Amedment Solicitation W911S6-24-R-0002-00001 dpg 062424.pdf

PDF 295 KB Posted

Attached to
W911S6-24-R-0002-Dugway Proving Ground-Job Order Contract-Minor Construction
Solicitation number
W911S6-24-R-0002
Issued by

About this file

This document is an amendment to Solicitation W911S6-24-R-0002 for a Firm Fixed Price (FFP) Indefinite Delivery-Indefinite Quantity (IDIQ) Job Order Contract (JOC) at the Task Order level. The amendment corrects the due date and time for offers, which has been extended from 08-Jul-2024 03:00 PM to 31-Jul-2024 12:00 PM. The contract is for a broad range of real property repair and construction work at USAG Dugway Proving Ground, including administrative facilities, maintenance shops, utility systems, and other infrastructure. Task Orders may include facility repairs, renovations, construction, testing, surveys, and abatement for lead-based paint or asbestos. The contractor will use an electronic cost planning software with RS Means cost data as the Unit Price Book. The contractor will also provide record drawings and perform work in accordance with local policies, codes, and industry standards.

View the file

Other files

File Type Posted
Conformed Copy Solicitation W911S6-24-R-0002.pdf PDF
Amedment Solicitation W911S6-24-R-0002-00006 dpg 080624.pdf PDF
Amedment Solicitation W911S6-24-R-0002-00005 dpg 073024.pdf PDF
Amedment Solicitation W911S6-24-R-0002-00004 dpg 072524.pdf PDF
Attachment 6 Coefficient Non-PrePriced Items - JOC 24R0002 DPG 072424-RV1.xlsx XLSX spreadsheet
Attachment C Floor Plan 5124 020.pdf PDF
Amedment Solicitation W911S6-24-R-0002-00003 dpg 072224.pdf PDF
Sign In Rooster-Industry Day dpg 071024.pdf PDF
Attachment 3 Past Performance Questionnaire JOC 24 R 0002 dpg 070824 RV1.docx DOCX document
Amedment Solicitation W911S6-24-R-0002-00002 dpg 070124.pdf PDF
Technical Exhibit A Division 1 Specification dpg 112823.pdf PDF
Attachment 7a JOC SOW Bldg 5124 Community Center.docx DOCX document
Attachment 5 Coefficient Other Than Normal JOC 24R0002 DPG 010324.xlsx XLSX spreadsheet
Attachment 6 Coefficient Non-PrePriced Items JOC 24R0002 DPG 010324.xlsx XLSX spreadsheet
Technical Exhibit D Davis-Bacon Act-UT20230097 JOC 24-R-0002 DPG 041224.pdf PDF
Attachment 4 Coefficient Normal-JOC 24R0002 DPG 010324.xlsx XLSX spreadsheet
DPG JOC Solicitation W911S6-24-R-0002 dpg 062424.pdf PDF
Attachment 3 Past Performance Questionnaire-JOC 24-R-0002-dpg 120523.docx DOCX document
Attachment 8 JOC SOW B5230 Demolition.pdf PDF
Attachment 7 Notional One and two Task Order Req JOC 24R0002 DPG.docx DOCX document
Technical Exhibit B Areas of DPG with historical workload-JOC W911S6-24-R-0002 dpg 102423.pdf PDF
Technical Exhibit C Davis-Bacon Act-UT20230086 JOC 24-R-0002 DPG 053124.pdf PDF
Attachment 8a Exterior Details 5230-005.pdf PDF
Technical Exhibit E Davis-Bacon Act-UT20230112 JOC 24-R-0002 DPG 010524.pdf PDF
Attachment 8c 5230 011 Roof Framing Plan.pdf PDF
Attachment 8b 5230 010 Second Floor Framing B5230.pdf PDF
DPG JOC Scope of Work-W911S6-24-R-002 (1).pdf PDF
Attachment 7b Technical Drawings Bldg 5124 Community Center.pdf PDF
Attachment 1 Consent Letter - JOC-24-R-0002 dpg 120523.docx DOCX document
Attachment 2 Specific Relevant Contracts - JOC 24R0002 dpg 120523.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICC- DUGWAY PROV GRD

NICHOLAS J. ROWTON

5330 VALDEZ CIRCLE MS 1

CCMI-CHD-DP

DUGWAY UT 84022-5001

0011920488

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment under solicitation W911S6-24-R-0002 is issued due to administrative error on the Government, w hich the amendment is for correcting the dates and times under block thirteen (13) page one (1)

Note: All amendments need to be signed and submitted w ith the solicitation and all required documents

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911S624R0002

X 9B. DATED (SEE ITEM 11)

24-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2024

CODE

MICC- DUGWAY PROV GRD

5330 VALDEZ CIR

MS 1 CCMI-CHD-DP

DUGWAY UT 84022-5001

W911S6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W911S6

FACILITY CODECODE

EMAIL:TEL:

W911S624R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 08-Jul-2024 03:00 PM to 31-Jul-2024 12:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .