POM Job Order Contracting (SATOC) 2503
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 08/21, CHG 9: 04/22 GENERAL REQUIREMENTS
01 10 00 JOC STATEMENT OF WORK
01 32 01 02/15, CHG 4: 09/22 PROJECT SCHEDULE
01 33 00 08/18, CHG 7: 10/22 SUBMITTAL PROCEDURES
01 35 26 11/20, CHG 5: 08/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 03/22 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 11/16, CHG 5: 06/22 QUALITY CONTROL
01 45 00.15 11/16, CHG 2: 1/22 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 9: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 12/18, CHG 6: 12/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23.01 09/14, CHG 2: 06/22 SMALL PROJECT TEMPORARY STORM WATER
POLLUTION CONTROL
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 71 10 05/10 MOBILIZATION AND DEMOBILIZATION
01 72 00 09/11 ALTERATIONS TO EXISTING FACILITIES
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 6: 08/22 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 78 24 05/18, CHG 2: 09/22 FACILITY DATA REQUIREMENTS
01 91 00.15 05/19, CHG 3: 05/22 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 42 51 11/19 CARPET REMOVAL AND RECLAMATION
02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC
CONSTRUCTION MATERIALS
02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 85 00 11/18, CHG 1: 05/22 MOLD REMEDIATION
DI VI SI ON 03 - CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 37 13 02/18 SHOTCRETE
DI VI SI ON 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
04 23 00 11/15 GLASS UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
PROJECT TABLE OF CONTENTS Page 1
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 17 00 02/16 BENTONITE WATERPROOFING
07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 21 23 05/11, CHG 4: 08/18 LOOSE FILL THERMAL INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION AND FINISH SYSTEMS
07 31 13 08/16, CHG 2: 08/18 ASPHALT SHINGLES
07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING
07 55 00 08/09, CHG 1: 05/14 PROTECTED MEMBRANE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 72 20 08/09 GRAVITY-TYPE ROOF VENTILATORS
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 01 52 08/09 OPERATION AND MAINTENANCE OF WOOD
WINDOWS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 73 08/20 SLIDING FIRE DOORS
08 13 73 02/11 SLIDING METAL DOORS
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 36 13 08/20 SECTIONAL OVERHEAD DOORS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 05/19 ALUMINUM WINDOWS
08 51 23 08/20, CHG 1: 02/22 STEEL WINDOWS
08 51 69.10 08/20 ALUMINUM STORM WINDOWS
08 52 00 08/20, CHG 1: 02/22 WOOD WINDOWS
PROJECT TABLE OF CONTENTS Page 2
08 56 53 08/20 BLAST RESISTANT TEMPERED GLASS WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 01/08, CHG 2: 11/18 LATH
09 23 00 08/16, CHG 1: 11/18 GYPSUM PLASTERING
09 23 82 11/19 FIREPROOF GYPSUM PLASTERING
09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO
09 26 00 08/16, CHG 1: 08/18 VENEER PLASTER
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 35 16 08/16, CHG 1: 08/18 CHEMICAL-RESISTANT QUARRY TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 64 00 08/16, CHG 1: 08/18 PORTABLE (DEMOUNTABLE) WOOD FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 67 23.14 08/16, CHG 1: 08/18 CHEMICAL RESISTANT RESINOUS FLOORING
09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 22 19 08/17, CHG 1: 08/18 DEMOUNTABLE AND MOVABLE PARTITIONS
10 22 39 08/20 FOLDING PANEL PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 34 17 08/20, CHG 1: 02/21 PRE-ENGINEERED METAL CANOPY
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
10 56 13 04/06 STEEL SHELVING
DI VI SI ON 11 - EQUI PMENT
11 11 37 11/18 ELECTRIC VEHICLE SUPPLY EQUIPMENT
11 47 00 08/17, CHG 1: 08/18 ICE MACHINES
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
PROJECT TABLE OF CONTENTS Page 3
EQUIPMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM
21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR
KITCHEN CABINET
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES
22 05 83.63 08/22 CURED-IN-PLACE PIPE (CIPP) LINING FOR
PLUMBING APPLICATIONS
22 33 30.00 10 08/20 SOLAR WATER HEATING EQUIPMENT
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 01 30.41 05/22 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 05/22 COMMON PIPING FOR HVAC
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 35 16.17 10 05/20 MECHANICAL ENGINE EXHAUST SYSTEMS
23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS
23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING
WATER AND STEAM HEAT EXCHANGERS
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 65 00 11/16, CHG 2: 08/18 COOLING TOWERS AND REMOTE
EVAPORATIVELY-COOLED CONDENSERS
23 76 00 08/21 EVAPORATIVE COOLING SYSTEMS
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
23 81 29 02/20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
23 81 47 08/08, CHG 4: 08/18 WATER-LOOP AND GROUND-LOOP HEAT PUMP
SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
PROJECT TABLE OF CONTENTS Page 4
DI VI SI ON 26 - ELECTRI CAL
26 05 19.10 10 05/16 INSULATED WIRE AND CABLE
26 05 33 02/22 DOCKSIDE POWER CONNECTION STATIONS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 11/21 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 12 21 05/17, CHG 2: 11/19 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 24 13 08/21 SWITCHBOARDS
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 27 29 05/21 MARINA ELECTRICAL WORK
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL
INDUCTION TYPE
26 29 02.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL
SYNCHRONOUS TYPE
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)
SYSTEMS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC
PROTECTION (GACP) SYSTEM
26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE
INTERIOR OF STEEL WATER TANKS
26 42 17 05/21 IMPRESSED CURRENT CATHODIC PROTECTION
(ICCP) SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 29.00 10 08/11 PROTECTIVE DISTRIBUTION SYSTEM (PDS)
FOR SIPRNET COMMUNICATION SYSTEMS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 41 00 11/21 AUDIO-VISUAL SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
PROJECT TABLE OF CONTENTS Page 5
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 13.62 05/18 ASPHALT SURFACE TREATMENT
32 01 16.71 11/22 COLD MILLING ASPHALT PAVING
32 01 17.61 05/22 SEALING CRACKS IN ASPHALT PAVING
32 01 17.62 05/20 PAVING FABRIC INTERLAYER
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 SUBBASE COURSE
32 11 23 05/22 AGGREGATE BASE COURSE
32 12 13 05/17 BITUMINOUS TACK COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 12 36.13 05/17 ASPHALTIC SEAL AND FOG COATS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 31 26 11/21 WIRE FENCES AND GATES
32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 84 23 02/21 UNDERGROUND SPRINKLERS
32 84 24 08/11, CHG 1: 05/17 IRRIGATION SPRINKLER SYSTEMS
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 01 30.16 11/21 TV INSPECTION OF SEWER LINES
33 01 30.72 11/21 RELINING SEWERS
33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 16 15 11/20 WATER STORAGE STEEL TANKS
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 34 56.00 10 08/18 DRAINAGE FIELD DOSING CHAMBERS
33 40 00 11/21 STORMWATER UTILITIES
33 46 13 05/20 FOUNDATION DRAINAGE
33 46 16 05/18 SUBDRAINAGE PIPING
33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS
DISTRIBUTION PIPELINES
33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --