This solicitation seeks proposals for hazardous material and hazardous waste management support services at Fort Stewart and Hunter Army Airfield in Georgia. Services required include conducting RCRA inspections, facility assistance visits, field inspections, hazardous waste training, and spill response support. Offerors must submit proposals electronically by November 28, 2022. This is a 100% small business set-aside in the NAICS code for hazardous waste collection with a $41.5 million size standard. The contract will have a one-year base period and four one-year options, using firm-fixed pricing. Wage determinations apply. The Department of the Army Materiel Command Mission and Installation Contracting Command is the contracting agency.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirement Summary Performance
Objective PWS Paragraph
Performance Standard
Performance Threshold Acceptable Level (AQL)
Method of Surveillance
Incentive/Disincentive
PWS 1.6.1.1
QCP
NLT 10 work days after award and with 5 work days of proposed changes
MS Word or PDF Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 1.6.2
Property Management System
Within 30 calendar days of award and semi-annual thereafter
100% accountability of
GFE/GFP
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 1.6.7
Key Control
Within 30 calendar days of award and semi-annual thereafter
100% accountability of keys
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 1.6.8
Special Qualifications
Within 90 calendar days of award and annual thereafter
PDF Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 1.6.8.1.4
Background Checks
Within 30 calendar days of award and when new personnel come on-board
Provide all information required for background checks
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS
1.6.8.1.4.1 AT Level 1, OPSEC trainings
Within 30 calendar days of award and annually thereafter
PDF Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 1.6.8.2
IA/Info Tech Cyber Awareness
Within 30 calendar days of award and annually thereafter
Copy of certificates
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 1.6.12.1.3
Provide personnel roster to COR
Within 10 calendar days of award and within 5 calendar days of any changes
Copy of roster 100% Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS
1.6.12.3.5 UXO Training
Within 7 work days of award and annually thereafter
Copy of certificates
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 1.6.12.3.6
SMs Training
Within 30 calendar days of award and annually thereafter
Copy of certificates
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS
1.6.12.3.7 ECO Course
Within 90 calendar days of award
Copy of certificates
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS
1.6.15.2.2 Phase out Plan
90 calendar days prior to phase-out period commences
90 calendar days out
100% Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.1.2
Prepare HWPS
Within 5 work days of receipt of new waste stream with SDS and 30 calendar
5 business day upon completion
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective days utilizing lab analysis ratings of contractor performance.
PWS 5.2.1.4
Weigh and mark containers
Weigh and mark all containers
Mark all containers
Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.1.5
Properly Label each containers
Label all containers
100% Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.1.6
Maintain Daily Log
Daily Log Update
100% Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.1.7
Prepare DA Form 1348-1
Prepare and submit DA Form
100% Weekly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.2
Prepare Waste for Pickup
Hazardous Waste Pickup
100% Per occurrence
Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.3 Track issuance of supplies to units
Maintain issue log
95% Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.4
Maintain used oil
Update Used Oil data base
90% Monthly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.6
Maintain GFE and GFP
Submit work order and maintenance request
Within 5 business days of deficiency identification
Random Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.8
Prepare Hazardous Waste Management Fee Record
Submit record NLT 15 FEB of each even year
NLT the 5th working day of
MAR
Annually Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.8
Additional Report
Submit Biennial report NLT 15 FEB of each even year.
NLT the 5th working day of
MAR
Every even year
Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.2.9
Provide technical spill response support
100% 100% Per occurrence
Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.3.1
Conduct RCRA Inspection
100% 95% Quarterly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.3.2
Conduct Facility Assistance Visits
100% 95% Quarterly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective
PWS 5.3.3
Conduct field inspections and assistance visits
In lieu of RCRA Inspections in
Garrison
95% Per occurrence
Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.3.4
HW/HM
Training at unit level
Train 10% of assigned strength at
FS/HAAF
95% Quarterly Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective ratings of contractor performance.
PWS 5.3.5
Facilitate ECO Training and Support AMMO/Fuel Handlers Training
100% 100% Per occurrence
Contractor compliance will be tallied for CPAR reporting periods and the results of the data will be used to substantiate objective