Exhibit A TACP CASS SW 145 CDRL 20120627 DRAFT.pdf
PDF 1 MB Posted
- Attached to
- Tactical Air Control Party-Close Air Support System (TACP-CASS) Federal contract opportunity
- Solicitation number
- TACPCASS061512
About this file
DRAFT Contract Data Requirements List
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8307-12-R-0014 TACP CASS Software v1.4.5 CDRL
27 June 2012
FA8307-12-R-0014
Exhibit A
Tactical Air Control Party Modernization (TACP-M)
Close Air Support System (CASS)
Software Version 1.4.5
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Electronic Systems Center
Airborne Network Division (ESC/HNA)
Hanscom Air Force Base, Massachusetts 01731
DRAFT
This is a draft release intended to solicit comments from potential offerors and is subject to change.
TABLE OF CONTENTS
General Instructions
Detailed Explanation of DD Form 1423
Index of CDRL Items
DD Forms 1423
GENERAL INSTRUCTIONS
1. The CDRL identifies the data deliverable for the related Contract Line Item Numbers (CLINs) pursuant to the tasks defined in the Statement of Work (SOW). The Contractor shall deliver all data items in accordance with the SOW, paragraph 3.1.4.8b, by posting the data to the program’s on-line library, with email notification to the TACP CASS Data Manager and the Contracting
Officer.
2. Contractually binding instructions for data content and format preparation are in Block 10, “Preparation Instructions,” of the applicable Data Item Description (DID), and permit the easy segregation of content related to specific efforts. Tailored instructions are on the CDRL or backup sheets. In such cases, “/T” (tailored) is suffixed to the DID number. The Contractor shall not deviate from the requirements of the DID, tailored or untailored, without receiving prior approval of the Government Contracting Officer. If Contractor format is permitted, all DID content must be addressed, unless the DID content is specifically tailored.
a. The Contractor shall submit data electronically in Microsoft Office compatible format, e.g., Microsoft Word, Microsoft Excel, Microsoft PowerPoint, Microsoft Project, etc., and when requested by the Government, in Adobe PDF format.
b. The Contractor shall deliver data not originally created in Microsoft Office format in its source file format when directed by the Government.
3. The CDRL was prepared using the following documents for guidance and information:
a. DoD 5010.12-M, Procedures for the Acquisition and Management of Technical Data, dated May 1993.
b. DoD Directive 5230.24, Distribution Statements of Technical Documents.
4. Unless otherwise specified, the submittal dates for the CDRL items are based on the effective date of the contract. Submittal dates falling on non-working days (Saturday, Sunday, legal holidays) shall be construed to mean the first working day following such non-working days. All submittal time periods (e.g., “60 days after contract award (DAC),” “30 days prior (DP) to test,”
“10 days after (DA) FCA,” etc.) shall be calendar counted days. Data that is dependent on events that may not occur during the performance of the contract will be submitted on an “as required” basis.
5. Unless otherwise specified, the submittal date is the date the data item is required at the office specified in Block 6 of the CDRL. Distribution to other recipients of the data shall be made on or about the same date. In the event data is delivered electronically receipt confirmation is required and may be made on line.
6. The Data Transmittal Form (DTF) shall contain the contract number, the CLIN, the CDRL sequence number, the date of transmittal, and the Contractor’s reference number. The DTF will identify the data by title and document number, as well as the type of submission (e.g., draft, final, resubmission of draft, change pages, etc.). The DTF shall also include a list showing addressees, distributions made, and number of copies distributed. One information copy of all
DTFs shall be forwarded to ESC/HNAC (TACP CASS Data Manager) and ESC/HNAK (TACP
CASS Contracting Officer). Receipt acknowledgement by means of endorsement and return of the DTF to the Contractor is required for classified documents only.
7. All correspondence relating to data items shall reference the contract number, CLIN, CDRL sequence number, and DID number.
8. Unless otherwise specified, an “A” in Block 8 of the DD Form1423 indicates written approval by the Contracting Officer shall be provided before distribution of the final data. The
Government will respond within 30 days of receipt of the data, unless a different time period is specified on the DD1423. (NOTE: ECPs, SCNs, RFDs, and NORs are exempt from this approval cycle.) However, Government failure to respond to the Contractor within this 30-day period does not constitute Government approval of data deliveries and does not constitute approval of the initiation of an effort. Government written responses shall be provided in one of three categories only: (1) Approved; (2) Approved with comments; or (3) Disapproved.
a. Data that is “Approved with comments” will be updated by the Contractor to incorporate the comments and resubmitted within 30 days of receipt of the Government response, unless otherwise directed by the Contracting Officer or contract requirements. This resubmitted data shall be considered final and will not require further Government approval if the comments have been incorporated as provided. In the event the Contractor takes exception to any Government comments, these shall be addressed in writing to the Government.
b. In the event that a data submission is disapproved, the Contracting Officer will advise the Contractor of the reason(s) for disapproval. Disapproved data items shall be revised to address/include the comments, and shall be resubmitted (or change pages provided) to the
Government as noted above. These re-submittals, or change pages, shall not be regarded as subsequent submittals as specified in Block 13 of the DD1423, unless the next submittal of the
CDRL item is scheduled such that this would be a duplication of effort. (For example, an item submitted 90 DP to test, which is disapproved and is due again 30 DP to test, would be revised to address/include the comments in the next scheduled submittal.) The Government will review the changes the Contractor has made to the data addressing Government comments/disapproval and will limit subsequent review(s) to address only those changes (with the exception of those instances where comments are incorporated in the next scheduled submittal).
c. Even in the absence of an “A” in Block 8 of the DD1423, the Government has the inherent right to approve/disapprove any data submittal which does not meet the contractual requirements of the DID, tailored or untailored.
9. The Contractor will take care not to unnecessarily duplicate data previously procured by the
Government, except to provide required copies to newly established recipients under this contract. Instances of unnecessary duplications should be identified to the TACP CASS Data
Manager. The Contractor is encouraged to recommend deletions, additions, substitutions, consolidations, and use of existing Contractor formats for data when such actions will aid the
Government in obtaining minimum essential data in a timely and cost effective manner.
10. CDRL items that have codes DD, DS, SD or SS in Block 7 of the DD1423 require the processing of a DD Form 250, Material Inspection and Receiving Report. If none of these codes are present in Block 7 then a DD Form 250 is not required for that data item. The code letter “S” indicates “Source” and refers to the Contractor’s facility; the code letter “D” indicates
“Destination.” The first code letter indicates the point of preliminary inspection (for count, style, format, legibility, reproducibility, etc.). The second code letter indicates the point of formal acceptance (on DD Form 250). In cases where draft copies are required, the draft copies shall be provided by a DTF. A DD250 is required only for transmittal of the final copies to the office identified in Block 6 of the DD1423. In addition a final DD250 shall be provided at the completion of all final CDRL deliveries against applicable CLINs. Send the final DD250 directly to the TACP CASS Contracting Officer with a copy to the TACP CASS Data Manager.
11. Change pages are normally acceptable for revisions to data items. The Government will notify the Contractor if the entire revised data item must be submitted. Requirements for periodic revisions to data, where no changes have occurred since the date of last submission, may be satisfied by a DTF stating that “No changes have occurred since the last submission.”
Requirements for submittal of data “if changed,” where no change has occurred prior to the submittal requirement, may be satisfied by a DTF stating that “No change has been made to the data to date.” In such cases, the Contractor will identify the data in question, and the reporting period.
12. Distribution statement requirements are specified in Block 9 of the DD1423. The code letter corresponds to the distribution statement to be marked on the technical data item by the
Contractor. See Block 9 in the detailed DD1423 instructions.
13. The Contractor will be notified in writing of any of the following changes to Block 14 of the
CDRL: (a) place of delivery, (b) technical office symbol, (c) increase or decrease in addressees, or (d) increase or decrease in the number of copies specified for any addressee.
The written notification will include a redlined CDRL. The Contractor may use this written notification as its authority until the issuance of a contract modification incorporating the CDRL change. There is no contract price change for changes (a) or (b). There is no contract price change for changes (c) or (d), provided that either type of increase or decrease for an individual
CDRL item is not greater than 50% of what was initially specified.
14. Questions regarding preparation and content of the CDRL items may be directed to the
ESC/HNAC TACP CASS Data Manager.
DETAILED EXPLANATION OF DD FORM 1423
Block 1: Data Item Number: Sequential number relating to the CLIN, Block A, under which the data will be delivered.
Block 2: Title of Data Item: The title of the DID cited in Block 4.
Block 3: Subtitle: Subtitle of data item for further definition of data item (optional entry).
Block 4: Authority: The DID number that defines data content and format requirements for the data item listed in Block 2. All MIL-STDs of MIL-Specs referenced in a data item description are for guidance only, unless otherwise directed in the DD 1423.
Block 5: Contract Reference: The specific paragraph number(s) of the SOW, specification, standard, or other applicable document that contain the tasking for generating the data requirement.
Block 6: Requiring Office: The technical office responsible for ensuring adequacy of the data item.
Block 7: DD 250 Req: The applicable code, designating the requirement for inspection and acceptance of the data item:
DD250 REQ CODE INSPECTION ACCEPTANCE
SS (1) (2)
DD (3) (4)
SD (1) (4)
DS (3) (5)
LT (6) (7)
NO (8) (8)
XX (9) (9)
(1) Inspection at source.
(2) Acceptance at source.
(3) No inspection performed at source; final inspection performed at destination.
(4) Acceptance at destination.
(5) Acceptance at source; acceptance based on written approval from the Contracting Officer.
(6) Letter of transmittal only.
(7) As specified in Block 16 of the DD1423.
(8) No inspection or acceptance required; no DD250 or LT required.
(9) Inspection and acceptance requirements specified elsewhere in the contract.
Block 8: App Code: Data items requiring specific advance written approval before distribution of the final data item will have “A” in this block. If approval of the data item is not required, an “N/A” will be in this block.
Block 9: Distribution Statement Required: The code letter that corresponds to the distribution statement to be marked on the technical data item by the contractor as shown below. Contact the TACP CASS Data
Manager to coordinate the exact distribution statement to be affixed to the data item.
CODE DISTRIBUTION STATEMENT
A Approved for public release; distribution is unlimited.
B Distribution authorized to U.S. Government agencies only (reason) (date). Other requests for this document shall be referred to (requiring office).
C Distribution authorized to U.S. Government agencies and their contractors
(reason) (date). Other requests for this document shall be referred to (requiring office).
D Distribution authorized to the Departments of Defense (DoD) and DoD
Contractors only (reason) (date). Other requests for this document shall be referred to (requiring office).
E Distribution authorized to DoD components only (reason) (date). Other requests shall be referred to (requiring office).
F Further dissemination only as directed by (requiring office) (date) or higher DoD authority.
X Distribution authorized to U.S. Government agencies and private individuals or enterprises eligible to obtain export-controlled technical Data IAW regulations implementing 10 U.S.C. 140c (date). Other requests shall be referred to
(requiring office).
N/A Not applicable. No distribution marking required.
Each data item requiring a distribution statement, except for Distribution Statement A, shall also have the following destruction notice below the distribution statement:
“Destruction Notice: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Notice to accompany release of Export Controlled Data – Unabbreviated Warning Notice:
“WARNING - This document contains technical data whose export is restricted by the
Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration
Act of 1979, as amended, Title 50, U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25.”
Block 10: Frequency: The following is a list of typical codes used to specify frequency of submittals:
ABBREVIATION DEFINITION
MTHLY Monthly
ASREQ* As required
BI-WE Every two weeks
BI-MO Every two months
DAILY Daily
DFDEL Deferred delivery
ONE/R One time with revisions
OTIME One time
QRTLY Quarterly
SEMIA Every six months
XTIME** Number of times to be submitted
*Further explanation of this code will be in Block 16.
**A number must be inserted in place of the “X” (e.g., 3TIME).
Block 11: As of Date: If the data will be submitted only once, the “as of date” (the cut-oft date) is entered as follows: day/month/year. This is the date for cutting off collection of data. If the data is to be submitted multiple times, the number in the block indicates the number of calendar days before the end of the reporting period, established in Block 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter or year depending on the frequency established in Block 10.
Block 12: Date of First Submission: The initial data submission is entered as follows: day/month/year. If the submittal is constrained by a specific event or milestone, the event of milestone is identified. If the contract start date is not known, the number of days the data is due after contract start is identified (e.g., 30 DAC).
Block 13: Data of Subsequent Submission: For data items being submitted more than once, the date(s) of subsequent submission(s) is identified. If submittal is constrained by a specific event or milestone, this will be explained in Block 16.
Block 14: Distribution: Block 14 provides for the following particulars:
Block 14a: Addressee: A listing of who will receive the data item by their component designator or office symbol and/or codes, or unit identification codes. Complete addresses are in the next section of this
CDRL, if applicable.
Block 14b: Copies: The specific number and type of copies to be delivered to each addressee. When the data item requires advance written approval (indicated by an “A” in Block 8), draft copies are required for approval before publication of the final document to the addressees identified. Also included will be digital media details and constraints and non-digital media details and constraints.
Block 15: Total: The total number of draft and final copies required by Block 14.
Block 16: Remarks: This block provides additional or clarifying information for Blocks 1 through 15, e.g., clarification relative to distribution statements, DID tailoring requirements, use of contractor format, and distribution of the data. If additional space is required, backup sheets, which shall be attached to the applicable DD1423, will be used.
INDEX OF DATA ITEMS
Seq. No. DID Title
A001 DI-IPSC-81435A/T Software Design Description (SDD)
A002 DI-IPSC-81441A/T Software Product Specification (SPS)
A003 DI-IPSC-81442A/T Software Version Description (SVD)
A004 DI-MGMT-81605/T Briefing Material
A005 DI-ADMN-81505/T Report, Record of Meeting/Minutes
A006 DI-CMAN-81248A/T Interface Control Document (ICD)
A007 DI-IPSC-81427A/T Software Development Plan (SDP)
A008 DI-IPSC-81432A/T System/Subsystem Design Description (SSDD)
A009 DI-IPSC-81433A/T Software Requirements Specification (SRS)
A010 DI-HFAC-81743A/T Human Systems Integration Program Plan
A011 DI-MISC-80508B/T Technical Report – Study/Service (HMI Style Guide)
A012 DI-HFAC-81833/T Human Systems Integration Report
A013 DI-MISC-80711A/T Scientific and Technical Reports (DIACAP Security Assessment)
A014 DI-CMAN-80639C/T Engineering Change Proposal (ECP)
A015 DI-CMAN-80643C/T Specification Change Notice (SCN)
A016 DI-CMAN-80642C/T Notice of Revision (NOR)
A017 DI-CMAN-80640C/T Request for Deviation (RFD)
A018 DI-CMAN-81253A/T Configuration Status Accounting Information
A019 DI-MGMT-81453A/T Data Accession List (DAL)
A020 DI-IPSC-81438A/T Software Test Plan (STP)
A021 DI-IPSC-81439A/T Software Test Description (STD)
A022 DI-IPSC-81440A/T Software Test Report (STR)
A023 DI-IPSC-81443A/T Software User Manual (SUM)
A024 DI-MISC-80508B/T Technical Report – Study/Service (System Administration &
Maintenance Manual)
A025 DI-IPSC-81633/T Software Programmer’s Guide (SPG)
A026 DI-MISC-80508B/T Technical Report – Study/Service (Quick Reference Guide)
A027 DI-ILSS-81070/T Training Program Development and Management Plan
Seq. No. DID Title
A028 DI-ILSS-80872/T Training Materials
A029 DI-MISC-80508B/T Technical Report – Study/Service (Composite Training Analysis
Report)
A030 DI-MGMT-80555A/T Program Progress Report
A031 DI-MGMT-81650/T Integrated Master Schedule (IMS)
A032 DI-MGMT-81468/T Contract Funds Status Report (CFSR)
A033 DI-MGMT-81466A/T Contract Performance Report (CPR)
A034 DI-MGMT-80269/T Status of Government Furnished Equipment (GFE) Report
A035 DI-IPSC-81429A/T Software Transition Plan (STrP)
A036 DI-MISC-80508B/T Technical Report – Study/Service
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Software Design Description (SDD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81435A/T
5. CONTRACT REFERENCE
SOW 3.1.1, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
9. DIST. STATEMENT
REQUIRED
D
10.
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
Draft 30 DP to PDR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only.
DID: Include all CSCI internal interface descriptions.
Blk 13: Submit for approval 30 DP to CDR. Submit final version for “as built” configuration for each software build with SPS.
Blk 14: Submissions shall be IAW CDRL instructions and SOW 3.1.4.8.
ESC/HNAC 1
ESC/HNAK 1
15. TOTAL 2
G. PREPARED BY
H. DATE
27 JUN 12
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
J. DATE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Software Product Specification (SPS)
DI-IPSC-81441A/T
5. CONTRACT REFERENCE
SOW 3.1.1, 3.1.2, 3.1.8, 3.1.9, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only.
DID para 3.1: Deliver executable software on Software Application Disk.
DID para 3.2: Deliver source files on Source Code Disk.
DID para 5.1: Reference final SDDs and final DBDDs.
Blks 12 & 13: Submit draft SPS 30 DP to CDR. Submit SPS for approval 30 DP to PCA. Revise within 30 days of receipt of Government comments.
Deliver Software Application Disk and Source Code Disk for operational builds 30 DP to TRR for Government DT/OT, 30 DP to each subsequent test event, 30 DP to FCA, 30 DP to PCA, and upon Government direction.
Deliver Software Application Disk and Source Code Disk for engineering builds two weeks prior to each supported exercise or other event.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Software Version Description (SVD)
DI-IPSC-81442A/T
5. CONTRACT REFERENCE
SOW 3.1.1, 3.1.2, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only.
DID paras 3.1 & 3.2: Using DoDI 8500.2 as a guide, the following shall be incorporated into the SVD:
a. Comprehensive baseline inventory of all hardware to include the following information: name of hardware, hardware description, name and version of software installed, manufacturer, type, model, physical location, and network topology or architecture required to support operations.
b. The software baseline listing that contains the following information:
software description, name, version, manufacturer, and hardware requirements to support operations.
c. Include a statement as follows: "This document provides versioning from a system perspective."
Blks 12 & 13: Submit SVD with each delivery of Software Application Disk and Source Code Disk for each software build/version.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Briefing Material
DI-MGMT-81605/T
5. CONTRACT REFERENCE
See Blk 16
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
See Blk 16
8. APP CODE
N/A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military
Blk 5: SOW 3.1.4.1, 3.1.4.5, 3.1.10.1, 3.1.10.4, 3.2.1, 3.2.2
Blk 12: Submit 10 DP to each briefing and review. The Government will provide specific comments not more than five DA receipt.
Blk 13: Subsequent submissions required at briefing/review and anytime there is a change in briefing materials.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Report, Record of Meeting/Minutes
DI-ADMN-81505/T
5. CONTRACT REFERENCE
See Blk 16
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 5: SOW 3.1.4.1, 3.1.4.5, 3.1.10.1, 3.1.10.4, 3.2.1, 3.2.2
Blk 8: The Government will provide specific comments not more than five days after receipt of meeting minutes.
Blk 12: First submission required within five days following meeting.
Blk 13: Submit within five days after receipt of Government comments.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Interface Control Document (ICD)
DI-CMAN-81248A/T
5. CONTRACT REFERENCE
SOW 3.1.4.2, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
Draft 30 DP to PDR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military
DID: Document all TACP CASS Software external interfaces.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
DI-IPSC-81427A/T
5. CONTRACT REFERENCE
SOW 3.1.4.3
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
30 DP to SRR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only.
DID: Describe the detailed, planned content of each operational and engineering software build, including all new and modified computer software configuration items (CSCIs). Define the proposed software metrics and describe the software assurance activities.
DID 5.2: Describe the plan for implementing the SIL, including SIL structure and organization, configuration control, SIL-related processes & procedures, asset management, security infrastructure, scheduling, and resource support.
Blk 13: Final due 15 DA Contractor receipt of Government comments.
Submit revisions for approval if proposed software build content changes.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
System/Subsystem Design Description (SSDD)
DI-IPSC-81432A/T
5. CONTRACT REFERENCE
SOW 3.1.4.3, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
30 DP to SRR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only.
DID: Include all CSCI interface descriptions. Reference ICD for TACP CASS Software external interfaces. Provide an annex for HMI design, including both textual and graphic descriptions of displays and that serves as a “build-to” specification that standardizes user interface components such as display terminology, error messages, abbreviations, and acronyms. All user interface software shall conform to the design defined in the SSDD.
Blk 13: Submit for approval 30 DP to PDR. Submit final version for “as
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Software Requirements Specification (SRS)
DI-IPSC-81433A/T
5. CONTRACT REFERENCE
SOW 3.1.4.3, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
Draft 30 DP to PDR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Human Systems Integration Program Plan
DI-HFAC-81743A/T
5. CONTRACT REFERENCE
SOW 3.1.4.5
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
Draft 30 DP to SRR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 13: Submit for approval 30 DP to PDR. Submit final version for “as
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Technical Report – Study/Service
3. SUBTITLE
HMI Style Guide
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B/T
5. CONTRACT REFERENCE
SOW 3.1.4.5, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
30 DP to SRR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only.
DID: Address standards, best practices, and design guidelines for the HMI that illustrate use of CASS Software HMI design elements, including:
(1) support of multiple echelons, user roles, hardware configurations, and growth for new capabilities; (2) ease and flexibility for the operator to execute the mission; (3) support of timely, correct messaging, including data entry, forms, navigation, help/cues, and error handling/prevention;
(4) visibility and ease of response to monitoring and status accounting data for hardware and software interfaces; (5) prompt, current, and visible status information (e.g., alerts and pop-ups); 6) accessibility and ease of use of geo-rectification and target mensuration; (7) ease of operator interaction with ownship, hostile, and friendly track data; (8) ease of manipulation and display of mapping and screen overlays, situational awareness filtering, and off-screen indicators; (9) ease of manual/ automated configuration of radios and peripheral hardware; and
(10) correct, consistent use of battlefield geometry data.
Blk 13: Submit revisions as required and when directed by the Government.
Blk 14: Submissions shall be IAW CDRL instructions and SOW 3.1.4.8.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Human Systems Integration Report
DI-HFAC-81833/T
5. CONTRACT REFERENCE
SOW 3.1.4.5
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
See Blk 16
8. APP CODE
N/A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only.
DID: Include the results of HMI analyses, prototyping, and usability testing. Report the current HMI metrics.
Blks 12 &13: Submit two weeks prior to PDR, TRR, and each applicable HSi Working Group meeting. Submit 30 DP to CDR.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
DIACAP Security Assessment
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A/T
5. CONTRACT REFERENCE
SOW 3.1.4.6, 3.2.1
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
See Blk 16
12. DATE OF FIRST
SUBMISSION
30 DP to PDR
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only. The Contractor shall document compliance with all DIACAP software development requirements.
Blk 8: The is a critical data item and requires advance written approval before the Contractor can proceed to the CDR for each software build.
Blk 10: This data item must be submitted for each operational software build.
Blk 13: 30 DP to TRR. Update as directed by the Government.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
DI-CMAN-80639C/T
5. CONTRACT REFERENCE
SOW 3.1.4.7
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
See Blk 16
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
Blk 12: Submit draft 15 days prior to formal submission of an ECP.
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TACP Close Air Support System (CASS)
E. CONTRACT/PR NO.
FA8307-12-R-0014
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Specification Change Notice (SCN)
DI-CMAN-80643C/T
5. CONTRACT REFERENCE
SOW 3.1.4.7
6. REQUIRING OFFICE
ESC/HNAC
7. DD 250 REQ
LT
FREQUENCY
ASREQ
12. DATE OF FIRST
SUBMISSION
ASREQ
14. DISTRIBUTION
See Blk 16
8. APP CODE
A
11. AS OF
DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
a.
ADDRESSEE
b. COPIES
Draft Final
Reg. Repro
16. REMARKS:
I. APPROVED BY
Ilkyu Yim, Major, USAF, ESC/HNAC
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 1014, 2014, 3014, 4014
B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM.
TA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .