POJ HCH FMP V2.2.xlsx

XLSX spreadsheet 345 KB Posted

Attached to
Preventative & Corrective Maintenance (formerly RMMR) Fuels - Japan
Solicitation number
PANHES25P0000001179
Issued by

About this file

This document is a Facility Maintenance Plan (FMP) version 2.2 for the Defense Logistics Agency (DLA) Fuel Storage and Pipeline Terminal located at DFSP Hachinohe in Japan. The facility is situated approximately 300 miles northeast of Tokyo and provides bulk jet fuel storage for distribution to nearby Misawa Air Base, with an operational site covering multiple pump stations, pipelines, and storage infrastructure.

The maintenance plan details comprehensive documentation for the facility's assets, including a detailed task matrix, component unique identifiers, and maintenance requirements for various system components such as pipelines, valves, pumps, tanks, and associated infrastructure. The document includes specific maintenance instructions for over 100 individual components, with references to UFC (Unified Facilities Criteria) section requirements, manufacturer specifications, and operational considerations. The maintenance plan emphasizes systematic tracking of equipment, specifying maintenance frequencies, special considerations, and operational impacts for each asset within the fuel storage and distribution system.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Administrative

LocationSite NameDFSP Hachinohe
RPSUID931
DLA Site CodeHCH
Hours of Operation0700 - 1700
Address10-9 Uheiegawara Kawaragi Hachinohe, Aomori 039-1161 Japan
ContractContractor
Contract #
Local POCsQAE Name
QAE Phone
QAE Email
Alt QAE Name
Alt QAE Phone
Alt QAE Email
DLA/SCP POCsDLA PM Name
DLA PM Phone
DLA PM Email
SCP PM Name
SCP PM Phone
SCP PM Email
Contractor POCsContractor PM Name
Contractor PM Phone
Contractor PM Email
Contractor QC Name
Contractor QC Phone
Contractor QC Email
Contractor SM Name
Contractor SM Phone
Contractor SM Email
USACE POCsUSACE PM/COR Name
USACE PM/COR Phone
USACE PM/COR Email
USACE PE Name
USACE PE Phone
USACE PE Email
USACE KO Name
USACE KO Phone
USACE KO Email

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.

General Facility Description

General Facility Description
Installation NameDFSP Hachinohe
DLA Site CodeHCH
LocationHachinohe, Japan
DFSP Hachinohe Terminal is located about 300 miles northeast of Tokyo at the Hachinohe sea port on the northern coast of Honshu, Japan’s largest island. DFSP Hachinohe Terminal provides bulk storage of jet fuel for distribution to nearby Misawa Air Base (AB), which is located about 15 miles south of the Terminal.

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.

Include Site Specific Conditions and Restrictions in this tab.

Figure 1

Site Location Drawings
Figure 1 - Site Location

Facility Maintenance Plan v2.2 &P of &N

Communication Plan

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.

Safety

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.

RM Schedule

Facility Maintenance Plan

FMP v2.2 &P of &N

Instructions:

Link RM schedule here

Task Matrix

Applicable Facility AssetsUFC System Level Maintenance FrequencySpecial Considerations
Real Property Unique Identifier
(RPUID)Real Property Facility #Real Property Facility NameOperational AreaComponent TypeBase Asset IDComponent Unique Identifier (CUID)MakeModelCapacity/SizeQSAUFC Section ReferenceAdditional Manufacturer RM RequirementsOperator/ equipment RequirementsSystem availabilityOther ContractCommentsSupplementary Comments (Not Required in Template)
1116108HCH-200000200000-SECURITY FENCE AT PS 3Pump Station 3EQ-Real Property*HCH-200000-ASSET-116762Non-Appx G ClassSecurity Fence around Pump Station 2
1286267HCH-200005200005-SECURITY FENCE AT PS2PUMP STATION 2EQ-Real Property*HCH-200005-ASSET-116766Non-Appx G ClassSecurity Fence around Pump Station 2
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116767XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve Pit for Pit 262
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116768XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 263
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116769XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 28
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116770XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 23
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116771XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 250
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116772XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 240B
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116773XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 240A
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116774XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 232
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116775XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 223
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116776XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 222B
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116777XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for 222A
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116778XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 209
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116779XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 192
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116780XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 191
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116781XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 174
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116782XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 155B
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116783XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 155A
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116784XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 173
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116785XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 140
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116786XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 130
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116787XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 122
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116788XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 117
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116789XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 113
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116790XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 62
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116791XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 3
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116792XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 49
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116793XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 72
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116794XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 83
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116795XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 91
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116796XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 95
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116797XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 97
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116798XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 79
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116799XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 102
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116800XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 108
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116801XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 116
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Isolation Valve PitsHCH-201051-ISVLP-116802XSection 6-11.1FAC assists with access to pit-4 week notice required-Valve pit for Pit 213
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-116741XXSection 8-10.6No requirements-No requirements-Pit 91 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-116752XXSection 8-10.6No requirements-No requirements-Pit 213 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-116753XXSection 8-10.6No requirements-No requirements-Pit 116 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01324HCH-201051-BLVL-116827XSection 6-6.2.4No requirements-4 week notice required-HPV Line #1 Outlet
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01325HCH-201051-BLVL-116828XSection 6-6.2.4No requirements-4 week notice required-HPV Line #1 Inlet - Camlock
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTR1-088HCH-201051-BLVL-116829XSection 6-6.2.4No requirements-4 week notice required-Below PG on SS 2-in
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01326HCH-201051-BLVL-116830XSection 6-6.2.4No requirements-4 week notice required-HPV Line #1 Camlock
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01327HCH-201051-BLVL-116831XSection 6-6.2.4No requirements-4 week notice required-HPV Line #2 Plug
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01340HCH-201051-BLVL-116832XSection 6-6.2.4No requirements-4 week notice required-LPD Line #1 near stairs
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01329HCH-201051-BLVL-116833XSection 6-6.2.4No requirements-4 week notice required-LPD Line #2 near stairs
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01328HCH-201051-BLVL-116834XSection 6-6.2.4No requirements-4 week notice required-HPV Line #3 near stairs
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHC01339HCH-201051-BLVL-116835XSection 6-6.2.4No requirements-4 week notice required-LPD Line #3 near stairs
123072HCH-201051201051-POL PIPELINEPIPELINECS-Dike/Berm with Walls and FloorsHCH-201051-DKBW-116738XSection 8-10.2No requirements-No requirements-SDA Injector Manifold Containment
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Check ValvesHCH-201051-CKVL-116849XSection 6-6.2.8No requirements-4 week notice required-Flanged CSTank three Outlet header line to common relief CV
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Check ValvesHCH-201051-CKVL-116850XSection 6-6.2.8No requirements-4 week notice required-Flanged CSTank four inlet header to common relief CV
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Check ValvesHCH-201051-CKVL-116851XSection 6-6.2.8No requirements-4 week notice required-Flanged CSCommon relief line header CV tank 5
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Check ValvesHCH-201051-CKVL-116852XSection 6-6.2.8No requirements-4 week notice required-Flanged CSTank seven header drain line CV 2in
123072HCH-201051201051-POL PIPELINEPIPELINEFP-Low Point DrainsHCH-201051-LPDN-116853XSection 6-12.1LPD on Basket Strainer
123072HCH-201051201051-POL PIPELINEPIPELINEPL-Non-DOT RegulatedHCH-201051-NDPL-116858XSection 6-1.2.1No requirements-No requirements-Underground, Double-Walled Pipeline (2 Lines). PS1 to PS2 including Pits 3, 49, 62, 72, 79, 83
123072HCH-201051201051-POL PIPELINEPIPELINEPL-Non-DOT RegulatedHCH-201051-NDPL-116859XSection 6-1.2.1No requirements-No requirements-Underground, Double-Walled Pipeline (2 Lines). PS2 to PS3 including Pits 91, 95, 97, 102, 108, 113, 116, 117, 122, 130, 140, 155A, 155B
123072HCH-201051201051-POL PIPELINEPIPELINEPL-Non-DOT RegulatedHCH-201051-NDPL-116860XSection 6-1.2.1No requirements-No requirements-Pits 262 and 263 on MisawaUGD, Double-Walled Pipeline (2 Lines). PS3 to Misawa including Pits 173, 174, 191, 192, 209, 213, 222A, 222B, 223, 232, 240A, 240B, 250, 262, 263
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123189XXSection 8-10.6No requirements-No requirements-Pipe penetrations at Pit 23
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123190XXSection 8-10.6No requirements-No requirements-Pipe penetrations at Pit 28
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123191XXSection 8-10.6No requirements-No requirements-Pit located on MIS ABPit 262 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINEFT-Basket StrainerHCH-201051-BSTR-123193XXSection 3-6.4No requirements-4 week notice required-Class 300; 80 meshY-Strainer on bypass Line 1 in Pit 23; right side of the pit
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123194XXSection 8-10.6No requirements-No requirements-Pit located on MIS ABPit 263 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINEFT-Basket StrainerHC00153HCH-201051-BSTR-123195XXSection 3-6.4No requirements-4 week notice required-Line #1 Basket Strainer
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123197XXSection 8-10.6No requirements-No requirements-Pit 250 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123200XXSection 8-10.6No requirements-No requirements-Pit 240B - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123202XXSection 8-10.6No requirements-No requirements-Pit 240A - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123205XXSection 8-10.6No requirements-No requirements-Pit 232 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123207XXSection 8-10.6No requirements-No requirements-Pit 223 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123209XXSection 8-10.6No requirements-No requirements-Pit 222B - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123211XXSection 8-10.6No requirements-No requirements-Pit 222A - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123213XXSection 8-10.6No requirements-No requirements-Pit 209 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123214XXSection 8-10.6No requirements-No requirements-Pit 192 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123216XXSection 8-10.6No requirements-No requirements-Pit 191 - Penetrations (QTY: 5; 1 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123218XXSection 8-10.6No requirements-No requirements-Pit 174 - Penetrations (QTY: 5; 1 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123220XXSection 8-10.6No requirements-No requirements-Pit 173 - Penetrations (QTY: 5; 1 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123223XXSection 8-10.6No requirements-No requirements-Pit 155B - Penetrations (QTY: 9; 5 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123225XXSection 8-10.6No requirements-No requirements-Pit 155A - Penetrations (QTY: 9; 5 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123227XXSection 8-10.6No requirements-No requirements-Pit 140 - Penetrations (QTY: 9; 5 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123230XXSection 8-10.6No requirements-No requirements-Pit 130 - Penetrations (QTY: 8; 4 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123233XXSection 8-10.6No requirements-No requirements-Pit 122 - Penetrations (QTY: 8; 4 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123234XXSection 8-10.6No requirements-No requirements-Pit 117 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123236XXSection 8-10.6No requirements-No requirements-Pit 113 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123238XXSection 8-10.6No requirements-No requirements-Pit 3 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123240XXSection 8-10.6No requirements-No requirements-Pit 49 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123242XXSection 8-10.6No requirements-No requirements-Pit 62 - Penetrations (QTY: 6; 2 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123244XXSection 8-10.6No requirements-No requirements-Pit 72 - Penetrations (QTY: 8; 4 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123246XXSection 8-10.6No requirements-No requirements-Pit 79 - Penetrations (QTY: 6; 2 capped)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123247XXSection 8-10.6No requirements-No requirements-Pit 83 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123249XXSection 8-10.6No requirements-No requirements-Pit 95 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123251XXSection 8-10.6No requirements-No requirements-Pit 97 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123253XXSection 8-10.6No requirements-No requirements-Pit 102 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINECS-Pipe PenetrationsHCH-201051-PPEN-123255XXSection 8-10.6No requirements-No requirements-Pit 108 - Penetrations (QTY: 4)
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127863APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 140 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTRI-098HCH-201051-BLVL-127864APOLLOXSection 6-6.2.4No requirements-4 week notice required-BV on PRV 7589HCH
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127865APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 140 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127866APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 140 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127867APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 130 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTRI-099HCH-201051-BLVL-127868APOLLOXSection 6-6.2.4No requirements-4 week notice required-BV on PRV 7589HCH
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127869APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 130 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127870APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 130 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTRI-096HCH-201051-BLVL-127871APOLLOXSection 6-6.2.4No requirements-4 week notice required-BV on PRV 7587HCH
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127872APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 130 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127873APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 122 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTRI-097HCH-201051-BLVL-127874APOLLOXSection 6-6.2.4No requirements-4 week notice required-BV on PRV 7587HCH
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127875APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 122 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127876APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 122 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTRI-095HCH-201051-BLVL-127877APOLLOXSection 6-6.2.4No requirements-4 week notice required-BV on PRV 7588HCH
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127878APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 122 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127860APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 140 - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127880APOLLOXSection 6-6.2.4No requirements-4 week notice required-BV on PRV 7588HCH
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTR1-093HCH-201051-BLVL-127882APOLLOXSection 6-6.2.4No requirements-4 week notice required-Line #1 check loop around 7582
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTR1-092HCH-201051-BLVL-127884APOLLOXSection 6-6.2.4No requirements-4 week notice required-Line #1 check loop around 7582
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127886APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 222A - L1 - BV on LP near PG 8833
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127888APOLLOXSection 6-6.2.4No requirements-4 week notice required-ThreadedPit 222A - L1 - BV on PG 8834
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127890APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 222A - L2 - BV on LP near PG 8837
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127892APOLLOXSection 6-6.2.4No requirements-4 week notice required-ThreadedPit 222A - L2 - BV on PG 8837
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127894APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155B - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127895APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155B - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127896APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155B - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127898APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155B - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127900APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155A - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127902APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155A - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127904APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155A - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-127906APOLLOXSection 6-6.2.4No requirements-4 week notice required-Pit 155A - BV sticking out from wall; blinded
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00445HCH-201051-DBBVL-128549Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00431HCH-201051-DBBVL-128551Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #2 By-pass
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00446HCH-201051-DBBVL-128553Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00437HCH-201051-DBBVL-128555Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #2 Inlet O/H
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00442HCH-201051-DBBVL-128557Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #2 O/H Outlet
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00447HCH-201051-DBBVL-128559Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00441HCH-201051-DBBVL-128561Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Line #1 O/H Outlet
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00432HCH-201051-DBBVL-128563Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00435HCH-201051-DBBVL-128564Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #1 Inlet O/H
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00277HCH-201051-DBBVL-128566Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #3 O/H Outlet
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00443HCH-201051-DBBVL-128568Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB onLine #3 Inlet O/H
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00425HCH-201051-DBBVL-128569Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00426HCH-201051-DBBVL-128570Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00486HCH-201051-DBBVL-128571Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-DBB on Line #3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesTR1-089HCH-201051-BLVL-128539CameronXSection 6-6.2.4No requirements-4 week notice required-Line #3 Inlet
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131415Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSInlet header tank 2 to common relief BV
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131416Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV Inlet header tank 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131417Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV line 1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131418Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV line 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131419Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV line 3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131420Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on LPD line 1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131421Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on LPD line 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131422Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on LPD line 3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131423Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131424Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank three Outlet header line to common relief BV
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131425Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV line 1 tank two
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131426Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV line 2 tank two
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131427Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on HPV line 3tank two
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131428Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on LPD line 1 tank two
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131429Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on LPD line 2 tank two
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131430Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSBV on LPD line 3 tank two
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131431Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank four inlet header to common relief BV
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131432Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSHPV BV line 1 tank 4
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131433Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSHPV BV line 2 tank 4
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131434Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSHPV BV line 3 tank 4
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131435Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSLPD BV line 1 tank 4
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131436Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSLPD BV line 2 tank 4
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131437Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSLPD BV line 3 tank 4
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131438Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSCommon relief line header BV tank 5
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131439Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSCommon relief line tank 5
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131440Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSCommon relief line tank 5
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131441Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank five BV on HPV line 1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131442Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank five BV on HPV line 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131443Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank five BV on HPV line 3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131444Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank five BV on LPD line 1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131446Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank five BV on LPD line 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131456Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank six BV on HPV line 1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Check ValvesHCH-201051-CKVL-131457Flow-TekXSection 6-6.2.8No requirements-4 week notice required-Flanged CSInlet header tank 2 to common relief CV
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131459Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank six BV on HPV line 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131462Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank six BV on HPV line 3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131464Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank six BV on LPD line 1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131466Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank six BV on LPD line 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131468Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank six BV on LPD line 3
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Ball ValvesHCH-201051-BLVL-131471Flow-TekXSection 6-6.2.4No requirements-4 week notice required-Flanged CSTank seven header drain line BV 2in
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00468HCH-201051-DBBVL-132388Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Three Line 1 DBB between Inlet and Outlet Header
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHCH-201051-DBBVL-132390Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Six Outlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00784HCH-201051-DBBVL-132391Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Three Outlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHCH-201051-DBBVL-132393Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Six outelet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00472HCH-201051-DBBVL-132394Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Three Outlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00507HCH-201051-DBBVL-132396Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Five after Inlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00457HCH-201051-DBBVL-132397Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two Inlet Header Line 2 DBB Inlet Header
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHCH-201051-DBBVL-132399Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Six Outlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00509HCH-201051-DBBVL-132400Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Five after Inlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed Valves539HCH-201051-DBBVL-132402Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Seven Inlet Header DBB Line 2
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00502HCH-201051-DBBVL-132403Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Five between Inlet and Outlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00505HCH-201051-DBBVL-132405Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Five Outlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed Valves538HCH-201051-DBBVL-132406Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Seven Inlet Header DBB Line 1
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00491HCH-201051-DBBVL-132408Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four after Inlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00462HCH-201051-DBBVL-132410Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two after Inlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00479HCH-201051-DBBVL-132411Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four Inlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC000487HCH-201051-DBBVL-132413Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four Inlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHCH-201051-DBBVL-132415Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four Outlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00484HCH-201051-DBBVL-132416Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four between Outlet and Inlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00485HCH-201051-DBBVL-132418Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four between Outlet and Inlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00489HCH-201051-DBBVL-132419Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four Inlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00488HCH-201051-DBBVL-132421Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four Outlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00493HCH-201051-DBBVL-132422Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four after Inlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00476HCH-201051-DBBVL-132424Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two after Inlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00461HCH-201051-DBBVL-132425Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two after Inlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00478HCH-201051-DBBVL-132427Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Four Outlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00496HCH-201051-DBBVL-132428Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Five Outlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00473HCH-201051-DBBVL-132430Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two Inlet Header Line 3 DBB Inlet Header
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00494HCH-201051-DBBVL-132431Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Five Outlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00470HCH-201051-DBBVL-132433Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Three Outlet Header Line 3 DBB between Inlet and Outlet Header
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00475HCH-201051-DBBVL-132434Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two after Inlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00463HCH-201051-DBBVL-132436Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Three Outlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00455HCH-201051-DBBVL-132438Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two Outlet Header Line 3 DBB between Inlet and Outlet Header
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC0448HCH-201051-DBBVL-132439Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two Inlet Header Line 1 DBB Inlet Header
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00508HCH-201051-DBBVL-132441Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Five after Inlet Header Line 2 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00460HCH-201051-DBBVL-132442Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two after Inlet Header Line 1 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00477HCH-201051-DBBVL-132444Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two after Inlet Header Line 3 DBB
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00453HCH-201051-DBBVL-132445Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two Outlet Header Line 1 DBB between Inlet and Outlet Header
123072HCH-201051201051-POL PIPELINEPIPELINEMV-Double Block and Bleed ValvesHC00454HCH-201051-DBBVL-132447Cameron GENERAL VALVE TwiXXSection 6-6.2.5FAC provides test fuel and disposal-4 week notice required-Flanged CSTank Two Outlet Header Line 2 DBB between Inlet and Outlet Header

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .