Tab 02 post Drawings Full Repair Design 65 percent 2023 10 03.pdf
PDF 13 MB Posted
- Attached to
- Altmeyer Building Column Repair -- Woodlawn, MD
- Solicitation number
- 47PD0224R0014
About this file
This file contains 65 percent design drawings for the full repair of columns at the Altmeyer Building in Woodlawn, Maryland. The drawings relate to solicitation number 47PD0224R0014 issued by the General Services Administration Public Buildings Service Region 3 for column repair work at the Altmeyer Building. The solicitation seeks bids for structural repair of columns at the specified federal building located in Woodlawn, Maryland, as depicted in the 65 percent design drawings. The response deadline and anticipated award date are not provided in the file or related solicitation information.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Controlled By: GSA (Records@gsa.gov)
I
SUMMER
CONSULTANTS
N C O R P O R A T E D
/3 /2
:0
:1
P
M
G-001
COVER SHEET
65% SUBMISSION
2023/10/03
09/25/23JHG
KMD
6401 Security Boulevard Woodlawn, MD
214.029
47PD0322D0008
Arthur J. Altmeyer Building
47PD0223F0013
GSA
Arthur J. Altmeyer Building
6401 Security Boulevard Woodlawn, MD
Mark Date Description
VICINITY
AREA OF WORK
LOCATION MAP VICINITY MAP CODE CONFORMANCE CERTIFICATE
7900 Westpark Drive, Suite A405 McLean, Virginia 22102
SUMMER CONSULTANTS, INC.
PROJECT CONTROL NUMBER: 47PD0223F0076
CONSTRUCTION CONTRACT NUMBER: 47PD0322D0008
COVER SHEET APPROVALS
THE DESIGN OF THIS PROJECT CONFORMS TO THE FOLLOWING CODES AND
GOVERNMENT REQUIREMENTS AS NOTED BELOW.
1. FACILITY STANDARDS FOR THE PUBLIC BUILDINGS SERVICE PBS-P100 - APRIL 2017
2. INTERNATIONAL BUILDING CODE (IBC 2015) WITH CHAPTER 10 EGRESS SUPERCEDED BY
NFPA-101 2015 AND INCLUDES REFERENCE TO NFPA-13 2013
3. INTERNATIONAL MECHANICAL CODE (IMC 2015)
4. INTERNATIONAL PLUMBING CODE (IPC 2015)
5. INTERNATIONAL FIRE CODE (IFC 2015)
6. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
7. NATIONAL EMISSIONS STANDARDS FOR THE CONSTRUCTION INDUSTRY: FOLLOW ALL
PERTINENT LOCAL, STATE AND FEDERAL HEALTH SAFETY AND ENVIRONMENTAL REGULATIONS.
8. NFPA 70 - NATIONAL ELECTRIC CODE - (2017)
9. NFPA 70E STANDARD FOR ELECTRIC SAFETY IN THE WORKPLACE (2015)
10. NFPA 101 LIFE SAFETY CODE (2015)
TENANT AGENCIES ELECTRICAL
ARCHITECTURAL BUILDING MANAGER
FIRE PROTECTION
ENVIRONMENTAL MANAGEMENT
SOCIAL SECURITY ADMINISTRATION
ALTMEYER FULL COLUMN REPAIR
ARTHUR J. ALTMEYER BUILDING
6401 SECURITY BLVD
WOODLAWN, MD 21235
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE MID ATLANTIC REGION
100 S INDEPENDENCE MALL W, 2ND FLR
PHILADELPHIA, PA 19106
Altmeyer Columns Full Repair Design
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Controlled By: GSA (Records@gsa.gov)
I
SUMMER
CONSULTANTS
N C O R P O R A T E D
/3 /2
:4
:0
P
M
G-002
SHEET LIST
65% SUBMISSION
2023/10/03
09/25/23JHG
KMD
6401 Security Boulevard Woodlawn, MD
214.029
47PD0322D0008
Arthur J. Altmeyer Building
47PD0223F0013
GSA
Arthur J. Altmeyer Building
6401 Security Boulevard Woodlawn, MD
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
G-001 COVER SHEET
G-002 SHEET LIST
G-003 PROJECT SEQUENCING
G-004 SITE PLAN
G-005 ROUTING PLAN
GI001 SYMBOLS & ABBREVIATIONS
HM-001 HAZARDOUS MATERIALS
S-001 DESIGN NOTES
S-002 DESIGN NOTES AND ABBREVIATIONS
S-101 EXIST. BASEMENT FLOOR
S-102 MEZZANINE LEVEL PLAN
S-103 EXIST. GROUND FLOOR FRAMING
S-104 EXIST. BASEMENT FLOOR
S-105 MEZZANINE FRAMING
S-401 MEZZANINE PART PLANS
S-411 AS-37 EXISTING/DEMO
S-412 AS-37 SHORING
S-413 AS-37 REPAIR IN PHASES
S-414 AS-37 CONSTRUCT JACKET
S-415 AS-37 REPLACE MEZZANINE AND SLAB ON GRADE
S-421 AR-35 EXISTING/DEMO
S-422 AR-35 SHORING
S-423 AR-35 REPAIR IN PHASES
S-424 AR-35 CONSTRUCT JACKET
S-425 AR-35 REPLACE MEZZANINE AND SLAB ON GRADE
S-431 AS-35 EXISTING/DEMO
S-432 AS-35 SHORING
S-433 AS-35 REPAIR IN PHASES
S-434 AS-35 CONSTRUCT JACKET
S-435 AS-35 REPLACE MEZZANINE AND SLAB ON GRADE
S-441 AT-37 EXISTING/DEMO
S-442 AT-37 SHORING
S-443 AT-37 REPAIR IN PHASES
S-444 AT-37 CONSTRUCT JACKET
S-445 AT-37 REPLACE MEZZANINE AND SLAB ON GRADE
S-451 AU-37 EXISTING/DEMO
S-452 AU-37 SHORING
S-453 AU-37 REPAIR IN PHASES
S-454 AU-37 CONSTRUCT JACKET
S-455 AU-37 REPLACE MEZZANINE AND SLAB ON GRADE
S-501 DETAILS
S-510 CORROSION PROTECTION DETAILS
P-001 SYMBOLS AND ABBREVIATIONS
PD2-111 MEZZANINE PLAN - AR-35 - DEMOLITION
PD2-411 ENLARGED MEZZANINE PLAN - AR-35 - DEMOLITION
P2-111 MEZZANINE PLAN - AR-35
P2-411 ENLARGED MEZZANINE PLAN - AR-35
M-001 SYMBOLS, ABBREVIATIONS, AND SCHEDULES
MD1-101 BASEMENT PLAN - AS-37 - DEMOLITION
MD1-111 MEZZANINE PLAN - AS-37 - DEMOLITION
MD1-401 ENLARGED BASEMENT PLAN - AS-37 - DEMOLITION
MD1-402 ENLARGED BASEMENT PLAN - AS-37 - DEMOLITION
MD1-411 ENLARGED MEZZANINE PLAN - AS-37 - DEMOLITION
MD1-412 ENLARGED MEZZANINE PLAN - AS-37 - DEMOLITION
M1-101 BASEMENT PLAN - AS-37
M1-111 MEZZANINE PLAN - AS-37
M1-401 ENLARGED BASEMENT PLAN - AS-37
M1-402 ENLARGED BASEMENT PLAN - AS-37
M1-411 ENLARGED MEZZANINE PLAN - AS-37
M1-412 ENLARGED MEZZANINE PLAN - AS-37
MD2-101 BASEMENT PLAN - AR-35 - DEMOLITION
MD2-111 MEZZANINE PLAN - AR-35 - DEMOLITION
MD2-401 ENLARGED BASEMENT PLAN - AR-35 - DEMOLITION
MD2-402 ENLARGED BASEMENT PLAN - AR-35 - DEMOLITION
MD2-411 ENLARGED MEZZANINE PLAN - AR-35 - DEMOLITION
MD2-412 ENLARGED MEZZANINE PLAN - AR-35 - DEMOLITION
M2-101 BASEMENT PLAN - AR-35
M2-111 MEZZANINE PLAN - AR-35
M2-401 ENLARGED BASEMENT PLAN - AR-35
M2-402 ENLARGED BASEMENT PLAN - AR-35
M2-411 ENLARGED MEZZANINE PLAN - AR-35
M2-412 ENLARGED MEZZANINE PLAN - AR-35
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
MD3-101 BASEMENT PLAN - AS-35 - DEMOLITION
MD3-111 MEZZANINE PLAN - AS-35 - DEMOLITION
MD3-401 ENLARGED BASEMENT PLAN - AS-35 - DEMOLITION
MD3-402 ENLARGED BASEMENT PLAN - AS-35 - DEMOLITION
MD3-411 ENLARGED MEZZANINE PLAN - AS-35 - DEMOLITION
MD3-412 ENLARGED MEZZANINE PLAN - AS-35 - DEMOLITION
M3-101 BASEMENT PLAN - AS-35
M3-111 MEZZANINE PLAN - AS-35
M3-401 ENLARGED BASEMENT PLAN - AS-35
M3-402 ENLARGED BASMENT PLAN - AS-35
M3-411 ENLARGED MEZZANINE PLAN - AS-35
M3-412 ENLARGED MEZZANINE PLAN - AS-35
MD4-101 BASEMENT PLAN - AT-37 - DEMOLITION
MD4-111 MEZZANINE PLAN - AT-37 - DEMOLITION
MD4-401 ENLARGED BASEMENT PLAN - AT-37 - DEMOLITION
MD4-402 ENLARGED BASEMENT PLAN - DEMOLITION
MD4-411 ENLARGED MEZZANINE PLAN - AT-37 - DEMOLITION
MD4-412 ENLARGED MEZZANINE PLAN - AT-37 - DEMOLITION
M4-101 BASEMENT PLAN - AT-37
M4-111 MEZZANINE PLAN - AT-37
M4-401 ENLARGED BASEMENT PLAN - AT-37
M4-402 ENLARGED BASEMENT PLAN - AT-37
M4-411 ENLARGED MEZZANINE PLAN - AT-37
M4-412 ENLARGED MEZZANINE PLAN - AT-37
M-601 RISER
M-602 RISER
M-603 RISER
M-604 RISER
E-001 SYMBOLS & ABBREVIATIONS
ED1-101 BASEMENT PLAN - AS-37 - DEMOLITION
ED1-111 MEZZANINE PLAN - AS-37 - DEMOLITION
ED1-401 ENLARGED BASEMENT PLAN - AS-37 - DEMOLITION
ED1-411 ENLARGED MEZZANINE PLAN - AS-37 - DEMOLITION
E1-101 BASEMENT PLAN - AS-37
E1-111 MEZZANINE PLAN - AS-37
E1-401 ENLARGED BASEMENT PLAN - AS-37
E1-411 ENLARGED MEZZANINE PLAN - AS-37
ED2-101 BASEMENT PLAN - AR-35 - DEMOLITION
ED2-111 MEZZANINE PLAN - AR-35 - DEMOLITION
ED2-401 ENLARGED BASEMENT PLAN - AR-35 - DEMOLITION
ED2-411 ENLARGED MEZZANINE PLAN - AR-35 - DEMOLITION
E2-101 BASEMENT PLAN - AR-35
E2-111 MEZZANINE PLAN - AR-35
E2-401 ENLARGED BASEMENT PLAN - AR-35
E2-411 ENLARGED MEZZANINE PLAN - AR-35
ED3-101 BASEMENT PLAN - AS-35 - DEMOLITION
ED3-111 MEZZANINE PLAN - AS-35 - DEMOLITION
ED3-401 ENLARGED BASEMENT PLAN - AS-35 - DEMOLITION
ED3-411 ENLARGED MEZZANINE PLAN - AS-35 - DEMOLITION
E3-101 BASEMENT PLAN - AS-35
E3-111 MEZZANINE PLAN - AS-35
E3-401 ENLARGED BASEMENT PLAN - AS-35
E3-411 ENLARGED MEZZANINE PLAN - AS-35
ED4-101 BASEMENT PLAN - AT-37 - DEMOLITION
ED4-111 MEZZANINE PLAN - AT-37 - DEMOLITION
ED4-401 ENLARGED BASEMENT PLAN - AT-37 - DEMOLITION
ED4-411 ENLARGED MEZZANINE PLAN - AT-37 - DEMOLITION
E4-101 BASEMENT PLAN - AT-37
E4-111 MEZZANINE PLAN - AT-37
E4-401 ENLARGED BASEMENT PLAN - AT-37
E4-411 ENLARGED MEZZANINE PLAN - AT-37
ED5-101 BASEMENT PLAN - AU-37 - DEMOLITION
ED5-111 MEZZANINE PLAN - AU-37 - DEMOLITION
ED5-401 ENLARGED BASEMENT PLAN - AU-37 - DEMOLITION
ED5-411 ENLARGED MEZZANINE PLAN - AU-37 - DEMOLITION
E5-101 BASEMENT PLAN - AU-37
E5-111 MEZZANINE PLAN - AU-37
E5-401 ENLARGED BASEMENT PLAN - AU-37
E5-411 ENLARGED MEZZANINE PLAN - AU-37
E-501 DETAILS
E-601 SCHEDULES
Mark Date Description
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Controlled By: GSA (Records@gsa.gov)
I
SUMMER
CONSULTANTS
N C O R P O R A T E D
/3 /2
:4
:0
P
M
G-003
PROJECT SEQUENCING
65% SUBMISSION
2023/10/03
09/25/23JHG
KMD
6401 Security Boulevard Woodlawn, MD
214.029
47PD0322D0008
Arthur J. Altmeyer Building
47PD0223F0013
GSA
Arthur J. Altmeyer Building
6401 Security Boulevard Woodlawn, MD
Mark Date Description
Altmeyer Columns Full Repair Design
BASIS OF DESIGN
PROPOSED CONSTRUCTION PHASING APPROACH
1. THIS PROJECT SUPPORTS REPAIRING FIVE COLUMNS IN THE BASEMENT OF THE ALTMEYER BUILDING AT THE SOCIAL SECURITY ADMINISTRATION (SAA) WOODLAWN HEADQUARTERS CAMPUS IN WOODLAWN, MARYLAND. THE COLUMNS TO BE REPAIRED ARE AS-37, AR-35, AR-37, AT-37, AND AU-37.
2. THE REPAIRED COLUMNS ARE SURROUNDED BY VARIOUS UTILITIES, INCLUDING STEAM AND
CONDENSATE PIPING, ELECTRICAL, WATER, NATURAL GAS, SPRINKLER, AND WIRING FOR CONTROLS, AND FIRE ALARM.
3. THE COLUMNS WILL BE TEMPORARILY SUPPORTED TO FACILITATE SEGMENTED REPAIRS BASED ON THE
STRUCTURAL DESIGN. UTILITIES WILL BE RELOCATED AS NECESSARY TO ACCOMMODATE THE
PROPOSED SHORE POSTS, STEEL PLATES, ANCHORS, BASE PLATES, AND SHORING BEAMS.
4. AFTER COMPLETING THE REPAIRS, A REINFORCED CONCRETE JACKET WILL BE ADDED TO ENLARGE THE EXISTING COLUMNS BY ABOUT 5 INCHES ON EACH SIDE. THIS JACKET AIMS TO PREVENT THE NEED FOR
FUTURE REPAIRS AND WILL BE APPLIED TO ALL COLUMNS EXCEPT AU-37.
5. TO PERFORM THE REPAIRS, THE CONTRACTOR MUST REMOVE UTILITIES AND ITEMS LIKE CATWALKS, ACCESS LADDERS, AND STEEL FRAMING WITHIN APPROXIMATELY 24 INCHES OF THE EXISTING
COLUMNS. STRUCTURAL DRAWINGS OUTLINE MODIFICATIONS TO ACCESS LADDERS, MEZZANINES, GRATING, AND OTHER STRUCTURAL ELEMENTS, WHICH NEED CLOSE COORDINATION WITH MECHANICAL
WORK DURING CONSTRUCTION TO MAINTAIN ACCESS, MAINTAINABILITY, AND OPERATION.
6. ENSURING THE CENTRAL HEATING PLANT'S CONTINUED OPERATION IS VITAL FOR THE HEADQUARTERS COMPLEX. SOME UTILITIES MAY BE TEMPORARILY DEMOLISHED, CAPPED, AND RECONNECTED AFTER REPAIRS, WHILE OTHERS REQUIRE PERMANENT RELOCATION. MANY OF THESE UTILITIES ARE CRUCIAL FOR THE BOILER PLANT, WHICH PROVIDES HIGH-PRESSURE STEAM FOR HEATING THE MAIN COMPLEX, INCLUDING THE ROBERT M. BALL BUILDING, ANNEX BUILDING, WEST HIGH-RISE BUILDING, WEST
LOW-RISE BUILDING, EAST HIGH-RISE BUILDING, AND EAST LOW-RISE BUILDING.
7. ENSURING UNINTERRUPTED OPERATION OF THE CENTRAL STEAM UTILITY PLANT IS VITAL FOR PROJECT SUCCESS. THE BOILER PLANT EXPERIENCES SEMI-ANNUAL SCHEDULED SHUTDOWNS, COMMENCING AT
6:00 PM BEFORE THE HOLIDAY WEEKENDS INDICATED. DURING THESE PLANNED OUTAGES, THE
CONTRACTOR MUST COMPLETE AS MUCH ESSENTIAL WORK AS POSSIBLE TO PRESERVE A SEAMLESS
WORKFLOW AND ADHERE TO THE PROJECT SCHEDULE.
7.1. SPRING SHUTDOWN: JUNETEENTH WEEKEND
7.2. FALL SHUTDOWN: COLUMBUS DAY WEEKEND
8. THE PROJECT PRICING WILL BE ITEMIZED FOR EACH COLUMN, COVERING ALL ASSOCIATED EXPENSES, SUCH AS UTILITY RELOCATIONS, MEZZANINE AND CATWALK ADJUSTMENTS, STRUCTURAL SHORING AND REPAIRS, AS WELL AS THE EXPENSES TO RESTORE THE BOILER PLANT TO ITS ORIGINAL OPERATIONAL
STATE.
8.1. BASE BID: DEMOLITION OF BOILER #4, UTILITY DEMOLITION AND RELOCATIONS, MEZZANINE AND CATWALK MODIFICATIONS AND EXPANSION, DA TANK RELOCATION, BOILER FEEDWATER PUMP AND
ASSOCIATED PIPING, AND STRUCTURAL REPAIRS ASSOCIATED WITH COLUMN AS-37.
8.2. BID OPTION 1: UTILITY DEMOLITION AND RELOCATIONS, MEZZANINE AND CATWALK
MODIFICATIONS, CONDENSATE TANK RELOCATION, AND STRUCTURAL REPAIRS ASSOCIATED WITH
COLUMN AR-35.
8.3. BID OPTION 2: UTILITY RELOCATIONS, MEZZANINE AND CATWALK MODIFICATIONS, AND
STRUCTURAL REPAIRS ASSOCIATED WITH COLUMN AS-35.
8.4. BID OPTION 3: INCLUDES UTILITY RELOCATIONS, MEZZANINE AND CATWALK MODIFICATIONS, AND
STRUCTURAL REPAIRS ASSOCIATED WITH COLUMN AT-37.
8.5. BID OPTION 4: INCLUDES UTILITY RELOCATIONS, MEZZANINE AND CATWALK MODIFICATIONS, AND
STRUCTURAL REPAIRS ASSOCIATED WITH COLUMN AU-37.
9. BASE BID - REPAIR OF COLUMN AS-37
9.1. BOILER #1 WILL BE SHUT DOWN AND PRESERVED FOR THE ENTIRE DURATION OF THE WORK USING
DRY PACKING WITH DESICCANT TO PREVENT ADDITIONAL CORROSION ON BOTH THE WATERSIDE
AND FIRESIDE. THE PROCESS FOR DRY LAY-UP IS AS FOLLOWS:
9.1.1. COORDINATE THE SHUTDOWN OF BOILER #1 A MINIMUM OF 4 WEEKS IN ADVANCE WITH
THE CONTRACTING OFFICER, AND THE SOCIAL SECURITY ADMINISTRATION.
9.1.2. PERFORM A BOTTOM BLOW-DOWN BEFORE, AND THEN AGAIN AFTER SHUTDOWN TO
REMOVE SEDIMENT AND LOWER THE BOILER'S PRESSURE AND TEMPERATURE UNTIL THE
BOILER REACH 0-PSIG, AND WATER TEMPERATURE IS UNDER 140-DEGREES F. UTILIZATION
OF THE BOILER'S SAFETY VALVE FOR VENTING IS NOT PERMITTED.
9.1.3. SHUT OFF THE MAIN FUEL AND POWER SUPPLY TO THE BOILER TO ENSURE IT'S
COMPLETELY DISCONNECTED FROM EXTERNAL ENERGY SOURCES.
9.1.4. DRAIN ALL WATER FROM THE BOILER, INCLUDING THE STEAM AND WATER SIDES THROUGH
LOW POINTS AND DRAINS. CONTRACTOR SHALL ENSURE NO RESIDUAL WATER REMAINS.
UPON COMPLETION OF THE DRAIN-DOWN PROCESS, OPEN ALL VENTS AND INSPECTION
PORTS TO ALLOW FOR PROPER VENTILATION AND AIR CIRCULATION WITHIN THE BOILER.
9.1.5. OPEN, CLEAN, AND INSPECT THE BOILER FIRESIDE. FOLLOW THE MANUFACTURER'S
INSTRUCTIONS FOR MINIMIZATION OF METAL REMOVAL DURING CLEANING.
9.1.5.1. THOROUGHLY EXAMINE THE BOILER FOR RUST AND SCALE TRAILS ON THE PRESSURE
VESSEL BOUNDARY AND RECORD ANY SUSPICIOUS CONDITIONS FOR SUBMISSION TO
THE CONTRACTING OFFICER AND SUBSEQUENT EVALUATION BY THE GOVERNMENT.
9.1.5.2. INSPECT AND DOCUMENT FIRESIDE GASKETS FOR SIGNS OF SOOT TRAILS TO
EVALUATE POTENTIAL COMBUSTION GAS SHORT-CIRCUITING, CORROSION OF THE
GASKET SEATING SURFACE, AND INDICATIONS OF OVERHEATING OF AIR-COOLED
SURFACES.
9.1.5.3. INSPECT THE FIRESIDE REFRACTORY AND INSULATION FOR CRACKS AND DOCUMENT
ANY DISCOVERED.
9.1.6. ENSURE THAT THE OUTLET, FEED, AND MAKE-UP VALVES ARE SECURELY LOCKED AND
TAGGED AS CLOSED, WHILE THE AIR VENT VALVE IS LOCKED AND TAGGED AS OPEN.
PROCEED TO REMOVE ALL INSPECTION OPENING CLOSURES. DURING THIS PROCESS:
9.1.6.1. INSPECT FOR INDICATIONS OF GASKET LEAKAGE AND POTENTIAL CORROSION OF THE
GASKET SEATING SURFACE. EXAMINE ALL HANDHOLE AND MANWAY YOKE BOLTS AND
NUTS FOR ANY SIGNS OF DETERIORATION. EVALUATE THE SCALE AND CORROSION
CONDITION ON THE WATERSIDE. DOCUMENT AND REPORT ANY SUSPECT CONDITIONS.
9.1.7. THOROUGHLY WASH DOWN THE BOILER AND ENSURE THE REMOVAL OF ALL SCALE AND
SEDIMENT FROM THE WASHOUT OPENINGS AT THE BOILER'S BOTTOM. COMPLETE
REMOVAL OF SCALE AND SEDIMENT IS ESSENTIAL TO PREVENT THE ENTRAPMENT OF
MOISTURE AND OXYGEN, WHICH CAN ULTIMATELY RESULT IN CORROSION OF THE BOILER.
9.1.8. DRY ALL BOILER SURFACES USING FANS AND ELECTRIC AIR HEATERS. POWER FOR
HEATERS MAY BE SOURCED FROM LOCAL ELECTRIC CIRCUITS.
9.1.9. WITHIN 7 DAYS OF FINISHING THE WASH DOWN AND BEFORE PACKING AND SEALING THE
BOILER, SUBMIT A WRITTEN COPY OF ALL DOCUMENTATION FROM THE CLEANING
PROCESS TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL.
GOVERNMENT-CONDUCTED THIRD-PARTY INSPECTIONS MAY BE REQUIRED TO ASSESS
THE CONTRACTOR'S FINDINGS. THESE INSPECTIONS MUST BE ORGANIZED AND ATTENDED
BY THE CONTRACTOR.
9.1.10. BEFORE SEALING THE BOILER, PLACE MOISTURE-ABSORBING MATERIAL SUCH AS SILICA
GEL OR LIME (ALSO KNOWN AS UNSLAKED LIME, QUICK LIME, CALCIUM OXIDE, BURNT LIME,
CALX, AND CAUSTIC LIME) IN THE WATERSIDE. THE MATERIAL SHALL BE PLACED IN A FLAT
TRAY OR PAN INSIDE THE BOILER PRIOR TO CLOSING AND SEALING ALL BOILER OPENINGS.
RENEW OR REDRY THE MATERIAL EVERY THREE MONTHS FOR THE DURATION OF THE
PROJECT. SWAB THE INTERIOR OF THE FIRESIDE WITH MINERAL OIL. INSERT A PIECE OF
SHEET METAL BETWEEN THE BOILER EXHAUST FLANGE AND STACK FLANGE.
9.1.11. SEAL ALL OPENINGS AND MANHOLES SECURELY TO MAINTAIN A DRY INTERIOR
ENVIRONMENT.
9.1.12. REGULARLY INSPECT THE BOILER DURING ITS IDLE PERIOD TO ENSURE THE INTEGRITY OF
THE DRY LAY-UP PROCESS AND ADDRESS ANY ISSUES PROMPTLY.
9.1.13. CONTRACTOR SHALL FOLLOW ALL APPLICABLE CONFINED SPACE ENTRY PROCEDURES.
9.1.14. THE BOILER #1 GAS TRAIN WILL NEED TO BE TEMPORARILY DISCONNECTED AND CAPPED
OFF DURING THE STRUCTURAL REPAIRS AND SHALL BE REINSTALLED AT THE COMPLETION
OF THE WORK AS INDICATED ON THE DRAWINGS.
9.2. DEMOLITION OF BOILER #4
9.2.1. COMPLETELY DEMOLISH BOILER #4 AND REMOVE IT FROM THE BUILDING, ENSURING
RECYCLING AND DISPOSAL COMPLIANCE WITH FEDERAL, STATE, AND LOCAL
REGULATIONS.
9.2.2. REMOVE ALL PIPING FOR BOILER FEEDWATER, STEAM, VENTING, NATURAL GAS, FUEL OIL, BLOWDOWN, AND RELIEF BACK TO DESIGNATED POINTS INDICATED ON THE DRAWINGS.
9.2.3. CAREFULLY DISCONNECT AND REMOVE ALL BOILER CONTROL WIRING, SENSORS, AND
CONTROL PANELS. REPROGRAM THE BOILER CONTROL SEQUENCES AT THE OPERATOR'S
WORKSTATION TO EXCLUDE BOILER #4 FROM THE SYSTEM'S CONTROL SEQUENCE OF
OPERATION. UPDATE THE WORKSTATION'S VISUAL GRAPHICS TO REMOVE BOILER #4 AND
ALL RELATED SYSTEM COMPONENTS.
9.2.4. REMOVE BOILER BREECHING AND FLUE-GAS RECIRCULATION DUCTWORK AS PER THE
DRAWING SPECIFICATIONS. SEAL THE BOILER BREECHING DUCTWORK.
9.2.5. REMOVE 6-INCH 125# HPS BACK TO STEAM DISTRIBUTION HEADER AND CAP.
9.3. TEMPORARILY RELOCATE SOFTENING SYSTEM
9.3.1. CAREFULLY DISCONNECT AND RELOCATE BRINE TANKS AND WATER SOFTENERS TO
POSITION INDICATED ON THE DRAWINGS. EXTEND DOMESTIC WATER AND SOFTENED
WATER PIPING TO TEMPORARY LOCATION. SYSTEM SHALL OPERATE AS BEFORE.
9.4. SUPPORT EXISTING AND EXTEND MECHANICAL MEZZANINE
9.4.1. PROVIDE STRUCTURAL FOUNDATIONS AND VERTICAL SUPPORTS FOR EXISTING
MECHANICAL MEZZANINE.
9.4.2. RELOCATE REMAINING UTILITIES ALONG NORTH FACE OF EXISTING MECHANICAL
MEZZANINE.
9.4.3. PROVIDE STRUCTURAL STEEL FRAMING, FOUNDATIONS, VERTICAL SUPPORTS, AND
FUTURE DA TANK SUPPORTS FOR MECHANICAL MEZZANINE EXPANSION.
9.5. PREPARE FOR AND RELOCATE DA TANK AND FEEDWATER PUMPS
9.5.1. CAREFULLY ISOLATE AND DISCONNECT BOILER FEEDWATER PUMP #3 (FWP-3). RELOCATE
PUMP ONTO A NEW CONCRETE PAD IN POSITION INDICATED ON THE DRAWINGS.
FEEDWATER PUMPS #1 (FWP-1) AND #2 (FWP-2) SHALL CONTINUE TO OPERATE AS BEFORE.
9.5.2. PROVIDE NEW BOILER FEEDWATER PUMP #4 (FWP-4) ON A NEW CONCRETE PAD IN
POSITION INDICATED ON THE DRAWINGS.
9.5.3. PROVIDE ALL BOILER FEEDWATER AND FEEDWATER RECIRCULATION PIPING, VALVES,
FITTINGS, CONTROLS, AND POWER FOR FWP-3 AND 4. CONNECT FEEDWATER PUMP
DISCHARGE PIPING TO EXISTING FEEDWATER PIPING WHERE INDICATED ON THE
DRAWINGS AND ISOLATE FOR FUTURE USE.
9.5.4. PROVIDE 3-WAY MANUAL ISOLATION GATE VALVES ON EXISTING 4-INCH PUMPED
CONDENSATE PIPING BETWEEN CONDENSATE PUMPS PCP-1 AND PCP-2, AND DA TANK
CONDENSATE RETURN PORT. INSTALLATION OF THE VALVE ASSEMBLY SHALL BE
COMPLETED DURING A SCHEDULED SHUTDOWN.
9.5.5. PROVIDE 4-INCH PUMPED CONDENSATE PIPING FROM 3-WAY VALVE ASSEMBLY TO THE
6-INCH BOILER FEEDWATER SUPPLY HEADER BELOW THE MEZZANINE. INSTALLATION OF
THE CONNECTION TO THE 6-INCH FEEDWATER HEADER SHALL BE COMPLETED DURING A
SCHEDULED SHUTDOWN. THE PURPOSE OF THIS CROSS-CONNECTION IS TO FUNCTION AS
A BYPASS OF THE DA TANK DURING RELOCATION.
9.5.6. PREPARE FOR DA TANK RELOCATION BY PROVIDING FUTURE UTILITY PIPING
CONNECTIONS INCLUDING TANK VENT, 4# STEAM, EMERGENCY MAKE-UP WATER BYPASS,
PUMPED CONDENSATE, BOILER FEEDWATER RECIRCULATION AND SUPPLY, CHEMICAL
FEEDWATER, TANK DRAIN, FWP-3 AND FWP-4 SUPPLY, RETURN, AND RECIRCULATION
HEADERS, AND OVERFLOW PIPING.
9.5.7. DURING A SCHEDULED SHUTDOWN, RELOCATE DA TANK TO NEW MECHANICAL MEZZANINE
AND PROVIDE ALL FINAL PIPING CONNECTIONS. RECONNECT ALL FLOATS, CONTROLS,
AND SENSORS TO OPERATE AS BEFORE.
9.5.7.1. THE DA TANK OUTAGE MAY EXTEND BEYOND THE DURATION OF THE SCHEDULED
SHUTDOWN FOR A MAXIMUM OF 3-DAYS, DURING WHICH THE SYSTEM MAY OPERATE IN
BYPASS USING THE 3-WAY MANUAL ISOLATION VALVE ASSEMBLY.
9.5.8. CAREFULLY DISCONNECT AND REMOVE FEEDWATER PUMPS, FWP-1 AND 2. PROTECT AND
STORE PUMPS FOR FUTURE USE. REMOVE BOILER FEEDWATER PIPING HEADER,
ASSOCIATED VALVES, CONTROLS, ASSOCIATED ELECTRICAL FEEDERS AND CONDUIT, AND
CONCRETE PADS COMPLETE. ISOLATE AND CAP PIPING AT LOCATIONS INDICATED ON THE
DRAWINGS.
9.5.9. PROVIDE METAL GRATINGS AND MEZZANINE FALL PROTECTION SURROUNDING THE DA
TANK. TEMPORARILY INFILL ANY EXISTING OPENINGS IN GRATING AT OLD DA TANK
LOCATION.
9.6. RELOCATE REMAINING UTILITIES
9.6.1. RELOCATE REMAINING UTILITIES WHICH SURROUND THE COLUMN AND ARE IMPACTED BY
THE STRUCTURAL REPAIRS.
9.7. REPAIR COLUMN AS-37
9.7.1. REPAIR COLUMN AS-37 IN ACCORDANCE WITH THE PROCESS OUTLINED ON THE
STRUCTURAL DOCUMENTS.
9.7.1.1. DEMOLISH SLAB SURROUNDING COLUMN AS-37 AND INSTALL MICROPILES DRILLED AND
GROUTED INTO THE BEDROCK TO PROVIDE INDEPENDENT FOUNDATION SUPPORT TO
THE STEEL SHORING.
9.7.1.2. DISCONNECT THE EXISTING MEZZANINE AND CATWALK FRAMING FROM COLUMN AS-37
AND PARTIALLY DEMOLISH THE MEZZANINE FRAMING, BAR GRATING, RAILING, SHIP'S
LADDER IN THE VICINITY OF THE COLUMN IN ORDER TO INSTALL THE TEMPORARY
COLUMN SHORING FRAMING. COORDINATE MEZZANINE AND CATWALK REMOVAL WITH
MEZZANINE EXPANSION FRAMING.
9.7.1.3. CONSTRUCT STEEL SHORING INCLUDING: BASE FRAME SUPPORTED BY MICROPILES,
VERTICAL COLUMNS, UPPER STEEL FRAME, BRACKET FOR JACKING OF THE COLUMN,
ATTACHMENT PLATES AND STIFFENERS AT EACH COLUMN FACE, AND EPOXY ANCHORS
INTO THE COLUMN.
9.7.1.4. JACK THE COLUMN GRADUALLY TO RELIEVE THE LOAD IN THE COLUMN WHILE REPAIRS
ARE MADE. INSTALL DEFLECTION MONITORS AT THE JACK AND AT SELECTED
LOCATIONS THROUGHOUT THE BUILDING.
9.7.1.5. REMOVE EXISTING EXTERNAL STEEL CONFINEMENT REINFORCING AND PERFORM
REPAIRS TO THE COLUMNS BY REMOVING CRACKED AND DETERIORATED CONCRETE,
REMOVING CORROSION OFF REINFORCING STEEL, FORMING AND PUMPING CONCRETE
REPAIR MATERIAL INTO THE PREPARED REPAIR AREAS.
9.7.1.6. WHILE THE CONCRETE IS REMOVED, PREPARE THE REINFORCING STEEL FOR
INSTALLATION OF THE CATHODIC PROTECTION SYSTEM BY ELECTRICALLY
CONNECTING ALL OF THE EXPOSED REINFORCING STEEL.
9.7.1.7. CONCRETE REMOVAL AND PLACEMENT OF CONCRETE REPAIR MORTAR WILL BE DONE
IN PHASES SO AS NOT TO COMPLETELY REMOVE THE COLUMN CROSS SECTION AT
ONE TIME.
9.7.1.8. AFTER EACH COLUMN IS REPAIRED, THE SHORING CONNECTIONS TO THE COLUMN MAY
BE REMOVED TO ALLOW ACCESS TO THE UPPER PORTION OF THE COLUMN. THE
VERTICAL STEEL SHORING MEMBERS MAY REMAIN IN PLACE TO FACILITATE ACCESS
FOR THE REMAINING WORK, OR MAY BE COMPLETELY REMOVED AND REPLACED BY
SCAFFOLDING FOR ACCESS IN THE REMAINDER OF THE WORK.
9.7.1.9. AFTER REMOVAL OF THE UPPER CONNECTION PLATES ON THE COLUMN, INSTALL
CORROSION PROTECTION SYSTEM TO THE FACE OF THE COLUMN FOR THE FULL
HEIGHT, MAKE CONNECTIONS TO THE EXISTING STEEL REINFORCING AND CHECK FOR
CONTINUITY OF ALL REBAR. INSTALL GROUNDING. INSTALL CONTROLS IN AN
ELECTRICAL BOX MOUNTED ON OR NEAR THE COLUMN.
9.7.1.10. CONSTRUCT A CIRCULAR CONCRETE JACKET AROUND THE COLUMN, ENCASING THE
CORROSION PROTECTION SYSTEM AND PROVIDING STRUCTURAL CONFINEMENT AND
REDUNDANCY.
9.7.1.11. AFTER THE JACKET IS CONSTRUCTED AND FORMS REMOVED, ANY REMAINING
SHORING OR SCAFFOLDING MAY BE REMOVED. RESTORE ANY FRAMING, GRATING,
AND RAILINGS AT THE MEZZANINE AND CATWALKS. RESTORE THE SUBGRADE AND
SLAB ON GRADE.
10. BID OPTION 1 - REPAIR OF COLUMN AR-35
10.1. CONDENSATE TANK RELOCATION
10.1.1. PROVIDE NEW 4-INCH DOMESTIC COLD WATER PIPING AND ISOLATION VALVE FROM
EXISTING 8-INCH DOMESTIC WATER. PERFORM WORK DURING SCHEDULED SHUTDOWN
PERIOD.
10.1.2. PROVIDE STRUCTURAL SUPPORTS AT MEZZANINE FOR THE RELOCATED CONDENSATE
TANK. REMOVE EXISTING GRATING TO SUPPORT THE INSTALLATION OF NEW SUPPORT
STEEL.
10.1.3. PREPARE NEW CONDENSATE PIPING. PROVIDE TEMPORARY PIPING FOR DUMPING OF
CONDENSATE DURING RELOCATION PERIOD.
10.1.4. DURING SCHEDULED OUTAGE, RELOCATE CONDENSATE TANK TO NEW POSITION ON
MEZZANINE. REMOVE ALL CONDENSATE PIPING WHICH CONFLICTS WITH STRUCTURAL
REPAIR WORK, AND EXTEND TO NEW CONDENSATE TANK LOCATION ON MEZZANINE.
RECONNECT ALL PUMPS, VALVES, FITTINGS, AND CONTROLS TO OPERATE AS BEFORE.
10.2. RELOCATE 10-INCH STORM PIPING
10.2.1. PREPARE FOR STORM PIPING RELOCATION BY INSTALLING AS MUCH OF THE NEW STORM
PIPING AS POSSIBLE AND PREPARE FOR CHANGEOVER.
10.2.2. DURING AN EXTENDED PERIOD OF FAVORABLE WEATHER CONDITIONS, DISCONNECT AND
REMOVE EXISTING 10-INCH STORM PIPING. PROVIDE CONNECTIONS TO NEW STORM
PIPING AND RECONNECT TO OPERATE AS BEFORE.
10.3. MODIFY EXISTING CATWALKS
10.4. REPAIR COLUMN AR-35
10.4.1. REPAIR COLUMN AR-35 IN ACCORDANCE WITH THE PROCESS OUTLINED ON THE
STRUCTURAL DOCUMENTS.
10.4.1.1. THE SEQUENCE FOR STRUCTURAL REPAIRS AT AR-35 IS THE SAME AS DESCRIBED FOR
AS-37.
11. BID OPTION - COLUMN AS-35
11.1. UTILITY SHUTDOWNS AND TEMPORARY RELOCATIONS:
11.1.1. CONDENSATE RECEIVER TANK
11.1.1.1. THE CONDENSATE RECEIVER TANK MUST BE TEMPORARILY SHUTDOWN TO ALLOW FOR
ITS PERMANENT RELOCATION TO A LOCATION APPROXIMATELY CENTERED BETWEEN
COLUMNS AR-35 AND AR-37. IN ORDER TO MAXIMIZE SERVICEABILITY OF THE
EQUIPMENT LONG-TERM, IT IS RECOMMENDED THAT THE TANK IS ROTATED
90-DEGREES FROM IT'S CURRENT CONFIGURATION.
11.1.1.2. THE CONDENSATE RECEIVER TANK SHALL NOT BE SHUTDOWN AT THE SAME TIME AS
THE DA TANK BEING MODIFIED UNDER REPAIRS OF COLUMN AS-37.
11.1.2. OTHER ITEMS
11.1.2.1. COORDINATE WITH FAVORABLE WEATHER TO ALLOW FOR RELOCATION OF EXISTING
10-INCH STORM PIPING. SHUTDOWN ANTICIPATED TO TAKE A MAXIMUM OF 3-DAYS,
WITH MUCH OF THE NEW PIPING TO BE INSTALLED PRIOR TO DISCONNECTION AND
DEMOLITION OF THE EXISTING.
11.2. PERMANENT UTILITY RELOCATIONS:
11.2.1. THE CONDENSATE RECEIVER TANK SHALL BE PERMANENTLY SHIFTED APPROXIMATELY
42-INCHES TO THE WEST, AND ROTATED 90-DEGREES CLOCKWISE. ALL ASSOCIATED
SERVICES INCLUDING GRAVITY CONDENSATE, PUMPED CONDENSATE, CONDENSATE
RECIRCULATION, DRAINS, BALL LEVEL AND FLOATS, AND CONTROLS SHALL BE
INTERCEPTED AND EXTENDED TO THE NEW LOCATION.
11.2.2. UTILITY BTU FLOW METER FT-004 AND FT-005 SHALL BE PERMANENTLY RELOCATED AWAY
FROM THE COLUMN ALONG WITH THE ASSOCIATED CONDENSATE PIPING.
11.2.3. THE 10-INCH STORM PIPE WHICH FEEDS THE ALTMEYER BUILDING MUST BE PERMANENTLY
RELOCATED.
11.3. REPAIR COLUMN AS-35
11.3.1. REPAIR COLUMN AS-35 IN ACCORDANCE WITH THE PROCESS OUTLINED ON THE
STRUCTURAL DOCUMENTS.
11.3.1.1. THE SEQUENCE FOR STRUCTURAL REPAIRS AT AS-35 IS SIMILAR AS DESCRIBED FOR
AS-37.
11.3.1.2. COLUMN AS-35 DOES NOT HAVE EXTERNAL STEEL CONFINEMENT REINFORCEMENT TO
REMOVE.
12. BID OPTION - COLUMN AT-37
12.1. TEMPORARY UTILITY RELOCATIONS
12.1.1. DEMOLISH EXISTING 1-1/2” HIGH PRESSURE STEAM PIPING CONNECTING TO THE BOILER #1
ECONOMIZER. PROVIDE NEW PIPING IN SIMILAR LOCATION TO OPERATE AS BEFORE UPON
COMPLETION OF REPAIR OF COLUMN AR-37.
12.2. PERMANENT UTILITY RELOCATIONS
12.2.1. RELOCATE EXISTING 4-INCH BOILER ECONOMIZER SANITARY PIPING AWAY FROM AREA OF
REPAIR.
12.2.2. RELOCATE EXISTING WATER TREATMENT PIPING, BOILER BLOWDOWN, AND BOILER
ECONOMIZER PIPING AWAY FROM AREA OF REPAIR.
12.2.3. RELOCATE FOUR 1-1/2” NATURAL GAS PIPES AWAY FROM AREA OF REPAIR.
12.2.4. DEMOLISH, RELOCATE, AND/OR PERMANENTLY CAP EXISTING 6-INCH AND 8-INCH BOILER
VENT PIPING AWAY FROM AREA OF REPAIR.
12.3. REPAIR COLUMN AT-37
12.3.1. REPAIR COLUMN AT-37 IN ACCORDANCE WITH THE PROCESS OUTLINED ON THE
STRUCTURAL DOCUMENTS.
12.3.1.1. THE SEQUENCE FOR STRUCTURAL REPAIRS AT AT-37 IS SIMILAR AS DESCRIBED FOR
AS-37.
12.3.1.2. COLUMN AT-37 DOES NOT HAVE EXTERNAL STEEL CONFINEMENT REINFORCEMENT TO
REMOVE.
12.3.1.3. COLUMN AT-37 DOES NOT HAVE MEZZANINE FRAMING TO MODIFY, ALTHOUGH IT DOES
HAVE CATWALK FRAMING AND CONNECTIONS.
13. BID OPTION - COLUMN AU-37
13.1. TEMPORARY UTILITY RELOCATIONS
13.1.1. DURING A SCHEDULED SHUTDOWN, SEVERAL FEET OF THE EXISTING MAIN
HIGH-PRESSURE STEAM DISTRIBUTION HEADER WILL NEED TO BE DEMOLISHED, AND A
CAP PROVIDED. THE CONNECTIONS THAT WILL BE DEMOLISHED ARE THE CONNECTED TO
THE STEAM SUPPLY PIPING WHICH COMES FROM BOILER #1 AND BOILER #4. GIVEN THAT
THESE BOILERS WILL NEED TO BE SHUTDOWN FOR REPAIRS OF PREVIOUS PHASES, THE
ISOLATION AND DEMOLITION OF THESE PIPES CAN OCCUR DURING A SCHEDULED OUTAGE
AT ANY TIME DURING THE PREVIOUS PHASES OF THE PROJECT.
13.1.2. UPON COMPLETION OF THE REPAIRS OF COLUMN AU-37, THE STEAM HEADER CAN BE
RECONSTRUCTED IN A SIMILAR CONFIGURATION TO OPERATE AS BEFORE.
13.1.3. UPON COMPLETION OF THE RECONSTRUCTION OF THE STEAM HEADER, BOILER #1 AND
BOILER #4 CAN BE RECOMMISSIONED FOR OPERATION. THIS WILL INCLUDE REMOVAL OF
ALL DRY PACK DESICCANT, CHECK OUT OF BOILER CONTROLS, BOILER SAFETIES, GAS
PIPING, AND ALL OTHER BOILER COMMISSIONING PROCEDURES IN ACCORDANCE WITH
THE MANUFACTURER'S RECOMMENDATIONS.
13.2. REPAIR COLUMN AU-37
13.2.1. REPAIR COLUMN AU-37 IN ACCORDANCE WITH THE PROCESS OUTLINED ON THE
STRUCTURAL DOCUMENTS.
13.2.1.1. REPAIRS AT COLUMN AU-37 ARE MINOR AND DO NOT REQUIRE SHORING OR REMOVAL
OR MODIFICATION OF THE CATWALK.
13.2.1.2. PERFORM LOCAL CONCRETE REPAIRS BY CHIPPING OUT DELAMINATED CONCRETE
AND CLEANING CORROSION OFF THE REINFORCING STEEL. PLACE CONCRETE REPAIR
MATERIAL USING FORM AND POUR METHOD. THE EXTENT OF REPAIR IS NOT
EXPECTED TO EXCEED 4 SQUARE FEET AT THIS COLUMN.
13.2.1.3. THE CATHODIC PROTECTION WILL STILL BE INSTALLED AT COLUMN AU-37. ENSURE
EXISTING REINFORCING STEEL IS ELECTRICALLY CONNECTED BY CUTTING A
CONTINUOUS VERTICAL SLOT IN THE CONCRETE TO EXPOSE THE EXISTING STIRRUPS
AND CONNECT THEM ELECTRICALLY. SIMILARLY, CUT TWO CONTINUOUS HORIZONTAL
SLOTS TO EXPOSE ALL VERTICAL REINFORCING STEEL BARS AND CONNECT THEM
ELECTRICALLY. INSTALL THE CATHODIC PROTECTION GRID ON EACH FACE OF THE
COLUMN FOR THE FULL HEIGHT. ENCASE THE GRID IN A THIN LAYER OF CONCRETE.
INSTALL GROUNDING. INSTALL CONTROLS IN AN ELECTRICAL BOX MOUNTED ON OR
NEAR THE COLUMN.
14. BID OPTION - CORROSION PROTECTION AT REMAINING FIVE COLUMNS: AR-37, AT-35, AU-35, AV- 35, AV-37.
14.1. CORROSION PROTECTION AT THE REMAINING COLUMNS WILL BE INSTALLED SIMILAR TO COLUMN
AU-37
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Controlled By: GSA (Records@gsa.gov)
I
SUMMER
CONSULTANTS
N C O R P O R A T E D
AREA OF WORK
/3 /2
:0
:2
P
M
G-004
SITE PLAN
65% SUBMISSION
2023/10/03
09/25/23JHG
KMD
6401 Security Boulevard Woodlawn, MD
214.029
47PD0322D0008
Arthur J. Altmeyer Building
47PD0223F0013
GSA
Arthur J. Altmeyer Building
6401 Security Boulevard Woodlawn, MD
0 18"12"6" 1-1/2"=1'-0"
Mark Date Description
AREA OF WORK
BASEMENT AREAWAY
PRIMARY LOADING &
UNLOADING DOCK
ENTRANCE 12
CONTRACTOR'S
PRIMARY ENTRANCE
CONTRACTOR
STAGING AREA
ACCESS ENTRANCE
TO AREAWAY
N0 50' 100' 1"=50'-0"
SITE PLAN1
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Controlled By: GSA (Records@gsa.gov)
I
SUMMER
CONSULTANTS
N C O R P O R A T E D
/3 /2
:0
:2
P
M
G-005
ROUTING PLAN
65% SUBMISSION
2023/10/03
09/25/23JHG
KMD
6401 Security Boulevard Woodlawn, MD
214.029
47PD0322D0008
Arthur J. Altmeyer Building
47PD0223F0013
GSA
Arthur J. Altmeyer Building
6401 Security Boulevard Woodlawn, MD
Mark Date Description
UP
G1. THIS SHEET IS PROVIDED FOR INFORMATION PURPOSES.
GENERAL NOTES
CONTRACTOR EQUIPMENT ACCESS
LOADING DOCK (ALTMEYER BUILDING)
LOADCENTER 3
A B C D E F G H J K L M N O P Q R S
N0 32' 64' 1/32"=1'-0"
ROUTING PLAN1
AWAVAUATASARAQAOANAL
31'
1 1
1 1
AWAVAUATASARAQAOANAL
31'
1 1
1 1
HAZARDOUS MATERIALS SUMMARY
LEAD BASED PAINT WITH LEAD CONCENTRATIONS GREAT THAN OR EQUAL TO 0.7 MG/CM2 COVER
FOLLOWING:
METAL GAS VALVES
METAL DAVIT ARMS
METAL CATWALK HANDRAILS
METAL SAFETY GUARD
LEAD BASED PAINT WITH LEAD CONCENTRATIONS LESS THAN 0.7 MN/CM2 COVER ALL SURFACES
NOT IDENTIFIED AS LEAD BASED PAINT ABOVE.
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".
PROPERTY OF THE UNITED STATES GOVERNMENT This is controlled unclassified information. Do not remove the CUI marking. Properly destroy or return documents when no longer needed.
True North
Plan North
SHEET NOTES
GENERAL NOTES
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BUILDING NUMBER
CITY/ST./ZIP
ADDRESS
BUILDING NAME
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SHEET SIZE:
DATE DRAWN:
30 X 42
S H
E E
T
ID
E N
TI
FI
C A
TI
O
N
DISCIPLINE
P R
O
JE
C T
ID
E
N
TI
FI
C
A
TI
O N
B U
IL
D
IN
G
BIM FILE NAME
C O
N
TR
A C
TO
R
S R
E V
IS
IO
N B
LO
C
K G
R A
P H
IC
S
C A
LE
K
E Y
P
LA
N S
TA
M
P O
R S
E A
L D
E S
IG
N
E R
ID
E
N
TI
FI
C
A
TI
O N
O W
N E
R
ID
E N
TI
FI
C A
TI
O
N
SHEET OF SHEETS
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Controlled By: GSA (Records@gsa.gov)
7900 Westpark Dr. | Suite A405 | McLean, VA 22102
(703) 556-8820 | www.summerconsultants.com
I
SUMMER
CONSULTANTS
N C O R P O R A T E D
AREA OF WORK
/3 /2
:4
:3
P
M
HM-001
HAZARDOUS MATERIALS
Altmeyer Columns Full Repair Design
65% SUBMISSION
2023/10/03
10/03/23Author
Checker
6401 Security Boulevard Woodlawn, MD
214.029
47PD0322D0008
Arthur J. Altmeyer Building
47PD0223F0013
GSA
Arthur J. Altmeyer Building
6401 Security Boulevard Woodlawn, MD
LOWER LEVEL BASEMENT PLAN1
MEZZANINE PLAN2
0 24'8' 16' 3/32"=1'-0"
1 ALL SURFACES ASSUMED TO CONTAIN DETECTABLE CONCENTRATIONS OF
LEAD. REFER TO HAZARDOUS MATERIALS SUMMARY ON THIS SHEET FOR
ADDITIONAL INFORMATION.
DESIGN NOTES
CODES AND STANDARDS
A. WORK IN ACCORDANCE WITH REQUIREMENTS OF THE LOCAL BUILDING DEPARTMENT, THE MARYLAND UNIFORM
STATEWIDE BUILDING CODE, FACILITIES STANDARDS FOR PUBLIC BUILDINGS SERVICE (P100) AND THE INTERNATIONAL
BUILDING CODE, 2021.
B. USE THE CURRENT VERSION OF ALL CODES, REFERENCES AND STANDARDS REFERRED UNLESS A DIFFERENT
VERSION IS LISTED IN THE BUILDING CODE.
DESIGN AND LOADING CRITERIA
A. SNOW LOAD
1. GROUND SNOW LOAD: (PG) = 30.0 PSF
2. SNOW EXPOSURE FACTOR (CE): = 1.0
3. IMPORTANCE FACTOR (I): = II
4. THERMAL FACTOR (CT): = 1.0
5. FLAT ROOF SNOW LOAD (PF): = 21.0
B. SEISMIC LOAD
1. RISK CATEGORY: = I/II
2. SEISMIC IMPORTANCE FACTOR (I): = 1.0
3. MAPPED SPECTRAL RESPONSE: SS = 0.14, S1= 0.043
4. SPECTRAL RESPONSE COEFF SDS = 0.15, SD1= 0.069
5. SITE CLASSIFICATION: = D
6. SEISMIC DESIGN CATEGORY = B
7. RESPONSE MODIFICATION FACTOR: R = 3
8. SEISMIC RESPONSE COEFF: CS = 0.05
9. SEISMIC RESISTANCE SYSTEM TYPE: = [XXX]
10. DESIGN BASE SHEAR: = 657K
11. ANALYSIS PROCEDURE USED: = [XX]
C. WIND LOAD
1. ULTIMATE WIND SPEED: = 115 MPH
2. RISK CATEGORY: = II
3. EXPOSURE: = B
4. COMPONENT AND CLADDING:
FOR WALL = [XX] PSF MAX
FOR ROOF = [XX] PSF MAX
FOR PARAPET = [XX] PSF MAX
OTHER DESIGN PRESSURES MAYBE USED IF SIGNED & SEALED CALCULATIONS
ARE SUBMITTED FOR REVIEW
D. FLOOR DESIGN MINIMUM LIVE LOADS:
1. CLASSROOMS: = 40 PSF + 20 PARTITION
2. OFFICES: = 50 PSF + 20 PARTITION
3. STAIRS: = 100 PSF
4. CORRIDORS ABOVE FIRST FLOOR: = 80 PSF
5. ASSEMBLY (FIRST FLOOR) = 100 PSF
6. MECHANICAL ROOM FLOORS: = 150 PSF OR EQUIP WT. STORAGE: = 150 PSF
7. ROOFS: = 30 PSF IN ADDITION TO APPLICABLE SNOW DRIFTING CONSIDERATION.
E. EXISTING LIVE LOAD CAPACITIES
1. THE EXISTING ALLOWABLE LIVE LOAD CAPACITIES ARE AS FOLLOWS:
GROUND FLOOR = 100PSF, TYPICAL FLOOR = 100PSF, ROOF = 30PSF
2. PROVIDE TEMPORARY SHORING AND/OR BRACING WHEREVER THE LOADING FROM THE CONTRACTOR’S WORK
EXCEEDS THE ALLOWABLE LOAD CAPACITIES OF THE EXISTING STRUCTURE.
GENERAL
A. INFORMATION SHOWN REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED BY LIMITED VISUAL OBSERVATIONS
AND/OR FROM EXISTING DRAWINGS BY MEYER AND AYERS FISHER, NES. CAMPBELL & ASSOCIATES ASSOCIATED ARCHITECTS DATED AUGUST 1957 PROVIDED BY THE OWNER. AREAS NOT VISIBLE HAVE BEEN ASSUMED TYPICAL
WITH OBSERVED EXISTING CONDITIONS.
B. MEASURE AND PROVIDE ALL DIMENSIONS, ELEVATIONS AND CONDITIONS AT THE JOB SITE PRIOR TO CONSTRUCTION AND THE SUBMISSION OF SHOP DRAWINGS, AND NOTIFY THE COTR IMMEDIATELY OF ANY DISCREPANCIES. PROVIDE VERIFICATION AND NOTIFICATION AT LEAST TWO WEEKS PRIOR TO THE START OF WORK SO THAT ANY NECESSARY
CHANGES CAN BE MADE WITHOUT DELAYING THE PROJECT SCHEDULE.
C. DETAILS, SECTIONS, AND NOTES SHOWN ON THESE DRAWINGS ARE INTENDED TO BE TYPICAL AND APPLY TO SIMILAR
CONDITIONS ELSEWHERE UNLESS OTHERWISE SHOWN OR NOTED.
D. PROVIDE SHOP DRAWINGS SUBMITTED TO THE COTR BEARING THE CONTRACTOR'S STAMP, DATE AND SIGNATURE THAT VERIFIES THAT THE DOCUMENTS HAVE BEEN REVIEWED AND CORRECTED FOR CONFORMANCE TO AND
COORDINATION WITH CONTRACT DOCUMENTS.
E. PROCEED WITH FABRICATION ONLY AFTER SHOP DRAWING APPROVAL BY THE ENGINEER.
F. DO NOT REPRODUCE ANY PORTION OF CONTRACT DOCUMENTS IN THE SHOP DRAWINGS.
G. SUBMIT INSPECTION REPORTS AND MATERIALS TESTING REPORTS TO THE COTR IN A TIMELY MANNER SUCH THAT
CONSTRUCTION DELAY WILL BE AVOIDED.
H. MEANS AND METHODS OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
I. PROVIDE TEMPORARY BRACING AND SHORING, AS REQUIRED, TO ENSURE VERTICAL AND LATERAL STABILITY OF THE
ENTIRE STRUCTURE OR PORTION THEREOF DURING CONSTRUCTION.
J. WHERE THE CONTRACTOR IS REQUIRED TO ENGAGE A PROFESSIONAL ENGINEER TO DESIGN AND SUBMIT
CALCULATIONS, AND WHERE THE PROFESSIONAL ENGINEER PREPARES THE CALCULATIONS USING A COMPUTER SOFTWARE SYSTEM, USE SOFTWARE THAT IS READILY AVAILABLE, INDUSTRY STANDARD FOR STRUCTURAL
ENGINEERING IN COMMON USE.
STRUCTURAL DEMOLITION (EXCLUDING CONCRETE REPAIRS)
A. ALL MEANS AND METHODS OF REMOVING EXISTING CONSTRUCTION SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
B. VERIFY ALL OPENING SIZES AND LOCATIONS WITH OTHER DISCIPLINES. THE DRAWINGS DO NOT SHOW ALL OPENINGS
REQUIRED. ADDITIONAL OPENINGS, BLOCKOUTS AND SLEEVES MAY BE REQUIRED BY OTHER DISCIPLINES AND SHALL BE CONSTRUCTED USING THE TYPICAL DETAILS AND/OR THE CRITERIA INDICATED ON THE DRAWINGS. OPENINGS REQUIRED BUT NOT SHOWN ON THE STRUCTURAL DRAWINGS MUST BE APPROVED BY THE STRUCTURAL ENGINEER.
C. ALL NEW OPENINGS THROUGH EXISTING STRUCTURE SHALL BE LOCATED AND MARKED. IF OPENING ARE THROUGH REINFORCED CONCRETE, FIND AND MARK THE LOCATION OF THE REINFORCEMENT. DO NOT CUT OPENINGS UNTIL
APPROVED BY COTR.
D. WHERE NEW OPENINGS IN EXISTING CONCRETE SLAB OR WALLS ARE TO BE CREATED, CORE HOLES AT THE OUTSIDE CORNERS OF THE NEW OPENING PRIOR TO DEMOLITION. SAW-CUT AND DEMOLISH SLAB OR WALL ONLY AFTER THE INSTALLATION OF ALL REQUIRED NEW STRUCTURAL FRAMING AND/OR REINFORCEMENT IN PLAN OR SECTION, UNO.
SAW CUT IN STRAIGHT LINES AND DO NOT EXTEND INTO EXISTING SLAB OR WALL TO REMAIN NOR BEYOND THE HOLES
CORED AT THE CORNERS OF THE NEW OPENING.
E. THE EXISTING BUILDINGS [WILL, WILL NOT] BE OCCUPIED DURING THE WORK, NOISE AND VIBRATION PRODUCING ACTIVITIES SHALL BE RESTRICTED TO [NIGHT TIME AND WEEKEND HOURS]. COORDINATE WORK SCHEDULE AND
ACTIVITIES WITH THE COTR.
F. PROVIDE REPAIRS TO ANY STRUCTURAL ELEMENT WHICH IS TO REMAIN AND THAT HAS BEEN DAMAGED DURING THE DEMOLITION PROCESS. PROVIDE REPAIRS AT NO EXPENSE TO THE OWNER AND TO THE COMPLETE SATISFACTION OF THE OWNER. ALL REPAIR WORK SHALL BE DESIGNED BY A LICENSED STRUCTURAL ENGINEER IN THE JURISDICTION AND THE DESIGN SUBMITTED TO THE STRUCTURAL ENGINEER OF RECORD FOR REVIEW AND APPROVAL PRIOR TO
COMMENCING REPAIR WORK.
G. ACCORDING TO THE HAZARDOUS MATERIALS REPORT CONTAINED IN THE PROJECT SPECIFICATIONS ASBESTOS CONTAINING MATERIALS [WAS/WAS NOT] IDENTIFIED IN EXISTING [COURTYARD, PARKING STRIPPING, DUCTWORK, INSULATION, SEALANTS, LIGHTWEIGHT CONCRETE FILL.] IF OTHER SUSPECTED ASBESTOS CONTAINING MATERIALS
ARE ENCOUNTED, NOTIFY THE [ARCHITECT, CONTRACTING OFFICER OR COTR] IMMEDIATELY.
H. ALL DEBRIS FROM DEMOLITION AND/OR REPAIR WORK SHALL BE LEGALLY TRANSPORTED AND DISPOSED OF OFFSITE.
DO NOT STORE DEBRIS ON THE STRUCTURE.
SHORING AND BRACING
A. ENGAGE A PROFESSIONAL STRUCTURAL ENGINEER REGISTERED IN LOCAL JURISDICTION TO PERFORM AN
ENGINEERING SURVEY OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT COULD RESULT IN A STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF STRUCTURE OR ADJACENT STRUCTURES
DURING DEMOLITION OPERATIONS.
1. SUBMIT SURVEY A MINIMUM OF TWO WEEKS BEFORE SCHEDULED START OF WORK OR EARLIER IF NECESSARY TO
AVOID DELAYS.
2. SUBMIT WEEKLY SURVEY REPORTS FROM THE CONTRACTOR’S PROFESSIONAL ENGINEER WHO IS RESPONSIBLE
FOR SHORING AS THE WORK PROGRESSES NOTING HAZARDS RESULTING FROM STRUCTURAL DEMOLITION
ACTIVITIES.
B. AT A MINIMUM, SHORE AND BRACE THE EXISTING STRUCTURE AS INDICATED IN THE CONSTRUCTION DOCUMENTS AND AS NEEDED TO COMPLETE THE WORK. INSTALL ADDITIONAL SHORING AND BRACING AS DETERMINED BY THE
CONTRACTOR’S PROFESSIONAL SHORING ENGINEER.
C. DESIGN TEMPORARY SHORING AND BRACING FOR SELF WEIGHT OF STRUCTURE, CODE WIND LOADS, AND A MINIMUM CONSTRUCTION LOAD OF 100 PSF OR 3,000 LBS POINT LOAD OR ACTUAL LOAD WHICHEVER PRODUCES GREATER STRESSES. USE DESIGN PROCEDURES THAT CONFORM TO ALL GOVERNING CODES AND SAFETY REQUIREMENTS.
D. SHORE AND BRACE EXISTING STRUCTURE PRIOR TO DEMOLITION WORK AND UNTIL PERMANENT NEW STRUCTURE OR
REPAIRED EXISTING STRUCTURE CAN SUPPORT LOADS.
E. SUBMIT SHORING DESIGN DRAWINGS SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE PROJECT JURISDICTION. INDICATE ALL POINTS OF SUPPORT TO EXISTING STRUCTURE, AND ANY LOADS APPLIED TO EXISTING
STRUCTURE TO REMAIN.
F. AFTER SHORING INSTALLATION, SUBMIT A LETTER REPORT FROM THE CONTRACTOR’S SHORING ENGINEER THAT THEY HAVE VISITED THE SITE AND DETERMINED THAT THE SHORING WAS INSTALLED IN ACCORDANCE WITH THEIR
DESIGN.
G. PROVIDE ADEQUATE TEMPORARY BRACING AND SUPPORT FOR ALL NEW WORK INCLUDING BUT NOT LIMITED TO
UNBRACED MASONRY WORK UNTIL PERMANENT CONSTRUCTION IN PLACE.
H. MAINTAIN INTERIOR AND EXTERIOR SHORING, BRACING, AND STRUCTURAL SUPPORTS TO PRESERVE STABILITY AND
PREVENT MOVEMENT OR COLLAPSE OF ANY PART OF STRUCTURE.
1. STRENGTHEN OR ADD NEW SUPPORTS WHEN REQUIRED DURING PROGRESS OF DEMOLITION.
I. BRACING
1. BRACING: LOCATE BRACING TO CLEAR COLUMNS, FLOOR FRAMING CONSTRUCTION, AND OTHER PERMANENT
WORK. IF NECESSARY TO MOVE BRACE, INSTALL NEW BRACING BEFORE REMOVING ORIGINAL BRACE.
I. DO NOT PLACE BRACING WHERE IT WILL BE CAST INTO OR INCLUDED IN PERMANENT CONCRETE WORK
UNLESS OTHERWISE APPROVED BY COTR.
II. INSTALL INTERNAL BRACING IF REQUIRED TO PREVENT SPREADING OR DISTORTION OF BRACED FRAMES.
III. MAINTAIN BRACING UNTIL STRUCTURAL ELEMENTS ARE SUPPORTED BY OTHER BRACING OR UNTIL
PERMANENT CONSTRUCTION IS ABLE TO WITHSTAND DESIGN LOADS.
CONCRETE AND REINFORCING
A. PROVIDE CONCRETE WORK IN ACCORDANCE WITH "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE", ACI 318. AS MODIFIED BY IBC CODE.
B. CONCRETE DESIGN IS IN ACCORDANCE WITH "STRENGTH DESIGN METHOD."
C. PROVIDE CONCRETE MIX WITH ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS (F'C) AND WATER/CEMENT (W/C) RATIO
AS FOLLOWS:
1. SPREAD FOOTINGS: = 4,500 PSI W/C 0.45 MAX
2. SLABS ON GRADE: = 4,500 PSI W/C 0.45 MAX CLASS C1
3. FREE STANDING COLUMNS: = 5,000 PSI W/C 0.40 MAX CLASS C2
D. CONCRETE MATERIALS:
1. CEMENT: ASTM C-150 TYPE I OR III
2. CEMENT SUBSTITUTES: ASTM C-595 TYPE '1P' (LIMIT TO 25% MAXIMUM CEMENTITIOUS CONTENT BY
WEIGHT.)
3. AGGREGATES: ASTM C-33 (NORMAL WEIGHT)
4. AIR-ENTRAINING ADMIX: ASTM C-260
E. RELATED MATERIALS:
1. ISOLATION JOINT FILLER: ASTM D-1751
2. JOINT SEALANT: ASTM C-920
F. THOROUGHLY COMPACT CONCRETE DURING PLACEMENT AND WORK AROUND EMBEDDED ITEMS AND INTO CORNERS
OF FORMS.
G. LOCATE AND SECURE ALL ITEMS TO BE EMBEDDED IN CONCRETE. VERIFY LOCATION OF EMBEDMENT PLATES PRIOR TO
CONCRETE PLACEMENT.
H. COORDINATE PENETRATIONS FOR MECHANICAL, PLUMBING AND ELECTRICAL WORK WITH MECHANICAL, PLUMBING
AND ELECTRICAL ENGINEERING AND ARCHITECTURAL DRAWINGS.
I. PROVIDE CONCRETE SLUMP = 4" PLUS OR MINUS 1" UNLESS OTHERWISE NOTED IN THE APPROVED MIX DESIGN.
J. PROVIDE GROUT UNDER STEEL BASE/BEARING PLATES THAT IS NON-SHRINKABLE, NON-METALLIC CONFORMING TO
ASTM C1107, AND WITH A SPECIFIED COMPRESSIVE STRENGTH AT 28 DAYS OF 7,000 PSI. PREGROUTING OF BASE
PLATES SHALL NOT BE PERMITTED.
K. PROVIDE DEFORMED REINFORCING BARS #3 THRU #11 IN ACCORDANCE WITH "SPECIFICATIONS FOR DEFORMED AND
PLAIN BILLET STEEL BARS FOR CONCRETE REINFORCEMENT" ASTM A-615. GRADE 60 KSI.
L. SUBMIT SHOP DRAWINGS FOR REINFORCEMENT TO THE COTR FOR APPROVAL. PREPARE DRAWINGS UNDER THE SUPERVISION OF A PROFESSIONAL STRUCTURAL ENGINEER REGISTERED IN THE LOCAL JURISDICTION DETAILING FABRICATING, BENDING, AND PLACING CONCRETE REINFORCEMENT. COMPLY WITH ACI 315 AND ACI DETAILING MANUAL SP-66, SHOWING BAR SCHEDULES, STIRRUP SPACING, BENT BAR DIAGRAMS, AND ARRANGEMENT OF CONCRETE REINFORCEMENT. INCLUDE SPECIAL REINFORCING REQUIRED FOR OPENINGS THROUGH CONCRETE
STRUCTURES.
M. PROVIDE WELDED WIRE FABRIC NOTED "WWF" IN ACCORDANCE WITH "STANDARD SPECIFICATION FOR STEEL WELDED
WIRE REINFORCEMENT, PLAIN, FOR CONCRETE" ASTM A-1064.
N. PROVIDE BARS MARKED CONTINUOUS (CONT) THAT ARE LAPPED IN ACCORDANCE WITH REQUIREMENTS FOR SPLICES AS DEFINED IN ACI 318, MINIMUM 50 BAR DIAMETERS, UNLESS INDICATED OTHERWISE. COLUMN VERTICAL
REINFORCING SHALL BE SPLICED AS SHOWN IN COLUMN DETAILS.
O. BAR LENGTHS SHOWN ON PLAN DO NOT INCLUDE LENGTH OF HOOK WHERE A HOOK IS INDICATED. PROVIDE
STANDARD HOOK UNLESS DETAILED OTHERWISE.
P. PROVIDE SLAB-ON-GRADE WHERE NOT OTHERWISE SHOWN AS MINIMUM 5-INCHES THICK WITH WWF 6 X 6 W2.9 X W 2.9 IN TOP 1/3 OF SLAB. LAP ALL MESH EDGES A MINIMUM OF TWO (2) SQUARES. PLACE CONCRETE SLAB ON MINIMUM 2 LAYERS OF 10-MIL POLYVINYL VAPOR-RETARDER FILM, PLACED ON MINIMUM 6” OF WELL COMPACTED DRAINAGE FILL.
Q. PROVIDE MINIMUM CONCRETE COVER BETWEEN FACE OF REINFORCING BAR AND FACE OF CONCRETE AS FOLLOWS:
1. CONCRETE CAST AGAINST EARTH = 3"
2. FORMED CONCRETE EXPOSED TO WEATHER OR EARTH = 2"
3. FORMED CONCRETE NOT EXPOSED TO WEATHER:
a) SLABS AND JOISTS = 3/4"
b) BEAMS, COLUMNS = 1-1/2"
STRUCTURAL STEEL
A. PROVIDE STRUCTURAL STEEL THAT IS DESIGNED, FABRICATED AND ERECTED IN ACCORDANCE WITH "SPECIFICATION
FOR STRUCTURAL STEEL BUILDINGS AND THE "MANUAL OF STEEL CONSTRUCTION" FIFTEENTH EDITION.
B. STRUCTURAL STEEL:
1. STRUCTURAL "W" & "T" SHAPES: ASTM A-992 FY = 50,000 PSI
2. BALANCE OF STEEL SHAPES & PLATES: ASTM A-36 FY = 36,000 PSI
3. STRUCTURAL PIPE: ASTM A-53B FY = 35,000 PSI
4. HOLLOW SECTIONS (HSS) SQUARE & RECTANGULAR ASTM A-500 GR C, FY = 50,000 PSI
5. STRUCTURAL ROUND HSS: ASTM A500 GR C, FY = 46,000 PSI
6. HIGH STRENGTH BOLTS:
TEMPORARY HEAVY SHORING: ASTM F3125, GRADE A-490 CONN TYPE-N
PERMANENT FRAMING: ASTM F3125, GRADE A-325 CONN TYPE-N
7. ANCHOR RODS: ASTM F-1554 GR36 OR GR 55 WITH WELDABILITY SUPPLEMENT S1.
8. SMOOTH, THREADED ROD: ASTM A-36
C. PROVIDE CONNECTIONS IN ACCORDANCE WITH "BEAM CONNECTIONS" AS DESCRIBED IN THE AISC MANUAL.
CONNECTIONS SHALL BE MADE USING HIGH STRENGTH BOLTS IN ACCORDANCE WITH ASTM F3125 GRADE A-325 OR GRADE A490. SHOP CONNECTIONS MAY BE WELDED IN LIEU OF BOLTING. WHERE REACTION NOT GIVEN ON PLANS AND SECTIONS, PROVIDE CONNECTIONS DESIGNED FOR A MINIMUM OF 60% FOR FILLER BEAMS AND 70 % FOR GIRDERS OF MAXIMUM BEAM CARRYING CAPACITY UNDER UNIFORM LOAD FOR SPAN SHOWN. SEE PLANS AND SECTIONS FOR OTHER THAN STANDARD CONNECTIONS. PROVIDE MINIMUM NUMBER OF BOLTS IN EACH OF BEAM WEB CONNECTION AND TO
SUPPORTING MEMBER AS FOLLOWS:
(SECTIONS; MC, C, S, M & WF)
D = 4" - 6": 2 BOLTS HORIZONTAL
D = 8" - 10": 2 BOLTS VERTICAL
D = 12" - 15": 3 BOLTS VERTICAL
D = 16" - 21": 4 BOLTS VERTICAL
D = 24" 5 BOLTS VERTICAL
D = 27" 6 BOLTS VERTICAL
D = 30" 7 BOLTS VERTICAL
D = 33" 8 BOLTS VERTICAL
D = 36" 9 BOLTS VERTICAL.
BOLT SPACING SHALL BE 3" O/C.
D. ALTERNATE CONNECTIONS TO THOSE SHOWN ON PLANS AND DETAILS WILL BE ALLOWED ONLY WITH THE APPROVAL OF THE COTR. IF SUCH APPROVAL IS GRANTED FOR ANY CONNECTIONS NOT IN ACCORDANCE WITH CONTRACT DOCUMENTS (FABRICATOR'S REDESIGN), THEN SUBMIT SHOP DRAWING FOR ALTERNATE CONNECTIONS UNDER THE
SEAL OF LICENSURE OF THE FABRICATOR'S ENGINEER FOR THE LOCAL JURISDICTION.
E. PROVIDE A-325 OR A-490 BOLTS TIGHTENED TO THE "SNUG TIGHT" CONDITION DEFINED AS THE TIGHTNESS ATTAINED BY A FEW IMPACTS OF AN IMPACT WRENCH OR THE FULL EFFORT OF A MAN USING AN ORDINARY SPUD WRENCH UNLESS OTHERWISE NOTED. ALL THE PLIES OF THE CONNECTED MATERIAL MUST BE INTO FIRM CONTACT TO CONFIRM THE
SNUG TIGHT CONDITION.
F. PROVIDE WELDING ACCORDING TO THE REQUIREMENTS OF THE "STRUCTURAL WELDING CODE" AWS D1.1-08. USE 70 KSI
LOW-HYDROGEN ELECTRODES.
G. PROVIDE NON-SHRINK NON-METALLIC GROUT UNDER BEAM BEARING PLATES AND COLUMN BASE PLATES WITH A
MINIMUM 28…