TE F - DRAFT Ground Work Repairs and Maintenance Workload.pdf
PDF 736 KB Posted
- Attached to
- Range Operations - Fort Hood
- Solicitation number
- W91151RA014
About this file
This document is Technical Exhibit F detailing the Ground Work Repairs and Maintenance Workload for a military range facility. The exhibit presents a comprehensive inventory of maintenance and repair issues identified across multiple range areas, organized by range designation with descriptions of specific issues and dates when work was identified.
The workload encompasses diverse repair categories including berm repair and pit maintenance (affecting ranges such as BGPQ, SLMU, HGC, and CCRB), installation of limit markers across approximately 20 range areas, concrete wall installation at 25+ locations, road and drainage repairs, revetment wall damage remediation, railroad tie replacement and protection berm repair at multiple pit locations, and line-of-sight clearing work. Specific maintenance needs include pothole and washout repairs on service roads, culvert cleaning and repair, erosion control, mover retaining wall repairs, and various site-specific infrastructure work such as gate installations, trench excavation for electrical cables, and range signage installation. The document notes that the only information available to the Government regarding repair timelines and costs is proprietary to the previous contractor's methods and means. Work identification dates range from January 2, 2024 through December 31, 2024, with the most recent items identified in late December 2024. The exhibit references detailed range maps for precise location information and serves as the workload specification for ground maintenance activities across the entire range complex.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Note:
Use information below in conjunction with
TE O Detailed Range Maps
Range Description of Issue
BGPQ
Berm Repair Pits 4,11,18,25,32,33,35,42,46,47,49,53,54,55,56,60,63, 67,77
SLMU Berm Repair Pits 78,54,34, Mover 4 and Cluster 9 HGC Lanes need filled 1-12 CCRB Pit repair and berm fill Pits 36,54,63,81 CCRB Rut repair lanes 4,5,6,8,9,10,11 and 12 CDF Install 2 ea limit markers RUAC Install 2 ea limit markers EUAC Install 2 ea limit markers CHDEMO Install 2 ea limit markers CCMGB Install 2 ea limit markers CCRZ Install 2 ea limit markers CCRB Install 2 ea limit markers CCRA Install 2 ea limit markers CCMGA Install 2 ea limit markers BGRC Install 2 ea limit markers BGRB Install 2 ea limit markers BGRZ Install 2 ea limit markers BGPQ Install 2 ea limit markers BWPA Install 2 ea limit markers BWPB Install 2 ea limit markers BWRA Install 2 ea limit markers BWRB Install 2 ea limit markers BWGL Install 2 ea limit markers PKRA Install 2 ea limit markers PKRZ Install 2 ea limit markers PKGL Install 2 ea limit markers CHMG Install 2 ea limit markers TRSN Install 2 ea limit markers BWMU Pot hole PV 198-505 near Pit 74 HCUA Dig area for gate install BGR Dig area for gate install CSDF Dig area for gate install
Note that the only information available to the Government ab to repair or the cost of repair is proprietary to previous contrac means.
Technical Exhibit F Ground Work Repairs and Maintenance Wo
LSMU BP 4 has holes in need of repair BGRC Round Damage 200-250M terrain QTR Main Service road erosion QTR Main Service road drainage LSMU Washout CL13 LSMU Washout CL16 LSMU Washout Mover 99 road west end BCMU Install Concrete walls at BCMU JMMU Install Concrete walls at JMMU CCMU Install Concrete walls at CCMU BOAZ Install Concrete walls at BOAZ PSR Install Concrete walls at PSR BWRB Install Concrete walls at BWRB BWRA Install Concrete walls at BWRA BWGL Install Concrete walls at BWGL HGQ Install Concrete walls at HGQ HGC Install Concrete walls at HGC HGDA Install Concrete walls at HGDA BRSR Install Concrete walls at BRSR OCAC Install Concrete walls at OCAC RAA Install Concrete walls at RAA CUD Install Concrete walls at CUD BKSR Install Concrete walls at BKSR TRMG Install Concrete walls at TRMG PHNTMR Install Concrete walls at PHNTMRUN TRMU Install Concrete walls at TRMU TRSN Install Concrete walls at TRSN SLMU Install Concrete walls at SLMU HUBBARDInstall Concrete walls at HUBBARD FARP E Install Concrete walls at FARP E EWING RAInstall Concrete walls at EWING RA EWING R Install Concrete walls at EWING RB LSMU Install Concrete walls at LSMU QTR Install Concrete walls at QTR CMPRC Install Concrete walls at CPMC BCMU Obstructed view of HBP2 to V29 BCMU Obstructed view of BP5 to V25 BCMU Obstructed view of BP4 EWING R Service road washed out PKMU Pot Hole needs repaired by Pit S2 PKMU Road to tower washing out grid 16252-49079 PKMU Road at BP10 needs repaired grid 16837-47397 PKMU Road washing out at BP7 PKMU Road repair BP3 PKMU MV3 Fire damage to Revetment wall PKMU MV3 collapsed Revetment wall PKMU MV2 Revetment wall damage
PKMU MV3 Berm damaged by 120mm PKRA Revetments damaged, railroad ties
BWMU Rail Road ties on MV6 causeing track malfuction
PKMU
Road to pit V4 washing and standing water grid 17008-49777
OCAC Road to down range washing grid 29229-56099 OCAC Main road washing grid 29288-56088 OCAC Main road washing grid 28990-56255
OCAC
Course route has pot holes and washout grid 28748- 56212
OCAC Road to pit 19 wash out OCAC Trench needs repair grid 28448-56196 OCAC Trench need repair Grid 28568-56129 OCAC Road needs repaired grid 28737-56192 OCAC Wash out to pit 10
RAA Main road to down range washing grid 29522-55241 DMRAP Clear Brush to MLRS DMMU Clear Brush line of sight FB 52 DMMU Clear Brush line of sight FB 11 DMMU Clear Brush line of sight FB 12 FARP E Install gate DMRAP Install gate DMMU Install gate FARP W Install gate QTR Install gate DMRAP Road needs cleared, and fireing point marked HG Clay Revement wall needed CCMGA Install Concrete walls at CCMGA CCMGB Install Concrete walls at CCMGB CCRA Install Concrete walls at CCRA CCRB Install Concrete walls at CCRB CCRZ Install Concrete walls at CCRZ BWPA Install Concrete walls at BWPA BWPB Install Concrete walls at BWPB LRC Install Concrete walls at LRC Supply Pick up 648 RR ties from Rail Head HMMU Ammo Point area needs filled and graded BKSR Road wasing by pit 150 at PV 27538-51645 BKSR Road wasing by pit 148 at PV 27263-51695
BKSR
Road wasing by middle right limit marker at PV 27662-52008
BKSR Road wasing by mover 138 at PV 27727-52187 BKSR Road wasing by mover 138 at PV 27681-51993 BKSR Road wasing by pit 115 at PV 27753-51760 BKSR Road wasing by pit 38 at PV 28146-51602
CMPRC Road wasing at PV 28926-52160 CMPRC Road wasing at entrance PV 29659-51925
CUD
Road to Ammo point has potholes Grid PV 29667- 53577
CUD
Road from Ammo bunker has potholes Grid PV 29469-53644
PKMU Repair Road to pt V4 Grid PV 17008-49777
PKMU Repair Road wasing by BP7 Grid PV 16363-49027 PKMU Repair Road at BP3 Grid PV16843-49478 CMPRC Service rooad from Mover 2 needs roadwork Wolf CreeInstall 57 each route signs QTR Road washing by LLM Grid 25020-64919 SLMU Ammo road on SLMU needs roadwork SLMU Road from pit 10 to CL16 needs roadwork
Note:
Use information below in conjunction with
TE O Detailed Range Maps
Range Description of Issue Date Work Identified
PKMU Pits dug gravel installed V1,V2,V3,V4,V5,V6,V8,V9 1/2/2024
PKMU Pits dug gravel installed V10,V11,V13,V14,V16,V17 1/2/2024
PKMU Pits dug gravel installed V19,V22,V23,V24,V27,V28 1/2/2024 PKMU Pits dug gravel installed V29 AND V30 1/2/2024 PKMU Drainage dug out Pits V3, V4, V6, V17, V24 V27 1/2/2024
PKRA Rail tie replacement pits 11,12,13,21,25,30,31,38,41 1/2/2024
PKRA Rail tie replacement pits 48,51,58,61,68,71.81,82,84 1/2/2024
PKRA Rail tie replacement pits 87,91,95,101,105,111,115 1/2/2024 PKRA Rail tie replacement pits 121,131,141,151,161 1/2/2024 SLMU Assembly area 1/2/2024 SLMU Ammo Storage Area 1/2/2024 SLMU Screening line 1/2/2024 SLMU FB 4,4,6,8,10,12,13,16 need repair 1/2/2024 EKMG V415 drainage 1/10/2024 EKMG V215 drainage 1/10/2024 EKMG V613 road 1/10/2024 EKMG Sit 458 road 1/10/2024 EKMG Sit 281 road 1/10/2024 EKMG V66-S96 road 1/10/2024 EKMG S78-V68 road 1/10/2024 EKMG S73-S942 road 1/10/2024 EKMG Main service road washed out 25-1500 meters 1/10/2024 TRMU BP3 needs re-orientated downrange 1/19/2024 TRMU FB 6,FB8,FB12,FB14 Blade and repair roads 1/22/2024 TRMU Main service road washed out 1/22/2024 TRMU Clusters1,2,3,4,5,6,7,8,9 and 10 repair roads 1/22/2024 TRMU Pits 5,7,9,11,13,15 and 19 Repair roads 1/22/2024
TRMU Left Limit Marker road Far and Distant Repair roads 1/22/2024
Technical Exhibit F Ground Work Repairs and Maintenance Workload
Note that the only information available to the Government about the amount of time to repair or the cost of repair is proprietary to previous contractor's methods and means.
TRMU
Right Limit Marker road Far and Distant Repair roads 1/22/2024
CCMU Flooding pits 1/23/2024 LSMU Ammo Point needs repaired 1/29/2024 LSMU Tower roads need repaired 1/29/2024
LSMU Return routes for convoy live fire need repaired 1/29/2024
TRMU Center Road culvert road washed out 15 foot ditch 2/2/2024 TRMU CL 8 far right pit falling into the ditch 2/2/2024
TRMU Small bridge right side of the range washed out 2/2/2024 BCMU Line of sight to targets 2/16/2024 CCMU Mover retaining wall Mover 53 2/28/2024 TRMG Pit 217 berm work 3/8/2024 TRMG Pit 218 berm work 3/8/2024 TRMG Pit 219 berm work 3/8/2024 TRMG Pit 227 berm work 3/8/2024 TRMG Pit 228 berm work 3/8/2024 TRMG Pit 229 berm work 3/8/2024 TRMG Pit 236 berm work 3/8/2024 TRMG Pit 245 berm work 3/8/2024 TRMG Pit 246 berm work 3/8/2024 TRMG Pit 224 berm work 3/8/2024 TRMG Pit 248 berm work 3/8/2024 TRMG Pit 277 road work 3/8/2024 TRMG Pit 239 berm work 3/8/2024 TRMG Pit 238 berm work 3/8/2024 TRMG Pit 237 berm work 3/8/2024 TRMG Pit 226 berm work 3/8/2024 TRMG Pit 201 berm work 3/8/2024 DMMU Pit 22 draingage repaired and ties replaced 3/10/2024 DMMU Pit 74 drainage repaired and ties replaced 3/10/2024 HMMU Pit 39 drainage repaired and ties replaced 3/10/2024 CPRC Entrance road filled 4"x3" hole 3/10/2024 CCMU CL 21 ditch and road 3/12/2024 CCMU Pit 459 road repaired 3/12/2024 CCMU Pit 445 road repaired 3/12/2024 CCMU Pit 441 road repaired 3/12/2024 CCMU Mover 53 road repaired 3/12/2024 CCMU Pit 3481 road repaired 3/12/2024 CCMU Mover 57 road repaired 3/12/2024
BKSR Power box 90 rail ties replaced. Fire damaged 3/15/2024 LSMU PIT 2 Retaining wall repaired ties replaced 3/18/2024 HCUA Blade a pad for concrete work 3/23/2024
BWMU Pit 56 training damage pit and ties need replaced 3/29/2024 SLMU Haul fill material BP 13 4/2/2024 SLMU Haul fill material BP 15 4/2/2024 SLMU Haul fill material BP 17 4/2/2024 SLMU Haul fill material BP19 4/2/2024 JMMU Road to BP22 needs repaired 4/16/2024 JMMU Road to BP 40, 30, 20 & 10 needs repair 4/16/2024 JMMU BP40 needs repair 4/16/2024 CUD Metal Culvert needs Reapir 4/17/2024 DMMU Service road to BP3 holes need filled 4/18/2024 DMMU FB11 filling and drainage 4/18/2024 DMMU BP7 filling and drainage 4/18/2024 CPRC Cluster 2 road washed out no access 4/30/2024 CSDF Road unpassable need to install barrels 5/7/2024 CPRC Road to Cl2 6 loads of 10"to 14" rock 5/7/2024 CPRC Mover 8 ditch and road 5/7/2024 CPRC Road repair right camera 5/14/2024 CPRC Mover 10 clean out and repair 5/14/2024 PKMU Repair ammo point 5/15/2024 PKMU Entrance road grid 482 to 492 5/15/2024 PKMU Repair road BP 1 5/15/2024 PKMU Repaired road from BP2 to BP3 5/15/2024 DMMU Mover 4 berm wall repair and build up 6/1/2024 BKSR Road to TGT 35 needs repaired 6/5/2024 BKSR Intersection at PV27687-51984 needs repaired 6/5/2024 BKSR Clean out ditches along side course roads 6/5/2024 BKSR BP1 Needs repaired 6/5/2024 BKSR BP2 needs repaired 6/5/2024 BKSR BP4 needs repaired 6/5/2024 BKSR BP3 needs repairs 6/5/2024 BKSR BP 1 needs repairs 6/5/2024 CCATP Repair entrance road holes 6/6/2024 DMMU BP8 filling and drainage 6/10/2024 DMMU BP7 filling and drainage 6/10/2024 BKSR Road washout near pit 35 PV 2813551600 6/12/2024 SLMU Service road by Mover 35 PV 23026-51423 6/15/2024 SLMU Service road to target 88 PV 23305-51056 6/15/2024 SLMU Service road to target 28 PV 23498-50287 6/15/2024 SLMU Service road to target 48 PV 23609-51050 6/15/2024 SLMU Service road to target 86 PV 23371-50980 6/15/2024
QTR Roadway possibly needs culvert PV2431264859 6/15/2024 QTR Road needs repiared PV 2460264645 6/15/2024 Deadman gate needs repaired 6/15/2024
SLMU
Hole needs filled between pits 48-50 PV 30317- 50057 6/18/2024
CMPRC Service road from mover 14 to mover 10 6/21/2024 CMPRC Road behind Mover 14 washing out 6/21/2024 CMPRC Course road from BP 5D to the east Pot holes 6/25/2024 CMPRC Service Road to G15C 6/25/2024 CMPRC Road behind G15 B 6/25/2024 CMPRC Road to FB 5A 6/25/2024 CMPRC Road to FB 5 B 6/25/2024
CCMU
Line of sight to targets 411 and C 11 from BP31 to
BP 33. 6/25/2024
CCMU
Line of sight to targets 489,C35, 491, 493, 477, 479 from BP19 6/25/2024
CCMU
Line of sight to targets 415, C21, 425 and 423 from
BP11 6/25/2024
BKSR Road between M138 and Pit 150 washing out 7/5/2024 BKSR Road to Cluster 11 Culvert damage 7/5/2024 BKSR Road to Pit 35 washing out PV281-516 7/5/2024 BKSR Road to cluster 8 concrete pad washing 7/5/2024 BKSR Road by CL2 PV 281-514 7/5/2024 BKSR Road behind pit 6 road washing 7/5/2024 BKSR Road by Pit 124 Pot hole PV 276-518 7/5/2024 BKSR Road by Pit 144 pot hole PV272-519 7/5/2024
BKSR Road to ammo point. Pothole by concrete pad 7/5/2024 BKSR Road by pit 134 Pot hole 7/5/2024 PSR Road by tower has a pot hole 7/9/2024 BGRC Entrance road to Range holes in asphalt 7/9/2024
BKSR culvert needs cleaned PV 27733-51747 by pit 115 7/9/2024 BKSR Culvert needs cleaned PV 28123-51577 7/9/2024 BKSR Culvert needs cleaned PV 27597-51849 7/9/2024 BKSR Culvert needs cleaned PV 27604-51897 7/9/2024 BKSR Culvert needs cleaned PV 27618-51937 7/9/2024 BWMU Road to Pit 188 Pothole 196-508 7/11/2024 BWMU Road in front of Pit 76 Pothole PV 199-505 7/11/2024 BWMU Pit 90 dirt work on berm PV 195-508 7/11/2024 BWMU Road to Pit 78 Erosion PV 199-506 7/11/2024 BWMU Road at Pit 90 Washout PV 195-508 7/11/2024 BWMU Road to Pit 11 Potholes PV 195-511 7/11/2024
BWMU Road to Pit 90 washed out and pot holes 194-506 7/11/2024 BGRC Deep pot holes at entrance 7/20/2024 CMPRC Road at Mover 8 Culvert damaged 7/20/2024 CMPRC Road past west end of Mover 12 Pot hole 7/20/2024 CMPRC Road by west end of Mover 12 ruts 7/20/2024 BWMU Road by Pit 22 erosion 7/27/2024 BWMU Road to Pit 81 7/27/2024 BWMU Road to pit 54 washing out 7/27/2024
BWMU Road by Pit 62 has ruts and potholes 7/27/2024 BWMU Road behind pit 54 washing out 7/27/2024 BWMU Road behind Pit 68 washing out 7/27/2024 BWMU West end of Mover 4 ruts in the road 7/27/2024 BWMU Road behind Pit 48 ruts and pot holes 7/27/2024 BWMU Road by Pit 70 Pot holes 7/27/2024 BWMU Road behind pit 50 has ruts and potholes 7/27/2024 SLMU Road next to pit 30 eroded 7/27/2024 SLMU Road to Mover 8 Pot hole and washed out 7/27/2024 SLMU Road to pit 24 washed out 7/27/2024 BWMU Road to Pit 28 pothole 7/27/2024 SLMU Road by mover 2 wash out 7/27/2024 BWMU Road past cluster 24 7/27/2024 PKMU Road by V6 potholes 8/9/2024 PKMU Road by V5 potholes 8/9/2024 PKMU Road by Mover 7 pothole 8/9/2024 PKMU Road between battle positions pothole 8/9/2024 PKMU Road to CL 4 pothole 8/9/2024 PKMU Low water crossing by V4 pothole 8/9/2024 PKMU Road from CL 8 to V 6 potholes 8/9/2024 CPRC Crossing at entrance very large hole 8/13/2024 CPRC Road to pit 90 & 92 washed out 8/20/2024 CPRC 4 Lanes to the BP's rutted and washed out 8/20/2024 CPRC Road to Pit 18 washed out 8/20/2024 CHMG Dig a trench for electrical cable 8/20/2024 OCAC Range Sign - 14R PV 29433 55837 install sign 8/24/2024 OCAC Flagpole - 14R PV 29435 55835 install sign 8/24/2024 CCRB Road by pit 92 washing out 8/29/2024 CCRB Road to pit 3 washing out 8/29/2024 LSMU Main entrance to range eroded 9/11/2024 LSMU Main road to range close to AAR eroded 9/11/2024 LSMU Pit4 potholes 9/11/2024 LSMU BP4 potholes 9/11/2024 LSMU Road to Pit 6 potholes 9/11/2024 LSMU Road between Pit 12 and C4 potholes 9/11/2024 LSMU Road by C13 Potholes 9/11/2024 LSMU Road by Pit 22 potholes 9/11/2024 LSMU Road by Pit 29 potholes 9/11/2024 LSMU Road by Pit 30 potholes 9/11/2024 LSMU Road from Pit 30 to Pit 31 potholes 9/11/2024 LSMU Road by Pit 33 potholes 9/11/2024 LSMU Road from Pit 33 to Pit 32 potholes 9/11/2024 LSMU Pit 36 Repair berm wall 9/11/2024 LSMU Pit 42 Repair berm wall 9/11/2024 LSMU West end of Mover 99 washing out 9/11/2024 QTR Road by Pit 191 pothole 9/17/2024 QTR Road by Pit 186 pothole 9/17/2024
QTR Road by Pit 223 turn around washing out 9/17/2024 QTR Road by FP1 washing out 9/17/2024 QTR Road by Sat 12 pothole 9/17/2024 QTR Road from Sat 15 to Pit 328 needs repaired 9/17/2024 DMMU Mover 8 berm wall collapsing 9/18/2024 DMMU Road to pit 104 and 106 erosion 9/18/2024 DMMU Road to pit 101 and 102 erosion 9/18/2024 DMMU Entrance to Pit 54 erosion 9/18/2024 DMMU Entrance to Pit 56 erosion 9/18/2024 DMMU Road past generator shop erosion 9/18/2024 DMMU Road to pit 18 erosion 9/18/2024 DMMU Mover 6 berm wall collapsing 9/18/2024 DMMU Mover 2 west end wall 9/18/2024 HMMU Road by Pit 49 erosion 9/19/2024 HMMU Road by Pit 45 erosion 9/19/2024 HMMU Road to Mover 1 bunker end erosion 9/19/2024 HMMU Road from Pit 43 to 49 erosion 9/19/2024 HMMU Road to Cluster 29 erosion 9/19/2024 HMMU Pit 15 Pothole 9/19/2024 HMMU Road in front of pit 25 9/19/2024 HMMU Berm wall at Mover 3 9/19/2024 HMMU Bus Bar covers on Mover 1 need replaced 9/19/2024 FARPW Road to ammo point pothole 9/20/2024 FARPW road to ammo point washout 9/20/2024 FARPW Road to ammo point drop off 9/20/2024 SLMU Service road past flag pole washing out 9/25/2024 SLMU Road to pit 62 and 64 washing out 9/25/2024 SLMU Road to AAR building washing out 9/25/2024 BRSR Road to clearing box pothole 10/4/2024 BRSR BP3 potholes 10/4/2024 BRSR BP1 pothole 10/4/2024 CHMG Road by pit 49 pothole 10/4/2024 JMMU Line of Sight Pit 450 and Cluster 30 10/18/2024 CCMU Clear LOS issues 11/6/2024 BCMU Clear LOS issues 11/9/2024 CHMG Trench to Pit washed away by flooding 11/10/2024 CPRC Line of sight BP5A 11/20/2024 CPRC Line of sight BP 5B 11/20/2024 CPRC Line of sight BP 5C 11/20/2024 CPRC Line of sight BP 5D 11/20/2024 CPRC Line of sight BP3A 11/20/2024 CPRC Line of sight BP3B 11/20/2024 CPRC Line of sight BP3C 11/20/2024 CPRC Line of sight BP3D 11/20/2024 SLMU Pits 96 and 98 short rounded the road 11/20/2024 SLMU Pits 36 and 38 short rounded the road 11/20/2024 SLMU Firing Box 8 erosion pot holes 11/21/2024
SLMU Screening line road erosion potholes 11/21/2024 SLMU Service road erosion pot holes 11/21/2024 SLMU Road to target 28, 24, & 26 pot holes 11/21/2024 SLMU Road to target 88 and 86 pot holes 11/21/2024 SLMU Road to Pits 48/50 erosion and pot holes 11/21/2024 BWMU LOS FB 4, 5 and 6 12/1/2024 SLMU Pit 48 road culvert needs repaired 12/1/2024 SLMU Road from Pit 64 to Pit 76 rutted 12/1/2024 SLMU 1500 Meter line 12/1/2024
LSMU LOS FB3 12/7/2024
BCMU Clear LOS issues 12/17/2024 CCMU Clear LOS issues 12/17/2024
QTR
Railtie replacement berm repair 146,150,158,167,176,178,180.188,189,190,193,194 ,229,230,262,250,251,254,255,256,257,265,266,26 7,268,271,272,277.278,282,290, 12/18/2024
PKRA
Rail tie for protection berms need replaced Pits 11,14,15,17,21,25,34,35,37,44,45,57,54,64,67,68,6 9,71,74,77,78,81,84,95,101,115,111,121,131,141,1 51,161 12/18/2024
EKMG S26-2 and S26-3 concrete repair 12/20/2024 SLMU Berm repair Pits 16,18,28,86, CL9 and CL10 12/20/2024 SLMU Mover 8 and tgt 88 berm repair add fill 12/29/2024
TRMG
Berm and dirt work pits 210,204,216,219,226,229,236,239,211,212,213,and 214 12/31/2024
EKMG Concrete repair S26 12/31/2024
EKMG
berm repair Pits 81,91,34,64,35,45,55,26,36,46 and 48 12/31/2024
TRMG Pit 277 reventment and berm repair 12/31/2024
CHMG
Rail tie replacement and backfill Pits 1,10,13,23,40,62,21,22,23,25,30,31,38,39,40,41,42, 43,44,49,58,59,60,61,63,64,65,66 12/31/2024
BGPQ
Rail replacement 26,28,33,35,40,45,47,49,54,56,58,63,64,66,68,69,7 0,71,72,73,79 12/31/2024
| CY 25 |
| CY 24 |
File details come from the government source that posted it. Updated .