This document is a Service Order Form for a routine maintenance task involving the replacement of a PRT pump/motor assembly at Tank #23 for a Fuel Storage facility. The service order, numbered 6AA4302, is part of a contract with XYZ-KTR-100 and focuses on replacing a defective pump and motor assembly at a JP-8 Fuel Tank location, with work to be performed across multiple terminals including Terminal 2, 3, 4, 5, and Pier 17.

The total cost of the service order is $6,811.00, which includes $5,500.00 for a Pump/Motor Assembly from R S Corcoran Co. with a 10% markup, $1,000.00 in labor costs for a site superintendent, and additional expenses for taxes and materials. The work requires a qualified electrician to handle electrical disconnects and terminations, and will be conducted in accordance with NFPA 780 article 500. The service order was initiated on 26-Oct-20 with a priority level of P2 and is categorized under the maintenance category of Pump, with funding from CLIN 0004AA.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICE ORDER NUM.: REV #

6AA

XXXX

T2-468

TEXTRA47

XYZ Navy

No No

FMSR FINAL VALIDATION:

NOYES

FMSR COMMENTS: Any box checked "NO" requires a comment, other comments encouraged. If contractor performed in a manner worth noting (positive or negative), please provide

Did contractor communicate with you prior to and upon completion of work? YES

Did contractor have all necessary certifications? YES NO Were there any issues with the work performed? YES NO

YES NO

X

Did contractor arrive with all parts, materials, and tools needed to complete the repair? YES NO

Was the work area kept clean during and upon completion of work?

E-SIGNED & DATED

By signing below, I certify that the services under the above Service Order have been satisfactorily completed.

YES

YES

FMSR INITIAL VALIDATION:

E-SIGNED & DATED

PART III - QUALITY OF WORK

Was work performed in a quality manner?

NO

NO

NO

SERVICE ORDER FORM

PART I - SERVICE ORDER INFORMATION

Contractor Name

FACILITY NUM./NAME:

(Use ALT-Enter to add rows)

CONTRACT NUMBER:CONTRACTOR:

RoutineSERVICE ORDER TYPE:

Contract # aaa

STOR JET FL

EXAMPLE NAME 2

JP-8 Fuel Tank Terminal 2 Terminal 3 Terminal 4 Terminal 5 Pier 17

XYZ-KTR-100

NO

Was work performed safely?

Was work performed in a timely manner? YES Did the prime contractor successfully manage the subcontractor?

Replace PRT Pump/Motor Assembly - CUIDs: ROB-4302-CENPT-0002 & ROB-4302-ELEMT-0002.

Per the FMSR, the PRT pump/motor assembly for Tank #23 (FAC 4302) requires replacement. It has been noted that the motor is defective as well as the pump.

Ktr to replace the defective pump/motor assembly. A qualified electrician will be present for all efforts to make electrical disconnects and final terminations as required. Work will be IAW NFPA 780 article 500.

MORE INFO

MORE INFO More and Better Info.

FMSR NAME (First and Last):

MAINTENANCE CATEGORY: Pump

DETAILED SO DESCRIPTION: (Use ALT-Enter to add rows or new paragraphs)

PART II - AUTHORIZATION

P2 Notice of Violation (NOV) Related?

Is the SO related to Natural Disaster? SO PRIORITY LEVEL:

POJSERVICE & PHASE:

FUNDING CLIN: 0004AA

SITE CODE/SITE NAME: Site Name SERVICE ORDER INITIATION DATE: 26-Oct-20

REV #

6AA

XXXX

T2-468

TEXTRA47

Navy

XYZ

SERVICE ORDER SUBMISSION DATE: 29-Mar-21 No Expected Deliver Date of LL item: 9-Mar-21 29-Apr-21

No CUID: ROB-4302-CENPT-000

ROB-4302-ELEMT-0002

No COMPLEXITY: Low Work Plan Required (Yes/No): No

RITM Used: (Yes/No): Yes ITEM(S) USED: CONTRACT RITM QUANTITY: 800 LF

Date:

CUSTOMER:

E-SIGNED & DATED

Contractor Safety Manager

E-SIGNED & DATED

CONTRACTOR:

E-SIGNED & DATED

CONTRACTING OFFICER OR SOA:

E-SIGNED & DATED

Prime 10.00 $100.00 $1,000.00

1,000.00$

Item Description Manufacturer Man. Part No. Vendor Part No. Catalog/Vendor Catalog # Vendor Price Markup (%) Pump/Motor Assembly R S Corcoran Co. 3000 D (AA05) R S Corcoran Co. $5,000.00 10% 1.00 $5,500.00 $5,500.00

$5,500.00

1.00 $70.00 $70.00

140.00$

5%

15%

JOINT SEALANT/CRACK REPAIR SO QUANTITY TOTAL: 200/800 or 900/800

Subcontractor Materials/Equipment/Other $140.00

$0.00 $171.00Tax (sample percentage)

QTY. UNIT COST TOTAL COST

Item Description

Item Description

Replace PRT Pump/Motor Assembly - CUIDs: ROB-4302-CENPT-0002 & ROB-4302-ELEMT-0002.

Per the FMSR, the PRT pump/motor assembly for Tank #23 (FAC 4302) requires replacement. It has been noted that the motor is defective as well as the pump.

Ktr to replace the defective pump/motor assembly. A qualified electrician will be present for all efforts to make electrical disconnects and final terminations as required. Work will be IAW NFPA 780 article 500.

MORE INFO

MORE INFO More and Better Info.

Site Superintendant - 1-10 hr day Labor Category / Description: Confirm All Rates are in Accordance with TO Proposed Rates.

Prime/Sub

Included in SOSHO PROOF OF QUALIFICATION?

Included in SO

By signing below, I certify that I have reviewed the safety documents for this service order and they meet all contract, OSHA, and regulatory requirements.

TASK ORDER SAFETY MANAGER SIGNATURE: (MUST BE E-SIGNED AND DATED)

Yes LIST INCLUDED AHAs:

Service Order Revision Log:

FULLY BURDENED LABOR

Description:

FACILITY NUM./NAME:

Contract #

Sections 7-2 through 7-10

SO Priority Level: P2

MAINTENANCE CATEGORY:

0004AA

Pump

UFC REFERENCE:

PRIME CONTRACTOR

PART I - SERVICE ORDER INFORMATION

PART III - SERVICE ORDER PRICING

TOTAL MH HOURLY RATE TOTAL COST

SO DESCRIPTION:

TOTAL COST OF SERVICE ORDER: $6,811.00

SERVICE ORDER TYPE:

CONTRACT NUMBER:Contractor NameCONTRACTOR:

SITE CODE/SITE NAME: FUNDING CLIN:

PART II - SERVICE ORDER SAFETY INFORMATION

QUALIFIED/COMPETENT PERSON'S NAME: John Doe

LIST INCLUDED PLANS (SEE EM385-1-1 APPENDIX A):

SERVICE ORDER NUM.:

TOSM NAME:

Sub-Contractor Name

Routine

QP/CP PROOF OF QUALIFICATION?

ALL AHAs ARE PREACCEPTED? Yes

Is the SO related to Natural Disaster?

Notice of Violation Related?

L2 - Dual Hatted Safety

DUID:

EXAMPLE 1

EXAMPLE 2

EXAMPLE 3

XYZ-KTR-100

Site Name

JUSTIFICATION FOR LEVEL OF SHO:

REQUIRED SHO LEVEL:

SERVICE & PHASE:

Does SO Include Long Lead Items?

Expected Start Work Date:

SUB-CONTRACTOR(S):

POJ

aaa

STOR JET FL

EXAMPLE NAME 2

JP-8 Fuel Tank Terminal 2 Terminal 3 Terminal 4 Terminal 5 Pier 17

ANY NEW PLANS REQUIRE SAFETY REVIEW?

TOTAL $6,811.00

Subtotal $5,640.00 Labor $1,000.00

Tax (sample percentage) $275.00

John DoeJOBSITE SHO NAME:

PRIME Material/Equipment/Other Sub-Totals

SUBCONTRACTOR MATERIAL/EQUIPMENT/OTHER

John Doe

Prime Materials/Equipment/Other $5,500.00

Pump/Motor Assembly Subcontractor Material/Equipment/Other Sub-Totals

PRIME MATERIAL/EQUIPMENT/OTHER