCHEDULE

After award, one set of Adobe PDF contract drawings and PDF specifications, and one set of MicroStation format drawings (if available) will be furnished to the Contractor. Reference publications will not be furnished. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.

A project construction sign will not be required for this project. Contractor shall keep all permits and other documents required to be on the job site in a 3-ring binder or posed on a bulletin board within the construction area.

PERFORMANCE PERIOD: Barring any contingencies that arise during, the Government requires this project be completed within 210 calendar days. Completion is defined as completion of all contractual obligations.

IDENTIFICATION OF THE PROCUREMENT TEAM:

Contracting Officer (ACO): The Contracting Officer has sole authority to obligate the Government.

Contracting Officer's Representative (COR): The COR is appointed by the Contracting Officer and serves as the Government's technical representative and primary point of contact in the field following contract award. The COR will inspect various phases of work in progress to ensure the 3-phase inspection plan is in place and being adhered to. The COR will perform all inspection and acceptance on behalf of the Government for this project.

Project Manager: The Project Manager developed and reviewed this requirement and will participate in further developing the project through negotiation of a firm fixed price. The PM will serve as the technical liaison between the Government (fire and safety staff) and the contractor in clarifying work requirements, performance standards, and other technical requirements. Following contract award, the Project Manager is accessible only through coordination with the COR.

Design Engineer: Design Engineer developed this requirement and will participate in further developing and reviewing the project through negotiation of a firm fixed price with the Project Manager. The DE will serve as a technical liaison to the in clarifying work requirements, performance standards, and other technical requirements. Following contract award, the Design Engineer is accessible only through coordination with the COR to the PM.

SCOPE:

GENERAL REQUIREMENTS

1. The Contractor shall refer to Attachment A for locations and elements of repair.

2. The Contractor shall obtain all the necessary permits prior to the starting of any work.

3. The Contractor shall provide all necessary equipment, materials, tools, transportation, services, labor, and supervision required to perform this project safely in a professional workman like manner and in accordance with the latest proven practices of the trade by thoroughly skilled and experienced workmen.

4. The Contractor shall survey the site to determine the extent of the work while taking the necessary precautions to avoid damage to existing items to remain in place, to be reused or to remain the property of the Government. Any damaged items shall be repaired or replaced as approved by the Contracting Officer and at the expense of the contractor. The Contractor shall immediately report any unforeseen damage or issues that cause or may cause additional work to the COR and not covered in the scope of work (SOW) during this project.

5. It is Contractor’s responsibility to thoroughly investigate, evaluate, and verify the existing conditions at the walk through prior to development of the proposal and prior to commencing physical work required for the project. Referencing and using Government-provided project documentation including as-built drawings does not relieve Contractor of their responsibility for adequately investigating and evaluating existing conditions of the facility, materials, equipment, building systems, the building loads, and such information that is necessary to develop a proposal. All quantities, locations, measurements, and installation types provided by the government shall be considered estimates for bidding purposes only.

6. It will be the responsibility of the Contractor to move furniture in the rooms in order to perform work required in the work package.

7. The Contractor shall take photos and report any damaged furniture before moving it.

8. The Contractor shall include all necessary demolition work to successfully perform the renovation, repair and any construction work necessary to fully implement the SOW. Where removals leave damaged surfaces exposed in the finished work, patch and repair these damaged surfaces flush to adjacent finished surfaces to match texture and finish.

9. Field-Directed Changes shall be defined as minor changes to the Scope of Work that would result in zero additional cost to the Government or would result in a credit to the Government and would have zero impact on Schedule or would result in earlier completion of Schedule, as agreed by both Government and Contractor.

10. Materials and products shall be new and delivered materials shall be certified by the manufacturer to be as specified. Packaging must be sealed with clear manufacturer and identification markings. New items shall be installed according to the manufacturer’s recommendations.

11. Throughout the performance of the project the Contractor shall:

a. Ensure work area is maintained as clean as possible during project execution.

b. Remove all construction debris from the project areas and the building daily.

c. Provide a dumpster onsite to perform daily cleanup.

d. Remove from the project site any defective product or material that has been delivered to the site in error.

e. Complete cleanup at project conclusion leaving nothing behind

12. The Contractor shall clean all rooms throughout the building prior to final inspection to include deep cleaning of latrines, cleaning of rooms, sweeping and damp moping of floors, clean and polish windows on the interior side of building.

13. The Contractor shall, at a minimum, keep the COR and Site Point of Contact (POC) apprised of the work and coordinate as necessary to avoid and/or lessen any impact on the tenant(s). Further details shall be provided prior to work commencing during the Kick-Off Meeting. The Contractor shall provide prior notification of any upcoming work activities and necessity for closure of certain areas. Performance of work during Occupancy:

a. It shall be the Contractor’s responsibility to coordinate with the Site POC to schedule and perform their work in such a manner as to create the least possible interference with the conduct of normal activities within the areas.

b. The Contractor shall not receive any additional compensation due to the conditions brought about by this occupancy and usage of the Government.

c. Contractors are only authorized to occupy areas in which active construction, maintenance, repair, or associated work in the performance of the contract is required to be done.

d. The Contractor shall not block more than one access of the building at any time, nor shall they disrupt the existing parking arrangement at any of the building parking areas without prior coordination with the COR and Site POC.

OPENINGS

1. The Contractor shall adjust all doors opening into suites to open and close properly.

2. The Contractor shall remove and replace all missing and/or damaged door signs. New door signs shall match existing.

FINISHES

3. The Contractor shall ensure to NOT wedge anything between the door and frame to keep door open that shall damage or degrade its structural integrity. Any doors who hinges are sprung if found with something wedged between the door and hinges shall be replaced at contractor’s expense.

4. The Contractor shall prep, prime, and paint all suites through Buildings 29019, 29020, 29021, and 29022.

Painting shall include patch and repair of all holes in walls and ceilings to match existing adjacent finished surfaces. Repaired areas shall be flush to existing adjacent surfaces and shall match existing surfaces in texture and paint finish.

5. The Contractor shall demolish existing flooring, prep, and install approximately 25 SF of new flooring.

Prep shall include cleaning subfloor and removal of adhesive residue. Doorstops, cove base, and other fixtures removed due to floor demolition shall be replaced once the new flooring is installed. New items shall match existing. Ceramic tile flooring and tile base in Community Building shall match existing,

6. The Contractor shall remove and replace approximately 25 LF of cove base. New 4” cove base to match existing.

7. The Contractor shall repair countertop formica laminate. Repairs shall include adhering loose panels or back splash back to the countertop. Caulking around the countertop shall be removed and replaced.

8. The Contractor shall machine clean grout in restrooms, the laundry area in each barracks building.

ELECTRICAL

9. The Contractor shall remove and replace lights with LED equivalent.

10. The Contractor shall ensure that any electrical light switch, or receptacle cover plates replaced shall be ivory in color.

11. The contract drawings call out for 53 ceiling fans, 17 kitchen vanity lights, and 66 closet lights to be replaced. The government is requesting the actual total of lights to be replaced are as follows, 75 ceiling fans, 35 kitchen vanity lights, and 75 closet lights.

HEATING, VENTILATION, & AIR CONDITIONING

12. The Contractor shall clean all grilles and registers in suites. Remove surface dust and dirt by vacuum. Clean and wipe down each with multi-purpose spray cleaner in all suites. Prep, prime, and paint any vent that needs painting and/or showing signs of rust.

MOLD ABATEMENT & REMEDIATION

13. The contractor shall remediate all mold in rooms. Mold remediation shall consist of demolition, removal, and replacement of all damaged drywall, insulation, device covers, lighting, cove base, and floor tiles.

Tape, float, texture, and paint new drywall to match existing. New cove base, floor tiles, device covers, etc.

shall match existing.

14. The Contractor shall clean all grilles, registers, and access panels in affected rooms throughout the building to ensure that the mold and spores are not present. Remove surface dust and dirt by vacuum. Vents severely affected by mold shall be replaced. Ductwork shall be cleaned back to air handler unit. Prep, prime, and paint any vent that needs painting and/or showing signs of rust. Contractor shall ensure vents are installed securely and flush with surface of ceiling.

**********************************END OF SCOPE***********************************