TE 07 - Electrical Substations.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
BASE OPERATION SUPPORT SERVICES (BASOPS) FOR YUMA PROVING GROUND (YPG)
Solicitation number
W5168W23R0004
Issued by

About this file

This technical exhibit provides details on fourteen electrical substations located at Yuma Proving Ground, including each substation's number, facility number, KVA rating and voltages for power received and distributed, service area, year built, and designated backup substation where applicable.

The related federal contract opportunity is a solicitation issued by the Department of the Army seeking proposals for base operation support services at Yuma Proving Ground. Services required under the contract include facility operations and maintenance, engineering services, environmental services, transportation services, and information technology services in support of base operations. The solicitation number is W5168W23R0004 and proposals are due by the date specified in the solicitation. The contract to be awarded will have a one-year base period of performance with four one-year option periods.

View the file

Other files

File Type Posted
Conformed W5168W-23-R-0004.pdf PDF
TE_05_Installed_Building_Equipment_and_Equipment In Place.xlsx XLSX spreadsheet
Attachment K - Staffing Matrix-19JAN2024-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
TE_02_Workload_History_CY21_Revised.xlsx XLSX spreadsheet
YPG Attachment List-05JAN2024.xlsx XLSX spreadsheet
TE_02_Workload_History_CY22_05JAN2024.xlsx XLSX spreadsheet
TE_02_Workload_History_CY21_05JAN2024.xlsx XLSX spreadsheet
TE_01_Real_Property_Inventory-05JAN2024.xlsx XLSX spreadsheet
TE 15 Grounds Inventory-05JAN2024.xlsx XLSX spreadsheet
TE_16_Roads_and_Test_Courses_05JAN2024.xlsx XLSX spreadsheet
Attachment_P_Davis_Bacon_Highway_29NOV2023.pdf PDF
Attachment I - YUMA Annex M CLS 510 Pest Management 05JAN2024.pdf PDF
Attachment E - YUMA Annex F CLS 404 Grounds 05JAN2024.pdf PDF
W5168W-23-R-0004-Solicitation Closing Date Extened-Formal Amendment ForthComing-29DEC2023.pdf PDF
Attachment T - Past Performance Questionnaire.docx DOCX document
TE 17 - Petroleum-Oil-Lubricant Facility Locations and Equipment.xlsx XLSX spreadsheet
TE 18 - Petroleum-Oil-Lubricant Facility BI-Monthly Checklist.xlsx XLSX spreadsheet
TE 29 Stormwater Pollution Prevention Plan.pdf PDF
TE 45 Builder Inventory and Assessment.pdf PDF
TE 44 Builder Condition Manual for components.pdf PDF
TE 05 - Installed Building Equipment and Equipment In Place.xlsx XLSX spreadsheet
TE 25 GFEBS Field Requirments.pdf PDF
TE 22 - Labor Category per Functional Area.xlsx XLSX spreadsheet
TE 19 - Cathodic Protection System Locations.xlsx XLSX spreadsheet
TE 20 - Cathodic Protection System Preventive Maintenance Checklist.xlsx XLSX spreadsheet
TE 12 - Water Storage Tank.xlsx XLSX spreadsheet
TE 41 Recurring OWO.xlsx XLSX spreadsheet
TE 06 Deliverables.docx DOCX document
TE 48 ATEC - Mission Non-Real Property Work Load Data History (1).pdf PDF
Attachment U - PIEE CCM Vendor Training.pdf PDF
Attachment E - YUMA Annex F CLS 404 Grounds 11-23-21.docx DOCX document
Attachment D - YUMA Annex E CLS 403 Waste Management 11-23-21.docx DOCX document
Attachment T3 - Specific Relevant Contracts Reference Sheet.docx DOCX document
Attachment J - Yuma Pricing Matrix CLIN Structure as of 06-21-2023.xlsx XLSX spreadsheet
Attachment T2 - Consent Form for Release of Past Performance Information.docx DOCX document
TE 31 Disposal of Hazardous Material Combined.pdf PDF
TE 43 Builder Inventory Guide.pdf PDF
TE 02 Workload History CY22.xlsx XLSX spreadsheet
TE 02 Workload History CY21 (1).xlsx XLSX spreadsheet
TE 33 Uninterrupted Power Supply.xlsx XLSX spreadsheet
TE 32 Heavy Equipment List.xlsx XLSX spreadsheet
TE 09 - ICE Monthly Visible Emissions Checklist.xlsx XLSX spreadsheet
TE 21 GSA Fleet Vehicles.xlsx XLSX spreadsheet
TE 10.1 - Boiler Tune-Up Form.xlsx XLSX spreadsheet
TE 08 - ICE Maintenance CK List.xlsx XLSX spreadsheet
TE 04 - Contractor Occupied Facilities.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers.xlsx XLSX spreadsheet
TE 37 PWO-IJO History.xlsx XLSX spreadsheet
Attachment M - Collective Bargaining Agreement 2021.2024 fully executed 8.10.2021.pdf PDF
Attachment N - Davis-Bacon Heavy.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TECHNICAL EXHIBIT 7
ELECTRICAL SUBSTATIONS
SUBSTATION NUMBERFACILITY NUMBERKVA RATING & VOLTAGE IN/ VOLTAGE OUTSERVICE AREAYEAR BUILTBACK-UP SUBSTATION
A7087000 @ 69000 12470HCA1948B
B20077000 @ 69000 12470WCA LAAF & DYNO COURSE2006A
C35407000 @ 69000 12470KFR MAIN AREA/951995G
D60097000 @ 34500 12470CDH,CDA, BP, AEROSTAT1960C, G
E354014000 @ 69000 34500KOFA & CIBOLA RANGE AREA1995L
F70053750 @ 34500 12470CIBOLA RANGE1970NONE
G35407000 @ 69000 12470KFR MAIN AREA1995C
ISS4861288 @ 34500 12470EAST KFR RANGE1995NONE
L354014000 @ 69000 34500KOFA & CIBOLA RANGE AREAS2002E
HSS31920000 @ 161000 69000ALL YPG1995ARMY TAP
MFFNA7000 @ 69000 12470MILITARY FREEFALL TRAINING CENTER2014B
ARMY TAP150824000 @ 69000 (SWITCH)ALL YPG1970K
WMIDD SOUTH CIBOLA RANGE FEEDN/A34500 & 12470BIG GUNS & SOUTH CIBOLA RANGE1952NONE
APS NORTH CIBOLA FEED MILE POST 82N/A12000/12000NORTH CIBOLA RANGE1990NONE
APS NORTH CIBOLA FEED MILE POST 89N/A12000/12000NORTH CIBOLA RANGE2004NONE

&P &D

File details come from the government source that posted it. Updated .