TABLE 3 - Deliverables.pdf

PDF 105 KB Posted

Attached to
Military Housing Maintenance – San Francisco Bay Area
Solicitation number
70Z08425RALAM0002
Issued by

About this file

The document is a comprehensive Deliverables Table for a U.S. Coast Guard military housing maintenance contract in the San Francisco Bay Area. The table details 22 specific reports and documents that the contractor must submit, including initial status reports, safety plans, personnel rosters, equipment inventories, and various monthly and as-needed reports such as playground reports, exterior lighting reports, vandalism reports, and fire hydrant preventive maintenance documentation.

Each deliverable is precisely mapped with specific requirements: submission frequency (ranging from daily to annual), recipient (consistently the Contracting Officer Representative or Contracting Officer), and reference sections within the Statement of Work (SOW) or various appendices. Most reports are due within 15 days after contract award, monthly, or as needed, with recipients typically being the COR and KO. The table provides a structured framework for documentation and performance tracking, ensuring comprehensive oversight of the military housing maintenance services across locations including Alameda, Novato, Petaluma, and Yerba Buena Island in California.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE 3 - DELIVERABLES:

REPORT Paragraph DUE DATE RECIPIENT

Initial Status Report SOW 11. 30 days after start of

Contract

COR and KO

Conditions Affecting Performance

SOW 20.8. As Needed COR

Safety Plan SOW 12. 15 days after award COR and KO Accident Report SOW 13. As Needed COR Recycling Report SOW 14. Monthly COR

Phase-In/Phase-Out Plan

SOW 17. 10 prior to contract start date/end date

COR and KO

Personnel Roster SOW 5. 15 days after award or within 5 days of change

COR and KO

Lost or Stolen Key Report

SOW 5.6.5 As Needed COR

Equipment Inspection Appendix A 9.30

As they occur COR

Call Center phone number

Appendix A 1.1

Appendix B 4.

15 days after award COR and KO

Service Call log and work sheets

Appendix A 1.3

Appendix B 4.2

When requested COR

Pesticide/Herbicide Management Plan

Appendix A 9.23, 9.29

Appendix B 16.8, 16.8.5

15 days after award COR and KO

Playground report Appendix A 10.1

Appendix B 11.1

Monthly COR

Exterior Lighting Report

Appendix A

Appendix B 12

Monthly COR

SAMS information SOW 4 Appendix A

14.3

Daily COR

Appendix B 10.3

Vandalism Report Appendix A 14.5

Appendix B 10.5

Appendix C

Monthly COR

Property Damage Report

Appendix A 14.6

Appendix B 10.6

Appendix C 4

As Needed COR

Materials cut sheets Appendix A

Appendix B 10.7

Appendix C 6

15 days after award COR

Equipment and appliance Inventory

Sheet

Appendix A 33.5

Appendix B 16.4

As needed COR

Fire Hydrant PM Appendix A

Appendix B 17

Annual COR

Irrigation System Report

Appendix A

As Needed COR

QC Plan SOW 25 15 days after award COR and KO

Materials and Product Submittals

Appendix A

Appendix B 10.7

Appendix C 6

15 days after award COR

TABLE 3 - DELIVERABLES:

File details come from the government source that posted it. Updated .