Section L Annex 3 Cost Formats 20120702 DRAFT.pdf

PDF 775 KB Posted

Attached to
Tactical Air Control Party-Close Air Support System (TACP-CASS) Federal contract opportunity
Solicitation number
TACPCASS061512
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Tactical Air Control Party-Close Air Support System (TACP-CASS), newest first.
File Type Posted
Copy_of_CASS_1_4_5_Technical_Library_Index.pdf PDF
Attachment_14_TACP_CASS_SW_145_Section_L_20130206_v10.pdf PDF
FA8730-13-R-0008_Amendment_0002.pdf PDF
Copy_of_CASS_1_4_5_Technical_Library_Index.pdf PDF
CASS_1_4_5_Technical_Library_Index_xlsx.pdf PDF
Attachment_14_TACP_CASS_SW_145_Section_L_20130125_v9.pdf PDF
FA8307-12-R-0014_A0001.pdf PDF
CASS_1_4_5_Technical_Library_Index.pdf PDF
CASS_1_4_5_Technical_Library_Index.pdf PDF
FA8730-13-R-0008.pdf PDF
RFP_Memo.pdf PDF
Attachment_14_TACP_CASS_SW_145_Section_L_Cost_Formats.xlsx XLSX spreadsheet
Updated_CASS_1_4_5_Technical_Library_Index_12282012.pdf PDF
Q A_for_Draft_RFP_061212.docx DOCX document
TACP_CASS_145_Draft_RFP_Attachments_20121205.pdf PDF
CASS_1_4_5_Technical_Library_Index_(updated).pdf PDF
NOCA_TACP_CASS.docx DOCX document
CASS_1_4_5_Technical_Library_Index.pdf PDF
CASS_1_4_5_Technical_Library_Index.pdf PDF
Notification to Industry.pdf PDF
CASS 1 4 5 Technical Library Index —
Memo for industry.pdf PDF
Draft FA8307-12-R-0014.pdf PDF
TACP-CASS SW 145 Draft RFP Comment Form.xlsx XLSX spreadsheet
CASS 1 4 5 Technical Library Index.pdf PDF
TACP CASS v1.4.5 Bidders Technical Library.pdf PDF
TACP CASS v1.4.2 software source code.pdf PDF
NDA TACP CASS.pdf PDF
OCI Industry Day Briefing.pptx PPTX presentation
OCI Mitigation Plan Outline.pdf PDF
Attachment 1 TACP CASS SW 145 SOW 20120627 DRAFT.pdf PDF
Exhibit A TACP CASS SW 145 CDRL 20120627 DRAFT.pdf PDF
Memo for Industry.pdf PDF
Attachment 16 TACP CASS SW 145 Section L 20120627 DRAFT.pdf PDF
Attachment 17 TACP CASS SW 145 Section M 20120628 DRAFT.pdf PDF
CASS Industry Template_Final.pptx PPTX presentation
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Summary

CLIN Summary

Base CLINs Estimated Target Total

CLIN Description Cost Fee Price Cost Plus Incentive Fee CLINs CLIN 0001 - CASS Software V1.4.5 Build 1 CLIN 0002 - CASS Software V1.4.5 Build 2

Total CPIF Base CLINs $0 $0 $0

Cost Reimbursable (CR) CLINs CLIN 0003 - CASS Software Development Travel and ODC CLIN 0004 - CASS Software Development Material

Total CR Base CLINs $0 $0

Total Base CLINs $0 $0 $0

Option CLINs Estimated Target Total

CLIN Description Cost Fee Price Cost Plus Incentive Fee CLINs CLIN 1008 - Interim Contractor Support Service Packs (Option Year 1) CLIN 2008 - Interim Contractor Support Service Packs (Option Year 2) CLIN 3008 - Interim Contractor Support Service Packs (Option Year 3)

Total CPIF Option CLINs $0 $0 $0

Cost Reimbursable (CR) CLINs CLIN 0005 - Interim Contractor Support Data (Option Year 1) CLIN 1011 - Interim Contractor Support Field Support (Option Year 1) CLIN 1012 - Interim Contractor Support Travel and ODC (Option Year 1) CLIN 1013 - Interim Contractor Support Material (Option Year 1) CLIN 1014 - Interim Contractor Support Data (Option Year 1) CLIN 2011 - Interim Contractor Support Field Support (Option Year 2) CLIN 2012 - Interim Contractor Support Travel and ODC (Option Year 2) CLIN 2013 - Interim Contractor Support Material (Option Year 2) CLIN 2014 - Interim Contractor Support Data (Option Year 2) CLIN 3011 - Interim Contractor Support Field Support (Option Year 3) CLIN 3012 - Interim Contractor Support Travel and ODC (Option Year 3) CLIN 3013 - Interim Contractor Support Material (Option Year 3) CLIN 3014 - Interim Contractor Support Data (Option Year 3) CLIN 4011 - Contractor Logistics Support Field Support CLIN 4012 - Contractor Logistics Support Travel and ODC CLIN 4013 - Contractor Logistics Support Material CLIN 4014 - Contractor Logistics Support Data

Total CR Option CLINs $0 $0

FFP CLINs CLIN 0007 - CASS Software Technical Data Rights CLIN 1009 - Interim Contract Support Training (Option Year 1) CLIN 1010 - Interim Contractor Support Help Desk (Option Year 1) CLIN 2009 - Interim Contract Support Training (Option Year 2) CLIN 2010 - Interim Contractor Support Help Desk (Option Year 2) CLIN 3009 - Interim Contract Support Training (Option Year 3) CLIN 3010 - Interim Contractor Support Help Desk (Option Year 3) CLIN 4008 - Contractor Logistics Support Service Packs CLIN 4009 - Contractor Logistics Support Training CLIN 4010 - Contractor Logistics Support Help Desk

Total FFP Option CLINs $0 $0

T&M CLIN

CLIN 0006 - Special Projects and Studies

Total T&M Option CLIN $0

Total Option CLINs $0 $0 $0

Total Contract Price

Total Base Cost Element Summary

Cost Element Base Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs) Other ODCs Services

FY1 FY2 FY

Travel Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The Estimating System, expand as needed. For each separate cost element and extended amount. The rate for a Direct Input Cost (e.g., Purchased

Extended Amount Base

Extended Amount Base

Extended Amount Base

Extended

FYY3 FY4 FY5 FY6

e actual cost elements should be consistent with the contractor's that is either discretely estimated or computed, show the base, rate, d Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

Extended Amount

Y7 Total

Total Option Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs) Other ODCs

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Total Profit/Fee

Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

Total CPIF Base Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 0001 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 0002 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

Total CR Base Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 0003 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 0004 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

Total CPIF Option Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 0005 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 1008 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 2008 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 3008 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Fee Target Fee Total Price

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

Total CR Option Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 1011 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 1012 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 1013 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 1014 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 2011 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 2012 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 2013 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 2014 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 3011 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 3012 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 3013 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 3014 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 4011 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 4012 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 4013 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

CLIN 4014 Cost Element Summary

Extended Amount Base

Extended Amount Base

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Total Estimated Cost

Note 1 The cost elements shown above are for illustration purposes only. The

Extended Amount Base

Extended Amount Base

Extended

Extended

T&M Wrap Rates CLIN 0006

Cost Element FY1 FY2 FY3 FY4 FY5

Direct Labor Direct Labor Rate

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Other Direct Costs (ODCs) Other ODCs Services Travel Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

T&M Rate Labor Category A

Total FCCOM

Total Wrap Rate

Note 1

The cost elements shown above are for illustration purposes only. The ac Estimating System, expand as needed. For each separate cost element tha and extended amount. The rate for a Direct Input Cost (e.g., Purchased Pa

Direct Labor Direct Labor Rate

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Other Direct Costs (ODCs) Other ODCs Services Travel Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

Note 1 ctual cost elements should be consistent with the cont The cost elements shown above are for illustration purposes only. The ac at is either discretely estimated or computed, show th Estimating System, expand as needed. For each separate cost element tha arts) will be one (1). PLEASE PROVIDE ALL FOR and extended amount. The rate for a Direct Input Cost (e.g., Purchased Pa

Direct Labor Direct Labor Rate

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Other Direct Costs (ODCs) Other ODCs Services Travel Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

Note 1 ctual cost elements should be consistent with the cont The cost elements shown above are for illustration purposes only. The at is either discretely estimated or computed, show th Estimating System, expand as needed. For each separate cost element arts) will be one (1). PLEASE PROVIDE ALL FOR and extended amount. The rate for a Direct Input Cost (e.g., Purchased

WBS x GFY ($)

WBS by GFY ($)

This WBS may be expanded and extended as necessary

WBS

L L L L L WBS

1 2 3 4 5 Description GFY1 GFY2 GFY3 GFY4 GFY5 Total

Note 1: In the instance of more than one Product Fielding, the WBS structure shall be expanded and extended to accommodate multiple Prime Mission Products WBS threads for each Product Fielding instance.

LABOR HOURS - TOTAL CONTRACT

Total Total InterDiv Total WBS GFY Hours Prime Transfer SubKtrs SubKtr A SubKtr A

Allocation to

SubKtr B SubKtr C CLINs

Prime Contractor Rates

Direct Labor Labor Category A Labor Category B Labor Category C Labor Category D Labor Category E Labor Category F Labor Category G Labor Category H Total Direct Labor

Indirect Fringe & Overhead Engineering Fringe Manufacturing Fringe Total Fringe

Engineering O/H Manufacturing O/H Total Overhead

Total Indirect Fringe & O/H

Direct Materials Purchased Parts Tooling &Test Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts Subcontractor A Subcontractor B Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)

Total ODCs

Sub Total Costs

General & Administrative (G&A) Full G&A Other G&A Total G&A

Sub Total Costs Through G&A

Cost of Money Eng FCCOM Mfg FCCOM

G&A FCCOM

Total FCCOM

Note 1 The cost elements shown above are for illustration purposes only. The

Summary of Materials - TOTAL CONTRACT

Type CWBS Line Item Description (ex: Purchased Parts/Raw Material/Software Licenses/Services/Hardware)

TOTAL

Basis for Recurring Source Selection Version Vendor Quantity Unit Price Unit Price of Price Decrements Total Price

Associated

CLIN

PRICE TRACK ($)

Description

INITIAL

PROPOSAL

PRICE

Schedule Shift

Spec.

Changes

Change in Material

Cost

Change in Labor Hours

(Specify)

Change in Labor or Burden Rates

Change in Fee

Other Changes

Total Changes

CPFF CLINs

CR CLINs

FFP CLINs

TOTAL PROPOSAL

FPR

PRICE

CLIN Summary
Total Base Cost Element Sum
Total Option Cost Element Sum
Total CPIF Base CLINs
CLIN 0001
CLIN 0002
Total CR Base CLINs
CLIN 0003
CLIN 0004
Total CPIF Option CLINs
CLIN 0005
CLIN 1008
CLIN 2008
CLIN 3008
Total CR Option CLINs
CLIN 1011
CLIN 1012
CLIN 1013
CLIN 1014
CLIN 2011
CLIN 2012
CLIN 2013
CLIN 2014
CLIN 3011
CLIN 3012
CLIN 3013
CLIN 3014
CLIN 4011
CLIN 4012
CLIN 4013
CLIN 4014
CLIN 0006 T&M Rates
WBS x GFY ($)
WBS X GFY X Labor Hours
Rates
Material
Price Track

File details come from the government source that posted it. Updated .