Tab 15 Past Performance Questionnaire 2022 08 19.pdf
PDF 229 KB Posted
- Attached to
- Altmeyer Building Column Repair -- Woodlawn, MD
- Solicitation number
- 47PD0224R0014
About this file
This document contains a past performance questionnaire template for evaluation of offerors for the Altmeyer Building Column Repair project in Woodlawn, Maryland. The General Services Administration is seeking to repair columns at the SSA Altmeyer Central Utility Plant and will consider completed questionnaires from references provided by offerors in selecting the most qualified contractor. References should return completed questionnaires to Stephen Kohri and Nicholas Griffaton at the GSA by January 9, 2024. The questionnaire includes both numerical ratings and narrative comment sections to evaluate offerors on management, construction, close-out/warranty, and overall performance on relevant past projects. Details sought include adherence to schedule, budget, laws and regulations, quality of workmanship, safety record, timeliness of issue resolution, and likelihood of contracting with the firm in the future.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION SEE FAR 3.104
OFFEROR BEING EVALUATED: _______________________________________
PROJECT BEING EVALUATED: _______________________________________
NAME OF EVALUATOR: _______________________________________
EVALUATOR’S AGENCY/COMPANY: _______________________________________
EVALUATOR’S ROLE IN PROJECT: _______________________________________
EVALUATOR’S EMAIL ADDRESS: _______________________________________
EVALUATOR’S TELEPHONE NUMBER: ______________________________________
PAST PERFORMANCE QUESTIONNAIRE – PRIME CONTRACTOR
SSA Altmeyer Column Repair
The General Services Administration is evaluating past performance in selecting a contractor for the construction / repair of the SSA Altmeyer Central Utility Plant. You have been identified by the one of the offerors as someone who could attest to the quality that offeror’s performance on the project listed below.
Your completion of the attached questionnaire would be of great benefit in selecting the most qualified firm to perform this project.
Completed questionnaires will be considered procurement sensitive information and will not be seen or reviewed by the offeror in question or any other party not having a need to know. Electronic copies of the completed questionnaire should be emailed to Stephen Kohri at stephen.kohri@gsa .gov and Nicholas Griffaton at nicholas.griffaton@gsa.gov.
We request receipt of your completed questionnaire by
StevenMSutkin Typewriter
StevenMSutkin
1/9/2024.
SOURCE SELECTION INFORMATION SEE FAR 3.104
RATING PERFORMANCE LEVEL
5 EXCELLENT – The contractor’s performance met all contractual requirements and exceeded many to the Government’s or customer’s benefit. The few corrective actions that may have been necessary were provided expeditiously and were highly effective.
4 GOOD - The contractor’s performance met contractual requirements and exceeded some to the Government’s benefit. Performance was provided with some minor problems, but corrective action was prompt and effective.
3 ACCEPTABLE – The contractor’s performance met contractual requirements. There were minor problems but the corrective actions taken were generally satisfactory.
2 MARGINAL – The contractor’s performance did not meet some contractual requirements.
There were significant problems with the contractor’s performance and the corrective action provided was only marginally effective or was not fully implemented.
1 UNACCEPTABLE – The contractor’s performance did not meet most contractual requirements and corrective action was untimely, ineffective or both.
N NOT APPLICABLE – Unable to provide a rating
MANAGEMENT 5 4 3 2 1 N
Exhibits professional conduct Cooperation/responsiveness is timely, provides/solicits feedback, suggests alternatives Offeror is easy to work with, friendly, courteous Provides effective oversight of project managers/superintendents Quickly and professionally resolves issues/disputes Reviews and addresses subcontractor issues Provides a clear and effective line of supervision on the worksite Follows and maintains the established project budget Follows the negotiated subcontracting plan
CONSTRUCTION 5 4 3 2 1 N
Complies with laws and regulations Coordinates and controls subcontractors, adheres to work schedule Maintains good construction pace and work environment Site management – materials are properly stored and staged, job-site is clean Adheres to an adequate initial project schedule, schedule revisions are timely submitted Resolves delays in a timely manner
PAST PERFORMANCE QUESTIONNAIRE – PRIME CONTRACTOR
SSA Altmeyer Column Repair
SECTION 1 – NUMERICAL RATINGS
Please indicate your level of satisfaction with the contractor’s performance on the project in question by placing an “X” in the appropriate block using the rating scale provided to the right of each question. This scale is defined as follows:
StevenMSutkin
SOURCE SELECTION INFORMATION SEE FAR 3.104
Completes punch list items in a timely manner Uses specified materials Identifies and corrects deficient work timely and effectively Implements and follows a satisfactory safety plan Provides high quality workmanship QC testing is adequate and fully implemented
CLOSE-OUT/WARRANTY 5 4 3 2 1 N
Requirement documents are fully submitted Documents are submitted in a timely manger As-built drawings – redline drawings are accurately maintained on site per specs Close-out documents follow the required format Responses to warranty issues are timely and effective Noted deficiencies are adequately corrected
OVERALL PERFORMANCE 5 4 3 2 1 N
Overall performance – Likelihood of contracting with this firm on future projects
SECTION 2 – NARRATIVE COMMENTS
Please provide in the spaces below any additional comments you have regarding the offeror’s performance on the project in question:
1. Strengths of Performance:
2. Weaknesses of Performance:
3. Describe the contractor’s level of attention to safety and describe any incidents that occurred on the project:
StevenMSutkin
SOURCE SELECTION INFORMATION SEE FAR 3.104
4. Additional Comments:
StevenMSutkin
File details come from the government source that posted it. Updated .