TE N - DRAFT Target Fabrication and Workload.pdf

PDF 675 KB Posted

Attached to
Range Operations - Fort Hood
Solicitation number
W91151RA014
Issued by

About this file

Technical Exhibit N presents annual target fabrication and workload requirements for military training range targets across two fiscal years. The document specifies quantities for 31 different target types required in CY24 and CY25, ranging from screening panels and barrier systems to vehicle silhouettes (BMP, BRDM, T-72, trucks) and troop formations. Notable workload items include 601 truck frontal targets and 920 U-shape frames with 24-inch legs in CY24, with corresponding adjustments projected for CY25.

The exhibit clarifies that supplies and materials are not included as part of the supply contract line item, with material costs not borne by the contract. However, the contractor is responsible for labor costs associated with fabrication, issuance, and return of targets. The document notes that specific fabrication time and labor cost information is proprietary to the previous contractor's methods and means, indicating that offerors must develop their own labor estimates for pricing purposes based on the specified annual workload quantities.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

Target CY24 CY 25

10'X10' SCREENING PANEL 108 78

3' X 5' SCREENING PANEL CLOTH 0 10

3' X 5' SCREENING PANEL WOOD 276 295

6' X 6' KD PANEL 60 30

6'X6' BORESIGHT PANEL 27 16

6'X6' Z PANEL 13 22

AMMO TABLE 2 2

BARRIER 3.5'X4' 10

BATTERY BOX 20 0

BMP FLANK 69 34

BMP FRONTAL 426 339

BOOT 1"X4" 330 506

BOOT 4"X4" 0 10

BRDM FLANK 6 0

BRDM FRONTAL 165 145

BUNKER 0 10

KD FRAME 30 70

T-72 FLANK 47 51

T-72 FRONTAL 225 260

TECH-TRUCK FLANK 26 13

TECH-TRUCK FRONTAL 145 40

TGT REF PT 20 0

TROOP 3 MAN 20 14

TROOP 4 MAN 44 53

TRUCK FLANK 42 55

TRUCK FRONTAL 601 531

U-SHAPE FRAME 24" LEG 920 860

U-SHAPE FRAME 36" LEG 16 0

V-NOTCH STAKE 200 220

WINDOW 28 32

Technical Exhibit N Target Fabrication and Workload

Annual Workload

Note supplies and material are not a part of the supply CLIN and the cost burden is not borne by the Contract.

The assocated labor cost is borne by the contract for fabrication, issue and turn in.

Additionally note that the only information available to the Government about the amount of time to fabricate an labor is proprietary to previous contractor's methods and means.

DRAFT

nd the cost of that

Tech Ex N Target Fabrication

File details come from the government source that posted it. Updated .