POJ HCH FMP V2.2.xlsx
XLSX spreadsheet 345 KB Posted
- Solicitation number
- PANHES25P0000001179
About this file
This document is a Facility Maintenance Plan (FMP) version 2.2 for the Defense Logistics Agency (DLA) Fuel Storage and Pipeline Terminal located at DFSP Hachinohe in Japan. The facility is situated approximately 300 miles northeast of Tokyo and provides bulk jet fuel storage for distribution to nearby Misawa Air Base, with an operational site covering multiple pump stations, pipelines, and storage infrastructure.
The maintenance plan details comprehensive documentation for the facility's assets, including a detailed task matrix, component unique identifiers, and maintenance requirements for various system components such as pipelines, valves, pumps, tanks, and associated infrastructure. The document includes specific maintenance instructions for over 100 individual components, with references to UFC (Unified Facilities Criteria) section requirements, manufacturer specifications, and operational considerations. The maintenance plan emphasizes systematic tracking of equipment, specifying maintenance frequencies, special considerations, and operational impacts for each asset within the fuel storage and distribution system.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative
| Location | Site Name | DFSP Hachinohe |
| RPSUID | 931 | |
| DLA Site Code | HCH | |
| Hours of Operation | 0700 - 1700 | |
| Address | 10-9 Uheiegawara Kawaragi Hachinohe, Aomori 039-1161 Japan | |
| Contract | Contractor | |
| Contract # | ||
| Local POCs | QAE Name | |
| QAE Phone | ||
| QAE Email | ||
| Alt QAE Name | ||
| Alt QAE Phone | ||
| Alt QAE Email | ||
| DLA/SCP POCs | DLA PM Name | |
| DLA PM Phone | ||
| DLA PM Email | ||
| SCP PM Name | ||
| SCP PM Phone | ||
| SCP PM Email | ||
| Contractor POCs | Contractor PM Name | |
| Contractor PM Phone | ||
| Contractor PM Email | ||
| Contractor QC Name | ||
| Contractor QC Phone | ||
| Contractor QC Email | ||
| Contractor SM Name | ||
| Contractor SM Phone | ||
| Contractor SM Email | ||
| USACE POCs | USACE PM/COR Name | |
| USACE PM/COR Phone | ||
| USACE PM/COR Email | ||
| USACE PE Name | ||
| USACE PE Phone | ||
| USACE PE Email | ||
| USACE KO Name | ||
| USACE KO Phone | ||
| USACE KO Email |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
This table shows the minimum information required. Additional details should be included based on site specific requirements. Additional POCs may be required.
General Facility Description
| General Facility Description | |
| Installation Name | DFSP Hachinohe |
| DLA Site Code | HCH |
| Location | Hachinohe, Japan |
| DFSP Hachinohe Terminal is located about 300 miles northeast of Tokyo at the Hachinohe sea port on the northern coast of Honshu, Japan’s largest island. DFSP Hachinohe Terminal provides bulk storage of jet fuel for distribution to nearby Misawa Air Base (AB), which is located about 15 miles south of the Terminal. |
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Include a general facility overview and description of each fuel system for the sites in accordance with UFC 3-460-01. Examples include: Bulk Storage Facilities, Aircraft Fueling Facilities, Marine and Dispensing Facilities, Ground Products Fueling Facilities, Alternate POL Facilities, and Support Facilities. Also include facility #s, facility names, fuel type, photos, and any other pertinent information.
Include Site Specific Conditions and Restrictions in this tab.
Figure 1
| Site Location Drawings |
| Figure 1 - Site Location |
Facility Maintenance Plan v2.2 &P of &N
Communication Plan
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Communication plan shall address in/out briefs, lines of communication, coordination for access, etc.
Safety
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Site Specific Addendum and Activity Hazard Analysis, which are Attachments to the APP, specific to activities or tasks related to recurring maintenance for this site.
RM Schedule
Facility Maintenance Plan
FMP v2.2 &P of &N
Instructions:
Link RM schedule here
Task Matrix
| Applicable Facility Assets | UFC System Level Maintenance Frequency | Special Considerations | ||||||||||||||||||
| Real Property Unique Identifier | ||||||||||||||||||||
| (RPUID) | Real Property Facility # | Real Property Facility Name | Operational Area | Component Type | Base Asset ID | Component Unique Identifier (CUID) | Make | Model | Capacity/Size | Q | S | A | UFC Section Reference | Additional Manufacturer RM Requirements | Operator/ equipment Requirements | System availability | Other Contract | Comments | Supplementary Comments (Not Required in Template) | |
| 1116108 | HCH-200000 | 200000-SECURITY FENCE AT PS 3 | Pump Station 3 | EQ-Real Property* | HCH-200000-ASSET-116762 | Non-Appx G Class | Security Fence around Pump Station 2 | |||||||||||||
| 1286267 | HCH-200005 | 200005-SECURITY FENCE AT PS2 | PUMP STATION 2 | EQ-Real Property* | HCH-200005-ASSET-116766 | Non-Appx G Class | Security Fence around Pump Station 2 | |||||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116767 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve Pit for Pit 262 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116768 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 263 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116769 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 28 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116770 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 23 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116771 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 250 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116772 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 240B | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116773 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 240A | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116774 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 232 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116775 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 223 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116776 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 222B | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116777 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for 222A | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116778 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 209 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116779 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 192 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116780 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 191 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116781 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 174 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116782 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 155B | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116783 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 155A | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116784 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 173 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116785 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 140 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116786 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 130 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116787 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 122 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116788 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 117 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116789 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 113 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116790 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 62 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116791 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 3 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116792 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 49 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116793 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 72 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116794 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 83 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116795 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 91 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116796 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 95 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116797 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 97 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116798 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 79 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116799 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 102 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116800 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 108 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116801 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 116 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Isolation Valve Pits | HCH-201051-ISVLP-116802 | X | Section 6-11.1 | FAC assists with access to pit- | 4 week notice required- | Valve pit for Pit 213 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-116741 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 91 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-116752 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 213 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-116753 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 116 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01324 | HCH-201051-BLVL-116827 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | HPV Line #1 Outlet | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01325 | HCH-201051-BLVL-116828 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | HPV Line #1 Inlet - Camlock | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TR1-088 | HCH-201051-BLVL-116829 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Below PG on SS 2-in | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01326 | HCH-201051-BLVL-116830 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | HPV Line #1 Camlock | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01327 | HCH-201051-BLVL-116831 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | HPV Line #2 Plug | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01340 | HCH-201051-BLVL-116832 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | LPD Line #1 near stairs | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01329 | HCH-201051-BLVL-116833 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | LPD Line #2 near stairs | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01328 | HCH-201051-BLVL-116834 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | HPV Line #3 near stairs | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HC01339 | HCH-201051-BLVL-116835 | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | LPD Line #3 near stairs | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Dike/Berm with Walls and Floors | HCH-201051-DKBW-116738 | X | Section 8-10.2 | No requirements- | No requirements- | SDA Injector Manifold Containment | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Check Valves | HCH-201051-CKVL-116849 | X | Section 6-6.2.8 | No requirements- | 4 week notice required- | Flanged CS | Tank three Outlet header line to common relief CV | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Check Valves | HCH-201051-CKVL-116850 | X | Section 6-6.2.8 | No requirements- | 4 week notice required- | Flanged CS | Tank four inlet header to common relief CV | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Check Valves | HCH-201051-CKVL-116851 | X | Section 6-6.2.8 | No requirements- | 4 week notice required- | Flanged CS | Common relief line header CV tank 5 | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Check Valves | HCH-201051-CKVL-116852 | X | Section 6-6.2.8 | No requirements- | 4 week notice required- | Flanged CS | Tank seven header drain line CV 2in | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FP-Low Point Drains | HCH-201051-LPDN-116853 | X | Section 6-12.1 | LPD on Basket Strainer | ||||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | PL-Non-DOT Regulated | HCH-201051-NDPL-116858 | X | Section 6-1.2.1 | No requirements- | No requirements- | Underground, Double-Walled Pipeline (2 Lines). PS1 to PS2 including Pits 3, 49, 62, 72, 79, 83 | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | PL-Non-DOT Regulated | HCH-201051-NDPL-116859 | X | Section 6-1.2.1 | No requirements- | No requirements- | Underground, Double-Walled Pipeline (2 Lines). PS2 to PS3 including Pits 91, 95, 97, 102, 108, 113, 116, 117, 122, 130, 140, 155A, 155B | ||||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | PL-Non-DOT Regulated | HCH-201051-NDPL-116860 | X | Section 6-1.2.1 | No requirements- | No requirements- | Pits 262 and 263 on Misawa | UGD, Double-Walled Pipeline (2 Lines). PS3 to Misawa including Pits 173, 174, 191, 192, 209, 213, 222A, 222B, 223, 232, 240A, 240B, 250, 262, 263 | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123189 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pipe penetrations at Pit 23 | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123190 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pipe penetrations at Pit 28 | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123191 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit located on MIS AB | Pit 262 - Penetrations (QTY: 4) | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FT-Basket Strainer | HCH-201051-BSTR-123193 | X | X | Section 3-6.4 | No requirements- | 4 week notice required- | Class 300; 80 mesh | Y-Strainer on bypass Line 1 in Pit 23; right side of the pit | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123194 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit located on MIS AB | Pit 263 - Penetrations (QTY: 4) | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | FT-Basket Strainer | HC00153 | HCH-201051-BSTR-123195 | X | X | Section 3-6.4 | No requirements- | 4 week notice required- | Line #1 Basket Strainer | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123197 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 250 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123200 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 240B - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123202 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 240A - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123205 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 232 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123207 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 223 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123209 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 222B - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123211 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 222A - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123213 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 209 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123214 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 192 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123216 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 191 - Penetrations (QTY: 5; 1 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123218 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 174 - Penetrations (QTY: 5; 1 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123220 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 173 - Penetrations (QTY: 5; 1 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123223 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 155B - Penetrations (QTY: 9; 5 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123225 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 155A - Penetrations (QTY: 9; 5 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123227 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 140 - Penetrations (QTY: 9; 5 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123230 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 130 - Penetrations (QTY: 8; 4 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123233 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 122 - Penetrations (QTY: 8; 4 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123234 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 117 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123236 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 113 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123238 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 3 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123240 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 49 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123242 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 62 - Penetrations (QTY: 6; 2 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123244 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 72 - Penetrations (QTY: 8; 4 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123246 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 79 - Penetrations (QTY: 6; 2 capped) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123247 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 83 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123249 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 95 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123251 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 97 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123253 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 102 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | CS-Pipe Penetrations | HCH-201051-PPEN-123255 | X | X | Section 8-10.6 | No requirements- | No requirements- | Pit 108 - Penetrations (QTY: 4) | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127863 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 140 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TRI-098 | HCH-201051-BLVL-127864 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | BV on PRV 7589HCH | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127865 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 140 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127866 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 140 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127867 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 130 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TRI-099 | HCH-201051-BLVL-127868 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | BV on PRV 7589HCH | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127869 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 130 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127870 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 130 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TRI-096 | HCH-201051-BLVL-127871 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | BV on PRV 7587HCH | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127872 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 130 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127873 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 122 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TRI-097 | HCH-201051-BLVL-127874 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | BV on PRV 7587HCH | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127875 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 122 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127876 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 122 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TRI-095 | HCH-201051-BLVL-127877 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | BV on PRV 7588HCH | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127878 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 122 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127860 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 140 - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127880 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | BV on PRV 7588HCH | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TR1-093 | HCH-201051-BLVL-127882 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Line #1 check loop around 7582 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TR1-092 | HCH-201051-BLVL-127884 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Line #1 check loop around 7582 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127886 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 222A - L1 - BV on LP near PG 8833 | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127888 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Threaded | Pit 222A - L1 - BV on PG 8834 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127890 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 222A - L2 - BV on LP near PG 8837 | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127892 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Threaded | Pit 222A - L2 - BV on PG 8837 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127894 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155B - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127895 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155B - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127896 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155B - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127898 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155B - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127900 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155A - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127902 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155A - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127904 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155A - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-127906 | APOLLO | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Pit 155A - BV sticking out from wall; blinded | |||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00445 | HCH-201051-DBBVL-128549 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #1 | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00431 | HCH-201051-DBBVL-128551 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #2 By-pass | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00446 | HCH-201051-DBBVL-128553 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #2 | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00437 | HCH-201051-DBBVL-128555 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #2 Inlet O/H | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00442 | HCH-201051-DBBVL-128557 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #2 O/H Outlet | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00447 | HCH-201051-DBBVL-128559 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #3 | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00441 | HCH-201051-DBBVL-128561 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Line #1 O/H Outlet | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00432 | HCH-201051-DBBVL-128563 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #3 | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00435 | HCH-201051-DBBVL-128564 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #1 Inlet O/H | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00277 | HCH-201051-DBBVL-128566 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #3 O/H Outlet | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00443 | HCH-201051-DBBVL-128568 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB onLine #3 Inlet O/H | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00425 | HCH-201051-DBBVL-128569 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #1 | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00426 | HCH-201051-DBBVL-128570 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #2 | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00486 | HCH-201051-DBBVL-128571 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | DBB on Line #3 | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | TR1-089 | HCH-201051-BLVL-128539 | Cameron | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Line #3 Inlet | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131415 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Inlet header tank 2 to common relief BV | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131416 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV Inlet header tank 2 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131417 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV line 1 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131418 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV line 2 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131419 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV line 3 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131420 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on LPD line 1 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131421 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on LPD line 2 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131422 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on LPD line 3 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131423 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131424 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank three Outlet header line to common relief BV | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131425 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV line 1 tank two | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131426 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV line 2 tank two | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131427 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on HPV line 3tank two | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131428 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on LPD line 1 tank two | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131429 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on LPD line 2 tank two | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131430 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | BV on LPD line 3 tank two | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131431 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank four inlet header to common relief BV | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131432 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | HPV BV line 1 tank 4 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131433 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | HPV BV line 2 tank 4 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131434 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | HPV BV line 3 tank 4 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131435 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | LPD BV line 1 tank 4 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131436 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | LPD BV line 2 tank 4 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131437 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | LPD BV line 3 tank 4 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131438 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Common relief line header BV tank 5 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131439 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Common relief line tank 5 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131440 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Common relief line tank 5 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131441 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank five BV on HPV line 1 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131442 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank five BV on HPV line 2 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131443 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank five BV on HPV line 3 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131444 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank five BV on LPD line 1 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131446 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank five BV on LPD line 2 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131456 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank six BV on HPV line 1 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Check Valves | HCH-201051-CKVL-131457 | Flow-Tek | X | Section 6-6.2.8 | No requirements- | 4 week notice required- | Flanged CS | Inlet header tank 2 to common relief CV | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131459 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank six BV on HPV line 2 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131462 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank six BV on HPV line 3 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131464 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank six BV on LPD line 1 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131466 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank six BV on LPD line 2 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131468 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank six BV on LPD line 3 | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Ball Valves | HCH-201051-BLVL-131471 | Flow-Tek | X | Section 6-6.2.4 | No requirements- | 4 week notice required- | Flanged CS | Tank seven header drain line BV 2in | ||||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00468 | HCH-201051-DBBVL-132388 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Three Line 1 DBB between Inlet and Outlet Header | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HCH-201051-DBBVL-132390 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Six Outlet Header Line 2 DBB | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00784 | HCH-201051-DBBVL-132391 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Three Outlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HCH-201051-DBBVL-132393 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Six outelet Header Line 1 DBB | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00472 | HCH-201051-DBBVL-132394 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Three Outlet Header Line 2 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00507 | HCH-201051-DBBVL-132396 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Five after Inlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00457 | HCH-201051-DBBVL-132397 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two Inlet Header Line 2 DBB Inlet Header | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HCH-201051-DBBVL-132399 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Six Outlet Header Line 3 DBB | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00509 | HCH-201051-DBBVL-132400 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Five after Inlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | 539 | HCH-201051-DBBVL-132402 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Seven Inlet Header DBB Line 2 | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00502 | HCH-201051-DBBVL-132403 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Five between Inlet and Outlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00505 | HCH-201051-DBBVL-132405 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Five Outlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | 538 | HCH-201051-DBBVL-132406 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Seven Inlet Header DBB Line 1 | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00491 | HCH-201051-DBBVL-132408 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four after Inlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00462 | HCH-201051-DBBVL-132410 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two after Inlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00479 | HCH-201051-DBBVL-132411 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four Inlet Header Line 2 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC000487 | HCH-201051-DBBVL-132413 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four Inlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HCH-201051-DBBVL-132415 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four Outlet Header Line 3 DBB | |||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00484 | HCH-201051-DBBVL-132416 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four between Outlet and Inlet Header Line 2 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00485 | HCH-201051-DBBVL-132418 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four between Outlet and Inlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00489 | HCH-201051-DBBVL-132419 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four Inlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00488 | HCH-201051-DBBVL-132421 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four Outlet Header Line 2 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00493 | HCH-201051-DBBVL-132422 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four after Inlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00476 | HCH-201051-DBBVL-132424 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two after Inlet Header Line 2 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00461 | HCH-201051-DBBVL-132425 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two after Inlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00478 | HCH-201051-DBBVL-132427 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Four Outlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00496 | HCH-201051-DBBVL-132428 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Five Outlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00473 | HCH-201051-DBBVL-132430 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two Inlet Header Line 3 DBB Inlet Header | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00494 | HCH-201051-DBBVL-132431 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Five Outlet Header Line 2 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00470 | HCH-201051-DBBVL-132433 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Three Outlet Header Line 3 DBB between Inlet and Outlet Header | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00475 | HCH-201051-DBBVL-132434 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two after Inlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00463 | HCH-201051-DBBVL-132436 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Three Outlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00455 | HCH-201051-DBBVL-132438 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two Outlet Header Line 3 DBB between Inlet and Outlet Header | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC0448 | HCH-201051-DBBVL-132439 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two Inlet Header Line 1 DBB Inlet Header | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00508 | HCH-201051-DBBVL-132441 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Five after Inlet Header Line 2 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00460 | HCH-201051-DBBVL-132442 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two after Inlet Header Line 1 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00477 | HCH-201051-DBBVL-132444 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two after Inlet Header Line 3 DBB | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00453 | HCH-201051-DBBVL-132445 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two Outlet Header Line 1 DBB between Inlet and Outlet Header | ||||||
| 123072 | HCH-201051 | 201051-POL PIPELINE | PIPELINE | MV-Double Block and Bleed Valves | HC00454 | HCH-201051-DBBVL-132447 | Cameron GENERAL VALVE Twi | X | X | Section 6-6.2.5 | FAC provides test fuel and disposal- | 4 week notice required- | Flanged CS | Tank Two Outlet Header Line 2 DBB between Inlet and Outlet Header |