DPG JOC Solicitation W911S6-24-R-0002 dpg 062424.pdf
PDF 1 MB Posted
- Solicitation number
- W911S6-24-R-0002
About this file
This document is a solicitation for a Firm-Fixed-Price (FFP), single award, Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contract (JOC) for real property maintenance, repair, remodel, alteration, and minor construction projects at Dugway Proving Ground, Utah. The contract will include a base period and four one-year option periods. The solicitation is being issued as a 100% 8(a) Small Business Set-Aside under NAICS code 236220 with a $45 million size standard. The contractor will use an electronic cost planning software with RSMeans cost data as the Unit Price Book (UPB). Key requirements include providing on-site work, record drawings, and conformance to local policies, codes, and industry standards. Proposals are due by July 31, 2024. The government will evaluate technical capability, past performance, and price in a best value tradeoff.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011920488
Title: Dugw ay Proving Ground (DPG) Job Order Contract (JOC).
- This requirement is for a single aw ard Indefinite Delivery, Indefinite Quantity (ID/IQ) JOC for real property maintenance, repair, remodel, alteration, and minor construction projects to include industrial, commercial, and institutional facilities located on Dugw ay Proving Ground Utah.
- The North American Industry Classification System (NAICS) code is 236220, Commercial and Institutional Building Construction, size standard $45,000,000.00.
- Block 11: Performance w ill be as negotiated on each individual task order.
- This requirement is being solicited as a 100% 8(a) Competitive Small Business Set Aside.
NICHOLAS J. ROWTON 435-831-2620
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Jun-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________31 Jul 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC- DUGWAY PROV GRD
5330 VALDEZ CIR
MS 1 CCMI-CHD-DP
DUGWAY UT 84022-5001
W911S6
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W911S624R0002 69
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W911S624R0002
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job JOC Normal Working Hours-Base Period
FFP
Base Period Coefficient
Normal Working Hours are Monday through Thursday, 7:00 a.m. to 5:30 p.m.
local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 4, Development of Coefficient for Normal Working Hours
FOB: Destination
PURCHASE REQUEST NUMBER: 0011920488
PSC CD: Z2JZ
NET AMT
0002 1 Job JOC Other Than Normal-Base Period
FFP
Base Period Coefficient
Other Than Normal Working Hours are anytime Monday through Thursday, after 5:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 5, Development of Coefficient for Other Than Normal Working Hours
FOB: Destination
0003 1 Job JOC Non-Pre-Priced-Base Period
FFP
Base Period Coefficient
The value inserted here is transferred from Attachment 6, Development of Coefficient for Non-Pre-Priced.
FOB: Destination
1001 1 Job OPTION JOC Normal Working Hours-1st Option
FFP
1st Option Period Coefficient
Normal Working Hours are Monday through Thursday, 7:00 a.m. to 5:30 p.m.
local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 4, Development of Coefficient for Normal Working Hours
FOB: Destination
1002 1 Job OPTION JOC Other Than 1st Option Period
FFP
1st Option Period Coefficient
Other Than Normal Working Hours are anytime Monday through Thursday, after 5:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 5, Development of Coefficient for Other Than Normal Working Hours
FOB: Destination
1003 1 Job OPTION JOC Non-Pre-Priced-1st Option
FFP
1st Option Period Coefficient
The value inserted here is transferred from Attachment 6, Development of Coefficient for Non-Pre-Priced.
FOB: Destination
2001 1 Job OPTION JOC Normal Working Hours-2nd Option
FFP
2nd Option Period Coefficient
Normal Working Hours are Monday through Thursday, 7:00 a.m. to 5:30 p.m.
local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 4, Development of Coefficient for Normal Working Hours
FOB: Destination
2002 1 Job OPTION JOC Other Than 2nd Option Period
FFP
2nd Option Period Coefficient
Other Than Normal Working Hours are anytime Monday through Thursday, after 5:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 5, Development of Coefficient for Other Than Normal Working Hours
FOB: Destination
2003 1 Job OPTION JOC Non-Pre-Priced-2nd Option Period
FFP
2nd Option Period Coefficient
The value inserted here is transferred from Attachment 6, Development of Coefficient for Non-Pre-Priced.
FOB: Destination
3001 1 Job OPTION JOC Normal Working Hours-3rd Option
FFP
3rd Option Period Coefficient
Normal Working Hours are Monday through Thursday, 7:00 a.m. to 5:30 p.m.
local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 4, Development of Coefficient for Normal Working Hours
FOB: Destination
3002 1 Job OPTION JOC Other Than 3rd Option Period
FFP
3rd Option Period Coefficient
Other Than Normal Working Hours are anytime Monday through Thursday, after 5:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 5, Development of Coefficient for Other Than Normal Working Hours
FOB: Destination
3003 1 Job OPTION JOC Non-Pre-Priced-3rd Option Period
FFP
3rd Option Period Coefficient
The value inserted here is transferred from Attachment 6, Development of Coefficient for Non-Pre-Priced.
FOB: Destination
4001 1 Job OPTION JOC Normal Working Hours-4th Option
FFP
4th Option Period Coefficient
Normal Working Hours are Monday through Thursday, 7:00 a.m. to 5:30 p.m.
local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 4, Development of Coefficient for Normal Working Hours
FOB: Destination
4002 1 Job OPTION JOC Other Than 4th Option Period
FFP
4th Option Period Coefficient
Other Than Normal Working Hours are anytime Monday through Thursday, after 5:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 5, Development of Coefficient for Other Than Normal Working Hours
FOB: Destination
4003 1 Job OPTION JOC Non-Pre-Priced-4th Option Period
FFP
4th Option Period Coefficient
The value inserted here is transferred from Attachment 6, Development of Coefficient for Non-Pre-Priced.
FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 22-OCT-2024 TO
21-OCT-2025
N/A DUGWAY PROVING GROUND
KENT HAWKINS
DPW 5330 VALDEZ CR
DUGWAY UT 84022-5001
435-831-3555 FOB: Destination
W906AM
0002 POP 22-OCT-2024 TO
21-OCT-2025
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 22-OCT-2024 TO
21-OCT-2025
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 22-OCT-2025 TO
21-OCT-2026
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 22-OCT-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 22-OCT-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 22-OCT-2026 TO
21-OCT-2027
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 22-OCT-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 22-OCT-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 22-OCT-2027 TO
21-OCT-2028
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 22-OCT-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 22-OCT-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 22-OCT-2028 TO
21-OCT-2029
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 22-OCT-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 22-OCT-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
LIST OF DOCUMENTS
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Division 1, General Requirements 180 28-Nov-23
Exhibit B Areas of DPG with Historical Workload 1 24-Oct-23
Exhibit C Davis Bacon Act Wage Determination UT20240086 8 31-May-24
Exhibit D Davis Bacon Act Wage Determination UT202440097 6 12-Apr-24
Exhibit E Davis Bacon Act Wage Determination UT204401112 7 05-Jan-24
Attachment 1 Consent Letter 1 5-Dec-23
Attachment 2 Specific Relevant Contracts 3 5-Dec-23
Attachment 3 Past Performance Questionnaire 8 5-Dec-23
Attachment 4 Coefficient for Normal Working Hours 9 3-Jan-24
Attachment 5 Coefficient for Other Than Normal Working Hours 9 3-Jan-24
Attachment 6 Development of Coefficient for Non-Pre-Priced 9 3-Jan-24
Attachment 7 Notional One and two Task Order Requirement 2 25-Jan-24
Attachment 7a JOC SOW Bldg 5124 Community Center Notional Task Order 11 25-Jan-24
Attachment 7b Technical Drawings Bldg 5124 Community Center Notional Task Order 11 25-Jan-24
Attachment 8 JOC SOW Concrete Eyebrow Demolition 6 26 Feb-24
Attachment 8a Technical Drawings Exterior Details 5230-005 1 26 Feb-24
Attachment 8b Technical Drawings 5230_010,Second Floor Framing B5230 1 26 Feb-24
Attachment 8c Technical Drawings 5230_011,Roof Framing Plan-Notional Task Order 1 26 Feb-24
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFERORS
Proposals are due by 12:00 pm MST, July 31st, 2024.
1. Pre-proposal and site visit conference: The Government will hold a site visit conference for the Dugway Proving Ground (DPG) requirement on Wednesday, July 10th 2024 at 10:00 am in building 5330, room 1201, MICC-DPG conference room. All interested firms may attend with a limit of three (3) attendees per firm. Please submit, in writing, the names of attendees to nicholas.j.rowton.civ@army.mil and alfred.j.keetch.civ@army.mil by 8th July 2024. All Questions will need to be submitted in writing and an amendment to the solicitation will be issued. Questions will not be addressed during the site visit. The Site visit will give a brief introduction regarding the solicitation, the current Job Order Contract (JOC) and its function, a brief overview with pricing, the coefficient attachments and an overview regarding attachments 7 and 8 notional task order project. Attendees shall register at the Visitors’ Center for admittance onto the Dugway Proving Ground installation. This process can be lengthy.
Attendees should arrive early in order to obtain a visitor’s pass and arrive at the pre- proposal conference on time.
Be aware that the information that visitors are required to provide include: Full name, date of birth, state issued driver’s license, current vehicle registration, and proof of insurance or rental agreement contract. Attendees may be denied access to the installation if the background checks are less than favorable.
A. Proposal Submittal and Inquiries
Proposals shall be submitted prior to the closing date and time identified above, electronically at the following email address nicholas.j.rowton.civ@army.mil and alfred.j.keetch.civ@army.mil All other inquiries regarding this solicitation shall be submitted thru nicholas.j.rowton.civ@army.mil and alfred.j.keetch.civ@army.mil. No telephonic interaction will be allowed.
B. General Instructions
1. This procurement will be conducted utilizing source selection (negotiated) procedures as delineated in Federal Acquisition Regulation (FAR) Subpart 15.3. “Evaluation Factors for Award.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The Offer. The submission of the documentation specified below will constitute the offeror's acceptance of the terms and conditions of the RFP, concurrence with the SOW or General Requirements, and the proposed contract type. The proposal shall remain valid for a period of 120 days from the closing date specified in the solicitation.
3. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
4. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise deemed unsound, the offeror shall immediately notify the contracting specialist nicholas.j.rowton.civ@army.mil and contracting officer alfred.j.keetch.civ@army.mil in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
5. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Bid guarantees received in response to the original solicitation will be considered current and will be retained through contract award.
6. All referenced documents for this solicitation are available on the System for Award Management (SAM) website at http://www.sam.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
7. Debriefings. The Contracting Officer (KO) will promptly notify offerors of any decision to exclude them if the government establishes a competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505.
The KO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring debriefing shall make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
C. Proposal Preparation Instructions
IMPORTANT: Failure to follow the below proposal preparation instructions may cause a proposal to be deemed unacceptable by the Government and thus eliminated from the competition without further consideration.
1. Offeror’s proposal shall consist of four (4) separate volumes: General, Technical Capability, Past Performance, and Price.
2. Proposal Format
a. Exceptions. Offerors are required to meet all solicitation requirements in its entirety, in addition to those identified as evaluation factors or subfactors (Sections 00010 through 00600). Failure to meet a requirement may result in an offer being ineligible for award. If the offeror finds it necessary to take exception to any of the requirements specified in this solicitation, the offeror shall clearly identify the applicable Volume and exceptions with a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. It is recommended that the Offeror contact the KO through the nicholas.j.rowton.civ@army.mil and alfred.j.keetch.civ@army.mil immediately/prior to solicitation closing upon identifying an area that may result in an exception. This information shall be provided in the format below.
Table 1 - Solicitation Exceptions
Solicitation Document Page/Paragraph Requirement/Portion Rationale & Impact SOW, Section 00 70 00, etc.
Applicable Page and Paragraph Numbers
Identify the requirement or portion to which exception is taken
Describe the rationale and impact of the exception
b. The proposals shall be organized into four (4) volumes. All text shall be single spaced and black, on white paper (Black and white requirement does not apply to graphics, photos, etc., Company stationery and logos are acceptable). Text shall be easily readable (12- or 10-point font proportional spacing.) Cross-references should be utilized to preclude unnecessary duplication of data between sections. Digital copies shall be provided in Microsoft Word, PowerPoint, and/or Excel. PDF file format is allowable for Volumes I, II, and III only. File names to be “Volume #, Company Name – Initial” for the first submission. File name of later submissions (if necessary) shall be “Volume #, Company Name – Revision X’ with X indicating the number of the revision.
Page limitations are as follows:
Table 2 – Page Limits Volume Title Page Limits
I General None II Mission Capability except Subfactor (c) 75
Subfactor (c) - Notional Task Order Requirements only 50 III Past Performance None IV Price None
c. Proposal Limitation. The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and unread. The Government will not accept any changes to the offeror’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals). If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be established at the appropriate time.
d. Page Limit Includes: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.
e. Page Limit does not include covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.
f. What Counts as A Page? A page shall be an 8 ½ X 11” size page. For illustrations and tables, letter size and spacing requirements can be at the discretion of the offeror but shall be easily readable. Larger page sizes will be counted as the appropriate number of pages based on an 8 ½” X 11” size page. Margins shall be at least 1 inch on the top and bottom and 3/4 inch on the side. The offeror shall number each page in order to eliminate any confusion. In the event the offeror creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.
g. Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume.
h. Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with a definition for each.
3. Proposal Content
a. Volume I – General
i. Offerors are required to submit a completed SF 1442 (including acknowledgment of Amendments) and Section 00600. Failure to follow the below Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government.
ii. Submission Requirements. The General Volume shall be organized as follows and contain the identified information.
(1) Exceptions/Assumptions (if required): Identification and explanation of any exceptions or deviations.
Additionally, any assumptions used in the proposal preparation shall be identified and fully explained.
(2) SF 1442: The SF 1442 shall be submitted fully completed. The offeror shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 1442 and FAR 52.215-1, Instructions to Offerors - Competitive Acquisition. The offeror shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to their proposal and who can obligate it contractually. Also, identify those individuals authorized to negotiate with the Government.
(3) Section 00700 (Contract Clauses): The offeror shall ensure that Section 00700 is submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.
b. Volume II – Technical Acceptability
i. The Technical Acceptability Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the offeror’s proposal. Legibility, clarity, and coherence are very important. Proposals will be evaluated against the Mission Capability and subfactors c attachments 7 and 8. Evaluation Factors for Award. The proposal shall not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the SOW or General Requirements, (including referenced publications, technical data, etc.); statements paraphrasing the SOW or General Requirements or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and expertise and will base its evaluation on the information presented in the offeror's proposal.
Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.
ii. The Technical Acceptability Volume shall, at a minimum, be prepared in a form consistent with the evaluation criteria for award set forth in this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the offeror’s technical competence and ability to comply with the contract task requirements specified in Section 00100 and Division 1, General Requirements (Exhibit A). The offeror shall address as specifically as possible the actual methodology that would be used for accomplishing the SOW or General Requirements tasks. The Technical Acceptability Volume shall be organized according to the following general outline:
(1) Table of Contents: The table of contents section shall include a list of tables and drawings and across reference matrix, as applicable.
(2) Subfactor (a) – Mission Capability: The evaluation will consider how well the offeror understands how a job order contract operates; how its proposed methodology; processes and resources satisfy the management of the overall contract and, with regard to both the technical and administrative aspects of a JOC; how complete its plan is with respect to mobilization and task order proposals; the effectiveness of the process(es) employed to estimate and submit complete task order proposals; and overall task order management of a high volume of awarded task orders simultaneously and efficiently within established timelines and negotiated prices. The evaluation team will assess each offeror’s and how proposed methodology, processes and resources satisfy the management of the overall contract and whether the offeror demonstrates adequate management and oversight of the contract and all award task orders.
(3) Subfactor (b) - Proposed Staffing: The Government will evaluate the effective use of key personnel and determine if the offer’s proposed staffing matrix provides a successful mix of key positions. To be considered technically acceptable, proposals shall consider the following positions to be the absolute minimum management staffing requirements: Project Manager, Program Manager, Superintendent, Quality Control Plan Manager, Site Safety and Health Officer. The evaluation will assess the number of personnel per position; organizational management and hierarchy of authority within the on-site staff and corporate leadership; how the offeror will obtain and provide administrative support for Computer-aided Design and Drafting (CADD), project scheduling, payroll and other related administrative support functions; and manage periodic increase in active workload. To be considered acceptable, the evaluation extends to the assessment of the offeror’s process for replacing key personnel as vacancies occur, and how the offeror will provide additional staff to support fluctuating workload to satisfy the regulatory requirements for direct superintendence and quality control. Substantiated teaming arrangements, partnerships, and mentor/protégée agreements and joint ventures must be clearly explained to indicate which partner of the agreement is responsible for various functions, duties and responsibilities.
The Government considers the following key positions to be the absolute minimum acceptable level of management staffing requirements: Project Manager, Program Manager, Superintendent, Site Safety and Health Officer, and Quality Control Manager. Key personnel employed under the awarded contract shall meet the minimum qualifications described in the paragraphs below. All personnel performing in the described positions shall be direct employees of the prime contractor; none of these functions is allowed to be subcontracted below the prime contractor.
The Plan shall discuss the offeror’s retention and replacement program for these key positions, to include timelines for replacement and how the offeror will execute those functions until a new employee is hired.
The Plan shall describe how the offeror will provide additional resources during seasonal workload fluctuation.
The Plan shall include a description of work to be performed by in-house tradesmen (if used) and other team members, subcontractors, and suppliers.
Under this 8(a) set-aside, offerors are free to propose teaming arrangements, mentor/protégée agreements, partnerships, and joint ventures so long as they are official business arrangements allowable under Section 8(a) of the Small Business Act. Any arrangements proposed shall be sanctioned by the Small Business Administration, and the Contracting Officer will validate the eligibility of those arrangements as part of this sub-factor.
Project Manager: This individual shall be a full-time, dedicated employee of the prime contractor and speak fluent English. The Project Manager shall possess a minimum of 10 years of experience in the Construction field, with at least five (5) of those 10 years of experience in construction management and shall possess at least an associate degree in one of the following disciplines: Engineering, Architecture, Construction Science, Business Management, or Construction Management. The Project Manager shall have the maturity and business acumen to manage the entire effort, successfully plan and execute all task orders, and possess extensive understanding of and familiarity with the principles, methods, and techniques of architectural, civil, mechanical, and electrical engineering. The Project Manager shall be vested with the authority to commit the contractor and act as an official representative of the company. The Project Manager shall have documented work experience in Federal government construction contracts and be completely familiar with all Federal regulations relative to conducting construction on a Federal installation, to include all environmental and preservation implications.
Program Manager: This individual shall be a full-time, dedicated employee of the prime contractor and speak fluent English. The Program Manager shall possess a minimum of 5 years of experience in the Construction field, to include supervising construction projects similar to those required by this contract and shall possess at least an associate degree in one of the following disciplines: Engineering, Architecture, Construction Science, Business Management, or Construction Management.
Project Superintendent: This individual(s) shall be a full-time dedicated employee(s) of the prime contractor, speak fluent English, and be directly accountable to the Project Manager. The Contractor will provide a qualified Project Superintendent (PS) responsible for the overall management, coordination, and performance of all work under the TO. The PS will resolve construction problems in addition to coordinating with subcontractors, construction personnel, and Government personnel. The PS will have full authority to order supplies, to direct Contractor employees to enter or leave job sites, sign all TO submittal transmittal sheets, and to contractually commit the Contractor for prompt action. On a temporary basis only, another individual may be designated to act for the PS. Project superintendent shall possess a minimum of seven (7) years documented journeyman level work experience in the construction field, with no less than five (5) years of that experience being in a supervisory position. The individual(s) shall provide verification of credible qualifications through a recognized union in the construction trades environment. The superintendent(s) shall have authority to act for the Contractor, be on the jobsite during all times during performance of the contract until the work is completed and accepted and will be responsible for timely progress and completion of all assigned work.
Quality Control Manager (QCM): This individual shall be a full-time, dedicated employee of the prime contractor, speak fluent English, and be directly accountable to the corporate level Quality Control Manager only. The QCM will be physically present on-site or at the project office at all times throughout the construction period during the hours of 0700 – 1730, Monday through Thursday, except on Federal Government holidays.
As the QCM, this individual shall be responsible for the overall quality of work performed under this contract and possess knowledge of and show current license/certification in a 40-hour OSHA Safety Inspection Certification and the US Army Corps of Engineers Quality Control Training Course. The QCM and any utilized support staff shall remain autonomous to the corporate level Quality Control Manager, and not be influenced by other members of the on-site staff. The QCM shall have a minimum of three (3) years of experience in construction quality control in Department of Defense agency (i.e., Corps of Engineers, Air Force, Navy, Marine Corps, etc.) activities.
The QCM shall possess adequate skills and experience to implement and enforce the Contractor's Quality Control Plan (see detailed Quality Control Plan requirements at Division 1, General Requirements, (Exhibit A). If an alternate QCM is assigned such as the SSHO, meeting the same qualification standards stated herein, may be utilized during short absences of the QCM; however, an alternative QCM shall not perform in that capacity when the assigned QCM is present. The QCM and any quality control staff shall have adequate construction work experience to detect violations in all construction phases, and all disciplines (mechanical, electrical, plumbing, and civil) of construction quality control. The Government has determined that adequate construction work experience is expertise in all four disciplines (mechanical, electrical, plumbing, and civil), and show current license/certification in their respective areas of expertise (whether it be mechanical, electrical, plumbing or civil). The quality control support staff shall be directly accountable to the quality control management chain of command without influence from production.
Site Safety and Health Officer (SSHO): This individual shall be a full-time, dedicated employee of the prime contractor responsible for oversight of safety for projects at the installation., speak fluent English. The Site Safety and Health Officer (SSHO) will have the authority to act in all safety matters for the Contractor. The SSHO will remain autonomous and not be influenced by other on-site staff members. The SSHO will be physically present on-site or at the project office at all times throughout the construction period during the hours of 0700 – 1730, Monday through Thursday, except on Federal Government holidays. This individual will be a full-time, dedicated employee of the prime Contractor. The SSHO may also serve as the QCM or the PS. The SSHO shall have a minimum of three (3) years of experience in building construction safety. possess knowledge of and show current license/certification in a 40-hour OSHA Safety Inspection certification.
(4) Subfactor (c) - Notional Task Order Requirements: The evaluation will assess the offeror’s proposal prepared in response to two (2) fictional scenarios provided in Attachments 7 thru 7b and 8 thru 8c. The evaluation will determine the offeror’s ability to plan, estimate, schedule, and execute multiple task order requirements. The evaluation will assess the offeror’s ability to recognize and understand all the necessary inputs, assertions and assumptions steps required for the preparation and submission of a compliant task order proposal, to include all the requirements described in this solicitation and Exhibit A. The evaluation will consider the offeror’s ability to determine adequate timelines and proper scheduling of material submittals and other pre-construction deliverables, subcontractors, and inspections required by the contract. While these sample proposals will not be evaluated for price and are not reflective of any anticipated task orders under the awarded contract, the correct selection of line items, quantities, and time devoted to various aspects of the work will be evaluated for acceptability. Failure of an offeror to provide the requisite response to the notional task order in its entirety will result in an unacceptable rating in the subfactor.
c. Volume III – Past Performance
i. The Government will perform a Confidence Assessment of the Offeror’s past performance to arrive at a confidence rating. The Confidence Assessment represents the evaluation of an Offeror's past work record to assess the Government's confidence in the Offeror's probability of successfully performing as proposed. Past Performance information described herein is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform. In addition, the offeror shall detail the percentage of work performed by each subcontractor or partner based on the total proposed price. The offeror shall submit, along with the information required in this paragraph, a consent letter (see Attachment 1), executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the offeror's performance.
ii. The offeror shall include documentation regarding their present and past performance as it directly relates to the work being procured under this solicitation. The offeror SHALL NOT go back any farther than six (6) years from the issue date of this RFP for the submitted data. The past performance data shall document a successful history of past contract performance. This volume has no page limitation. Relevant efforts are defined as services/efforts that are the same as or similar to the effort (as compared to NAICS code 236220) required by the RFP including work on an active military installation, work in occupied buildings, and work with same/similar state and federal construction codes. Projects considered relevant may include JOC, Simplified Acquisition Base Engineer Requirements (SABER) contracts, or Construction, Repair, Renovation, Sustainment, Restoration, and Modernization (SRM) contracts of at least $2 Million and a duration of no less than 60 days of performance. The offeror is required to submit past performance data on itself as it directly relates to the work being procured under this solicitation. If the offeror has no past performance data, then it must so state. If it is relying on the past performance data of a joint venture or teaming partner that must also be stated, and evidence submitted showing that such a joint venture exists for the purposes of this acquisition.
Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, teaming partners, and/or joint venture partners in alphabetical order. In the case of a joint venture, the prime offeror joint venture should demonstrate successful experience and past performance as that joint venture, as well as each member of the joint venture as applicable. Failure to provide the past performance data/information requested can result in a proposal being determined to be noncompliant and may be eliminated from further consideration.
iii. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance Volume and information obtained from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. Offerors are reminded that both independent data and data provided by offeror in their proposals may be used by the Government to evaluate offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the offeror. Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government.
iv. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)) and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor. All past performance comments received will be taken into account and could affect the overall rating.
The overall past performance evaluation is a subjective decision based on the whole of all data received.
v. Submission Requirements. The offeror shall submit a Past Performance Volume containing the following:
(1) Table of Contents
(2) Consent Letters (Attachment 1): Executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the offeror can respond to such information.
(3) Client Authorization Letters: For each identified effort for a commercial customer authorizing release to the Government of requested information on the offeror’s performance under a specific contract.
(4) Organization Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company.
As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider present and past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
(5) Specific Relevant Contracts Format (Attachment 2): is limited to four (4) pages per reference. The offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this solicitation. The submittal shall include specific narrative explanation and rationale supporting objectives achieved and assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. The offerors shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
Additionally, provide a narrative describing any litigation activity (i.e., bond claims, liquidated damages, insurance actions, or claims related to project performance, etc.) that the Offeror has been, or is currently party to involving its subcontractors, customers or any Surety within the past six (6) years. The narrative should include the Parties involved, the magnitude of the Claim and the resolution.
vi. Past Performance Questionnaire (Attachment 3): is for the contracts identified on each Specific Relevant Contract Reference. The offeror shall forward a copy of the Past Performance Questionnaire to the points of contact responsible for monitoring performance under such contracts. The points of contact shall return the questionnaires directly to the nicholas.j.rowton.civ@army.mil and alfred.j.keetch.civ@army.mil not later than 3:00 pm MST, July 31st, 2024. Any questionnaires not returned directly to the nicholas.j.rowton.civ@army.mil and alfred.j.keetch.civ@army.mil by the date and time specified herein will not be reviewed and evaluated. The information contained in the questionnaires will be used to evaluate the offeror’s past performance. New entities formed for the purpose of proposing on this solicitation (joint venture, teaming partners, or mentor protégé) that have no past performance history under that business arrangement are permitted to submit past performance information for the individual entities forming the arrangement.
d. Volume IV – Price
i. General. The Government reserves the right to require the submission of Other Than Certified Cost or Pricing Data as is deemed necessary to arrive at a fair and reasonable price. All information relating to the proposed cost/price data must be submitted in electronic format. Electronic versions of the Cost/Price proposal shall be submitted in MS Office Excel format only, and shall NOT be read only or password protected.
All formulas, lookup tables, and links shall be intact, and no links shall exist to files not included with the submission. Excel workbooks should not contain hidden spreadsheets. PDF or flat files will not be acceptable.
Failure to comply with these formatting requirements may result in rejection of the proposal. Offeror’s submittals shall be free of viruses, Trojans, spyware, and other malicious code for which appropriate detection and removal/quarantine software exists.
ii. The basis for pricing this JOC incorporates the use of a commercial cost estimating and project management software tool (e.g., WinEst, MS Project, e4Clicks) which employs a price modifier known as a coefficient. A coefficient is a numerical factor that is multiplied by the estimated total project costs to derive the final fixed-price task order price proposed to the Government. The coefficient includes various factors reflecting the contractor’s cost of doing business and operating a field office on Dugway Proving Ground (e.g., direct and indirect labor, field overhead, corporate overhead, equipment leases, transportation, training and certification, permits and licenses, profit) and a factor reflecting an evaluation of the accuracy of a contract-specified cost estimating tool to the local subcontractor/supplier market. This is done using a Unit Price Book (UPB) RSMeans, and is generally referred to as the “value of the book.” The Government uses RSMeans data from Gordian as the RSMeans cost estimating tool. All estimates shall be submitted using a electronic cost planning software with RS Means cost data as the UPB. All the line items found in the RSMeans bound volumes.
iii. Submission Requirements. The offeror shall submit a Price Volume containing the following:
(1) Bondability Letter: The offeror shall provide a letter from a qualifying surety that validates the ability to provide bonding at the contract’s estimated annual maximum contract value and specifies the offeror’s aggregate and single project limits, remaining bond capacity, and impact anticipated from the proposed contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .