TECH LIBRARY 2-8310-PV-181-VTE-20210225.pdf

PDF 472 KB Posted

Attached to
Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL Federal contract opportunity
Solicitation number
FA4610-22-R-0001
Issued by
Department of the Air Force Space Command

About this file

This solicitation package seeks proposals for a Launch Operations Support Contract (LOSC) to provide services at Vandenberg Air Force Base in California. Offerors are requested to submit proposals by 27 January 2022 to support launch operations including facilities support, engineering, safety, quality, and mission assurance services. The incumbent contractor is encouraged to submit proposals. The North American Industry Classification System code for this effort is 561210 for facilities support services. The small business size standard is $41.5 million. The performance work statement and appendices describe the required services over a five-year period to support launch, ground systems, operations, and safety for the 30th Space Wing. Davis-Bacon Act and Service Contract Act wage determinations are included as attachments specifying prevailing wages for various job classifications.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
L-1_Contractor Staffing Plan and Matrix_30Aug22.xlsx XLSX spreadsheet
TECH LIBRARY Workload Data Information for CLINs X003_X004.docx DOCX document
Conformed Solicitation Amendment - FA461022R00010005.pdf PDF
L-5_Section M dtd 19Nov21_Revised_02Feb2022.pdf PDF
RFP Amendment 0003 FA461022R00010003 SF30 signed 20220125.pdf PDF
RFP Amendment - FA461022R00010002 SF30 signed 20220118.pdf PDF
Amend 0001 Conformed SF33 - FA461022R00010001_20220112.pdf PDF
Atch 6_LOSC_DD254_7Jan2022.pdf PDF
Atch 11 Appendix D - Job Descriptions_redacted_11Jan2022.pdf PDF
Atch 11 2019-2024 CBA_Redacted_w_Appendix A_12Jan2022.pdf PDF
L-5_Section M dtd 19Nov21_Revised_11Jan2022.pdf PDF
22R0001 LOSC RFP QandA Consolidated.pdf PDF
Atch 1_LOSC PWS_dtd 09Dec2021_Final.pdf PDF
Atch 2_Appendix A_Property and Equipment Responibility List_Final_9Dec2021.xlsx XLSX spreadsheet
Atch 2_Appendix K_Compliance documents_Final_9Dec2021.pdf PDF
Atch 9 SCA WD 2015-5647_Rev 13_20211020.pdf PDF
Atch 10 SCA WD 1986-0431 Rev 54_20210219.pdf PDF
Exhibit A_CDRL_A003_Test Inspection Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A007_P-E Certification Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A013_Backflow Prevention Systems Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A017_Lead-Based Abatement Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A022_Accident Incident Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A025_Generator Testing and Maint Report_Final_9Dec2021.pdf PDF
Exhibit B_LOSC_DID_Combined_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-IF8I_-en-e.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Everight Alliance S1A_datasheet_022610.pdf PDF
TECH LIBRARY 1 System and Overview ACGAL020S000001_A.pdf PDF
TECH LIBRARY 5-HPGSA-PV-230-VTE-20210121.pdf PDF
TECH LIBRARY 8-LOSC Service Calls 1Jul19_30Jun20.pdf PDF
TECH LIBRARY 9-TA rollup WLF.pdf PDF
TECH LIBRARY 11-Workload Factor Hours_OY2.pdf PDF
TECH LIBRARY 13-CDRL_A001_Submittal example.pdf PDF
TECH LIBRARY 13-CDRL_A003_Testing and Certification_example.pdf PDF
TECH LIBRARY 13-CDRL_A024_Work Order Status Report_example.pdf PDF
TECH LIBRARY 13-CDRL_A010 Daily Maintenance And Repair Schedule_example.pdf PDF
TECH LIBRARY 13-CDRL_A014_Cathodic Protection Tracker_example.pdf PDF
L-1_Contractor Staffing Plan and Matrix_Final_9Dec2021.xlsx XLSX spreadsheet
L-3 _OCI_MitigationPlanChecklist_Final_9Dec2021.pdf PDF
L-4_Section L dtd 19Nov21_Final_9Dec2021.pdf PDF
Atch 2_Appendix C_D_E_F_Final_9Dec2021.pdf PDF
Atch 2_Appendix H_Acronyms and Abbreviations_Final_9Dec2021.pdf PDF
Atch 3_LOSC_GFP Attachment (cover page)_9Dec2021.docx DOCX document
Atch 8 SCA WD 2015-5637_Rev 19_20211020.pdf PDF
Exhibit A_CDRL_A004_Power Plant Operation and Maintenance Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A008_P-E Responsibility List_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A018_Contract Work Breakdown Structure_Final_9Dec2021.pdf PDF
TECH LIBRARY 0 List of documents Tech Ref Library_09DEC21.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-um540_-en-p 1756-IRT8I.pdf PDF
TECH LIBRARY 1 Func Desc Instrux - HMI - ACGAL020S000003_B.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-IB32 Contact Input Module.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOSC ISI Program

CHI-PV-181-2021

Bld. Number

A/R/F/O

Acceptable

Acceptable

Other

Acceptable

N/A

Acceptable

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

Acceptable

Acceptable

A/R/F/O

Acceptable

N/A

Acceptable

N/A

Drain

Other No Comments

No Comments

Evidence of Leakage

Dents/Deformations

Insulation/CUI

Paint

Condition of Shell No Comments

Comments

No Comments

Welds

Head to Shell Welds

No Comments

No Comments

No Comments

No Comments

No Comments

No Comments

No CommentsGrayloc Connection

Skirt/Band Welds

Additional Component Welds

Bolts/Flanges

No Comments

No Comments

Comments

No Comments

Attachments

Longitudinal Weld(s)

Nozzle Welds

Support/Saddle Welds

The vessel was located in the fenced area behind building 8310 on VAFB, North Base. Access had to be set up in advance through the facility manager.

Previous Inspection Documentation

Manufacturer & Year Built

A.O. Smith / 1961

Inspector/Level

Brett Strickland / II

Client

Call Henry Inc.

National Board Number

N/A

MAWP Temp. Range

8,690 PSI

Vessel ID

Location/Area

VAFB / North Base

Commodity

Gaseous Helium

Required Equipment

Exterior Pressure Vessel Inspection Report Number: CHI-PV-181-VTE-2021

Leak at the drain plug

No Comments

Date

2/25/2021

Serial Number

MV-50617-1

PV-181

Vessel Type

Horizontal Pressure Vessel

Exam Type

External

Mirror, hammer, camera, flashlight, bubble leak, magnet

Condition of Heads

Room Number

AMB

VTE: 2020

GPS-R-132502 (2017)

Access Notes

Vessel Inspection

CommentsPrimary

N/A

CHI-PV-181-2021

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

N/A

Acceptable

N/A

N/A

N/A

N/A

N/A

A/R/F/O

Acceptable

N/A

N/A

Other

Acceptable

Acceptable

Inspection Findings/Code Violations

No Comments

Burst disc, set at: 8,429 PSI @ 72 degrees F.

Additional Notes/Recommendations

There was a slow leak at the vessels drain nozzle plug.

Other

Much of the connection hardware used on the tubing was made of dissimilar metals. This configuration is unusual in stainless tubing systems and was only recently discovered because the carbon connections have started to show visible signs of corrosion. This can lead to accelerated rates of corrosion and is technically not allowed in ground support pressure systems under AFSPCMAN 91-710 LOSC Tailored 11.2.1.5.6. The vessel relief valve lacked a calibration tag. The inspector was shown current calibration documentation for the relief valve ijn question while still on site so the item has been listed as "other".

Comments

233 GHE, reading: 6,200 PSI, cal due: 4/24/21

No Comments

No Comments

Vessel Inspection Cont. Vessel SN: MV-50617-1

403 GHE, set at: 7,600 PSI, cal tag missing see comments

Comments

No Comments

No Comments

No Comments

Gauges

Sensors/Transducer

Sight Glass/Liquid Level

Relief Valve

Grounding

Anchor Bolting

Saddle/Steel Support Structure

Supports

Platforms

Grating

Handrails/Kickplates

Auxiliary Equipment

Pedestal/Grouting

Concrete Pad

Foundation

Containment

Ladders/Stairs

No Comments

No Comments

No Comments

No Comments

No Comments

No Comments

No Comments

No Comments

Skirts/Bands

CHI-PV-181-VTE-2021

Vessel Overview Nameplate

Pressure Gauge Releif Valve

External Pressure Vessel Inspection

External Photographs Vessel SN: MV-50617-1

CHI-PV-181-VTE-2021

External Pressure Vessel Inspection

External Photographs Vessel SN: MV-50617-1

Leak at Drain Nozzle Dissimlar Metals

File details come from the government source that posted it. Updated .