TE 10.1 - Boiler Tune-Up Form.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
BASE OPERATION SUPPORT SERVICES (BASOPS) FOR YUMA PROVING GROUND (YPG)
Solicitation number
W5168W23R0004
Issued by

About this file

This document contains a boiler tune-up form and instructions for completing tune-ups of boilers. The form requires information on the boiler, the inspector, and records of completing specific tune-up procedures such as inspecting the burner and flame pattern, checking the air-to-fuel ratio control system, optimizing carbon monoxide emissions, and measuring CO and O2 levels before and after the tune-up. Inspectors must check boxes to indicate when each procedure is finished and note any corrective actions taken. Requirements include inspecting and cleaning burners, adjusting flames according to manufacturer specifications, ensuring air-fuel ratio systems are calibrated and functioning, optimizing CO emissions per manufacturer specifications, and recording CO and O2 measurements before and after the tune-up on a wet or dry basis.

The related federal contract opportunity is a solicitation for base operation support services at Yuma Proving Ground in Arizona. The solicitation number is W5168W23R0004 and is issued by the Department of the Army. No further details are provided on required services, response dates, or other salient information.

View the file

Other files

File Type Posted
Attachment K - Staffing Matrix-27DEC2023-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
TE_50_Landfill_Permit-05JAN2024.pdf PDF
TE_15_Grounds_Inventory_05JAN2024.xlsx XLSX spreadsheet
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical-04JAN2024.pdf PDF
Attachment V-W5168W-23-R-0004-YPG-ServiceContract-WageDetermination.pdf PDF
Attachment_Q_Davis_Bacon_Residential_29NOV2023.pdf PDF
Attachment D - YUMA Annex E CLS 403 Waste Management 05JAN2024.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 05JAN2024.pdf PDF
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-4JAN2024.xlsx XLSX spreadsheet
YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
W5168W-23-R-0004-Amendment0002-1NOV2023.pdf PDF
YPG Question and Answer from Draft RFP W5168W 23 R 0004 15JUNE2023.xlsx XLSX spreadsheet
TE 46 Builder Component Catalog.pdf PDF
TE 01 Real Property Inventory.xlsx XLSX spreadsheet
TE 36 Excavation Permit Form.pdf PDF
TE 15 Grounds Inventory.xlsx XLSX spreadsheet
TE 35 Pavement Sweeping Areas.xlsx XLSX spreadsheet
TE 02 Workload History CY20.xlsx XLSX spreadsheet
TE 14 - Ground Water Wells.xlsx XLSX spreadsheet
TE 30 Wash Racks.xlsx XLSX spreadsheet
TE 42 Incidental Property.xlsx XLSX spreadsheet
TE 0 Table of Contents.xlsx XLSX spreadsheet
TE 39 PWO Format.xlsx XLSX spreadsheet
TE 40 GFEBS Transaction Codes.xlsx XLSX spreadsheet
TE 38 Preventative Maintenance Checklist.xlsx XLSX spreadsheet
Attachment I3 - Government Furnished Property Provided Under FAR Clause 52.245-2.xlsx XLSX spreadsheet
Attachment Q - Davis-Bacon Residential.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 11-23-21.docx DOCX document
Attachment K - Staffing Matrix.xlsx XLSX spreadsheet
TE 28 Spill Prevention Control and Countermeasures Plan.pdf PDF
TE 24 Septic Tank and locations.xlsx XLSX spreadsheet
TE 31 Disposal of Hazardous Material Combined.pdf PDF
TE 43 Builder Inventory Guide.pdf PDF
TE 02 Workload History CY22.xlsx XLSX spreadsheet
TE 02 Workload History CY21 (1).xlsx XLSX spreadsheet
TE 33 Uninterrupted Power Supply.xlsx XLSX spreadsheet
TE 32 Heavy Equipment List.xlsx XLSX spreadsheet
TE 09 - ICE Monthly Visible Emissions Checklist.xlsx XLSX spreadsheet
TE 21 GSA Fleet Vehicles.xlsx XLSX spreadsheet
TE 08 - ICE Maintenance CK List.xlsx XLSX spreadsheet
TE 04 - Contractor Occupied Facilities.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers.xlsx XLSX spreadsheet
TE 37 PWO-IJO History.xlsx XLSX spreadsheet
Attachment M - Collective Bargaining Agreement 2021.2024 fully executed 8.10.2021.pdf PDF
Attachment N - Davis-Bacon Heavy.pdf PDF
Attachment P - Davis-Bacon Highway.pdf PDF
Attachment O - Davis-Bacon Building.pdf PDF
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical 11-23-21.docx DOCX document
Attachment W - YPG Site Visit Question and Answer W5168W-23-R-0004-15JUNE2023.xlsx XLSX spreadsheet
Attachment I - YUMA Annex M CLS 510 Pest Management 11-23-21.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TECHNICAL EXHIBIT 10.1
BOILER TUNE-UP FORM
RECORD OF GENERAL BOILER INFORMATION

Date:

Reporting Period:

Boiler Inspection:

Reporting Period:

Boiler Emission Unit IDa:

Tune-Up Conducted By:
Please Print

RECORD OF TUNE-UP PROCEDURES (§63.11225(c)(2) and (§63.11223(b)(6)(i) and (ii))

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicalbe' or 'NA' in the comments column.

RequirementDescriptionInspector Comments/ Corrective Actions Taken
Inspect the burnerbClean or replace any components of the burner, as necessary

Inspect the flame pattern Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.

Inspect air-to-fuel ratio control system Ensure system is calibrated and control system functioning properly, if such a system is installed on the boiler.

Optimize emissions of carbon monoxide (CO) Optimize emissions consistent with the carbon monoxide (CO) manufacturer's specifications, if available.

Measure CO and O2 levels in exhaust, before and after tune-upcParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
a. Use the boiler emission unit ID consistent with the ID provided in the Initial Notification Report.
b. You may delay the burner inspection until the next scheduled unit shut down, but you must inspect each burner at least
once every 60 months.
c. Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up
adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv).
Oxygen (O2) concentration measurements must be made as per cent by volume.

File details come from the government source that posted it. Updated .