Technical_Data_of_Proposed_BESS.xlsx

XLSX spreadsheet 65 KB Posted

Attached to
Battery Energy Storage System (BESS)
Solicitation number
2023-RFP-030
Issued by
Los Angeles County, California

About this file

The document is a comprehensive Technical Data spreadsheet for a Battery Energy Storage System (BESS) prepared for Pasadena Water and Power (PWP), a department of the City of Pasadena, California. The solicitation seeks a private entity to design, engineer, permit, finance, procure, operate, and maintain a 25 MW lithium-ion battery storage system with a minimum 4-hour storage capability at PWP's Glenarm Power Plant. The proposed project involves a minimum 15-year Energy Storage Agreement (ESA) with options for the City to purchase the BESS at the Commercial Operation Date, Year Two, and Year Five after COD. The technical specification covers extensive requirements across eleven sections including mandatory minimum requirements, performance standards, safety protocols, communications and controls, balance of system, installation details, mechanical and environmental specifications, operations and maintenance, and interconnection requirements.

The contract opportunity includes multiple technical and compliance specifications, with key requirements such as UL 9540 and UL 9540A safety certifications, compliance with California Rule 21 and IEEE 1547-2018 standards, and detailed operational parameters including a 100 MWh storage capacity, 60 Hz frequency, and 34.5 kV connection point. The proposal must demonstrate the BESS's ability to meet specific performance metrics like roundtrip efficiency, cycle life, calendar life degradation, and thermal management. Financial considerations include a 15-year warranty period, expected system availability metrics, and provisions for maintenance and potential system upgrades. The technical data spreadsheet serves as a comprehensive evaluation tool for potential bidders to demonstrate their system's capabilities and alignment with PWP's detailed technical and operational requirements.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Instructions:

Step 1:Confirm that the proposed BESS meets the Mandatory Minimum Requirements in Section 1 - "Mandatory Minimum Requirements"
Step2:Complete Sections 2-9. If the requested informatino is not applicable to the proposed BESS, indicate "N/A"
Step 3:Completed document must be included in the Technical Proposal of the RFP response

List of Standards and Codes

List of Standards and Codes - Technical Data of Proposed BESS
Below is a subset of select applicable Standards and Codes for the Proposed BESS. This list is not exhaustive and additional standards and codes may apply. It is the responsibility of the Qualified Respondents to verify any proposed design meets all relevant industry codes and standards for Battery Energy Storage Systems.
Electrical - Below are some but not all of the specific codes and standards that apply.
StandardDescription
ANSI C50.41Polyphase Induction Motors for Power Generating Stations
ANSI C80.1& UL6Steel conduit for electrical and instrument wiring shall comply with this standard
ANSI C80.4 & UL 514Metallic conduit fittings shall comply with this standard
IEEE C57.13Standard Requirements for Instrument Transformers
IEEE-112IEEE Standard Test Procedure for Polyphase Induction Motors and Generators
ANSI/IEEE 141Recommended Practice for Electrical Power Distribution for Industrial Plants
ANSI/IEEE 142Recommended Practice for Protection and Coordination of Industrial Plants.
ANSI/IEEE 242Recommended Practice for Protection and Coordination of Industrial Plants.
IEEE 399Recommended Practice for Industrial and Commercial Power System Analysis
IEEE 430Standard Procedures for the Measurement of Radio Noise from Overhead Power Lines and Substations
IEEE 519Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems.
IEEE 693Recommended Practice for Seismic Design of Substations
IEEE 1547Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces
IEEE C2National Electrical Safety Code
NEC 706Energy Storage Systems
NEMA MG1Motors and Generators
UL 1642Lithium Batteries
UL 1741/1741 SAStandard for Inverters, Converters, Controllers, and Interconnection System Equipment for Use with Distributed Energy Resources
UL 1973Standard for Batteries for Use in Stationary, Vehicle Auxiliary Power and Light Electric Rail (LER) Applications
UL 9540Safety of Energy Storage Systems and Equipment
UL 9540AStandard for Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems
Fire Detection and Protection - Below are some but not all of the specific codes and standards that apply. Standard Description
StandardDescription
CFCChapter 12, Energy Systems Supplement Effective July 1, 2021
NFPA 10Standard for Portable Fire Extinguishers
NFPA 12Standard on Carbon Dioxide Extinguishing Systems
NFPA 13Standard for the Installation of Sprinkler Systems
NFPA 15Water Spray Fixed Systems
NFPA 24Standard for the Installation of Private Fire Service Mains and Their Appurtenances.
NFPA 25Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems
NFPA 30Flammable and Combustible Liquids Code
NFPA 70National Electrical Code
NFPA 70BRecommended Practice for Electrical Equipment Maintenance
NFPA 72National Fire Alarm Code
NFPA 90AStandard for the Installation of Air-Conditioning and Ventilating Systems
NFPA 101Life Safety Code
NFPA 550Guide to Fire Safety Concepts Tree
NFPA 750Standard on Water Mist Fire Protection Systems
NFPA 850Recommended Practices for Fire Protection for Electric Generating Plants and High Voltage Direct Current Converter Stations.
NFPA 855Standard for the Installation of Stationary Energy Storage Systems
Infrastructure Protection - Below are some but not all of the specific codes and standards that apply. Standard Description
StandardDescription
NERC CIPCyber Security Requirements
Instrumentation & Controls - Below are some but not all of the specific codes and standards that apply. Standard Description
StandardDescription
ASTM A123 type 316Control tubing instrument air shall be fabricated of stainless steel 316.
ANSI/EIA RS-310-DRack-mounting standards
IEEE C37.1Standard for SCADA and Automation Systems
ISAInstrument Loop Diagrams
IEEE C 37Optical Interface and Generator Relay Protection
IEEE 802Networks
IEEE 519Harmonic Control for VFD
ISA 5.1Instrumentation Symbols and Identification
ISA 5.4Instrument Loop Diagrams
UL 508AIndustrial Control Panel
Mechanical - Below are some but not all of the specific codes and standards that apply. Standard Description
StandardDescription
40CFR60Standards of Performance for New Stationary Sources
API 521Pressure Relieving and De-Pressuring Systems
ANSI B73.1Centrifugal Pumps
ANSI S 1.4Specification for Sound Level Meters
AMCAFans
ASHRAE 15Safety Standard for Refrigeration Systems and Designation and Classification of Refrigerants
ASHRAE 147Reducing the Release of Halogenated Refrigerants from Refrigerating and Air - Conditioning Equipment and Systems
ASME B16 SeriesPipe Fittings
ASME A13.1Scheme for the Identification of Piping Systems
ASME B&PV Code Section VNon-Destructive Examination
ASME B&PV Code Section VIIIRules for Construction of Pressure Vessels
SCAQMD 1415.1Reduction of Refrigerant Emissions from Stationary Refrigeration Systems
Structural - Below are some but not all of the specific codes and standards that apply. Standard Description
StandardDescription
CBCCalifornia Building Code (CBC), latest edition, at time of submittal to City Building Department for approval.
ASTM A36Structural Steel
ASTM A572, GR 50High Strength Steel
ASTM A500 GRB: ASTM A501Structural Tubing
ASTM A1011Steel Floor Grating
ASTM A786, Pattern No.4Checkered Floor Plate
ASTM A53 GR BPipe Grade
ASTM A500 GR B or ASTM A501Pipe Handrail: 1 ½ in. Schedule 40
AISC 360Specification for Structural Steel Buildings
Additional Standards and Code that apply
StandardDescription
IEC 62619
IEEE 1679.1Recommended practices for Lithium-Based Batteries in stationary applications
IEEE 1375Guidance in the protection of Stationary Battery Systems
IEEE 946Recommended practices for the Design of DC Power Systems for Stationary Applications
IEEE 1491Guide for Selection and use of Battery Monitoring Equipment in Stationary Applications
IEEE 2030Guide for Smart Grid Interoperability of Energy Technology and Information Technology Operation with the Electric Power System (EPS), End-use Applications, and Loads
IEEE 2030.5Standard for Smart Energy Profile Application Protocol
IEEE 2030.2.1Guide for Design, Operation, and maintenance of Battery Energy Storage Systems, both Stationary and Mobile, and Applications Integrated with Electric Power Systems
IEEE 1453Standard for Measurement and Limits of Voltage Fluctuations and Associated Light Flicker on AC Power Systems

1-Mandatory Minimum Requirement

Mandatory Minimum Requirements -- Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
MMR1Size of BESSHow many Megawatts(MW) of power can it deliver as nameplate capacityMW25Contract Requirement
MMR2Amount Storage of BESSHow many Megawatt-hours (MWh) can this BESS store as maximum capacityMWh100Contract Requirement
MMR3Length of Storage DurationHow many Hours can the BESS store energy for?Hours4Contract Requirement
MMR4AC FrequencyWhat frequency is energy released at once connected to the distribution systemHz60Contract Requirement
MMR5Output Frequency RangeWhat range of frequency is expected from the BESSHz59.0 Hz- 60.0 HzContract Requirement
MMR6Point of Connection VoltageWhat voltage will the BESS operate at the Point of ConnectionkV34.5 kvContract Requirement

2-Performance

BESS Performance - STANDARD -- Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
P1Rated Discharge Power - FacilityThe maximum steady state active power at which the Facility can continuously deliver at the point of common coupling (PCC).kW ACper proposer supply optionContract Requirement
P2Rated Discharge Power - BESSThe maximum steady state active power at which the BESS can continuously deliver at the AC terminals of the Power Conversion System (PCS).kW ACper proposer supply optionContract Requirement
P3Rated Charge Power - BESSThe maximum steady state active power at which the BESS can continuously absorb at the AC terminals of the PCS.kW ACper proposer supply optionContract Requirement
P4Rated Reactive Power - BESSThe maximum steady state reactive power (active power = 0, lagging or leading) at which the BESS can continuously deliver/absorb at the AC terminals of the PCS.kVAR
P5Rated Apparent Power - BESSThe maximum steady state apparent power that the BESS can continuously deliver/absorb.kVA
P6Capability CurveProvide a capability curve that shows active and reactive power limits across all four quadrants.Provide Curve
P7Available Discharge Energy - FacilityThe accessible energy that can be provided by the Facility when discharging at rated power at Beginning of Life (BOL).kWh ACper proposer supply optionContract Requirement
P8Available Discharge Energy - BESSThe accessible energy that can be provided by the BESS when discharging at rated power at BOL.kWh ACper proposer supply optionResponse Required
P9Recommended Discharge Energy - BOLThe quantity of manufacturer-defined usable energy at BOL to maximize life of the asset when subjected to daily or more frequent cycling.kWh ACResponse Required
P10Recommended Maximum State of ChargeThe maximum percentage state of charge the manufacturers recommend to maximize life of the asset when subjected to daily or more frequent cycling. This value references the SOC reported to the BESS site controller.%Response Required
P11Recommended Minimum State of ChargeThe minimum percentage state of charge the manufacturers recommend to maximize life of the asset when subjected to daily or more frequent cycling. This value references the SOC reported to the BESS site controller.%Response Required
P12Average State of ChargeThe average percentage state of charge of the system over its operational life the manufacturers recommend to maximize life of the asset%Response Required
P13Charge DurationThe minimum amount of time required for the BESS to be charged at rated charge power over entire SOC range.Hours4Response Required
P14Recommended Charge PowerRecommended charge power while staying within the manufacturer's rated guidelines on SOC and internal temperatures.kWper proposer supply optionResponse Required
P15Roundtrip Efficiency - Facility
AC to AC (RTEAC)Total AC roundtrip efficiency of the Facility defined as the ratio of the delivered discharge energy to the delivered charge energy in a Full Duty Cycle of the Facility at the PCC, including facility parasitic loads. Specify EOL and BOL values.--Response Required
100% DoD Cycles, Full rated power.%Response Required
Efficiency over specified duty cycle.%Response Required
P16Roundtrip Efficiency - BESS
AC to AC (RTEAC)Total roundtrip efficiency of the BESS defined as the ratio of the delivered discharge energy to the delivered charge energy in a Full Duty Cycle at the PCS output terminals, including BESS parasitic loads. Specify EOL and BOL values.--Response Required
100% DoD Cycles, Full rated power.%Response Required
Efficiency over specified duty cycle.%Response Required
P17Charge Ramp RateThe maximum rate that the BESS can change its input power. This may vary in multiple dimensions such as SOC and/or other parameters of the system. Break out into multiple line item values, as applicable.kW/MinResponse Required
P18Discharge Ramp RateThe maximum rate that the BESS can change its output power. This may vary in multiple dimensions such as SOC and/or other parameters of the system. Break out into multiple line item values, as applicable.kW/MinResponse Required
P19System LatencyTime measured between when the control signal is sent and the BESS responds to the signal by changing the discharge or charge power value by more than 1% of the control setpoint.SecondsResponse Required
P20Self-Discharge RateRate at which the BESS will lose SOC while being held at __% SOC, not including auxiliary load energy.%/hrResponse Required
P21Cycle Life RatingsThe number of cycles that the energy storage system can perform until EOL, independent of calendar life degradation, at specified depth of discharge after which electricity storage becomes inoperable or unusable for a given application. The values should represent response of the system across the rated temperature range. Supplier to designate the assumed average resting SOC and active SOC for each. Supplier to provide cycle life at various increments of DoD power, i.e. 100%, 75%, 50%, 25%, etc.Provide Cycle Life GraphResponse Required
P22Calendar Life DegradationAnnual degradation of rated discharge energy, independent of cycle life degradation.%/yearResponse Required
P23Specified Duty CycleSite specific cycling requirement (e.g. 1 full discharge per day or kwh throughput per day). Buyer to specify requirement, which may include charge/discharge rate, DoD, and EOL conditions. Supplier to confirm this requirement can be met.Y/NYResponse Required
P24Annual Degradation for Specified Duty CycleDegradation rate of rated discharge energy and impedance (if applicable) with buyer-specified duty cycle. This includes both calendar and cycle life degradation.Chart or %/yearResponse Required
P25End of Life (EOL) CriteriaThe condition of the BESS at the end of life in terms of remaining capacity, impedance, efficiency, and other pertinent parameters.ChartResponse Required
P26Minimum Charge TimeThe minimum amount of time required for the BESS to be charged from minimum SOC to its rated maximum SOCHoursResponse Required
P27Typical Recharge TimeThis should include any time for a rest period needed between a full or partial charge or discharge cycleHoursResponse Required
P28Minimum Discharge TimeThe minimum amount of time required for the BESS to be discharged from maximum SOC to its rated minimum SOCHoursResponse Required

3-Safety

SAFETY REQUIREMENTS - Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
S1UL9540 ListingBESS has been tested and certified compliant to UL9540 Standard for Energy Storage Systems and EquipmentY/NYContract Requirement
S2UL 9540A TestingBESS has conducted large scale fire testing per UL 9540A Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage SystemsY/NYContract Requirement
S3NESC/NEC/NFPA Compliant Service AccessService areas in which a human needs to work compliant to the applicable electric safety standard.Y/NYContract Requirement
S4Active Hardware Safety FeaturesFeatures in place to mitigate or reduce impact of a cell failure or fire. Examples: active cell protections, adequate sensing and control, exhaust ventilation, fire suppression, gas phase suppression, temperature monitoring and alarms, water based suppression. See below for additional definitions.DescribeResponse Required
S5Passive Hardware Safety FeaturesFeatures in place to mitigate or reduce impact of a cell failure or fire. Examples: passive arc flash protection. See below for additional definitions.DescribeResponse Required
S6Continuous Hardware Safety FeaturesFeatures in place to mitigate or reduce impact of a cell failure or fire. Examples: BMS balancing algorithms/circuit sizing, BMS control, container HVAC, container monitoring, insulation monitoring, inverter/PCS controls, redundant HVAC, situational awareness, voltage monitoring and SOC estimation. See below for additional definitions.DescribeResponse Required
S7Safety Design ConsiderationsFeatures in place to mitigate or reduce impact of a cell failure or fire. Examples: arc flash design protections, BMS disconnect/shutdown, cell and module thermal management, container/structural resiliency, deflagration protection, design review, facility design and siting, module resiliency, passive cell and circuit protection and design, redundant failure detection, site electrical protections, system certification and standards compliance, system electrical abuse tolerance, System shutdown/disconnect, thermal isolation/cascading protection. See below for additional definitions.DescribeResponse Required
S8System Property Safety FeaturesFeatures in place to mitigate or reduce impact of a cell failure or fire. Examples: Cell electrical, physical, and thermal abuse tolerance, cell and system design quality control, maintenance and commissioning, disposal response. See below for additional definitions.DescribeResponse Required
S9Process and ProceduresFeatures in place to mitigate or reduce impact of a cell failure or fire. Examples: Emergency and first response, process control, training. See below for additional definitions.DescribeResponse Required
S10Lockable Disconnects (LOTO)Power connections between major system components (such as between the BESS and PCS) are separable by disconnect switch which can be locked in the open positionY/NYResponse Required
S11Visible DisconnectVisible open point between electrical interconnection point and facility.Y/NYResponse Required
S12Safety SignageSafety signs warning of high voltage and/or chemical hazards within the BESS perimeter.Y/NYResponse Required
S13Emergency Stop SwitchesProminently positioned, easily accessed switches that can render the system immediately inoperable.Y/NYResponse Required
S14Emergency EgressMore than one exit from service areas which contain high voltage and/or significantly flammable materials.Y/NYResponse Required
S15External Beacon/Siren for EmergencyEmergency beacons, auditory and/or visual indicators located on exterior of enclosures.Y/NYResponse Required
S16Remote Signaling for Emergency Conditions/AlarmsProvisions for remote signaling to remotely positioned terminals or systems of faults.Y/NYResponse Required
S17Ground Fault DetectionBESS detects the presence of an un-intended connection to ground of one of its power lines (AC and DC).Y/NYResponse Required
S18Ground Fault ResponseResponse of the system after a ground fault indication.DescribeResponse Required
S19Toxicity of Fire SuppresantProvide Safety Data Sheet (SDS).AttachResponse Required
S20Toxicity of Suppresant RunoffProvide chemical analysis or list of materials present in liquid and solid residual during a fire suppresant event.DescribeResponse Required
S4.3Exhaust VentilationEffectiveness of exhaust ventilation to remove battery off-gas, heat, and smoke which may result in adverse atmospheric conditionsDescribeResponse Required
S4.6Temperature Monitoring and AlarmsThermal monitoring within the container including BMS, fire alarm thermal monitoring and any BoS temperature monitoringDescribeResponse Required
S4.7Water Based Suppression SystemWater based suppression system including NFPA 13 sprinklers, NFPA 15 sprayers, deluge systems, or NFPA 750 water mist systems designed to suppress fireDescribeResponse Required
S6.2BMS ControlIncludes monitoring and shutdown/isolation capabilities of the affected BMS/module or system if necessary.DescribeResponse Required
S6.3Container HVACHeating, ventilation and air conditioning for the overall container designed to maintain overall system temperature and humidity levels.DescribeResponse Required
S6.7Redundant HVACDesign, sizing, and hardware physical redundancy of the HVAC system such that failure of one or multiple units does not result in adverse conditions within the container or systemDescribeResponse Required
S7.5Deflagration ProtectionNFPA 68, NFPA 69, or other deflagration protectionDescribeResponse Required
S7.6Pre-Incident GuidePre-Incident Guide to serve as a training platform.ProvideYContract Requirement
S7.7Emergency Response PlanEmergency Response Plan including, but not limited to an overview of the facility along with an explanation of the equiment contained therein, define hazards and recommended response associated with a battery energy storage system.ProvideYContract Requirement

4-Comms and Controls

COMMUNICATIONS and CONTROLS - Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
C1CA Rule 21 Phase 2Supports California Rule 21 Phase 2 FunctionsY/NYContract Requirement
C2CA Rule 21 Phase 3Supports California Rule 21 Phase 3 FunctionsY/NYResponse Required
C3IEEE 1547-2018Supports IEEE 1547-2018 FunctionsY/NYContract Requirement
C4IEEE 1547-2018 / 2030.5If supports IEEE 1547-2018, supports IEEE 2030.5 requirements in IEEE 1547-2018Y/NYResponse Required
C5IEEE 1547-2018 / SunSpec ModbusIf supports IEEE 1547-2018, supports SunSpec/MESA Modbus requirements in IEEE 1547-2018Y/NYContract Requirement
C6IEEE 1547-2018 / DNP3If supports IEEE 1547-2018, supports IEEE 1815/DNP requirements in IEEE 1547-2018Y/NYContract Requirement
C7Certified IEEE 1547-2018If supports IEEE 1547-2018, certified to IEEE 1547-2018 (IEEE P1547.1)Y/NYResponse Required
C8Supports DNP3Supports IEEE 1815/DNP3 for grid-facing communications.Y/NYResponse Required
C9Supports DNP3, Utility CustomIf supports IEEE 1815/DNP3, vendor will implement utility provided DNP point map and information modelY/NYResponse Required
C10Supports DNP3, Vendor CustomIf supports IEEE 1815/DNP3, utility will implement vendor provided DNP point map and information model.Y/NYResponse Required
C11Supports DNP3, AN2018-001If supports IEEE 1815/DNP3, AN2018-001/MESA will be used as the DNP point map and information model.Y/NYOptional
C12Support 2030.5Supports IEEE 2030.5 for grid-facing communications.Y/NYResponse Required
C13Support IEC-61850Supports IEC-61850 using IEC-61850-7-420.Y/NYOptional
C14Support Modbus within DER, CustomSupports SunSpec/MESA Modbus for intra-DER communications.Y/NYResponse Required
C15Support Modbus within DER, SunSpec/MESASupports Modbus for intra-DER communications using SunSpec/MESA Modbus specification.Y/NYResponse Required
C16State of Charge (SOC)The control system can monitor the available energy stored in the aggregate energy storage system.Y/NYContract Requirement
C17SOC CalculationDescription of how the SOC is calculated and parameters usedDescribeResponse Required
C18Energy SOHThe control system can monitor the ability of the energy storage system to store energy relative to its BOL capacity through EOL.Y/NYResponse Required
C19Operating Data Collection/Points ListList of data collected by the control system (data elements, refresh rates).ListResponse Required
C20On-Site Control ScreenDescribe capabilities to monitor and operate from local control panels.ListResponse Required
C21Remote Monitoring of Status and FaultsData and conditions alarms that are available to remote monitoring systems (data elements, alarms, refresh rates, event recording for data monitored during events, etc.)Y/NYContract Requirement
C22SCADA HMI Refresh RateThe slowest data update rate on the SCADA HMI for any variable.HzResponse Required
C23SCADA Response TimesTime between command issued via the on-site HMI and initiation of facility response.sResponse Required
C24Cyber Security MeasuresSpecify additional details on physical and cyber security (data transfer, data storage, connectivity, controllability, role-based access, encryption, passwords, VPN, firmware updates, software and hardware patches etc.)ListResponse Required
C25Architecture DiagramProvide a communication diagram, showing BESS components, communication devices, data connections, interactions with other systems, such as any grid-facing communication, cloud services, etc.ProvideContract Requirement
C26Grid ServicesList any available pre-programmed grid services available in the site controls (e.g., demand forecasting, load following, market participation schemes, etc.)DescribeResponse Required

5-BOS

BALANCE OF SYSTEM REQUIREMENTS - Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
B1“Ready” State Energy ConsumptionAverage hourly energy consumption of Facility when BESS is ON, ready to provide power instantaneously (< 1 sec). All subsystems are connected, but no grid power is flowing except that which is required to maintain state of charge if necessary.kWh AC per hourResponse Required
B2“Standby” State Energy ConsumptionAverage hourly energy consumption of Facility when BESS is ON, but some subsystems are disconnected or off to save energy.kWh AC per hourResponse Required
B3Auxiliary Power ProvisionDoes the auxiliary power need a separate feed from the premises, or does it get supplied from the main grid connection?DescribeResponse Required
B4Thermal Management System TypeDescribe thermal management systems that are used to heat or cool the BESS (HVAC, Chiller, Blower, etc.). Provide all assumed conditions and detailed calculations of performance at representative operating points during BOL and EOL. Describe redundancy units (if any).TypeResponse Required
B5Thermal System CapacityAmount of heat (watts) the thermal system can remove (or add) from (to) the BESS.Tons/ WattsResponse Required
B6“Sleep” State Energy ConsumptionAverage hourly energy consumption of Facility when BESS is mostly off, except for communication and safety equipment.kWh AC per hourResponse Required
B7“OFF” State Energy ConsumptionAverage hourly energy consumption of Facility when BESS is completely off, except for required safety equipment.kWh AC per hourResponse Required
B8Auxiliary Power - PeakAuxiliary peak power (locked rotor, etc.) used to size the ratings of in-line fuses and wiring and other thermally intolerant assets.kWResponse Required
B9Auxiliary Power - ContinuousAuxiliary continuous power (used to estimate system tare losses and to size the continuous rating of a power transformer or other thermally tolerant devices).kWResponse Required

6-Installation

INSTALLATION - STANDARD- Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
I1Site PlanProvide a proposed site plan showing all required BESS equipment. Include all underground work required and perimeter fence line, if applicable.DrawingContract Requirement
I2Total Land Use RequirementsLength x Width (LxW) including all required clearances, keep-away and access areas, including BESS, control room, auxiliary equipment, any special access and space required for construction, service, fire separation, etc.ft2Contract Requirement
I3Enclosure TypeA description of the system enclosure including that supplied with the system, provided as a part of the site installation and/or comprised of building assemblies associated with the installation, including HVAC systems.DescribeResponse Required
I4Equipment FootprintLength x Width (LxW) of equipment only (Includes BESS modules and all ancillary units as required) in intended layout.ft x ftContract Requirement
I5HeightEquipment height plus safe clearance distances above the equipment.ftContract Requirement
I6WeightWeight of all individual sub-systems (PCS, Battery module, accessories, etc.) and the maximum shipping weights of all assembled enclosures that will be transported to the project site.lbContract Requirement
I7Maximum Equipment Structural LoadingMaximum weight per loaded area for any one piece of equipment.lb/ft2Response Required
I8Site Exterior LightingBuyer to specify requirement; Seller to confirm if included in scope.Y/NResponse Required
I9Lightning ProtectionBuyer to specify requirement; Seller to confirm if included in scope.Y/NResponse Required
I10Ground GridBuyer to specify requirement; Seller to confirm if included in scope.Y/NResponse Required
I11Grounding Points on Exterior ChassisNumber and positions of grounding points on the exterior chassis.QtyResponse Required
I12Surveillance CamerasDescribe video/IR cameras included to monitor BESS and service areas? Describe their operation, recording means, transmission, etc.DescribeCompatible with existingResponse Required
I13Entry/AccessDescribe entry and access restrictions for the facility and BESS equipment.DescribeResponse Required
I14Cells Per ModuleBattery cells per moduleQtyResponse Required
I15Cell TypeBattery Cell type/chemistryDescribeResponse Required
I16Module ConfigurationBattery module configurationDescribeResponse Required
I17Battery WeightIndividual battery weightlbResponse Required

Any required fields not completed above should attach the response below. Please reference the Item Number.

7-Mechanical and Environmental

MECHANICAL AND ENVIRONMENTAL - STANDARD - Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
M1BESS Operational Temperature RangeTemperature range at which the BBESS can operate at its rated capacity.specify
°F or °CContract Requirement
M2BESS Storage Temperature RangeTemperature range in which BESS can be stored when not energized.specify
°F or °CResponse Required
M3BESS Operational Humidity RangeRange of humidity in which the BESS can operate according to its full specifications.%RHResponse Required
M4BESS Storage Humidity RangeHumidity range in which BESS can be stored when not energized.%RHResponse Required
M5BESS System Maximum Operational AltitudeRated maximum altitude at which the BESS can perform according to its full specifications.ft ASLResponse Required
M6Other Equipment Storage requirementsEnvironmental requirements to be maintained around spare parts and system components prior to installation and/or during temporary storage.DescribeResponse Required
M7BESS Enclosure RatingNEMA or IEC - Ingress Protection (IP) rating for the BESS enclosure (e.g. NEMA 3R, NEMA 4X, IP32, IP 66)TypeNEMA 3RResponse Required
M8BESS Enclosure Coating RatingSpecify, if any, requirements for enclosure coating, including thicknBESS and type of paint, rust and corrosion resistance, thermal conductivity, or other enclosure coverings.TypeResponse Required
M9Hazardous Location ClassificationHazardous location class, division and zone as defined by the National Electric Code. Buyer to specify and Supplier to confirm equipment is properly rated.Y/NYResponse Required
M10Dust, Rodent and Insect BarriersSpecify how BESS is protected from dust, rodent and insects, including sealing cable penetrations.DescribeResponse Required
M11Sound Emissions from Enclosure(s)Audible Noise dB at 6ft high and 3ft distance from enclosure.dBResponse Required
Audible Noise dB at 6ft high at site boundary.dBResponse Required
Audible Noise dB at _ft high and _ft distance from enclosure.dBResponse Required
M12Fluid Spill/ Containment Systems (Moat, Tank or Pond)Type, amount, and under which conditions.DescribeResponse Required
M13US EPA EPCRA complianceIndicate compliance of on site listed materials and any needed reportingY/NYResponse Required
M17Wind Speed LimitRated wind speed before damage to the BESS occurs.mphResponse Required
M18Flood Tolerance HeightRated flood tolerance height.ftResponse Required
M19Seismic CertificationEquipment is seismic certified per requirements defined by the International Building Code.Y/NYContract Requirement
M20Particulate Matter (Airborne)Type, amount of emitted airborne particulates and under which conditions with respect to the energy through-putLb. M WhIf Applicable
M21Gas EmissionsProvide Type and Amount of gas emitted, under which conditions with respect to the eneryg through-put. Exampls incldue criteria pollutants (NOx, SOx) Green House Gases (CO2, CH4, N2O) and fugitive emissions from cooling equipment and circuit breakers (refrigerants, SF6)Lb. M WhIf Applicable

8-O&M

OPERATION and MAINTENANCE (O&M) REQUIREMENTS - Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
OM1Warranty PeriodStandard warranty period for BESS and individual sub systems and major components (if different than BESS).Years15Response Required
OM2Expected System AvailabilityPercentage of available hours per year that the system is in full operation performing application specific functions taking into account both planned and unplanned down-time.%Response Required
OM3Expected battery refresh charge and discharge cycles per yearIntervals of complete cycling needed annually to maintain warranty. Describe the procedure for refresh charge and frequency.DescribeResponse Required
OM4Expected Yearly Planned Down-Time for MaintenanceExpected time required for regular maintenance and types of maintenance.Hrs/YearResponse Required
OM5Expected Yearly Unplanned Down-Time of System for RepairExpected down-time due to forced outages.Hrs/YearResponse Required
OM6Expected Service Life before Major ReplacementSpecify all known and required parts or systems replacement schedules.Part - YearResponse Required
OM7Startup TimeThe time that the BESS takes to go from an OFF state to an ON state. Startup Time shall include any manufacturer required warm-up and initialization times.SecondsResponse Required
OM8Wake TimeThe time that the BESS takes to go from a hibernation state to an ON state.SecondsResponse Required
OM9Shutdown TimeThe time that the BESS takes to go from an ON state to an OFF state.SecondsResponse Required
OM10Control Power UPS Back-Up TimeExpected minimum autonomy time on back-up power (provided by the UPS).HoursResponse Required
OM11Documentation Provided throughout the Project Life CycleDesign drawings, calculations and files (original format)Y/NYResponse Required
Site and Facilities requirements and drawings (original format)Y/NYResponse Required
Software and Firmware Updates - Operation and ControlsY/NYOptional
FAT, SAT and other Systems testing filesY/NYOptional
Installation ManualsY/NYContract Requirement
Commissioning ManualsY/NYResponse Required
Operation ManualsY/NYContract Requirement
Maintenance Manuals, Preventative Maintenance ScheduleY/NYResponse Required
Service ManualsY/NYOptional
Training Manuals and On Site Training for Operation and ServiceY/NYResponse Required
Spare parts listingsY/NYResponse Required
Safety Datasheets (SDS)Y/NYResponse Required
Lockout-Tagout Procedures (or MOPs) for all equipment at various disconnect points (e.g., switchgear/substation accBESS, PCS, battery enclosures, battery racks, battery modules, etc.)Y/NYResponse Required
OM20MTBFMean Time Between Failures (MTBF) or actual field failure data.YearResponse Required
OM21Expected Period between major Exterior RefinishingExstimated time before exterior refinishing when operated in the intended customer applicationYear

9-Interconnection

INTERCONNECTION -REQUIREMENTS - Technical Data of Proposed BESS
ItemsParametersDefinitionsUnitsBuyer RequirementBuyer DesignationSupplier Provided Values
IN1Single Line DiagramProvide a single line diagram of proposed interconnection at the PCC including any required isolation or step-up transformer, AC protection gear (e.g. motorized breaker, fused links, mechanical disconnects, etc.), PT/CT, metering, auxiliary loads or generators, other interconnection equipment and BESS related equipment. Equipment must comply with any other specifications or standards provided by buyer separate from this Energy Storage Technical Specification.DrawingContract Requirement
IN2Three Line DiagramProvide a three line diagram of proposed interconnection at the PCC including any required isolation or step-up transformer, AC protection gear (e.g. motorized breaker, fused links, mechanical disconnects, etc.), PT/CT, metering, auxiliary loads or generators, other interconnection equipment and BESS related equipment. Equipment must comply with any other specifications or standards provided by Buyer separate of this Energy Storage Technical Specification.DrawingResponse Required
IN3Facility PowerThe maximum steady state active power at which the Facility can continuously deliver at the point of common coupling (PCC).kWper proposer supply optionContract Requirement
IN4Facility Reactive PowerThe maximum continuous reactive power (active power = 0, lagging or leading) the facility can provide without overheating.kVARResponse Required
IN5Facility Apparent PowerThe maximum continuous apparent power that the Facility can provide into the AC grid continuouslykVAResponse Required
IN6Rated AC Current - FacilityThe maximum AC current that the Facility can provide to or consume from the grid continuously.AmpsResponse Required
IN7Rated AC Current - BESSThe maximum AC current that the BESS can provide to or consume from the grid continuously.AmpsResponse Required
IN8Interconnection VoltageInterconnection voltage of the Facility. Buyer specified, information only. Supplier required to meet this specification.Vac13800Contract Requirement
IN9System Power Factor RangeLeading and lagging power factor range.-0.9Response Required
IN10PT/CTs RequirementsSpecify quantity, location, type and accuracy class (if applicable).DescribeResponse Required
IN11Metering RequirementsDescribe metering requirements.DescribeResponse Required
IN12Transformer RatingThe continuous power rating of the transformer.MVAResponse Required
IN13Transformer SpecificationAttach transformer specification or provide the following information: configuration required by buyer (e.g. delta-wye), temperature rise and rating, impedance, BIL, taps, efficiency.DescribeResponse Required
IN14MV Protection TypeSpecify the type of AC protection gear (e.g. motorized breaker, fused links, mechanical disconnects, relays, protective switchgear etc.).DescribeResponse Required
IN18UL1741 ComplianceInverter has been tested and certified compliant UL 1741 Standard for Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy ResourcesY/NYContract Requirement
IN19Additional Interconnection Compliance CapabilityList any additional certifications (e.g., UL1741-SA, Rule 21, etc.).DescribeResponse Required
IN22DC InjectionInverter meets IEEE 1547 requirements to minimize DC current injection.Y/NYContract Requirement
IN25Black StartDoes the system perform "Black Start" startup services for microgrid or other islanded generators?Y/NResponse Required
IN26Inverter Conversion LossWhat level of loss is expected from the Inverter%/hourResponse Required

11-Acronyms

Acronyms - Technical Data of Proposed BESS
ACalternating current
ANSIAmerican National Standards Institute
BILbasic insulation level
BESSBattery Energy Storage System
BMSBattery management system
BOLbeginning of life
CTcurrent transformer
DCdirect current
DERdistributed energy resource
DoDdepth of discharge
EMIelectromagnetic interference
EOLend of life
EPAEnvironmental Protection Agency
EPCRAEmergency Planning and Community Right-to-Know Act
EPRIElectric Power Research Institute
ESenergy storage
ESDelectrostatic discharge
ESICEnergy Storage Integration Council
ESSenergy storage system
EUEuropean Union
FATfactory acceptance test
FMEAfailure modes and effects analysis
HVACheating ventilation and air conditioning
IECInternational Electrotechnical Commission
IEEEInstitute of Electrical and Electronics Engineers
IRinfrared
ISOInternational Organization for Standardization
LOPALayer of Protection Analysis
LOTOlockout/tagout
L x Wlength times width
MOPMethod of Procedure
MTBFmean time between failures
MVmedium voltage
NECNational Electrical Code
NEMANational Electrical Manufacturers Association
NESCNational Electrical Safety Code
NFPANational Fire Protection Association
OSHAOccupational Safety and Health Administration
PCCpoint of common coupling
PCSpower conversion system
PTpotential transformer
REACHRegistration, Evaluation, Authorisation and Restriction of Chemicals (EU)
RFIrequest for information
RFPrequest for proposal
RFQrequest for quotation
RTEroundtrip efficiency
RoHSRestriction of Hazardous Substances Directive
SATsite acceptance test
SCADAsupervisory control and data acquisition
SDSsafety datasheets
SILsafety integrity level
SOCstate of charge
SOHstate of health
SOPstandard operating procedure
THDtotal harmonic distortion
UPSuninterruptible power supply
VPNvirtual private network
WEEEwaste electrical and electronic equipment