Technical Exhibit B Areas of DPG with historical workload-JOC W911S6-24-R-0002 dpg 102423.pdf
PDF 352 KB Posted
- Solicitation number
- W911S6-24-R-0002
About this file
This document is a Technical Exhibit that outlines the historical workload distribution across different areas of the Dugway Proving Ground (DPG) for a Job Order Contract (JOC) solicitation (W911S6-24-R-0002).
The key details are: The solicitation is for a Firm Fixed Price (FFP) Indefinite Delivery-Indefinite Quantity (IDIQ) JOC contract at the Task Order level for a broad range of real property repair and construction work at the US Army Garrison Dugway Proving Ground. The historical workload percentages for different areas within DPG are provided, with the Ditto Area accounting for the highest portion at 38.54%, followed by the English Village at 25%, the Carr Facility at 14.58%, the Avery Area at 3.13%, and the Baker/Life Sciences Test Facility and All Others each at 9.38%. The total distance from the Visitor Center to these areas is 66 miles.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Area
Approximate Distance from Visitor Center
Historical % of Work
English Village 0.5 Miles 25% Avery Area 10 Miles 3.13% Carr Facility 10 Miles 14.58% Ditto Area 10 Miles 38.54% Baker/Life Sciences Test Facility 16 Miles 9.38% All Others 15 Miles 9.38%
Total Percentage 100% Total Distance From Visitor Center 66 Miles
File details come from the government source that posted it. Updated .