TA-000-232-002A Re-Bid_ Project Manual.pdf
PDF 9 MB Posted
- Attached to
- Task Order - TA-000-232-002A IQC Re-Bid - Pistol Range Modifications & Repairs - DGS-23-306-IQC
- Solicitation number
- BPM055461
- Issued by
- Maryland
About this file
Summary
This is a Project Manual for a re-bid construction project issued by the State of Maryland Department of General Services (DGS) on behalf of the Department of Public Safety and Correctional Services (DPSCS). The project involves pistol range modifications and repairs at the Maryland Police and Correctional Training Commission (PCTC) Firearms Training Facility located at 7320 Slacks Road, Sykesville, Maryland 21784 (Carroll County). The scope of work includes repairing spalling concrete masonry unit (CMU) walls at roof joist connections, reattaching roof trusses, covering separated storage room walls, replacing gutter sections (estimated 25 sections of 5-foot lengths), replacing approximately 475 tectum soundproofing panels (2'x12'x2"), installing approximately 400 energy-efficient 4-foot LED exterior fixtures and 50 LED flood fixtures to replace existing metal halide fixtures, pressure washing and applying protective sealant to approximately 40,000 square feet of trusses and steel baffle plates, and applying masonry waterproof coating to all exterior CMU walls. The project is classified as "C" and encourages Minority Business Enterprise (MBE) participation. Work must be completed between September and October 2026 during normal business hours, coordinated with facility staff, and must be finished within the designated period since the range operates year-round otherwise. Bidders are strongly encouraged to attend a pre-bid site visit and inspect conditions before submitting proposals.
Pricing for the project includes a base bid covering demolition, structural repairs, lighting replacement, drainage cleaning, waterproofing, and sealant application, with separate unit prices required for tectum panel replacement, gutter repair by five-foot section, and pressure-treated wood backing replacement. Liquidated damages are set at $550 per day, and the contract term is 120 calendar days from the Notice to Proceed with a two-year warranty period on all installed parts and labor. The contractor must provide all labor, materials, equipment, permits, testing, and incidental services with no additional cost to the state. Contractors must be licensed in Maryland with a minimum five years of documented experience in the specified work, provide references and evidence of similar completed projects, and comply with all applicable codes including the International Building Code, OSHA regulations, and Maryland Department of Transportation standards. All materials require DGS Project Manager approval prior to use, and the contractor is responsible for utility location, site protection, erosion control, temporary bathroom facilities, and final site restoration.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DGS Project No.: TA-000-232-002A Re-Bid
STATE OF MARYLAND
PROJECT MANUAL
Pistol Range Modifications & Repairs
AT
Maryland Police and Correctional Training Commissions Firearms Training Facility (Carroll County)
FOR
Department of Public Safety and Correctional Services
(DPSCS)
Department of General Services – State of Maryland
DGS PROJECT No.: TA-000-232-002A Re-Bid
Date: January 15, 2026
PROJECT CLASSIFICATION “C”
Minority Business Enterprises Are Encouraged To Respond To This Solicitation
DEPARTMENT OF GENERAL SERVICES BOARD OF PUBLIC WORKS
Atif Chaudhry, Secretary Wes Moore, Governor 301 West Preston Street, Room 1405 Brooke E. Lierman, Comptroller Baltimore, Maryland 21201 Dereck E. Davis, Treasurer
TABLE OF CONTENTS
Page Division 0 - Procurement & Contracting Requirements …………………………. 3-3 Scope of Work ……………………………………………………………………. 4-4 Project Location …………………………………………………………………... 5-5 Summary of Work ………………………………………………………………... 5-7 Bid Summary / Unit Prices / Alternates …………………………………………... 7-8 Site Conditions ………………………………………………………………….... 9-9 Site Inspection ……………………………………………………………………. 9-9 Quality Assurance ………………………………………………………………... 9-10 Materials and Supplies …………………………………………………………… 10-11 Submittals ………………………………………………………………………… 11-11 Warranty …………………………………………………………………………... 11-11 General Requirements ……………………………………………………………. 12-12 Attachments ………………………………………………………………………. 12-12
Drawings: TA-000-232-002A Firearms Training Facility Roof Framing Plan (S101, S201) TA-000-232-002A Reference Drawings Only -Firearms Training Facility (For Reference Only)
END OF TABLE OF CONTENTS
DIVISION 0 - PROCUREMENT & CONTRACTING REQUIREMENTS
Instructions to Bidders for Construction Projects (October 1, 2025) (eMaryland Marketplace Advantage attachment)
General Conditions for Construction Contracts (July 1, 2022) (eMaryland Marketplace Advantage attachment)
Bid/Proposal Affidavit (eMaryland Marketplace Advantage attachment)
Payment of Employee Health Care Expenses Certification (eMaryland Marketplace Advantage attachment)
Contractors Questionnaire (eMaryland Marketplace Advantage attachment)
Bid Bond, if applicable (eMaryland Marketplace Advantage attachment)
Minority Business Enterprise Forms Attachment D (February 5, 2021), if applicable (eMaryland Marketplace Advantage attachment)
Veteran-owned Small Business Enterprise (VSBE) Forms Attachment E (September 1, 2022), if applicable (eMaryland Marketplace Advantage attachment)
List of Prevailing Wage Rates, if applicable (eMaryland Marketplace Advantage attachment)
Corporate Diversity Addendum, if applicable (eMaryland Marketplace Advantage attachment)
Addenda, if any (eMaryland Marketplace Advantage attachment)
Exhibit 2 – Sample Contract (eMaryland Marketplace Advantage attachment)
Attachment P – Prime Contractor List of ALL Subcontractors Anticipated/Used During Contract (eMaryland Marketplace Advantage attachment)
Attachment AC - Certification of American-Manufactured Goods (eMaryland Marketplace Advantage attachment)
Pre-Bid Conference/Site Visit – Refer to: State Finance and Procurement Article §14- 302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).
Pistol Range Modifications & Repairs Maryland Police and Correctional Training Commission (PCTC)
I. SCOPE OF WORK:
a. The work to be accomplished under this Contract is located at the Maryland Police and Correctional Training Commissions Firearms Training Facility, 7320 Slacks Road Sykesville, Maryland 21784 (Carroll County). Work consists of providing all construction, permits, labor, materials, equipment, services, supplies, miscellany, testing and instrumentation necessary and incidental to the completion of all work as specified herein.
b. The Firearms Training Facility Pistol ranges has experienced spalling of the CMU wall where the bottom cords of the roof joists are attached. Corners of the storage room walls have separated. The attached reference drawings detail how to repair the separating walls and the spalling CMU at the roof trusses. Apply masonry elastomeric waterproof coating to all CMU walls after repairs are completed.
c. Each roof run has gutters which need to be inspected and sections replaced in-kind as required. Bidders will provide a unit price for each 5’ (ft) section of gutter to be replaced based on an estimated quantity. Repair includes application of caulk sealant on existing collector gutters along CMU walls.
d. Soundproofing material and its backing will be replaced in the areas where it is failing.
Bidders will provide a unit price for each 2’x12’x2” tectum panel, natural unpainted.
e. Existing lighting will be replaced and upgraded with new energy efficient outdoor fixtures. The ranges are under cover with sloped open roofing, but the fixtures are exposed to frequent moisture, rain, wind and some sunlight. Energy efficient 4' LED exterior fixtures to replace the 2 bulb CFL lighting. Energy efficient exterior flood fixtures to replace 100-watt metal halide fixtures.
f. Pressure wash and install a metal safe protective sealant on the top side of trusses and steel baffle plates. Area is approximately 40,000 square feet. DGS will review and approve the material submittal.
g. Dimensions given are approximations provided to potentially assist the Contractor and not intended to define the project. The State assumes no responsibility for the accuracy of measurements and quantities given in this specification. All Drawings and images contained in this document are diagrammatic in nature, not necessarily to scale, and are intended to identify the work to be performed and not to convey information about specific measurements.
h. The Contractor is strongly urged to visit the job site and take his/her own measurements and examine the conditions under which work must be performed. Items not described in this specification, but required for a safe, complete installation in accordance with all codes, laws, regulations, and generally accepted building industry practices are considered to be included and provided by the Contractor as part of this project with no additional cost to owner.
II. PROJECT LOCATION:
a. PCTC Firearms Training Facility, 7320 Slacks Road Sykesville, Maryland 21784
(Carroll County)
Location coordinates are for reference only:
PCTC Firearms Training Facility: 39°22'21.3"N 76°56'43.3"W
III. SUMMARY OF WORK:
General
a. Contractor to complete range repairs as described in this scope of work and be responsible for all work related to the repairs described. The work shall include, but not be limited to, patching masonry walls, reattaching roof trusses as designed, gutter repairs, tectum panel replacements, lighting upgrade, and metal safe protective sealant application.
b. The contractor will work a normal business hours schedule as coordinated with the
PCTC range Staff. The work of this contract will be completed between the months of September and October 2026, weather permitting. The contractor will remain on-site and work continuously to finish the project within this time frame. Project scheduling will be coordinated with Facility Staff and scheduling of training sessions. The work of this contract must be completed during the designated period as the range is otherwise active year-round.
c. Contractor is responsible for contacting a private utility locator and/or Miss Utility (800- 257-7777) to identify all existing utilities prior to digging. Contractor shall take sole responsibility for any cost incurred due to damage to such utilities caused by the Contractor.
d. Protection of existing roadways, streets, walks, utilities, trees and other adjacent facilities during operations are the responsibility of the Contractor. Maintain access to existing roadways and other adjacent occupied facilities. Temporary erosion control measures, when applicable, to be provided by the Contractor to prevent erosion or displacement of soils, and discharge of soil bearing water runoff or airborne dust to adjacent properties and walkways pursuant to the Maryland Department of Environment guidelines. Maintain temporary erosion and sediment controls during operations and repair as needed until stabilization of disturbed areas are complete.
e. Contractor is responsible for providing temporary bathroom facilities for workers associated with this project, including any subcontractors, vendors, suppliers, etc.
NOTE: It is the Contractor’s responsibility to check/confirm the exact measurements and material quantities to his/her satisfaction prior to bidding.
III-1. DEMOLITION
a. See note 2.1 of sheet S201
III-2. REPAIRS
a. Repair indicated (S101) joist end connections per detail A/S201
b. Cover storage room gaps per detail B/S201 and C/S201
c. Gutters shall be sloped (fall) at least 1/8” per foot extending to the CMU walls supporting the roof trusses.
c-1. Existing collector gutters, scuppers and downspouts will be utilized. Repair and replace caulk sealant as needed.
c-2. New gutter material to match existing material and color.
c-3. Existing gutters are 6” x 4” with a 1” galvanized steel gutter strap.
c-4. Straps shall be 3’ on center.
c-5. Gutters are to be 20-gauge galvanized steel.
c-6. Clear any obstructions as applicable.
d. The contractor shall clean and remove all blockages in the existing trench drains located at the end of each range. Verify all blockages are removed.
e. CMU Waterproofing - The Contractor shall apply Masonry Elastomeric Waterproof Coating to all CMU walls excluding the storage area internal walls, after repairs are completed.
f. Provide a unit price for each 2’x12’x2” tectum panels, natural unpainted. The estimated quantity is 475 tectum panels.
g. Provide and install approximately 400 energy efficient 4' LED exterior weatherproof fixtures. Provide and install approximately 50 energy efficient exterior weatherproof flood fixtures to replace 100-watt metal halide fixtures. Include all wiring and switches as needed.
h. Pressure wash and install a metal safe protective sealant on the top side of trusses and steel baffle plates. Area is approximately 40,000 square feet.
Materials List
**This materials list is not inclusive of all materials needed.
a. ¾” x 5” Hilti HY270 Epoxy Bolts or approved equal
b. ½” x 4-1/2” Hilti HY270 Adhesive Bolts or approved equal
c. Non-shrink grout
d. Spray Foam
e. 3/16” x 1’-0” wide continuous steel plate
f. L 4” x 4” x 3/16” continuous steel angle
g. 6” x 4” 20-gauge galvanized steel gutters
h. 4” x 5” 20-gauge galvanized steel down spouts
i. 1” wide galvanized steel gutter straps
j. 2’x12’x2” tectum panels
k. Benjamin Moore Ultra Spec Masonry Elastomeric Waterproof Coating, or approved equal
l. Energy efficient 4' LED exterior fixtures and energy efficient exterior flood lighting fixtures. Metalux-APVTS-Selectable-Vaportite 5,500-6,000 lumens at CCT 4000K. McGraw-Edison-GFLD-Galleon-II-Floodlight 9,000-10,000 lumens at CCT 4000K.
m. Metal safe protective sealant for trusses and steel baffle plates top side.
III-3. BID SUMMARY / UNIT PRICES / ALTERNATES
a. Base bid to include the following items:
• Demolition
• Repair indicated (S101) joist end connections
• Cover storage room gaps
• lighting replaced / upgraded with new energy efficient LED outdoor fixtures
• Clean and remove all blockages in the existing trench drains
• Apply CMU Waterproofing coating to all exterior CMU walls
• Pressure wash and install a metal safe protective sealant on the top side of trusses and steel baffle plates
b. Unit Prices
DEFINITIONS - Unit price is an amount proposed by bidders, stated on the Bid Form, as a price per unit of measurement for materials or services added to, or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased.
PROCEDURES - Unit prices include all necessary material, plus cost for delivery, installation, insurance, all applicable taxes, overhead, and profit.
MEASUREMENT AND PAYMENT - Methods of measurement and payment for unit prices shall be based on field measurement of work performed under unit pricing.
Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. The cost of each unit price will be used to add or deduct from contract price in accordance with the actual number of units used and verified by the Owner.
SCHEDULE - “Unit price Schedule” is included at the end of this section.
c. The Unit Prices described herein are to be included in the invitation to bid & excluded from the base bid.
Unit Price Schedule
d. 2’x12’x2” tectum panels (Quantity 475 panels)
1. Replace full sheets of tectum panels. Panels to be replaced will be indicated with paint marks.
2. 3” Metal Insulation Plates with appropriately sized weatherproof screws to fasten tectum panels.
3. Existing tectum panels are 2’x12’x2”
e. 2”x4”x12’ wood backing for tectum panels (Quantity 200 sections)
1. If required, replace 2x4 wood backing with new pressure treated 2x4 wood.
f. Gutter Repair
1. Damaged gutter per 5’ (ft) sections shall be replaced at one foot (1’) from the right and left edges of the damaged section. (Quantity 25 sections)
g. Alternate(s) DEFINITIONS - An Alternate(s) is for a specific scope of work or material. Alternates may Add or Deduct. The bid price for the Alternate shall represent only the amount bid for the work associated with the Alternate and shall be the sum total price to include without limitation all work, labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc. Any Completion Schedule accepted by the Department shall include all Alternate work awarded. The process for selection and award of Alternates is explained in Section 17.E of the Instructions to Bidders.
h. Provide alternate price for the following items:
None.
The Alternate Price described herein is to be included in the invitation to bid & excluded from the base bid.
Bid Breakdown Information Example
Unit Pricing:
Unit Price #1: 2’x12’x2” tectum panels (to include fasteners):
$______ per section X 475 sections = $______________
Unit Price #2: Gutter Replacement:
$______ per 5’ (ft) section X 25 sections = $__________
Unit Price #3: Pressure Treated 2” x 4” x 12’ (nominal) wood at 12’ (ft) section:
$ ______ per section X 200 Sections = $_____________
IV. SITE CONDITIONS:
a. The work covered by this specification is in an occupied facility.
b. The Contractor shall at all times keep the premises as clean as possible and free from an accumulation of waste materials and debris. Upon completion of the work, all debris, tools, and surplus materials shall be removed, and the work area left completely clean.
c. The Contractor shall leave no area unsafe or unsecure at the end of the working day.
d. It shall be the Contractor’s responsibility to field verify all existing conditions and dimensions prior to bidding and ordering materials.
e. The Contractor shall repair and restore to its original condition any equipment, materials or surfaces damaged as a result of their operations during this contract.
f. The Contractor shall be fully responsible for any loss or damage to his own materials, supplies, or equipment and to the personal property of their employees while they are on State premises. A DGS inspector’s field office is not required for this project.
g. The Contractor, during the construction period may leave their essential equipment on site at their risk. The State of Maryland will not assume any liability for any of the stored equipment. Any stored equipment, at the Owner’s risk, shall be stored in a safe manner and marked with reflective barricades. The Contractor shall be responsible for any and all damages to the State of Maryland and/or private property including trees, curbs, asphalt or concrete pavements, mailboxes, private yards and signage.
V. SITE INSPECTION:
a. All prospective bidders are encouraged to attend the pre-bid meeting and familiarize themselves with all requirements for the project. All dimensions and information given are approximations provided to potentially assist the contractor and not intended to define the project. Contractor shall visit the job site to familiarize him/herself with the project and to make any calculations necessary for a complete project.
b. Failure to attend the pre-bid meeting will not relieve the successful bidder from complying with the requirements of these specifications at no additional cost to the state.
c. Any site visits requiring access (other than the pre-bid meeting) shall be coordinated in advance by calling the Rangemaster - Firearms Training Facility, Mr. Jamie Green at 410-552-6300 or jamiel.green@maryland.gov.
VI. QUALITY ASSURANCE:
Supplier Qualifications:
a. Company shall have a minimum five years documented experience specializing in manufacturing the products specified in this section.
Contractor Qualifications:
a. Company shall have a minimum five years documented experience specializing in performing the work of this specification.
b. Upon request, prospective bidders shall be required to submit a list of references and similar projects which they have successfully completed.
c. The Contractor shall be licensed in the State of Maryland in accordance with COMAR regulations.
d. The Contractor shall coordinate all work with the Contractor’s sub-contractors, the various trades, and suppliers in order to complete the project expeditiously and within the time limits of the contract.
e. All work shall be performed in accordance to applicable code requirements. These shall include, but are not limited to, AASHTO, BOCA, State and local Health Department requirements.
f. All work shall be performed in the best and most professional manner by technicians skilled in their respective trades.
g. The Contractor shall maintain the job site in a safe, neat, and orderly manner throughout the entire project. Upon completion of the project, the Contractor shall dispose of all excess materials and debris in a lawful manner and leave the entire area clean and in an acceptable condition.
h. The Contractor shall adhere to OSHA-MOSH regulations throughout the project to ensure the safety of his/her employees, state employees, and the public.
i. All work shall conform to the requirements of the latest edition of the International Building Code and all state and local code requirements. All work shall be performed in a top-quality workmanship like manner in accordance with standards of the trade.
j. The Contractor shall examine the premises prior to submitting the bid and observe the conditions under which the work will be done or other circumstances which will affect the completed work. No allowance will be made, subsequently, in connection for any error or negligence on the Contractor’s part.
k. Return surrounding site to a pre-construction condition. Seed and mulch any disturbed areas as necessary.
MATERIALS AND SUPPLIES
a. All materials shall be as specified or approved equal. All materials to be used must be submitted and approved by the DGS Project Manager. In the event the Contractor chooses to substitute materials other than those specified, the Contractor shall provide to the Project Manager data necessary to determine the “or equal” rating. The Project Manager will make a decision and notify the Contractor within 7 business days of receipt of this information, as to the “or equal” status.
b. All materials shall be new and where applicable shall be delivered to the job site with labels intact and legible. Handling of materials shall be in accordance with the written directions and/or recommendations of the manufacturer. All materials used in the performance of this contract shall comply with all standards given herein.
c. Materials and construction methods (where applicable) shall conform to Maryland DOT
State Highway Administration, Standard Specifications for Construction and Materials dated July 2023 including all of the latest addenda and errata thereto. All materials shall be tested in accordance with SHA Specifications. The Contractor shall pay all fees associated with the testing procedures.
d. The Contractor shall be responsible for the coordination, off-loading and proper storage of all materials and supplies up until the time of final inspection. Where applicable, materials shall be delivered in their original unopened containers with labels intact and legible.
e. Materials shall be stored in a safe area, out of the way of traffic. Storage site location shall be approved by the Project Manager prior to the storage of any materials on site. If in the event the Contractor elects to store materials or equipment onsite they elect to do so at their own risk. The State will not be held responsible for any lost or damage to materials or equipment.
f. Any materials that have not been specifically mentioned, but are necessary for the complete, safe and satisfactory completion of the project, shall be provided by the Contractor as if specified herein.
SUBMITTALS
a. The Contractor shall (where applicable) submit all mix designs, material information, material suppliers’ information, and SHA plant certifications to the state representative for approval prior to starting any work.
b. Specifics:
1. Administrative Submittals
2. Material Information / Product Data Sheets
3. 20-Gauge Galvanized Steel Gutters
4. CMU Waterproofing
5. Tectum Panels
6. LED Exterior Light Fixtures
7. Metal Safe Protective Sealant
8. Pressure Treated 2x4 Wood
VII. WARRANTY:
a. Project Warranty: Refer to “Department of General Services General Conditions for Construction Contracts” (“General Conditions”) revised July 2023 for basic project warranty provisions.
b. Contractor Warranty Period: Two (2) years from the date of substantial completion of the project on installed parts and labor.
VIII. GENERAL REQUIREMENTS:
a. All work shall be coordinated with the Maintenance Supervisor / Facility Director / Manager and the DGS Project Manager and Construction Representative during the Pre- Construction meeting.
b. Work shall be accomplished during normal working hours Monday through Friday. Work at any other times must be requested in writing and subject to approval by the Maintenance Supervisor / Facility Manager.
c. The project shall be considered complete upon final inspection and approval by the Maintenance Supervisor / Facility Manager and the DGS Project Manager and Construction Representative.
d. Liquidated damages for this project shall be $550.00 per day.
e. Administrative Submittals shall be required and submitted to the DGS Project Manager and/or Construction Division, and the DGS Construction Representative. Documents shall be received within 15 business days after request date.
f. Work to be completed within one hundred twenty (120) calendar days from the date cited in the written Notice to Proceed. The date to be cited will be determined at the work pre-construction meeting.
g. The contractor shall attend a walkthrough with the Using Agency Representative, DGS Construction Manager, and the Project Manager. If there are any outstanding issues with the work, a punch list will be prepared, and the punch list items shall be completed within
(30) days per DGS General Conditions.
IX. ATTACHMENTS:
1. Maryland Green Purchasing Committee Approved Specification – Lighting Products
2. Metalux-APVTS-Selectable-Vaportite-spec-sheet
3. McGraw-Edison-GFLD-Galleon-II-Floodlight-Spec-Sheet
4. Benjamin Moore Ultra Spec Masonry Elastomeric Waterproof Coating
5. LR Metal Roofs Application Guide 2025
END OF SPECIFICATION
Maryland Green Purchasing Committee Approved Specification – Lighting Products
Originally issued: 2014 Revised and re-issued: 2020
How to use this document:
This document sets the minimum standard for lighting products procured by the State of Maryland.
Vendors are required to follow and when possible, go beyond these standards in their product offerings to the maximum extent practicable when such products are cost competitive and meet form, function and utility requirements.
For State procurement officers, this document outlines the legislation, statutes, and regulations that guide State purchasing practices for lighting products. The document also provides boilerplate language to be included in State procurement contracts associated with lighting products.
Index
The following information is included in this document:
1. Environmentally Preferable Purchasing Legislation, Statutes, and Regulations
a. For Procurement Officers and Agencies
b. For Vendors, Bidders, and Offerors
2. Prohibited Products
3. Required Environmental Specifications for Lighting Products
4. Required Environmental Specifications for Limited Use Lighting Products
5. End-of-Life Management
6. Utility Energy-Efficiency Rebate Programs
7. Additional Contract Language for Environmentally Preferable Purchasing
Appendix
Maryland Green Purchasing Committee Approved Specification - Lighting Products
1. Environmentally Preferable Purchasing Legislation, Statutes, and Regulations
For Procurement Officers and Agencies
Environmentally Preferable Purchasing (COMAR: 21.11.07.09(A))
“All procurement agencies shall purchase environmentally preferable products and services unless purchasing environmentally preferable products and services would limit or supersede any requirements under any provision of law or result in the purchase of products and services that:
(1) Do not perform adequately for the intended use;
(2) Exclude adequate competition; or
(3) Are not available at a reasonable price in a reasonable period of time.”
Mercury and Products that Contain Mercury (COMAR: 21.11.07.07(A)) “All procurement agencies shall give a preference under this regulation to procuring products and equipment that are mercury-free. If mercury-free products and equipment that meet the agency's product performance requirements are not commercially available, the procurement agency shall give preference under this regulation to products containing the least amount of mercury necessary to meet performance requirements.”
ENERGY STAR® Purchase Requirement (Executive Order 01.01.2001.02(C)(3), Effective date: March 13, 2001 (28:7 Md. R. 675))
Efficient Product Purchase Goal: “The State shall purchase Energy Star products when purchasing energy–using products, including computers, printers, copiers and other office equipment, or shall purchase products in the top 25% in energy efficiency for products where labels are not available.”
Responsible Recycling of Electronic Products (State Finance and Procurement Article §14–415(b))
“When awarding a procurement contract for services to recycle electronic products, a State unit shall award the contract to a recycler of electronic products that:
(1) Is R2 or e–Stewards certified; or
(2) Meets nationally recognized and consensus–based guidelines, standards, and systems for recycling that are approved by the Department of the Environment in consultation with the
Department of General Services.
For Vendors, Bidders, and Offerors
Verifying Environmental Claims (State Finance and Procurement Article §14–410(g))
“A bidder or offeror for a procurement contract shall certify in writing that any claims of environmental attributes made relating to a product or service are consistent with the Federal Trade Commission’s Guidelines for the Use of Environmental Marketing Terms.”
Energy Efficient Outdoor Lighting Fixtures (COMAR: 21.11.07.11(A)) “If State funds are used to install or replace a permanent outdoor luminaire for lighting on the grounds of any building or facility owned or leased by the State or a unit of the State, procurement specifications shall require that:
http://www.dsd.state.md.us/comar/comarhtml/21/21.11.07.09.htm http://www.dsd.state.md.us/comar/comarhtml/21/21.11.07.07.htm https://www.energystar.gov/productfinder/product/certified-light-bulbs/results http://www.dsd.state.md.us/comar/comarhtml/01/01.01.2001.02.htm http://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gsf§ion=14-415&enactments=False&archived=False http://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gsf§ion=14-410&enactments=False&archived=False http://www.dsd.state.md.us/comar/comarhtml/21/21.11.07.11.htm
(1) Design of the luminaire maximizes energy conservation and minimizes light pollution, glare, and light trespass;
(2) Illumination produced by the luminaire is the minimum illumination necessary for the intended purpose of the lighting; and
(3) For a luminaire with an output of more than 1,800 lumens, the luminaire is a restricted uplight luminaire.”
Mercury-Added Fluorescent Lamps: Labeling and Disposal (Environment Article: §6–905, §6–905.4)
§6-905
“‘Mercury–added product’ means any of the following products if containing elemental mercury or a mercury compound that has been added to the product for any reason:…Fluorescent lamps.”
§6-905.4
(a) “This section does not apply to: Products that contain mercury–added products [fluorescent lamps] that are labeled in accordance with this section.”
(b)(1) “On or after April 1, 2006, unless the product is labeled in accordance with subsection (c) of this section and the regulations adopted by the Department under this section, a manufacturer or wholesaler may not sell a mercury–added product:(i) At retail in the State; or (ii) To a retailer in the State. “ (b)(2) “On or after April 1, 2006, unless the product is labeled in accordance with subsection (c) of this section and the regulations adopted by the Department under this section, a retailer may not knowingly sell a new mercury– added product in the State.”
(c) “Except as provided in paragraph (2) of this subsection, the label of a mercury–added product shall clearly inform the purchaser or consumer that: (i) Mercury is present in the product; and (ii) The product shall be managed in accordance with federal and State environmental laws to minimize the release of mercury into the environment.”
(e)(1) “In this subsection, “mercury–added fluorescent lamp” means a fluorescent lamp that exhibits the toxicity characteristic for mercury under Title 26, Subtitle 13, Chapter 2 of the Code of Maryland
Regulations.”
(e)(2) “…on or after October 1, 2006, a person who, during a calendar year, discards at least the minimum weight or minimum number of mercury–added fluorescent lamps, as established in regulations adopted under subsection (f) of this section, shall arrange for the final reclamation or destination of the lamps at a: (i) Reclamation facility; or (ii) Destination facility, as defined by the
Department in regulation.
http://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gen§ion=6-905&enactments=false http://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=gen§ion=6-905.4&enactments=False&archived=False
2. Prohibited* Products
● Any lighting product (lamp, fixture, luminaire, retrofit kit or driver) that does not meet the
Required Environmental Specifications for Lighting below.
● Non-LED luminaires or fixtures.
● Any exit sign that is not LED or code-approved photoluminescent.
● General-purpose incandescent lamps, compact fluorescent lamps (CFLs) and halogen lamps, except when an LED alternative is determined to be unavailable. See list of prohibited incandescent and halogen lamps below.
PROHIBITED Ballasts:
● Magnetic fluorescent ballasts.
● Mercury vapor and low-pressure sodium HID ballasts.
● Probe-start metal halide HID ballasts (except for those designed to power lamps over 1000 watts).
PROHIBITED Fluorescent Lamps:
● Fluorescent lamps that do not comply with Environment Article §6–905, §6–905.4, Annotated
Code of Maryland (referenced above).
● Fluorescent lamps with a Color Rendering Index (CRI) of less than 80.
PROHIBITED Halogen and Incandescent Lamps:
● Exit sign lamps
● Lamps with a medium screw base except appliance, stage and studio, miniature, decorative, and clear light bulbs needed for historic fixtures.
● All A19, A21 and PAR38 lamps except clear light bulbs needed for historic fixtures.
● MR16 lamps, except those that use halogen infrared (HIR) technology.
● Other types of lamps identified by the MD GPC based on energy efficiency or toxicity concerns.
PROHIBITED High-Intensity Discharge Lamps:
● Mercury vapor and low-pressure sodium (all wattages)
● Probe start metal halides (except wattages above 1000 watts).
* Exceptions may be granted by the Maryland Green Purchasing Committee (GPC) where circumstances of an extreme nature are encountered. Thorough justification of an exception request, including energy usage, performance information, life-cycle costing, and pricing that compares all available alternatives, must be provided with the request.
3. Required Environmental Specifications for Lighting Products The following specifications support the purchase of lighting equipment products that are energy-efficient, have a long rated life, and are low in toxicity.
A. LIGHT-EMITTING DIODES (LEDs)
LEDs are the preferred lighting technology and are recommended over other lighting products.
1. All LED lamps, retrofit kits, luminaires, and fixtures (except miniature LEDs and LED exit signs) must be :
● On the US Department of Energy and Environmental Protection Agency’s criteria for use of the ENERGY STAR® trademark label; ENERGY STAR® Program certification list can be accessed at https://www.energystar.gov/products/lighting_fans
OR
● On the DesignLights Consortium® (DLC) Qualified Products List (QPL), which can be accessed at https://www.designlights.org/search/?search=. Products listed DLC
Premium are preferred.
The Maryland Green Purchasing Committee recommends replacing an old fixture with a new fixture, whenever possible. Use of an LED retrofit kit* is recommended as a secondary option. Installation of tubular LEDs (TLEDs) and other types of LED replacement lamps in an existing non-LED fixture is recommended only when the first two options are not technically feasible.
*A retrofit of existing equipment is any application that makes use of the existing luminaire housing as aligned by DLC Primary Use Designation. Retrofit kits and lamps must be listed under DLC Primary Use Designation to qualify for a corresponding measure code.
2. All exterior LED luminaires shall be fully shielded to minimize light pollution.
a. Additional Desirable Attribute: Products that are approved by the International Dark
Sky Association (IDA) are preferred. A list of IDA-approved products can be found at http://www.darksky.org/fsa/fsa-products/.
3. All LED drivers must have a minimum rated life of 50,000 hours and comply with the EU’s
Restriction of Hazardous Substances (RoHS) Directive.
B. EXIT SIGNS
1. All exit signs must be:
● LED (Light Emitting Diode) lamps;
OR
● Code-approved photo-luminescent (non-power using) https://www.energystar.gov/productfinder/product/certified-light-bulbs/results https://www.energystar.gov/products/lighting_fans https://www.designlights.org/search/?search= https://www.designlights.org/solid-state-lighting/qualification-requirements/product-eligibility/ https://www.designlights.org/solid-state-lighting/qualification-requirements/product-eligibility/ https://www.designlights.org/solid-state-lighting/qualification-requirements/product-eligibility/ https://www.designlights.org/solid-state-lighting/qualification-requirements/product-eligibility/ https://www.designlights.org/solid-state-lighting/qualification-requirements/product-eligibility/ http://www.darksky.org/fsa/fsa-products/
4. Required Environmental Specifications for Limited Use Lighting Products
Fluorescent lamps, HID lamps, and ballasts are considered to be limited use lighting products and shall only be used when LED equipment is not yet a practical solution or LED replacements do not exist.
Vendors must only offer limited use lighting products that meet the following minimum requirements.
A. FLUORESCENT LAMPS
1. All fluorescent lamps must have a color rendering index (CRI) of 80 or higher.
2. Four-foot linear T8 fluorescent lamps must have a minimum rated life of 24,000 hours when tested on instant start ballasts with 3-hour starts.
3. All other T8 lamps must have a minimum rated life of 18,000 hours when tested on instant start ballasts with 3-hour starts.
4. All T5 fluorescent lamps must have a minimum rated life of 30,000 hours when tested on programmed start ballasts with 3-hour starts.
5. Fluorescent lamps that are labeled TLCP-compliant (e.g., ECO) or RoHS-compliant are preferred.
Many fluorescent lamps (including fluorescent tube lamps and compact fluorescent lamps) can be cost-effectively replaced by LED lamps, retrofit kits or luminaires. Compared to fluorescent lamps, LEDs are more energy-efficient, longer lasting, and free of toxic mercury.
B. HIGH-INTENSITY DISCHARGE (HID) LAMPS
1. All HID lamps must be either metal halide (ceramic metal halides preferred) or high-pressure sodium (HPS).
2. HID lamps that are labeled TCLP-compliant (e.g., ECO) or RoHS-compliant are preferred.
Many HID lamps can be cost-effectively replaced by LED lamps, retrofit kits or luminaires.
Compared to HID lamps (such as high-pressure sodium and metal halides), LEDs are more energy efficient, longer lasting, and free of toxic mercury.
C. BALLASTS
1. All fluorescent ballasts must be electronic.
2. All electronic ballasts must be RoHS-compliant.
3. All HID ballasts must be designed to operate either metal halide lamps or high-pressure sodium (HPS) lamps. Probe-start ballasts are allowed only when they are designed to operate metal halide lamps over 1000 watts. Ballasts designed to operate lower-wattage metal halide lamps must use pulse start technology, which is more energy efficient.
Many fluorescent and HID ballasts (and accompanying lamps) can be cost-effectively replaced with LED drivers (and LED lamps). When fluorescent and HID ballasts reach the end of their useful life, they must be replaced with LED luminaires, LED retrofit kits, or LED drivers and lamps.
5. End-of-Life Management
All lighting equipment recycled under this contract shall be managed by an authorized lamp, ballast or electronic waste recycling company.
Pursuant to State Finance and Procurement Article §14–415 of the Annotated Code of Maryland, contractors shall use recyclers that are certified by either e-Stewards (http://e-stewards.org/) or R2
(https://sustainableelectronics.org/recyclers).
Mercury-Added Fluorescent and HID Lamps
Mercury-added fluorescent and HID lamps shall be managed in accordance with U.S. EPA standards and
State environmental laws to minimize the release of mercury into the environment.
Mercury-added fluorescent and HID lamps that have been replaced shall not be installed or retrofitted in another location for reuse.
More information on EPA guidelines on proper disposal can be found here:
Hazardous Waste - Universal Waste | US EPA
6. Utility Energy Efficiency Rebate Programs
Vendors are strongly encouraged to promote the purchase of LED lighting products that are eligible for utility energy-efficiency rebates. These programs incentivize lighting products that are listed on the ENERGY STAR Certification List or the DesignLights Consortium (DLC) Qualified Product List (QPL).
Financial incentives provided by the utility companies are an important instrument for increasing the use of energy-efficient technologies in State buildings and facilities. Taking advantage of utility financial incentives can help contract users overcome market barriers by lowering inhibitive upfront costs.
Financial incentives also complement other energy-efficiency policies such as appliance standards and energy codes.
More information on utility incentives and eligibility requirements can be found in the Appendix of this document.
7. Additional Contract Language for Environmentally Preferable Purchasing
On Environmentally Preferable Purchasing:
The State of Maryland is committed to purchasing environmentally preferable products and services (EPPs). Maryland’s State Finance & Procurement Article §14-410 defines environmentally preferable purchasing as “the procurement or acquisition of goods and services that have a lesser or reduced effect on human health and the environment when compared with competing goods or services that serve the same purpose.”
Accordingly, Bidders/Offerors are strongly encouraged to offer EPPs to fulfill this contract, to the greatest extent practicable.
http://e-stewards.org/ https://sustainableelectronics.org/recyclers https://www.epa.gov/hw/universal-waste#types
On Maryland’s Green Purchasing Reporting Requirements:
The State of Maryland requires from the Contractor, at a minimum, quarterly sales data over the life of this contract per a schedule established and deemed reasonable by both parties, or by request by the Department of General Services.
The report shall include at a minimum:
● Identification of the agencies using the contract
● Total cost of all invoiced purchases for each state agency
● Total cost of all invoiced lighting purchases for each state agency
● Itemized list, invoiced purchases, and total cost by state agency, of all lighting equipment, including an indication of whether the product is an LED luminaire, fixture, retrofit kit, driver or lamp, and whether it is a DesignLights Consortium-qualified or
ENERGY STAR®-certified product.
To facilitate consistent reporting on this contract, the Contractor will be provided with a
VENDOR GREEN SALES REPORT template from the Green Purchasing Committee (GPC), the
Office of State Procurement (OSP) or the Department of General Services (DGS).
This information will enable Maryland State agencies to comply with Md. Code Ann., State
Finance & Procurement, §14–405 and COMAR 21.13.01.14, which require Maryland State agencies to report to the Department of General Services their procurement of environmentally preferable products and services.
Appendix
Utility Incentives - Eligibility Requirements Utility rebate programs incentivize lighting products that are on the ENERGY STAR certification list or
DesignLights Consortium (DLC) Qualified Product List (QPL).
Lighting Controls
Lighting controls (e.g., photocells for outdoor lighting, occupancy sensors, daylight sensors, etc.) can provide an average of 30% savings on top of a luminaire or lamp replacement or retrofit. Each utility has requirements for controls on certain fixtures (see below) with extra incentives for networked controls that set lighting schedules and respond to peak demand opportunities. To be eligible for incentives, lighting controls are required to be installed as follows:
● Daylight controls are required to be installed in spaces with a total of more than 150 watts of general lighting within toplight and/or sidelight daylight zones.
● Daylight controls are not required in spaces in health care facilities where patient care is directly provided, dwelling units and sleeping units.
● Occupancy/vacancy controls are required to be installed in the following areas:
classrooms/lecture/training rooms, Janitorial closets, Restrooms, Conference/meeting/multipurpose rooms, Locker rooms, Storage rooms, Copy/print rooms, Lounges, Warehouses, Employee lunch and break rooms, Private offices, Other spaces 300 sq. ft.
or less that are enclosed by floor-to-ceiling height partitions.
● Lighting controls are not required in the following areas: electrical rooms, areas designated as security or emergency areas that are required to be continuously lit, interior exit stairways, interior exit ramps, and exit passageways, emergency egress lighting that is normally off.
● Space types which fall under the requirements of needing both a daylight and occupancy/vacancy control require a dual daylight and occupancy/vacancy DOS control or a combination of separate daylight and occupancy/vacancy controls (for example, an enclosed office containing windows with luminaires totaling more than 150W within the daylight zone).
For combinations of separate control types, only one control incentive will be paid. Spaces with existing control types are not eligible for control incentives.
● Exterior lighting requires a functioning time clock or photocell to qualify for advanced network control and/or occupancy/vacancy control incentives, but are not eligible for daylight control incentives.
For further details, see:
BG&E: BGE CI Retrofit Lighting Tech Sheet 091217
Delmarva Power: Lighting Fixtures and Controls Technical Sheet
PEPCO: Lighting Fixtures and Controls Technical Sheet
Potomac Edison: Potomac Edison Energy Solutions for Business Lighting Incentives https://bgesmartenergy.com/sites/default/files/public/BGE_IC_Tech_Sheet_Lighting.pdf https://homeenergysavings.delmarva.com/sites/default/files/public/DPL_CI_Tech_Sheet_Lighting_Fixtures_and_Controls.pdf https://homeenergysavings.pepco.com/sites/default/files/public/Pepco_CI_Tech_Sheet_Lighting_Fixtures_and_Controls.pdf http://energysavemd-business.com/documents/incentives/Potomac-Edison-Lighting-Incentives.pdf
Project Catalog # Type
Prepared by Notes Date
PS51957122 page 1 June 7, 2024 8:18 AM
Top Product Features
| • | Lumen and CCT select option provide application versatility |
| • | 2-piece easy access design: captive lens, electrical and housing enclosures |
| • | Impact protection rating IK07 Lens and IK10 Housing |
| • | Available in 4FT & 8FT lengths |
| • | Stainless steel latches, single conduit hub, and mounting included |
| • | Standard 0-10V dimming to 10% for more energy savings |
| • | Emergency and sensor options available for commercial applications |
Dimensional Details
APVT Select
4' and 8' Industrial Vaportite CCT and Lumen Select
Typical Applications
• Industrial • Manufacturing • Gymnasium • Warehouse • Parking • Retail
Interactive Menu
• Order Information page 2
• Energy Data page 2
• Photometric Data page 3
• Product Warranty
3-3/4" [95mm]
4'
47-1/4" [1200mm] 30-3/4" [780mm]
15/16" [23mm]
3-11/16" [94mm] 4" [100mm]
3-5/8" [93mm]
3-5/16" [80mm]
93-15/16" [2386mm] 78-5/8" [1998mm]
8'
3-3/4" [95mm]
Product Certification
Product Features https://www.cooperlighting.com/global/resources/legal https://www.cooperlighting.com/global/controls-wiring/building-systems
PS519273EN page 2 June 7, 2024 8:18 AM
APVT Select
Order Information by Catalog Number Default CCT/Lumen Setting: 4000K / Med Power 120V 277V
Catalog Number UPC Lumen Setting Nominal
CCT (K)
Nominal Lumens Watts
Efficacy (lm/W)
Nominal Lumens Watts
Efficacy (lm/W)
4APVTLD-SL3C3 080083266371
Low Power
3500 3043 21 144 3036 22 140
4000 3138 21 151 3128 21 147
5000 2988 22 138 2977 22 134
Mid Power
3500 4452 32 137 4443 33 137
4000 4620 32 146 4614 32 145
5000 4231 33 128 4242 33 127
High Power
3500 5906 46 127 5911 46 129
4000 6254 45 139 6241 45 140
5000 5667 47 120 5531 46 120
8APVTLD-SL3C3 080083266333
Low Power
3500 8726 59 149 8835 60 147
4000 8591 59 146 8658 60 144
5000 8379 59 142 8427 60 140
Mid Power
3500 10483 78 135 10461 78 134
4000 10321 78 132 10251 78 131
5000 10066 78 129 9977 78 128
High Power
3500 11664 94 124 11480 92 125
4000 11484 94 122 11249 92 122
5000 11200 94 119 10949 92 119
Energy Data - 120V
4' 8'
PF 0.99 0.99
THD % <15 < 15
Low Temp Start -20° C -20° C
Shipping Data
Catalog Base
Wt.
(lbs)
Unit per Pallet
Case Pack Qty.
4APVTLD 4.8 100 4
8APVTLD 9.7 70 2
Factory Installed Option
Catalog Number Sensor and Emergency
4APVTLD-SL3C3-______ EL10W=10-watt, 120-277V emergency battery pack installed (1), (4)
MSWL20=Wet Listed Motion Sensor 360º (3)
WPS4=WaveLinx Pro Wireless Sensor, Sidecar mount, 1200 sq ft. coverage at 40ft MH (2), (3), (4) WLS4=WaveLinx Lite Wireless Sensor, Sidecar mount, 15' - 40' Mounting Height (2), (3), (4)
WLS2=WaveLinx Lite, Wireless Sensor, Bluetooth Programmable, Sidecar mount, 7' - 15' Mounting (2), (3), (4)
8APVTLD-SL3C3-______
Example: 4APVTLD-SL3C3-EL10 Notes: (1) IP ratings require fixtures to be mounted horizontally. 40C max ambient for EL option.
| (2) WaveLinx Lite devices are not currently compatible with the WaveLinx Pro Wireless Area Controller. |
| (3) All fixtures with sensor come with two (2) hubs as standard. |
| (4) Wavelinx with EL10W available on 8 ft only. |
Chain/Suspended Surface
Mounting Data Mounting hardware included with luminaire
IK Rating
APVTS IK Rating
Lens IK07
Housing IK10
Accessories
Catalog Number Description
VT2 WATER TIGHT HUB (1) Water tight hub parts bag
AYC-Chain/Set-U (2) 36" Chain Hanger (Use 1 set per fixture)
APVT-SS-CLIPS PK (5) Stainless Steel APVTS replacement clips
PS51957122 page 3 June 7, 2024 8:18 AM
Cooper Lighting Solutions 1121 Highway 74 South Peachtree City, GA 30269 P: 770-486-4800 www.cooperlighting.com
© 2024 Cooper Lighting Solutions All Rights Reserved.
Specifications and dimensions subject to change without notice.
Product Specifications Construction
• High-impact polycarbonate housing with integrated metal gear tray
• Standard housing available with one 1/2" entry point. One conduit hub included with fixture.
• Stainless steel latches secures diffuser tightly for a positive seal between housing and diffuser
• Captive lens and gear tray light engine enclosure drops for easy electrical access by contractor
• Marked KO entry points for continuous feed installation and multiple entry points
• Continuous feed requires additional conduit hub. Order hub separately
• Impact protection rating IK07 Lens and IK10 Housing
Emergency Battery Pack Option
• Factory installed 120V-277V integral emergency battery pack available via mod-shop
| • | 90-minute backup period for code compliance |
| • | Factory installed integral test switch visible through lens |
| • | Max ambient temp with EL battery pack is 40°C (104°F) |
Electrical
| • | 0-10V dimming, 10% standard |
| • | Driver meets FCC part 15 Class B for use in residential or |
commercial applications
• Long-Life LED system with an energy-efficient electronic driver comes in 120-277V
• LED’s are 80 CRI and CCT Selectable option available for maximum color flexibility: choose from 3500K, 4000K or 5000K
• Lumen select switch provides three lumen package choices (Low, Medium and High) in selectable options
| • | L70 at >160,000 hours (TM-21) |
| • | Default CCT/Lumen Setting is 4000K and Med Power |
Lens
| • | UV stabilized high-impact polycarbonate lens |
| • | Lens is IK08 rated for impact protection |
| • | Diffuse lens provides medium distribution and general |
coverage
Controls
| • | Integral 360° motion sensor, 1200 sq. ft. coverage |
| • | Wavelinx Pro Wireless Sensor provides 1200 sq. ft. coverage |
for occupancy sensing and daylight…
This is the start of the file's text. The full file is on GovTribe.