This solicitation seeks proposals for hazardous material and hazardous waste management support services at Fort Stewart and Hunter Army Airfield in Georgia. Services required include conducting RCRA inspections, facility assistance visits, field inspections, hazardous waste training, and spill response support. Offerors must submit proposals electronically by November 28, 2022. This is a 100% small business set-aside in the NAICS code for hazardous waste collection with a $41.5 million size standard. The contract will have a one-year base period and four one-year options, using firm-fixed pricing. Wage determinations apply. The Department of the Army Materiel Command Mission and Installation Contracting Command is the contracting agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Requirement Summary Performance

Objective PWS Paragraph

Performance Standard

Performance Threshold Acceptable Level (AQL)

Method of Surveillance

Incentive/Disincentive

PWS 1.6.1.1

QCP

NLT 10 work days after award and with 5 work days of proposed changes

MS Word or PDF Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 1.6.2

Property Management System

Within 30 calendar days of award and semi-annual thereafter

100% accountability of

GFE/GFP

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 1.6.7

Key Control

Within 30 calendar days of award and semi-annual thereafter

100% accountability of keys

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 1.6.8

Special Qualifications

Within 90 calendar days of award and annual thereafter

PDF Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 1.6.8.1.4

Background Checks

Within 30 calendar days of award and when new personnel come on-board

Provide all information required for background checks

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS

1.6.8.1.4.1 AT Level 1, OPSEC trainings

Within 30 calendar days of award and annually thereafter

PDF Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 1.6.8.2

IA/Info Tech Cyber Awareness

Within 30 calendar days of award and annually thereafter

Copy of certificates

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 1.6.12.1.3

Provide personnel roster to COR

Within 10 calendar days of award and within 5 calendar days of any changes

Copy of roster 100% Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS

1.6.12.3.5 UXO Training

Within 7 work days of award and annually thereafter

Copy of certificates

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 1.6.12.3.6

SMs Training

Within 30 calendar days of award and annually thereafter

Copy of certificates

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS

1.6.12.3.7 ECO Course

Within 90 calendar days of award

Copy of certificates

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS

1.6.15.2.2 Phase out Plan

90 calendar days prior to phase-out period commences

90 calendar days out

100% Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.1.2

Prepare HWPS

Within 5 work days of receipt of new waste stream with SDS and 30 calendar

5 business day upon completion

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective days utilizing lab analysis ratings of contractor performance.

PWS 5.2.1.4

Weigh and mark containers

Weigh and mark all containers

Mark all containers

Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.1.5

Properly Label each containers

Label all containers

100% Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.1.6

Maintain Daily Log

Daily Log Update

100% Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.1.7

Prepare DA Form 1348-1

Prepare and submit DA Form

100% Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.2

Prepare Waste for Pickup

Hazardous Waste Pickup

100% Per occurrence

Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.3 Track issuance of supplies to units

Maintain issue log

95% Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.4

Maintain used oil

Update Used Oil data base

90% Monthly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.6

Maintain GFE and GFP

Submit work order and maintenance request

Within 5 business days of deficiency identification

Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.8

Prepare Hazardous Waste Management Fee Record

Submit record NLT 15 FEB of each even year

NLT the 5th working day of

MAR

Annually Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.8

Additional Report

Submit Biennial report NLT 15 FEB of each even year.

NLT the 5th working day of

MAR

Every even year

Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.2.9

Provide technical spill response support

100% 100% Per occurrence

Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.3.1

Conduct RCRA Inspection

100% 95% Quarterly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.3.2

Conduct Facility Assistance Visits

100% 95% Quarterly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective

PWS 5.3.3

Conduct field inspections and assistance visits

In lieu of RCRA Inspections in

Garrison

95% Per occurrence

Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.3.4

HW/HM

Training at unit level

Train 10% of assigned strength at

FS/HAAF

95% Quarterly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.

PWS 5.3.5

Facilitate ECO Training and Support AMMO/Fuel Handlers Training

100% 100% Per occurrence

Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective