Attachment_14_TACP_CASS_SW_145_Section_L_Cost_Formats.xlsx

XLSX spreadsheet 262 KB Posted

Attached to
Tactical Air Control Party-Close Air Support System (TACP-CASS)
Solicitation number
TACPCASS061512
Issued by

About this file

RFP Attachment 14 TACP CASS Section L Cost Formats

View the file

Other files

File Type Posted
Copy_of_CASS_1_4_5_Technical_Library_Index.pdf PDF
Attachment_14_TACP_CASS_SW_145_Section_L_20130206_v10.pdf PDF
FA8730-13-R-0008_Amendment_0002.pdf PDF
Copy_of_CASS_1_4_5_Technical_Library_Index.pdf PDF
CASS_1_4_5_Technical_Library_Index_xlsx.pdf PDF
FA8307-12-R-0014_A0001.pdf PDF
Attachment_14_TACP_CASS_SW_145_Section_L_20130125_v9.pdf PDF
CASS_1_4_5_Technical_Library_Index.pdf PDF
CASS_1_4_5_Technical_Library_Index.pdf PDF
RFP_Memo.pdf PDF
FA8730-13-R-0008.pdf PDF
Updated_CASS_1_4_5_Technical_Library_Index_12282012.pdf PDF
Q A_for_Draft_RFP_061212.docx DOCX document
TACP_CASS_145_Draft_RFP_Attachments_20121205.pdf PDF
CASS_1_4_5_Technical_Library_Index_(updated).pdf PDF
NOCA_TACP_CASS.docx DOCX document
CASS_1_4_5_Technical_Library_Index.pdf PDF
CASS_1_4_5_Technical_Library_Index.pdf PDF
Notification to Industry.pdf PDF
CASS 1 4 5 Technical Library Index —
TACP-CASS SW 145 Draft RFP Comment Form.xlsx XLSX spreadsheet
Memo for industry.pdf PDF
Draft FA8307-12-R-0014.pdf PDF
TACP CASS v1.4.2 software source code.pdf PDF
CASS 1 4 5 Technical Library Index.pdf PDF
NDA TACP CASS.pdf PDF
TACP CASS v1.4.5 Bidders Technical Library.pdf PDF
Section L Annex 3 Cost Formats 20120702 DRAFT.pdf PDF
OCI Industry Day Briefing.pptx PPTX presentation
OCI Mitigation Plan Outline.pdf PDF
Attachment 1 TACP CASS SW 145 SOW 20120627 DRAFT.pdf PDF
Exhibit A TACP CASS SW 145 CDRL 20120627 DRAFT.pdf PDF
Attachment 17 TACP CASS SW 145 Section M 20120628 DRAFT.pdf PDF
Memo for Industry.pdf PDF
Attachment 16 TACP CASS SW 145 Section L 20120627 DRAFT.pdf PDF
CASS Industry Template_Final.pptx PPTX presentation
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Summary CLIN Summary

Base CLINs
EstimatedTarget/FixedTotalMinimumMaximum
CLINDescriptionCostFeePriceFee (3%)Fee (9%)
Cost Plus Incentive Fee CLINs
CLIN 0001 - CASS Software V1.4.5 Release1
CLIN 0002 - CASS Software V1.4.5 Release 2
Total CPIF Base CLINs$0$0$0$0$0
Cost Reimbursable (CR) CLINs
CLIN 0003 - CASS Software Development Travel and ODC
CLIN 0004 - CASS Software Development Material
CLIN 0005 - CASS Software Development Data
Total CR Base CLINs$0$0

Total Base CLINs $0 $0 $0 $0 $0

Option CLINs
EstimatedTarget/FixedTotalMinimumMaximum
CLINDescriptionCostFeePriceFee (3%)Fee (9%)
Cost Plus Incentive Fee CLINs
CLIN 1008 - Interim Contractor Support Service Packs (Option Year 1)
CLIN 2008 - Interim Contractor Support Service Packs (Option Year 2)
CLIN 3008 - Interim Contractor Support Service Packs (Option Year 3)
CLIN 4008 - Contractor Logistics Support Service Packs
Total CPIF Option CLINs$0$0$0$0$0
Cost Plus Fixed Fee CLINs
CLIN 0006 - Special Projects and Studies$ 300,000
CLIN 1011 - Interim Contractor Support Field Support (Option Year 1)
CLIN 2011 - Interim Contractor Support Field Support (Option Year 2)
CLIN 3011 - Interim Contractor Support Field Support (Option Year 3)
CLIN 4011 - Contractor Logistics Support Field Support
Total CPIF Option CLINs$0$0$0$0$0
Cost Reimbursable (CR) CLINs
CLIN 1012 - Interim Contractor Support Travel and ODC (Option Year 1)
CLIN 1013 - Interim Contractor Support Material (Option Year 1)
CLIN 1014 - Interim Contractor Support Data (Option Year 1)
CLIN 2012 - Interim Contractor Support Travel and ODC (Option Year 2)
CLIN 2013 - Interim Contractor Support Material (Option Year 2)
CLIN 2014 - Interim Contractor Support Data (Option Year 2)
CLIN 3012 - Interim Contractor Support Travel and ODC (Option Year 3)
CLIN 3013 - Interim Contractor Support Material (Option Year 3)
CLIN 3014 - Interim Contractor Support Data (Option Year 3)
CLIN 4012 - Contractor Logistics Support Travel and ODC
CLIN 4013 - Contractor Logistics Support Material
CLIN 4014 - Contractor Logistics Support Data
Total CR Option CLINs$0$0
FFP CLINs
CLIN 0007 - CASS Software Technical Data Rights
CLIN 1009 - Interim Contract Support Training (Option Year 1)
CLIN 1010 - Interim Contractor Support Help Desk (Option Year 1)
CLIN 2009 - Interim Contract Support Training (Option Year 2)
CLIN 2010 - Interim Contractor Support Help Desk (Option Year 2)
CLIN 3009 - Interim Contract Support Training (Option Year 3)
CLIN 3010 - Interim Contractor Support Help Desk (Option Year 3)
CLIN 4009 - Contractor Logistics Support Training
CLIN 4010 - Contractor Logistics Support Help Desk
Total FFP Option CLINs$0$0

Total Option CLINs $0 $0 $0 $0 $0

Total Contract Price

&A

Total Base Cost Element Sum Total Base Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

Total Option Cost Element Sum Total Option Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Total Profit/Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

Total CPIF Base CLINs Total CPIF Base Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 0001

CLIN 0001 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 0002

CLIN 0002 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

Total CR Base CLINs Total CR Base Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 0003

CLIN 0003 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 0004

CLIN 0004 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 0005

CLIN 0005 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

Total CPIF Option CLINs Total CPIF Option Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 1008

CLIN 1008 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 2008

CLIN 2008 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 3008

CLIN 3008 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 4008

CLIN 4008 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Target Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

Total CPFF Option CLINs Total CPIF Option Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Fixed Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 1011

CLIN 1011 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Fixed Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 2011

CLIN 2011 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Fixed Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 3011

CLIN 3011 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Fixed Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 4011

CLIN 4011 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Fee
Fixed Fee

Total Price

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

Total CR Option CLINs Total CR Option Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 1012

CLIN 1012 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 1013

CLIN 1013 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 1014

CLIN 1014 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 2012

CLIN 2012 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 2013

CLIN 2013 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 2014

CLIN 2014 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 3012

CLIN 3012 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 3013

CLIN 3013 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's
Estimating System, expand as needed. For each separate cost element that is either discretely estimated or computed, show the base, rate,
and extended amount. The rate for a Direct Input Cost (e.g., Purchased Parts) will be one (1). PLEASE PROVIDE ALL FORMULAS.

CLIN 3014

CLIN 3014 Cost Element Summary

FY1FY2FY3FY4FY5FY6FY7Total
Cost ElementBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended AmountBaseExtended Amount
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Total Direct Labor
Indirect Fringe & Overhead
Engineering Fringe
Manufacturing Fringe
Total Fringe
Engineering O/H
Manufacturing O/H
Total Overhead

Total Indirect Fringe & O/H

Direct Materials
Purchased Parts
Tooling &Test
Total Direct Materials

Material Overhead

Total Direct Materials & O/H

Subcontracts
Subcontractor A
Subcontractor B
Total Subcontracts

Subcontracts Overhead

Interorganization Transfers (ITs)

Total Subcontractors, O/H, & ITs

Other Direct Costs (ODCs)
Other ODCs
Services
Travel
Total ODCs

Sub Total Costs

General & Administrative (G&A)
Full G&A
Other G&A
Total G&A

Sub Total Costs Through G&A

Cost of Money
Eng FCCOM
Mfg FCCOM
G&A FCCOM
Total FCCOM

Total Estimated Cost

Note 1The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the contractor's

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .