TE N - DRAFT Target Fabrication and Workload.pdf
PDF 675 KB Posted
- Attached to
- Range Operations - Fort Hood
- Solicitation number
- W91151RA014
About this file
Technical Exhibit N presents annual target fabrication and workload requirements for military training range targets across two fiscal years. The document specifies quantities for 31 different target types required in CY24 and CY25, ranging from screening panels and barrier systems to vehicle silhouettes (BMP, BRDM, T-72, trucks) and troop formations. Notable workload items include 601 truck frontal targets and 920 U-shape frames with 24-inch legs in CY24, with corresponding adjustments projected for CY25.
The exhibit clarifies that supplies and materials are not included as part of the supply contract line item, with material costs not borne by the contract. However, the contractor is responsible for labor costs associated with fabrication, issuance, and return of targets. The document notes that specific fabrication time and labor cost information is proprietary to the previous contractor's methods and means, indicating that offerors must develop their own labor estimates for pricing purposes based on the specified annual workload quantities.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Target CY24 CY 25
10'X10' SCREENING PANEL 108 78
3' X 5' SCREENING PANEL CLOTH 0 10
3' X 5' SCREENING PANEL WOOD 276 295
6' X 6' KD PANEL 60 30
6'X6' BORESIGHT PANEL 27 16
6'X6' Z PANEL 13 22
AMMO TABLE 2 2
BARRIER 3.5'X4' 10
BATTERY BOX 20 0
BMP FLANK 69 34
BMP FRONTAL 426 339
BOOT 1"X4" 330 506
BOOT 4"X4" 0 10
BRDM FLANK 6 0
BRDM FRONTAL 165 145
BUNKER 0 10
KD FRAME 30 70
T-72 FLANK 47 51
T-72 FRONTAL 225 260
TECH-TRUCK FLANK 26 13
TECH-TRUCK FRONTAL 145 40
TGT REF PT 20 0
TROOP 3 MAN 20 14
TROOP 4 MAN 44 53
TRUCK FLANK 42 55
TRUCK FRONTAL 601 531
U-SHAPE FRAME 24" LEG 920 860
U-SHAPE FRAME 36" LEG 16 0
V-NOTCH STAKE 200 220
WINDOW 28 32
Technical Exhibit N Target Fabrication and Workload
Annual Workload
Note supplies and material are not a part of the supply CLIN and the cost burden is not borne by the Contract.
The assocated labor cost is borne by the contract for fabrication, issue and turn in.
Additionally note that the only information available to the Government about the amount of time to fabricate an labor is proprietary to previous contractor's methods and means.
DRAFT
nd the cost of that
Tech Ex N Target Fabrication