File Type Posted
POM-MOTCO Sign In Sheets W9123823B0017 AND W9123823B0021.pdf PDF
Abstract of Offerors OF_1419 W9123823B0017 3 OF 4.pdf PDF
Abstract of Offerors OF_1419 W9123823B0017 1 OF 4 Signed 31 July 2023.pdf PDF
Abstract of Offerors OF_1419 W9123823B0017 4 OF 4.pdf PDF
Abstract of Offerors OF_1419 W9123823B0017 2 OF 4.pdf PDF
Attachment F-Responses to RFIs POM JOC 30 June 2023.pdf PDF
Amendment Solicitation W9123823B0017-0001 5 July 2023.pdf PDF
Technical Exhibit B-Div 01 GENERAL REQUIREMENTS 05 July 2023.pdf PDF
Conform Copy Amendment Solicitation W9123823B0017-0001 5 July 2023.pdf PDF
Attachment E- Wage Decision Number CA20230018 09 June 2023.pdf PDF
Technical Exhibit L-Div 11 EQUIPMENT 23 May 2023.pdf PDF
Technical Exhibit T-Div 27 COMMUNICATIONS 23 May 2023.pdf PDF
Technical Exhibit J-Div 09 FINISHES 23 May 2023.pdf PDF
Technical Exhibit K-Div 10 SPECIALTIES 23 May 2023.pdf PDF
Technical Exhibit Q-Div 23 HEATING-VENTILATING-AND AIR CONDITIONING (HVAC) 23 May 2023.pdf PDF
Technical Exhibit R-Div 25 INTEGRATED AUTOMATION 23 May 2023.pdf PDF
Technical Exhibit W-Div 32 EXTERIOR IMPROVEMENTS 23 May 2023.pdf PDF
Attachment A- Access Procedures - Camp Roberts - USASACR Vetting Form V5 23 May 2023.pdf PDF
Attachment C- Access Procedures - POM NonCitizen 23 May 2023.pdf PDF
Technical Exhibit V-Div 31 EARTHWORK 23 May 2023.pdf PDF
Technical Exhibit O-Div 21 FIRE SUPPRESSION 23 May 2023.pdf PDF
Attachment D- JOC Bid Schedule 9 June 2023.xlsx XLSX spreadsheet
Technical Exhibit F-Div 05 METALS 23 May 2023.pdf PDF
SOLICITATION W9123823B0017 15 June 2023.pdf PDF
Technical Exhibit C- Div 02 EXISTING CONDITIONS 23 May 2023.pdf PDF
Technical Exhibit H-Div 07 THERMAL AND MOISTURE PROTECTION 23 May 2023.pdf PDF
Attachment E- Wage Decision Number CA20230018 21 April 2023.pdf PDF
Technical Exhibit S-Div 26 ELECTRICAL 23 May 2023.pdf PDF
Technical Exhibit D-Div 03 CONCRETE 23 May 2023.pdf PDF
Technical Exhibit P-Div 22 PLUMBING 23 May 2023.pdf PDF
Technical Exhibit I-Div 08 OPENINGS 23 May 2023.pdf PDF
Attachment B- Access Procedures - POM Citizen 23 May 2023.pdf PDF
Technical Exhibit B-Div 01 GENERAL REQUIREMENTS 9 June 2023.pdf PDF
Technical Exhibit N-Div 13 SPECIAL CONSTRUCTION 23 May 2023.pdf PDF
Technical Exhibit G-Div 06 WOOD-PLASTICS-AND COMPOSITES 23 May 2023.pdf PDF
Technical Exhibit M-Div 12 FURNISHINGS 23 May 2023.pdf PDF
Technical Exhibit X-Div 33 UTILITIES 23 May 2023.pdf PDF
Technical Exhibit U-Div 28 ELECTRONIC SAFETY AND SECURITY 23 May 2023.pdf PDF
Technical Exhibit E-Div 04 MASONRY 23 May 2023.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POM Job Order Contracting (SATOC) 2503

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00 08/21, CHG 9: 04/22 GENERAL REQUIREMENTS

01 10 00 JOC STATEMENT OF WORK

01 32 01 02/15, CHG 4: 09/22 PROJECT SCHEDULE

01 33 00 08/18, CHG 7: 10/22 SUBMITTAL PROCEDURES

01 35 26 11/20, CHG 5: 08/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19, CHG 1: 03/22 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 11/16, CHG 5: 06/22 QUALITY CONTROL

01 45 00.15 11/16, CHG 2: 1/22 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 9: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 12/18, CHG 6: 12/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 23.01 09/14, CHG 2: 06/22 SMALL PROJECT TEMPORARY STORM WATER

POLLUTION CONTROL

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 71 10 05/10 MOBILIZATION AND DEMOBILIZATION

01 72 00 09/11 ALTERATIONS TO EXISTING FACILITIES

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 6: 08/22 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 78 24 05/18, CHG 2: 09/22 FACILITY DATA REQUIREMENTS

01 91 00.15 05/19, CHG 3: 05/22 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 08/22 DEMOLITION AND DECONSTRUCTION

02 42 51 11/19 CARPET REMOVAL AND RECLAMATION

02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC

CONSTRUCTION MATERIALS

02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

02 85 00 11/18, CHG 1: 05/22 MOLD REMEDIATION

DI VI SI ON 03 - CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

03 37 13 02/18 SHOTCRETE

DI VI SI ON 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

04 23 00 11/15 GLASS UNIT MASONRY

DI VI SI ON 05 - METALS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

PROJECT TABLE OF CONTENTS Page 1

05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00 02/17, CHG 1: 05/17 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING

07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING

07 17 00 02/16 BENTONITE WATERPROOFING

07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 21 23 05/11, CHG 4: 08/18 LOOSE FILL THERMAL INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION AND FINISH SYSTEMS

07 31 13 08/16, CHG 2: 08/18 ASPHALT SHINGLES

07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING

07 55 00 08/09, CHG 1: 05/14 PROTECTED MEMBRANE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 72 20 08/09 GRAVITY-TYPE ROOF VENTILATORS

07 81 00 02/11 SPRAY-APPLIED FIREPROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 01 52 08/09 OPERATION AND MAINTENANCE OF WOOD

WINDOWS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 73 08/20 SLIDING FIRE DOORS

08 13 73 02/11 SLIDING METAL DOORS

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 36 13 08/20 SECTIONAL OVERHEAD DOORS

08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 51 23 08/20, CHG 1: 02/22 STEEL WINDOWS

08 51 69.10 08/20 ALUMINUM STORM WINDOWS

08 52 00 08/20, CHG 1: 02/22 WOOD WINDOWS

PROJECT TABLE OF CONTENTS Page 2

08 56 53 08/20 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 01/08, CHG 2: 11/18 LATH

09 23 00 08/16, CHG 1: 11/18 GYPSUM PLASTERING

09 23 82 11/19 FIREPROOF GYPSUM PLASTERING

09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO

09 26 00 08/16, CHG 1: 08/18 VENEER PLASTER

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 35 16 08/16, CHG 1: 08/18 CHEMICAL-RESISTANT QUARRY TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 64 00 08/16, CHG 1: 08/18 PORTABLE (DEMOUNTABLE) WOOD FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 67 23.14 08/16, CHG 1: 08/18 CHEMICAL RESISTANT RESINOUS FLOORING

09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE

10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS

10 22 19 08/17, CHG 1: 08/18 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 39 08/20 FOLDING PANEL PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 34 17 08/20, CHG 1: 02/21 PRE-ENGINEERED METAL CANOPY

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

10 56 13 04/06 STEEL SHELVING

DI VI SI ON 11 - EQUI PMENT

11 11 37 11/18 ELECTRIC VEHICLE SUPPLY EQUIPMENT

11 47 00 08/17, CHG 1: 08/18 ICE MACHINES

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS

12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS

13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS

PROJECT TABLE OF CONTENTS Page 3

EQUIPMENT

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 12 00 05/11 STANDPIPE SYSTEMS

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM

21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR

KITCHEN CABINET

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES

22 05 83.63 08/22 CURED-IN-PLACE PIPE (CIPP) LINING FOR

PLUMBING APPLICATIONS

22 33 30.00 10 08/20 SOLAR WATER HEATING EQUIPMENT

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 01 30.41 05/22 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22 COMMON PIPING FOR HVAC

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 35 16.17 10 05/20 MECHANICAL ENGINE EXHAUST SYSTEMS

23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS

23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING

WATER AND STEAM HEAT EXCHANGERS

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 65 00 11/16, CHG 2: 08/18 COOLING TOWERS AND REMOTE

EVAPORATIVELY-COOLED CONDENSERS

23 76 00 08/21 EVAPORATIVE COOLING SYSTEMS

23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

23 81 29 02/20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS

23 81 47 08/08, CHG 4: 08/18 WATER-LOOP AND GROUND-LOOP HEAT PUMP

SYSTEMS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

PROJECT TABLE OF CONTENTS Page 4

DI VI SI ON 26 - ELECTRI CAL

26 05 19.10 10 05/16 INSULATED WIRE AND CABLE

26 05 33 02/22 DOCKSIDE POWER CONNECTION STATIONS

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 12 21 05/17, CHG 2: 11/19 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR

26 24 13 08/21 SWITCHBOARDS

26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS

26 27 29 05/21 MARINA ELECTRICAL WORK

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL

INDUCTION TYPE

26 29 02.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL

SYNCHRONOUS TYPE

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)

SYSTEMS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY

(UPS)

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC

PROTECTION (GACP) SYSTEM

26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE

INTERIOR OF STEEL WATER TANKS

26 42 17 05/21 IMPRESSED CURRENT CATHODIC PROTECTION

(ICCP) SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 29.00 10 08/11 PROTECTIVE DISTRIBUTION SYSTEM (PDS)

FOR SIPRNET COMMUNICATION SYSTEMS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 41 00 11/21 AUDIO-VISUAL SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

PROJECT TABLE OF CONTENTS Page 5

31 00 00 08/08, CHG 2: 02/21 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 13.62 05/18 ASPHALT SURFACE TREATMENT

32 01 16.71 11/22 COLD MILLING ASPHALT PAVING

32 01 17.61 05/22 SEALING CRACKS IN ASPHALT PAVING

32 01 17.62 05/20 PAVING FABRIC INTERLAYER

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 20 05/22 SUBBASE COURSE

32 11 23 05/22 AGGREGATE BASE COURSE

32 12 13 05/17 BITUMINOUS TACK COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 12 36.13 05/17 ASPHALTIC SEAL AND FOG COATS

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13 11/21 CHAIN LINK FENCES AND GATES

32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND

ORNAMENTAL) AND GATES

32 31 26 11/21 WIRE FENCES AND GATES

32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 84 23 02/21 UNDERGROUND SPRINKLERS

32 84 24 08/11, CHG 1: 05/17 IRRIGATION SPRINKLER SYSTEMS

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 92 23 04/06, CHG 1: 08/21 SODDING

DI VI SI ON 33 - UTI LI TI ES

33 01 30.16 11/21 TV INSPECTION OF SEWER LINES

33 01 30.72 11/21 RELINING SEWERS

33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION

33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING

33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 16 15 11/20 WATER STORAGE STEEL TANKS

33 30 00 05/18 SANITARY SEWERAGE

33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING

33 34 56.00 10 08/18 DRAINAGE FIELD DOSING CHAMBERS

33 40 00 11/21 STORMWATER UTILITIES

33 46 13 05/20 FOUNDATION DRAINAGE

33 46 16 05/18 SUBDRAINAGE PIPING

33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS

DISTRIBUTION PIPELINES

33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --