Bid Amendment #3 Summary

This is Bid Amendment #3 issued by the State of New Jersey Department of the Treasury, Division of Purchase and Property, for Bid Solicitation #26DPP01215 (T1841) – Geographic Information Systems Services. The amendment extends the quote submission deadline from February 4, 2026, to February 19, 2026, at 2:00 PM Eastern Time and provides responses to bidder questions submitted during the Electronic Question and Answer period. The solicitation seeks Geographic Information Systems services in two categories: Spatial Data Development and GIS Application Development and Implementation Services. The state intends to award contracts to a maximum of 20 bidders across both categories. Bidders must demonstrate a minimum of five years of experience in GIS services and provide at least three references for completed state government projects in each category for which they are bidding. An optional pre-quote conference was held on December 4, 2025, and the attendee list is included in the amendment. The base contract term is three years with potential extensions up to two additional years through mutual written consent.

Bidders must submit all-inclusive blended hourly rates for both contract years and three years of pricing on the state-supplied price sheet. The state will evaluate quotes using a weighted consumption/market basket model. Upon award, contractors will receive all work through a mini-bid process where individual project requests are distributed to all approved contractors in the relevant GIS service category. Professional liability insurance of at least $1,000,000 per occurrence is required, and contractors must comply with extensive data security requirements, including submission of a security plan within 30 days of award. The amendment clarifies numerous submission requirements, including that business registration documentation and New Jersey Certificate of Employee Information Report are not required at quote submission but will be required prior to contract award. Current awardees are not automatically included in future awards, and bidders awarded contracts may add subcontractors after initial award in compliance with Section 3.13.8 requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIKIE SHERRILL

Governor State of New Jersey

DEPARTMENT OF THE TREASURY

DIVISION OF PURCHASE AND PROPERTY

PROCUREMENT BUREAU

33 WEST STATE STREET

P. O. BOX 230

TRENTON, NEW JERSEY 08625-0230

AARON BINDER

Acting State Treasurer

DR. DALE G. CALDWELL

Lt. Governor

AMY F. DAVIS, ESQ.

Acting Director https://www.njstart.gov

January 30, 2026

To: All Interested Bidders

Re: Bid Solicitation # 26DPP01215 T1841 – Geographic Information Systems Services

Current Quote Submission Due Date: February 4, 2026 (2:00 p.m. Eastern Time)
REVISED Quote Submission Due Date: February 19, 2026 (2:00 p.m. Eastern time)

Bid Amendment #3

The following constitutes Bid Amendment #3 to the above referenced Bid Solicitation:

· Answers to questions submitted during the Electronic Question and Answer period;

· The Optional Pre-Quote Conference Attendees;

· The Quote Submission Due Date has been revised from 2:00 p.m. Eastern Time on Wednesday, February 4, 2026, to 2:00 p.m. Eastern Time on Wednesday, February 19, 2026; and

· A revised Bid Solicitation entitled, “T1841 Revised Bid Solicitation 1.30.2026”

· Please note that for all additions, deletions, clarifications, and modifications to the Bid Solicitation, Bidders should refer to “T1841 Revised Bid Solicitation 1.30.2026.” The following revisions are included in the Revised Bid Solicitation:

· Section 4.3, Contractor Mini-Bid Requirements Post-Award.

It is the sole responsibility of the Bidder to be knowledgeable of all of the additions, deletions, clarifications, and modifications to the Bid Solicitation and/or the New Jersey Standard Terms and Conditions relative to this Bid Solicitation as set forth in all Bid Amendments.

All other instructions, terms, and conditions of the Bid Solicitation shall remain the same.

Bid Solicitation #26DPP01215 T1841 – Geographic Information Systems Services

Answers to Questions

Where applicable, each question references the appropriate Bid Solicitation section.

Note: Some questions may have been paraphrased in the interest of readability and clarity.

#
Bid Solicitation

Section Reference Question (Bolded) and Answer

1
Quote Submission
Q: Please confirm a Bidder may deliver a hardcopy quote instead of submitting a response electronically.

A: Please be advised that all Quotes shall be submitted electronically through NJSTART.

2
Quote Submission
Q: Should I check that I have properly completed and attached all of the required documents with my submitted Quote?

A: Yes. Prior to the Quote Opening Deadline, a Bidder should review the documents comprising the submitted Quote to ensure that all of the required documents have been completed and attached. Oftentimes a Quote is deemed non-responsive because a Bidder fails to attach a required form or attaches a blank form. To review a submitted Quote, a Bidder should log into NJSTART and review each document attached to the Quote submission. Instructions on how to review a submitted Quote can be found in the Quick Reference Guide entitled How to Review a Submitted Quote, which is available on the NJSTART Vendor Support Page under Vendor Reference Guides.

3
PDF Documents
Q: When trying to open a Portable Document Format (PDF), I am receiving an error message and am unable to access the PDF. How should I proceed?

A: It is recommended that users utilize Microsoft Edge to view PDFs. Certain PDF forms cannot be opened in Chrome or Firefox built in PDF viewers that are enabled by default. If using Chrome or Firefox it is recommended that the file is downloaded instead by clicking the download button in the upper right-hand corner of the browser after an error message is received. An alternative option is to disable the built in PDF viewers in Chrome or Firefox.

4
Exceptions
Q: Will the State allow Bidders to take exception to any of the Standard Terms and Conditions?

A: As stated in Bid Solicitation Section 2.2, Exceptions to the State of NJ Standard Terms and Conditions (SSTC): “Questions regarding the State of New Jersey Standard Terms and Conditions and exceptions to mandatory requirements MUST be posed during the Electronic Question and Answer period and shall contain the Bidder’s suggested changes and the reason(s) for the suggested change(s).” Moreover, as stated in Bid Solicitation Section 3.11, Bidder proposed terms or conditions that conflict with those contained in the State of New Jersey Standard Terms and Conditions may render a Quote non-responsive.

5
Section 1.1 – Purpose and Intent and Background
Q: 1. Could you clarify whether this clause indicates a total of 20 or 40 contracts?

A: 1. The intent of this Bid Solicitation is to award Contracts to a maximum of 20 Bidders in either GIS Category.

Q: 2. Does it also include current awardees?

A: 2. The number of awards made will not automatically include the current awardees.

6
Section 2.5 – Optional Pre-Quote Conference
Q: Could you please provide the pre-submission conference attendance information. The cover sheet says "Refer to Bid Solicitation Section 2.5 for more information." Section 2.5 says "refer to cover sheet."

A: The Optional Pre-Quote Conference attendance information was provided via Bid Amendment #2, which was posted to NJSTART on November 28, 2025.

7
Section 3.0 – Quote Submission Requirements
Q: The Bid Solicitation requests references in Section 3.18 “Organizational Experience” and Section 3.22 “Experience with Contracts of Similar Size and Scope”. Is it sufficient to only include references in Section 3.22?

A: No, the references provided for Bid Solicitation Section 3.22, Experience with Contracts of Similar Size and Scope, will not satisfy the reference request set forth in Bid Solicitation Sections 3.18, Organizational Experience. References per Bid Solicitation 3.22, Experience with Contracts of Similar Size and Scope, relate to contracts undertaken by the Contractor that are comparable to the work found in this Bid Solicitation.

However, Bidders may use the same references already included in Section 3.22, Experience with Contracts of Similar Size and Scope for their response to Bid Solicitation Section 3.18, Organizational Experience, should the Bidder find said references adequately address the request set forth in Bid Solicitation Section 3.18, Organizational Experience, which requires information relating, but not limited to, to the firm’s organizational structure and capabilities.

The Bidder should include the level of detail it determines necessary to assist the Evaluation Committee in its review of the Bidder’s Quote.

8
Section 3.0 – Quote Submission Requirements
Q: The Bid Solicitation requests information relating to personnel in Section 3.18 “Organizational Experience” and Sections 3.20 and 3.21. Is it sufficient to only provide required personnel information in Sections 3.20 and 3.21?

A: No, the information provided for Bid Solicitation Sections 3.20, Organization Charts, and Section 3.21, Resumes, will not satisfy the information request set forth in Bid Solicitation Sections 3.18, Organizational Experience. Resumes per Bid Solicitation Section 3.21, Resumes, relate to individual personnel. Personnel information per Bid Solicitation 3.20, Organization Charts, relates to the Bidder’s organizational structure.

However, Bidders may use personnel information already included in both Bid Solicitation Sections 3.20, Organization Charts, and 3.21, Resumes, for their response to Bid Solicitation Section 3.18, Organizational Experience, should the Bidder find said information adequately addresses the request set forth in Bid Solicitation Section 3.18, Organizational Experience, which requires information relating, but not limited to, to the firm’s organizational structure and capabilities.

The Bidder should include the level of detail it determines necessary to assist the Evaluation Committee in its review of the Bidder’s Quote.

9
Section 3.0 – Quote Submission Requirements
Q: Do these three files submitted via the NJSTART system constitute a complete submission in response to bid solicitation # 26DPP01215? 1. Bidder Quote Overview Form, 2. T1841 Bid Solicitation Checklist, 3. T1841 Price Sheet 11.10.2025

A: A complete submission must include all mandatory requirements, which are designated by the word 'shall,' including all required forms. Quotes that are missing mandatory requirements may be deemed non-responsive. Not submitting requested information, indicated by 'should,' may impact the technical evaluation score. Bidders should refer to Section 3.0 Quote Submission Requirements of the Bid Solicitation for all mandatory requirements.

10
Section 3.0 – Quote Submission Requirements
Q: Please clarify that you are looking for references for projects in Organization Experience (3.18), on individual resumes, and Experience with Contracts of Similar Size and Scope (3.22).

A: Sections 3.18, 3.21, and 3.22 outline different requirements for the Bidder's submission. Section 3.18 requests general information about the Bidder's company, personnel, and experience, including references, to demonstrate overall qualifications. Section 3.22 requires specific details about past contracts similar to the current bid, including contract dates, contact references, any past negative actions like default notices, and information about subcontractors. Section 3.21 specifically requests resumes for all management, supervisory, and key personnel who will be assigned to the Contract. Although specific information is required, the Bidder is encouraged to address Sections 3.18 and 3.22 in a manner they find appropriate.

11
Section 3.8 – Small Business Set-Aside Contracts
Q: Please confirm whether all Small Business Set Asides are limited to subcontracting opportunities only?

A: This is a Contract with set-aside subcontracting for New Jersey Small Business Enterprises. However, New Jersey Small Business Enterprises may be one (1) of the intended awardees, provided their Quote complies with all mandatory requirements of the Bid Solicitation, and meets the necessary evaluation criteria.

12
Section 3.13.8 – Subcontractor Utilization Plan
Q: Subcontractor Utilization Plan (“SUP”) from page 7 of the RFP. Our company routinely works with many other companies that provide any of a wide range of supporting services. If we are awarded a contract, can we add a subcontractor in our response to a Mini-Bid that was not cited in the version of the SUP submitted with our proposal?

A: Yes, Contractors may add a Subcontractor after initial award but must adhere to the requirements and provisions outlined in Section 3.13.8 of the Bid Solicitation.

13
Section 3.13.8.1 – Small Business and/or Disabled Veterans’ Business Subcontracting
Q: Are there any goals or guidance re: the participation of any of the following: • Disadvantaged business entities (DBE) • Small business entities (SBE) • Women-owned businesses (WBE) • Minority-owned businesses (MBE) Service-disabled veteran-owned business (SDVOB)

A: This is a Contract with set-aside subcontracting for New Jersey Small Business Enterprises. However, New Jersey Small Business Enterprises may be one (1) of the intended awardees, provided their Quote complies with all mandatory requirements of the Bid Solicitation, and meets the necessary evaluation criteria.

14
Section 3.13.8.1 – Small Business and/or Disabled Veterans’ Business Subcontracting
Q: If our proposed SBE firm is in the process of approvals, and can prove that they are, will they be considered an SBE for this proposal, or do they have to already be approved?

A: Bidders and/or Subcontractors who are approved as a New Jersey Small Business Enterprise (SBE) at time of Quote submission will be considered as an SBE.

15
Section 3.13.8.1 – Small Business and/or Disabled Veterans’ Business Subcontracting
Q: Section 3.13.8.1: Is there a required minimum percentage that must be subcontracted to New Jersey Small Business Enterprises?

A: There is no specific minimum percentage that must be subcontracted. However, if an awarded Contractor intends to utilize a Subcontractor, they must do so in accordance with Section 3.13.8.1 of the Bid Solicitation.

16
Section 3.14 – Technical Quote
Q: Do you have a preferred length for the technical quote?

A: No, there is no preferred length for the technical quote. However, Bidders should include the level of detail it determines necessary to assist the Evaluation Committee in its review of the Bidder’s Quote.

17
Section 3.15 – Bidder Quote Overview Form
Q: Do we need to submit the Bidder Quote Overview form with our submission or just cover these items within the body of our proposal? It only includes 2 of the many areas to be addressed in our response.

A: No, the Bidder Quote Overview form does not have to be submitted, however, a complete submission must include all mandatory requirements, which are designated by the word 'shall,' including all required forms. Quotes that are missing mandatory requirements may be deemed non-responsive. Not submitting requested information, indicated by 'should,' may impact the technical evaluation score. Bidders should refer to Section 3.0 Quote Submission Requirements of the Bid Solicitation for all mandatory requirements.

Bidders should include the level of detail it determines necessary to assist the Evaluation Committee in its review of the Bidder’s Quote.

18
Section 3.15 – Bidder Quote Overview Form
Q: The Bidder Quote Overview Form appears to request the same information as Section 3.16 Management Overview and Section 3.17 Contract Management. Should the content in the Bidder Quote Overview Form be a summary of those sections, or should it replicate the full content of Sections 3.16 and 3.17?

A: The Bidder Quote Overview Form should not replicate the full content of Sections 3.16 Management Overview and 3.17 Contract Management. Instead, it should provide a concise summary of the key points from those sections. The form should highlight the bidder's capability to fulfill the Scope of Work by summarizing the technical approach, understanding of the contract's objectives, and management strategy, including communication plans. While Sections 3.16 and 3.17 offer detailed narratives and comprehensive plans, the Overview Form should distill this information into an accessible format that clearly demonstrates the bidder's preparedness and alignment with the solicitation's requirements.

19
Section 3.18 – Organization Experience
Q: It appears that the state is looking for individual GIS project related to each category in 3.22 Experience with Contracts of Similar Size and Scope. What kind of references is the state looking for in 3.18 Organization Experience?

A: With regard to Bid Solicitation Section 3.22, the Bidder should include information relating to its experience with contracts of similar size and scope with a level of detail which it determines necessary to assist the Evaluation Committee in its review of the Bidder’s Quote.

Q: Should projects presented under 3.18 illustrate our ability to manage task order based master contracts? Please clarify

A: With regard to Bid Solicitation Section 3.18, the Bidder should include information relating to its organizational experience with a level of detail which it determines necessary to assist the Evaluation Committee in its review of the Bidder’s Quote.

20
Section 3.21 – Resumes
Q: Do the resumes submitted as part of the mini-bid process need to have been included in the original RFP response, or can new resumes be submitted

A: No, resumes submitted as part of the Mini-Bid process do not have to be the same ones submitted with a Bidder’s original Quote.

21
Section 3.21 – Resumes
Q: How many resumes would you like us to provide?

A: The State does not require a specific number of resumes. Detailed resumes should be submitted for all management, supervisory, and key personnel to be assigned to the Contract.

22
Section 3.21 – Resumes
Q: Should provided resumes include those managing the contract or include individuals who will perform the work under task orders that may result under this contract?

A: Detailed resumes should be submitted for all management, supervisory, and key personnel to be assigned to the Contract.

23
Section 3.22 – Experience with Contracts of Similar Size and Scope
Q: Reference Contact Information Requirements

A: This is not a question and cannot be answered as posed.

24
Section 3.22 – Experience with Contracts of Similar Size and Scope
Q: 1. In section 3.22 of the bid solicitation, bidders are instructed to provide two names and telephone numbers of individuals from the contracting party for each contract listed. The solicitation goes on to say that the bidder shall provide a minimum of three references for completed state government projects in each category in which we are bidding. If we only have one contact name/number for some projects, is that acceptable?

A: As provided in Bid Solicitation Section 9.2, Definitions, the term “should” denotes that which is permissible or recommended, not mandatory. Paragraph 1 of Bid Solicitation Section 3.22 states that for each such contract listed, the Bidder should provide two (2) names and telephone numbers of individuals for contracting party. If a Bidder only has one (1) contact name/number for some projects, that is acceptable. However, Bidders should be aware that Quotes will be evaluated based on the content provided therein, and failure to provide all recommended information may result in a lower evaluation score.

Further, Bid Solicitation Section 3.22 states in paragraph 2 that the Bidder shall also provide a minimum of three (3) references for completed state government projects in each category in which they are bidding. As provided in Bid Solicitation Section 9.2, Definitions, the term “shall” denotes that which is a mandatory requirement. Therefore, a minimum of three (3) references for completed state government projects in each category is required.

25
Section 3.22 – Experience with Contracts of Similar Size and Scope
Q: 1. In section 3.22 of the bid solicitation, bidders are instructed to provide two names and telephone numbers of individuals from the contracting party for each contract listed. The solicitation goes on to say that the bidder shall provide a minimum of three references for completed state government projects in each category in which we are bidding. If we only have one reference for some projects, is that acceptable?

A: Please see response to Question #24.

26
Section 3.24 – State-Supplied Price Sheet Instructions
Q: Should we add labor categories to the pricing sheet with individuals rates or is the state looking for a blended hourly rate that covers all individuals that might work on a task order in these categories?

A: The State is looking for a blended hourly rate that covers all individuals that might work on Price Line 1 GIS spatial data development and/or Price Line 2 GIS application development and implementation.

27
Section 4.0 – Scope of Work
Q: Please detail all currently used software

A: The State uses a variety of software and will work with the awarded Contractor(s) to implement the best solution for a particular application. Esri ArcGIS is the de-facto GIS software standard for NJ State agencies.

28
Section 4.0 – Scope of Work
Q: Do current databases exist on-premises or on cloud services?

A: Both. Varies by both Using Agency and project as specified in each Mini-Bid Request for Quotations (RFQ).

29
Section 4.0 – Scope of Work
Q: application is used as your database storage (SQL, Oracle, ESRI Datastore, etc.)?

A: Varies by both Using Agency and project as specified in each Mini-Bid Request for Quotations (RFQ).

30
Section 4.0 – Scope of Work
Q: What versions of ArcGIS (desktop, enterprise) is the State currently using?

A: Varies by both Using Agency and project as specified in each Mini-Bid Request for Quotations (RFQ).

31
Section 4.0 – Scope of Work
Q: For field data collection related work, is the assumption that the contractor will be conducting the collection or will the contractor develop tools for the state to do the collection?

A: This will depend on the project scope of work as specified in each Mini-Bid Request for Quotations (RFQ).

32
Section 4.0 – Scope of Work
Q: Will the contractor be granted administrative access to existing State servers/cloud environments?

A: This will depend on the individual project scope of work as specified in each Mini-Bid Request for Quotations (RFQ).

33
Section 4.0 – Scope of Work
Q: Is there a specific version control system (e.g., State-hosted GitHub) where the "complete source code" must be maintained and delivered?

A: This will vary by Using Agency and/or project as specified in each Mini-Bid Request for Quotations (RFQ). Many State agencies maintain their own version control systems.

34
Section 4.0 – Scope of Work
Q: For application development projects involving ArcGIS Enterprise, does the State generally expect contractor support for on-premise, State-hosted, or cloud-hosted environments, and are there preferred architectures?

A: Varies by both Using Agency and project as specified in each Mini-Bid Request for Quotations (RFQ).

35
Section 4.1 – Spatial Data Development & Section 4.2 – Application Development and Implementation Services
Q: In document ‘T1841 Method of Operation 7/24/2025’ under the previous iteration of this bid/contract (Bid Solicitation: 26DPP01215) Awarded Vendors are separated into categories that appear to match subsections 4.1 and 4.2 in the current bid. For the current bid, do we expect that vendors will be awarded based on capacities for either ‘41. Spatial Data Development’ or ‘4.2 Application Development and Implementation Services’ - or can we expect that a vendor will be awarded for the full scope (ie. 4.1 and 4.2)?

A: Bidders will be awarded based on capacities for either Bid Solicitation Section 4.1 Spatial Data Development or Bid Solicitation Section 4.2 Application Development and Implementation Services.

36
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: Will all work contracted through this contract come only through the award of Mini-bids?

A: Yes, Bidders awarded a Contract for Bid Solicitation Section 4.1 Spatial Data Development and/or Bid Solicitation Section 4.2 Application Development and Implementation Services will receive all work via the Mini-Bid process.

37
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: For post-award mini-bids, how are price and technical approach weighted, and is past performance under this T1841 contract considered in subsequent mini-bid evaluations?

A: Varies by both Using Agency and project as specified in each Mini-Bid Request for Quotations (RFQ).

38
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: Does the State anticipate a higher volume of mini-bids in spatial data development or application development and implementation services over the base contract term?

A: Historically, there have been many more awarded Mini-Bids for Spatial Data Development than Application Development and Implementation Services. Though the size and scope and value vary widely.

39
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: Can the State provide any historical insight into how many awarded vendors typically receive mini-bid opportunities versus those that are rarely engaged?

A: The State cannot answer this question, as it does not track or maintain a database of this information.

40
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: Are awarded contractors permitted to propose fixed-price mini-bids that effectively blend labor categories, provided the total price aligns with the awarded hourly rate ceilings?

A: Yes, that is the requirement.

41
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: Are mini-bid requests automatically distributed to all approved contractors within the relevant GIS service category?

A: Mini-Bid requests will be distributed to all approved contractors for the particular GIS category sought after by the Using Agency.

42
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: Could you please confirm whether the mini-bid Firm Fixed Price (FFP) quote should be based on the all-inclusive hourly rates provided in the original pricing quote?

A: Yes, the Mini-Bid Firm Fixed Price should be based on the all-inclusive hourly rates provided by the Contractor’s original Quote.

43
Section 4.3 – Contractor Mini-Bid Requirements Post Award
Q: Are mini-bid requests and awards from the previous T1841 procurement available for reference?

A: The State is unable to provide this information to Bidders at this time.

44
Section 5.4 – Ownership of Material
Q: H. The State agrees that any reuse of the Contractor’s work product not related to the original project shall be at the State’s own risk. Justification: We respectfully request that its liability be expressly limited in the event that the work product is used in a manner not specifically contemplated under this Contract. When work product is transferred, we are unable to control its use and application. If a party elects to use the work product outside of the specific scope for which it was created, equity dictates that we are not liable.

A: The State does not accept the proposed modification. The State declines to waive any potential legal rights or to limit its potential risks beyond those outlined in the Bid Solicitation.

45
Section 5.4 – Ownership of Material
Q: I. Notwithstanding the foregoing, the Contractor shall retain all common law, statutory and other reserved rights including copyright in its pre-existing intellectual property, standard design elements, architectural/engineering details that are neither unique to the State nor related to the business of the State and the State shall be granted a non-exclusive license to reproduce such design elements and details in conjunction with its use on the projects. Justification: We request preserving certain GFT original content and pre-existing/background intellectual property.

A: This is not a question and cannot be answered as posed. However, the State does not accept any proposed modification to the identified section.

46
Section 7.1 – Insurance
Q: We will accept the contract “as-is” if awarded, but we assume it is in the best interest of all parties to have a fully insurable contract, and are hopeful that you will consider making minor edits. We note that the following section (4.1 Indemnification) presents insurability issues. Our insurance does not allow us to “defend” professional liability claims, but it can defend general liability claims. Additionally, the indemnification also creates insurability issues because it requires us to indemnify regardless of negligence or fault. As a professional services firm, the indemnity should be modified to provide a negligence-based indemnity for claims arising out of professional services. [Bidder] could agree to a non-negligence based indemnity for claims arising under general or automotive liability. Item 4.1.A.1. Delete the word “defend”. Item 4.1.A.1.a. Delete the phrase “which shall arise from or result directly or indirectly from the work and/or products supplied” and insert “to the extent caused by the negligent acts, errors or omissions in the performance of services “ under this Contract or the order; and…”

A: The State does not accept the proposed modification. Terms and conditions on publicly bid procurements must be consistent for all potential Bidders, and cannot be based on a single vendor’s terms.

47
Section 8.9.2 – Price Evaluation
Q: Could you provide clarification on the statement in 8.9.2 Price Evaluation?

A: The question does not specifically identify what statement needs to be clarified. Therefore, this question cannot be answered.

48
Attachment 1 – Combined State of New Jersey Standard Terms and Conditions
Q: Do we need to sign the State Standard Terms And Conditions document and return with our submission?

A: No, Bidders are not required to sign and return the State Standard Terms and Conditions document (Attachment 1) with their Quote submission.

49
Attachment 2 – Standard Forms Packet
Q: Can the State please confirm if the State of New Jersey Security Due Diligence Third-Party Information Security Questionnaire is required with this solicitation?

A: The State of New Jersey Security Due Diligence Third-Party Security Questionnaire is not required to be submitted with a Bidder’s Quote.

50
Attachment 2 – Standard Forms Packet
Q: Can the State please confirm if the Public Work Registration Certificate is required with this solicitation?

A: A Public Work Registration is not required to be submitted with a Bidder’s Quote.

51
Attachment 2 – Standard Forms Packet
Q: Can the State please confirm if the Affidavit of Apparel Form is required with this solicitation?

A: The Affidavit of Apparel Form is not required to be submitted with a Bidder’s Quote.

52
Attachment 2 – Standard Forms Packet
Q: Please confirm that the Business Registration documentation and New Jersey Certificate of Employee Information Report are not required to be submitted with our proposal but will be required after award notification.

A: Bidders are not required to submit their Business Registration Documentation and/or New Jersey Certificate of Employee Information Report with their Quote, but these items will be required prior to the award of a Contract.

53
Attachment 3 – State-Supplied Price Sheet
Q: Can you clarify what you are looking for in the price sheet? Do we enter just be one blended rate for each category?

A: Bidders may bid on one or both GIS categories. Bidders shall enter their All-Inclusive Hourly Rate for the category they intend to bid on in the corresponding Price Line on the State-Supplied Price Sheet. Bidders must include pricing for all three (3) years. The All-Inclusive Hourly Rate is intended to be a blended rate, as All-Inclusive Hourly Rate is defined in Section 9.2 to include all direct and indirect costs.

54
Attachment 3 – State-Supplied Price Sheet
Q: Do all expenses that may be incurred in performing the work specified in an awarded Mini-bid (e.g. travel) need to be accounted for in the hourly rates provided?

A: The Hourly Rate for Price Line 1 shall include all yearly costs associated with achieving the requirements of Bid Solicitation Section 4.1, Spatial Data Development. The Hourly Rate for Price Line 2 should include all yearly costs associated with achieving the requirements of Bid Solicitation Section 4.2, Application Development and Implementation Services.

Once a Mini-Bid RFQ is released, each awarded Contractor will have the opportunity to submit a final Quote based on the scope of work for the RFQ. This Mini-Bid Quote should then include all expenses associated with the RFQ scope of work.

55
Attachment 3 – State-Supplied Price Sheet
Q: Section 4.3 indicates that firm fixed prices must be included in mini-bid RFQ responses. Could you clarify how these prices relate to the STATE-SUPPLIED PRICE SHEET rates submitted in the original RFP response? Specifically, are we permitted to propose different rates, include additional expenses, and/or travel costs as necessary, or are we required to calculate prices by multiplying the originally submitted rates by estimated hours?

A: Rates provided on the State-Supplied Price Sheet shall be construed as the maximum or ceiling hourly price awarded Contractors are allowed to Quote Using Agencies. However, Contractors are encouraged to offer discounts or lowered pricing during the Mini-Bid Process. Additionally, the Mini-Bid Quotes shall be calculated by taking the original All-Inclusive hourly price listed on the Contractor’s State-Supplied Price Sheet and multiplying it by the estimated number of hours for the particular project.

56
General
Q: Could you please clarify why this solicitation is being issued outside of the state’s MSA contract vehicle? We want to ensure we understand the procurement pathway and any implications for eligibility.

A: The State does not recognize the “MSA contract vehicle” reference and therefore cannot answer this question.

57
General
Q: Is there a page limit to the length of the complete or any part of the respondent's proposal?

A: There is no required page limit required for a Bidder’s Quote. Bidders should ensure their Quote accurately and sufficiently addresses all components of the Bid Solicitation.

Optional Pre-Quote Conference Attendees

Representative
Firm
Aarthy Sabesan
Arora & Associates, PC

Linda Fennessy

Phil Rosner

Yehya Asker

Ian Shiland
Carto Concepts, LLC

Tyler McCracken

Danielle Dempsy
Dewberry

Delaney Resweber

Eva Reid

Kevin Christy

Nate Heatherly
Geographic Technologies Group
Shelley Ressler
GFT

Zach Hernandez

Dave Wagner
Greenman-Pedersen Inc.
Niki Miller
JMT Technology Group
Jen Davis
Michael Baker International Inc.

Jill Miscisin

Kevin McElwain

Polly Boardman

Jenna Messner
NOMADICS

Jose Carrilo

Matt Quackenbush
Pennoni
Alex Stasichin
SAM-NY Geospatial

Christopher Hedger

Evan Pilnick

Ryan Waters

Emily A. Becerra
Suburban Consulting Engineers, Inc.

Michael T. Kolody

Jade White
Timmons Group

Mike Wiley

12029960953 (Unverified)
Unverified

14074120359 (Unverified)

16145623054 (Unverified)

17032201494 (Unverified)

19178486504 (Unverified)