Syracuse VAMC_Replace AHU 2 7 11 - Bid Drawings.pdf
PDF 34 MB Posted
- Attached to
- Z1DA--NRM-CONST 528A7-18-725 REPLACE AHUs 2, 7, 11 Federal contract opportunity
- Solicitation number
- 36C24225B0001
About this file
This is a set of bid drawings for the replacement of Air Handling Units (AHU) 2, 7, and 11 at the Syracuse VA Medical Center. The drawings provide detailed mechanical, electrical, and structural engineering plans for the removal of existing air handling units and installation of new units, including associated ductwork modifications, piping systems, controls, and structural supports. The project is being managed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2, with the drawings serving as technical specifications for contractors to develop their bids for solicitation number 36C24225B0001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24225B0001 0003.docx | DOCX document | |
| 36C24225B0001 0002.docx | DOCX document | |
| 528A7-18-725 Additional Addendum Specifications.pdf | ||
| 013200 Construction Documentation.docx | DOCX document | |
| 36C24225B0001 0001.docx | DOCX document | |
| 528A7-18-725-ADDENDUM-FINAL_2023-06-30.pdf | ||
| 013200 Construction Documentation- autodesk build.pdf | ||
| 36C24225B0001_1.docx | DOCX document | |
| REVISED Syracuse VAMC_Replace AHU 2 7 11 - Bid Specifications.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf | ||
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
ABBEVIATIONS & NOTES
S-001
DSSF
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
DEMOLITION PLAN
5TH FLOOR M.E.R.
SD151
DSWC
N802
MECH ROOM
SHAFT 2
N902
MECH ROOM
SHAFT 2SHAFT 2
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
DEMOLITION PLAN
8TH & 9TH FLOOR
SD181
STAIR 1
SHAFT 5
L J I
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
DEMOLITION PLAN
10TH FLOOR PENTHOUSE
SD191
T S R Q P
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
FRAMING PLAN
5TH FLOOR
SF151
SHAFT 2SHAFT 2
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
FRAMING PLAN
8TH & 9TH FLOOR
SF181
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
FRAMING PLAN 9TH FL ROOF
& PENTHOUSE ROOF
SF191
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
SECTIONS & DETAILS
S-501
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
STRUCTURAL
SECTIONS & DETAILS
S-502
SHAFT 2
SHAFT 5
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
FIRE PROTECTION
SPRINKLER PLANS, DETAILS,
GENERAL NOTES & LEGEND
FX101
THPD
(E)54x24
(E)54x24
(D)54x24
(D)AC-11
(D)EF-11
(D)32x16
(E)EF-12
(E)28x22
(E)AC-12
(E)32x16
(E)54x24
(E )5 x
(E)34x12
(E)54x24
(E)28x22
(E)48x16
(D)48x16
(E )2 x
R QST
(D)48x16
PU
(D)44x22 OA
UP TO SRV-2
(D)48x24 OA
UP TO SRV-3
(E)SRV-3 ON ROOF
ABOVE TO REMAIN
(D)22x22 EXHAUST
DUCT UP THRU ROOF
(D)42x14 DROP TO
UNIT CONNECTION
RELOCATE
(E)ATC
PANEL
(E)SRV-2 ON ROOF
ABOVE TO REMAIN
(E)18x16
(E)AC-23
CUT & CAP DUCT
CUT &
CAP DUCT
(D)24x48 OA INTAKE
(D)20x20 SA DUCT
CUT & CAP EXISTING
32x16 EXHAUST DUCT
(E)32x16
20x26 UP THRU ROOF
(E)AC-13
(E)RF-13
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
AREA OF WORK
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MD151
MECHANICAL
DUCTWORK DEMOLITION PLN
5TH FLOOR M.E.R.
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. MAINTAIN EQUIPMENT CLEARANCES PER THE MANUFACUTURER'S RECOMMENDATIONS.
4. ADJUST EXISTING HANGERS AND SUPPORTS TO ALLOW INSTALLATION OF NEW
EQUIPMENT.
5. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-11, EF-11 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
1. CONNECT TEMPORARY 26x20 SUPPLY DUCT TO EXISTING TRUNK DUCT.
COORDINATE SCHEDULE OF ROOF PENETRATION AND SHUT DOWN OF EXISTING
AC-11/EF-11 WITH COR PRIOR TO PERFORMING WORK.
2. CAP EXISTING TRUNK DUCT TO ALLOW DUCT USE WITH TEMPORARY UNIT.
COORDINATE SCHEDULE OF ROOF PENETRATION AND SHUT DOWN OF EXISTING
AC-11/EF-11 WITH COR PRIOR TO PERFORMING WORK.
3. CONNECT 26"⌀ EXHAUST DUCT TO (E)32x16 AND EXTEND UP TO TEMP-EF-11
ON ROOF ABOVE.
4. PRIOR TO DEMOLITION OF (E)AC-11, DEMO AC-12 OA INTAKE DUCT TO ALLOW
FOR INSTALLATION OF NEW AHU-11. PROVIDE TEMPORARY OUTDOOR AIR INTAKE
DUCTWORK FOR (E)AC-12 DURING CONSTRUCTION. DUCT WILL BE EQUAL TO (2)
18"Ø FOR 3560 CFM AND RUN FROM (E)SRV-3 TO AC-12 INLET. COORDINATE
AND SCHEDULE REQUIRED SHUT DOWNS WITH COR.
5. PRIOR TO DEMOLITION OF (E)AC-11, PROVIDE (3) 22"Ø TEMPORARY DUCTS FOR
8620 CFM WHILE DUCTWORK FOR AC-23 IS ALTERED.
SCALE: 1/4" = 1'-0"1 DUCTWORK DEMOLITION PLAN - 5TH FLOOR M.E.R.
(E)6"HWS
(E)6"HWR
(E)4"HWR(E)4"HWS
(E)6"HWS
(E)6"HWR
(E)8"HPS
(E)2 1/2"CHR
(E)2 1/2"CHS (E)6"HWS
(E)6"HWR
(E )8 H P S
(E)4"HWR
(E)4"HWS
(E)6"CHR
(E)6"CHS
(E )6 H W R
(E )6 H W S
(E)HWS-301
(D)EF-11
(E)AC-12
(D)AC-11
(E)EF-12
(E)4"MPS
(E )6 H W S
(E )6 H W R
(D)2" (D)2"
(E)5"HWR
(E)2 1/2"CHS
(E)2 1/2"CHR
(E )8 H W R
(E)4"HWS
(E)6"HWS
(E)6"HW
(E)2 1/2"CHS
(E)4"CHS
(E)2 1/2"CHR
(E)2 1/2"CHS
(E)6"NG
(E)2"CD
(E)4"MPS
(E)2"HWR
(E)2"GRR
(E)8"HWR
(E)HX-13
(E)2"GHR
(E)2"GHR
(E)2"HWR
(E)2"HWR
(E)2"GHS
(E)2"GHR
(E)2"GHR
(E)2 1/2"CHR
(E)2 1/2"CHS
(D)4"
(E)2 1/2"CHS
(E)2 1/2"CHR
(E)2 1/2"CHS
(E)2"GHS
(E)2"CLN ST
(E)5"CHR
(E)4"CHS
(E)2"GHR
(E)2"GHS
(E)2"GHR DROP
(E)4"HWR
(E)2 1/2"CHS
R QST
PU
(E )6 H W S
(E)HX-11
(E)PUMP
(E)HX-12
(D)2 1/2" CHS
(D)2 1/2" CHR
(D)1" CLN ST
(D)2 1/2"
(D)2 1/2"
(D)5"
(E)HX
4" MPS
2" MPR
4" HWR
4" HWS
(D)HCP-11
(D)1 1/2" CLN ST
(D)C-11
(E)AC-23
(D)2" MPS
(D)2 1/2"GRS
(D)2 1/2"GRR
(D)2 1/2"GRR
(D)2 1/2"GRS
(D)2" GHS
(D)2" GHS
(D)HRP-11
(D)2 1/2" CD
(D)3" GHR
(E)AC-13
1" MPR
(E)RF-13
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
AREA OF WORK
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MD152
MECHANICAL
PIPING DEMOLITION PLAN
5TH FLOOR M.E.R.
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. MAINTAIN EQUIPMENT CLEARANCES PER THE MANUFACUTURER'S RECOMMENDATIONS.
4. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-11, EF-11 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
1. EXTEND 3" CHS&R, 2-1/2" MPS AND 1" MPR FROM MECH ROOM TO TEMPORARY
UNIT ON ROOF.
2. REROUTE 1" CLEAN STEAM PIPING TO (E)AC-12 PRIOR TO DEMOLITION OF AC-11
SUCH THAT CLEAN STEAM IS AVAILABLE TO (E)AC-12 DURING DEMOLITION AND
NEW CONSTRUCTION OF AHU-11.
3. DROP TO FLOOR LEVEL AND CONNECT TEMPORARY CONDENSATE PIPING TO
EXISTING.
SCALE: 1/4" = 1'-0"1 PIPING DEMOLITION PLAN - 5TH FLOOR M.E.R.
(E)24x18
(D)AC-02
(E)30x20
(E)26x18
(E)26x16
(E)26x16
(E )1 x 6 (E )3 x
(D )1 x
(E)36x30
(E )2 x
(E )3 x
(E)36x30
(E)28x18
(E)36x30 (E)32x30
(E )3 x
(E)40x32
(E )4 x
(E )3 x
(E )3 x
(E)26x18
(D)16x16
(E )2 x
(D)EF-02
(E)O.A. INTAKE LOUVER
(L-02) TO REMAIN (D)16x16 TO (E)SOLAR COLLECTOR
EXTERIOR TO THE BUILDING ABOVE
O.A. INTAKE LOUVER L-02
(E)26x18 DN
(E)26x16 DN
(D)40x32
(D)40x54 SMOKE VENTS
(E)40x32 EXHAUST DUCT
DN WITH TRANSITION TO
(E)36x32 IN VERTICAL
(D)45x27 EXHAUST
DUCT UP THRU ROOF
(D)32x30
(E)32x30 SUPPLY
ABOVE,
(E)36x30 SMOKE
VENT BELOW
JKL IM
TEMP-RTU-2
TEMP-HC-2
32x30 x
0 PROVIDE DURA-BLOK SUPPORTS OR
APPROVED EQUAL FOR TEMPORARY
DUCTWORK PER SPECIFICATIONS (TYP)
CONNECT (3) 20" DIA
TEMPORARY FLEX DUCTS TO
32x30 TEMPORARY DUCT
CONNECT TEMPORARY 32x30
SUPPLY DUCT TO (E)32x30 RISER (E)32x30 SUPPLY AIR DUCT DOWN IN SHAFT #5
DISCONNECT EXISTING EXHAUST DUCT
FROM EF-02 JUST PRIOR TO TIE-IN TO
NEW AHU/EF AIR HANDLER AHU-02.
CAP EXISTING 32x30 SUPPLY
DUCT AIRTIGHT FOR USE WITH
TEMPORARY AIR HANDLER
(E)36x30
RELOCATE EXISTING
UNIT HEATER
(E)20x20 OED4
CELL TOWER
ROOF
(E) VACUUM PUMP
(E)28x18 UP
30x32
SD
COORDINATE TEMPORARY DUCT
PENETRATION WITH (E) CONDUIT
FOLLOWING ACTIVATION AND
COMMISSIONING OF (N)AHU-02.
SHAFT #5
(E)SOLAR COLLECTOR ON
FACE OF EXTERIOR WALL
(E)F/S DAMPER FS48A
(E)F/S DAMPER FS48B
EXISTING FIRE/SMOKE DAMPERS
TO REMAIN AND BE RE-USED
AREA OF WORK
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MD191
MECHANICAL
DUCTWORK DEMOLITION PLN
10TH FLOOR PENTHOUSE
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. ALL EXISTING DUCTWORK AND EQUIPMENT TO REMAIN UNLESS OTHERWISE NOTED.
4. REPAIR ALL OPENINGS LEFT FROM THE REMOVAL OF DEMOLISHED DUCTWORK.
MATCH EXISTING COLOR AND WALL CONSTRUCTION.
5. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-02 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
1. FURNISH AND INSTALL A TEMPORARY ROOFTOP AIR HANDLER TO SERVE THE
EXISTING DUCT SYSTEM DURING DEMOLITION AND REPLACEMENT OF (E)AC-02.
2. (E)EF-2 SHALL REMAIN AND BE USED FOR GENERAL EXHAUST DURING
CONSTRUCTION OF NEW AHU-02. UPON COMPLETION, COMMISSIONING, AND
ACTIVATION OF NEW AHU-02, DEMOLISH EF-2 AND ALL ASSOCIATED
APPURTENANCES.
3. FOLLOWING DEMOLITION OF (E)EF-02, PATCH EXISTING ROOF OPENING TO MATCH
ADJACENT CONSTRUCTION.
4. DISCONNECT DUCT FROM SOLAR COLLECTOR AND PREPARE TO RECONNECT TO
SOLAR COLLECTOR WITH NEW DUCT.
5. EXISTING FIRE/SMOKE DAMPERS THAT ARE CURRENTLY CONTROLLED BY THE
BUILDING AUTOMATION SYSTEM SHALL BE RE-WIRED AND CONTROLLED BY THE
EDWARDS FIRE ALARM SYSTEM. COORDINATE WITH ELECTRICAL DRAWINGS.
6. UPON COMPLETION OF INSTALLATION AND COMMISSIONING OF NEW AHU-02,
DEMOLISH AND REMOVE ALL TEMPORARY EQUIPMENT DUNNAGE, DUCTS, PIPING,
SUPPORTS, ETC..
SCALE: 1/4" = 1'-0"1 DUCTWORK DEMOLITION PLAN - 10TH FLOOR PENTHOUSE
(D)HRP-02
(D)CSG-01
(E)2" HWR
(E)4" CHR
(E)4" HPS
(D)EF-02
(E)2" MPR
(E)2" MPR
(E)4" CHS
(E)4" CHR
(E)2" HWR
(E)2" HWS
(E)4" DHW
(E)4" DHW
(E)2" GHR
(E)HX-02
(D)4"
(E)4" DHW
(E)4" DHW
(D)2"
(D)4"
(D)4"
(E)2" MPR(D)6"
(D)6"
(D)2"
(E)4" CHS
(E)4" CHR
(E )4
H P S
(D)4"
(D)4"
(D)3"
(E)2" HWS
(E)4" MPS
(D)1"
(D)1"
(E)4" CHS
(D)C-02
(D)2"
(E)6" HWS
(E)6" HWR
(E)3" DHW
(E)2" GHS
(D)1"
(D)AC-02
(D)2"
JKL IM
(E)VACUUM PUMP
RELOCATE UNIT HEATER
(E)4" DHW DN
(E)6" HWS DN
(E)6" HWR DN
(D)1"
(E)5" ST
UP & DN
(E)2" MPR
(E)3" DHW
(D)3" HPS
(D)3" CD
(D)2" GRR
(D)2" GRS
(D)4" MPS ABOVE,
(E)4" ST BELOW
(D)3"
(E)5" CHR ABOVE,
(E)3" HWR BELOW
(E)5" CHS ABOVE,
(E)3" HWS BELOW
(E)PRV-501
(D)3"
(E)5" MPS
1 3TEMP-RTU-2
TEMP-HC-21-1/2" MPR
2-1/2" MPS
CELL TOWER
ROOF
4" CHS
4" CHR
4" CHS
4" CHR
COORDINATE TEMPORARY PIPE
PENETRATION WITH EXISTING CONDUIT
(E)HWH
STATION
(E)CH STATION
CH-501
(E)HWH STATION
(E)4" MPS TO
(E)HWH STATIONS
4" CHS DN TO
(E)CH-501
4" CHR DN TO
(E)CH-501
TO/FROM HWH
STATION
PROVIDE DURA-BLOK SUPPORTS
OR APPROVED EQUAL PER
SPECIFICATIONS (TYP)
PROVIDE DURA-BLOK SUPPORTS
OR APPROVED EQUAL PER
SPECIFICATIONS (TYP)
(E)3" HWR
(E)3" HWS
AREA OF WORK
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MD192
MECHANICAL
PIPING DEMOLITION PLAN
10TH FLOOR PENTHOUSE
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. ALL EXISTING PIPING AND EQUIPMENT TO REMAIN UNLESS OTHERWISE NOTED.
4. REPAIR ALL OPENINGS LEFT FROM THE REMOVAL OF DEMOLISHED PIPING. MATCH
EXISTING COLOR AND WALL CONSTRUCTION.
5. REFERENCE DETAILS FOR REQUIRED PIPING COMPONENTS AT COILS.
6. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-02 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
SCALE: 1/4" = 1'-0"1 PIPING DEMOLITION PLAN - 10TH FLOOR PENTHOUSE
SHEET KEYNOTES:
1. FURNISH AND INSTALL A TEMPORARY ROOFTOP AIR HANDLER TO SERVE THE
EXISTING DUCT SYSTEM DURING DEMOLITION AND REPLACEMENT OF (E)AC-02.
2. EF-02 SHALL REMAIN AND CONTINUE TO BE USED FOR GENERAL EXHAUST
DURING CONSTRUCTION OF AHU-02. EF-02 SHALL BE DEMOLISHED AND REMOVED
FOLLOWING CONSTRUCTION COMPLETION AND COMMISSIONING OF AHU-02.
3. TEMPORARY UNIT REQUIRES TEMPORARY PIPING: 4" CHILLED WATER (245 GPM),
2-1/2" MEDIUM PRESSURE STEAM (1400 LB/HR), 1-1/2" MEDIUM PRESSURE
RETURN.
4. STEAM COIL SHALL BE RAISED TO ALLOW 1-1/2" MPC TO DRAIN BACK BY
GRAVITY TO EXISTING 2" MPC.
5. DEMOLISH CLEAN STEAM GENERATOR, ASSOCIATED HEAT EXCHANGERS, BLOWDOWN
SEPARATOR, PIPING, CONTROLS, ETC. AND ALL ASSOCIATED APPURTENANCES.
6. HEAT TRACE CHILLED WATER PIPING AND CONDENSATE RETURN AT 8 W/FT.
7. REROUTE STORM DRAIN AS REQUIRED TO ALLOW FOR THE INSTALLATION OF
AHU-02.
R QST
PU
(E)54x24
(E)54x24
(E)EF-12
(E)28x22
(E)AC-12
(E)54x24
(E)34x12
(E)54x24
(E)28x22
(E )2 x
(E)SRV-3 ON ROOF
ABOVE TO REMAIN
(E)48x16
CONNECT NEW 48x24 OA
INTAKE DUCT TO (E)SRV-3
ON ROOF ABOVE
RELOCATED
ATC PANEL
22x22 EA UP THRU ROOF.
TERMINATE WITH GOOSENECK
3'-0" ABOVE ROOF.
(E )5 x
48x16
1-AHU-11
(E)AC-23
DROP
(E)SRV-3 ON ROOF
ABOVE TO REMAIN
CONNECT NEW 44x22 OA
INTAKE DUCT TO (E)SRV-2
ON ROOF ABOVE
54x24
(E)18x16
ON ROOF
32x16
(E)32x16
SD
1-EF-11
(E)26x8 DN
24x10 PRESSURE RELIEF DOOR
EQUAL TO RUSKIN PRD18
4800 CFM AT 6" W.G.
24x10 PRESSURE RELIEF DOOR
EQUAL TO RUSKIN NRD18
4800 CFM AT -3" W.G.
32x14 SUPPLY AIR DUCT
FROM AC-11 (BELOW)
48x24 OA INTAKE
DUCT FOR (E)AC-12
44x22 OA DUCT
UP WITH OFFSET
TO (E)SRV-2
(E)18x12 SS EXH.
DUCT UP & DN
DROP TO UNIT
CONNECTION
(E)EF-301 ON
ROOF ABOVE
EXISTING ELECTRICAL
EQUIPMENT
(E)AC-13
(E)RF-13
48x16
32x14
11-SF-1
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
AREA OF WORK
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MH151
MECHANICAL
DUCTWORK PLAN
5TH FLOOR M.E.R.
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. MAINTAIN EQUIPMENT CLEARANCES PER THE MANUFACUTURER'S RECOMMENDATIONS.
4. ADJUST EXISTING HANGERS AND SUPPORTS TO ALLOW INSTALLATION OF NEW
EQUIPMENT.
5. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-11, EF-11 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - 5TH FLOOR M.E.R.
U TV S
1-AHU-07
(E)42x38
(E)38x40
(E)HW STATION 201
(E)TEMPERATURE
CONTROL PANELS
(E)36x10
(E )3 x
(E)22x22
(E )2 x
(E)AHU-6
(E)36x10
(E)18x14
(E)24x12
24x12 SS
24x18 x
(E )3 x
(E)UH
SD
(N)54x36 OA INTAKE
LOUVER AND INSULATED
SHEET METAL PLENUM
(D)AC-42
CONNECT NEW 24x12 SS DUCT TO
(E)24x12 SUPPLY DUCT SERVING
ANGIOGRAPHY ON THE 3RD FLOOR
24x10 PRESSURE
RELIEF DOOR EQUAL
TO RUSKIN PRD18
2900 CFM AT 3" W.G.
22x22 EXHAUST
DUCT UP
(E)22x22 UP & DN
(E)24x12 SA DUCT DN
(E)24x20 SUPPLY
DUCT DN
(E)24x16 EXHAUST
DUCT UP & DN
07-SF-1
U TV S
(E)42x38
20x20 EXHAUST DUCT UP THROUGH
EXISTING ROOF OPENING. TERMINATE
EXHAUST DUCT WITH GOOSENECK MINIMUM
3 FT ABOVE ROOF WITH SEISMIC BRACING.
(E)AC-05
(E)38x38
(E)38x40
1-EF-07
(E)EF-06
(E )5 x
(E)50x36
(E)18x18
(E)16"ø
(E )1 ø
(E)18x18
22x22 EXHAUST
DUCT DN
24x16
CONNECT NEW 24x16
EXHAUST DUCT TO
EXISTING 24x16 UP FROM
ANGIOGRAPHY ON 3RD
FLOOR
24x10 PRESSURE RELIEF DOOR
EQUAL TO RUSKIN NRD18
2900 CFM AT -3" W.G.
DROP
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
AREA
OF WORK
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MH181
MECHANICAL
DUCTWORK PLANS
8TH & 9TH FLOORS
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - 8TH FLOOR
SCALE: 1/4" = 1'-0"2 DUCTWORK PLAN - 9TH FLOOR
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. MAINTAIN EQUIPMENT CLEARANCES PER THE MANUFACUTURER'S RECOMMENDATIONS.
4. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-07, EF-07 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
SHEET KEYNOTES:
1. UPON COMPLETION OF THE INSTALLATION AND COMMISSIONING OF NEW
AHU-07/EF-07, (E)AC-42/EF-42 AND ALL ASSOCIATED DUCTWORK, PIPING,
HEATING AND ENERGY RECOVERY EQUIPMENT, CONTROLS, AND APPURTENANCES
SHALL BE DEMOLISHED.
JKL IM
1-AHU-02
(E)24x18
(E)30x20
(E)26x18
(E)26x16
(E)26x16
(E )1 x 6 (E )3 x
(E)36x30
(E)24x18
(E )2 x
(E )3 x
(E)36x30
(E)28x18
(E)36x30 (E)32x30
(E )3 x
(E )4 x
(E )3 x
(E )3 x
(E)26x18
(E )2 x
(E)36x30
(E)26x18 DN
(E)26x16 DN
(E)32x30 SUPPLY
ABOVE,
(E)36x30 SMOKE
VENT BELOW
(E)32x30 DOWN
(E)20x20 OED(N)16x16 ON ROOF TO
(E)SOLAR COLLECTOR
(E) OA INTAKE LOUVER 36x36 EXHAUST DUCT UP THROUGH A
CURB TO THE ROOF. TERMINATE EXHAUST
DUCT WITH GOOSENECK MINIMUM 3 FT
ABOVE ROOF WITH SEISMIC BRACING.
16x16 x
NEW LOCATION OF
RELOCATED UNIT HEATER
CELL TOWER
ROOF
34x34
SD
18x18 PRESSURE RELIEF DOOR
EQUAL TO RUSKIN NRD18
15000 CFM AT -4" W.G.
18x18 PRESSURE RELIEF DOOR
EQUAL TO RUSKIN PRD18
13000 CFM AT 6" W.G.
x
FC
(E)FLOOR HATCH
DROP AND CONNECT INTO
(E)SOLAR COLLECTOR
CONNECT NEW OA INTAKE DUCT TO EXISTING
OA INTAKE LOUVER. CAULK AND SEAL DUCT
CONNECTION TO LOUVER AIR TIGHT.
(E) SOLAR COLLECTOR
SD
LOW-LEAK ISOLATION
DAMPER EQUAL TO RUSKIN
SD-50 ALUMINUM SMOKE
DAMPER
02-SF-1,2
(E)40x32 EXHAUST DUCT
DN WITH TRANSITION TO
(E)36x32 IN VERTICAL
(E)F/S DAMPER FS48A
(E)F/S DAMPER FS48B
(E)40x32
CONNECT NEW 75x28 DUCT TO
TWO (E)36x30 SMOKE VENT DUCTS.
CONNECT NEW 75x28 DUCT
TO EXISTING EXTERIOR WALL
SMOKE VENT LOUVER
75x28 DROP AS CLOSE TO THE
WALL AS POSSIBLE AND CONNECT
TO EXISTING SMOKE VENT LOUVER.
75x28
AREA OF WORK
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MH191
MECHANICAL
DUCTWORK PLAN
10TH FLOOR PENTHOUSE
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. MAINTAIN EQUIPMENT CLEARANCES PER THE MANUFACUTURER'S RECOMMENDATIONS.
4. CONTRACTOR TO REPAIR WALLS, FLOORS AND PARTITIONS DUE TO THE REMOVAL
OF DEMOLISHED EQUIPMENT TO MATCH EXISTING CONDITIONS.
5. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-02 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
SCALE: 1/4" = 1'-0"1 DUCTWORK PLAN - 10TH FLOOR PENTHOUSE
SHEET KEYNOTES:
1. 16x16 ENERGY RECOVERY DUCT UP TO ROOF ABOVE. ROUTE NEW ENERGY
RECOVERY DUCT FROM THE MECHANICAL ROOM THROUGH A CURB TO THE SOLAR
COLLECTOR ON THE ROOF AND CONNECT. DUCT ABOVE THE ROOF SHALL BE
MADE WEATHER TIGHT AND COORDINATED WITH EXISTING CONDITIONS ABOVE.
SUPPORT DUCT PER SPEC AND SMACNA RECOMMENDATIONS.
R QST
PU
(E)6"HWS
(E)6"HWR
(E)4"HWR(E)4"HWS
(E)6"HWS
(E)6"HWR
(E)8"HPS
(E)2 1/2"CHR
(E)2 1/2"CHS
(E)6"HWS
(E)6"HWR
(E )8 H P S
(E)4"HWR
(E)4"HWS
(E)6"CHR
(E)6"CHS
(E )6 H W R
(E )6 H W S
(E)HWS-301
(E)AC-12
(E)EF-12
(E)4"MPS
(E )6 H W S
(E )6 H W R
(E)5"HWR
(E)2 1/2"CHS
(E)2 1/2"CHR
(E )8 H W R
(E)4"HWS
(E)6"HWS
(E)6"HW
(E)2 1/2"CHS
(E)4"CHS
(E)2 1/2"CHR
(E)2 1/2"CHS
(E)6"NG
(E)2"CD
(E)4"MPS
(E)2"HWR
(E)2"GRR
(E)8"HWR
(E)HX-13
(E)2"GHR
(E)2"GHR
(E)2"HWR
(E)2"HWR
(E)2"GHS
(E)2"GHR
(E)2"GHR
(E)2"GRR
(E)2 1/2"CHR
(E)2 1/2"CHS
(E)2 1/2"CHS
(E)2 1/2"CHR
(E)2 1/2"CHS
(E)2"GHS
(E)2"CLN ST
(E)5"CHR
(E)4"CHS
(E)2"GHR
(E)2"GHS
(E)4"HWR
(E)2 1/2"CHS
(E )6 H W S
(E)HX-11
(E)PUMP
(E)HX-12
11-C-1
11-P-1A 1 1/2" CLN ST
1" MPR
(E)HX
1-EF-11
11-P-2A
1" CLN ST1 1/2" CLN ST
2 1/2" GRS
2 1/2" GRR
2 1/2" GHS
2 1/2" GHR
3" CHR
3" CHS
3" GHS
3" GHR
3/4" CD TO
FLOOR DRAIN
1 1/2" MPS
1" MPR
2 1/2" GRS
2 1/2" GRR
1" MPR
11-P-1B
11-P-2B
(BELOW)
(E)1 1/2"CLN ST
1-AHU-11
(E)AC-23
(E)AC-13
(E)RF-13
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
AREA OF WORK
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MP151
MECHANICAL
PIPING PLAN
5TH FLOOR M.E.R.
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. MAINTAIN EQUIPMENT CLEARANCES PER THE MANUFACUTURER'S RECOMMENDATIONS.
4. ADJUST EXISTING HANGERS AND SUPPORTS TO ALLOW INSTALLATION OF NEW
EQUIPMENT.
5. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-11, EF-11 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
SCALE: 1/4" = 1'-0"1 PIPING PLAN - 5TH FLOOR M.E.R.
SHEET KEYNOTES:
1. CONNECT NEW 1" MPR TO (E) 1 1/4" MPR DOWN THRU FLOOR.
JKL IM
(E)PRV-501
(E)2" HWR
(E)4" CHR
(E)4" HPS
(E)2" MPR
(E)2" MPR
(E)4" CHS
(E)4" CHR
(E)2" HWR
(E)2" HWS
(E)4" DHW
(E)4" DHW
(E)2" GHR
(E)HX-02
4" ST
(E)4" DHW
(E)4" DHW
(E)2" MPR
(E)4" CHS
(E)4" CHR
(E )4
H P S
(E)2" HWS
(E)4" MPS
(E)4" CHS
1-AHU-02
(E)6" HWS
(E)6" HWR
(E)3" DHW
(E)2" GHS
(E)VACUUM PUMP
NEW LOCATION OF
RELOCATED UNIT HEATER
(E)4" DHW DN
(E)6" HWS DN
(E)6" HWR DN
(E)5" ST UP & DN (E)2" MPR
(E)3" DHW
(E)5" CHR ABOVE,
(E)3" HWR BELOW
(E)5" CHS ABOVE,
(E)3" HWS BELOW
(E)5" MPS
2" GHS
2" GHS
2" GHR
2" GHS
1" MPS
4" ST
1" MPR
6" HWS
6" HWR
1" HWS
1" HWR
3" MPS 02-C-1
4" CHS
4" CHR
4" DHW
4" DHW
2" GHS
2" GHR
1" MPS
1" MPR
1" HWS
1" HWR
(E)HWH
STATION
(E)CH STATION
CH-501
(E)HWH STATION
(E)4" MPS TO
(E)HWH STATIONS
TO/FROM HWH
STATION
4" CHS DN TO
(E)CH-501
4" CHR DN TO
(E)CH-501
3" HWS
3" HWR
02-P-1A
02-P-1B
AREA OF WORK
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONALENGINEER.
BID DOCUMENTS
FULLY SPRINKLERED
REPLACEMENT OF
AHU 2, 7, 11
SYRACUSE VAMC, SYRACUSE, NY
528A7-18-725
2021-10-13 o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
JS HR
MP191
MECHANICAL
PIPING PLAN
10TH FLOOR PENTHOUSE
SCALE: 1/4" = 1'-0"1 PIPING PLAN - 10TH FLOOR PENTHOUSE
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL ABBREVIATIONS, NOTES & SYMBOLS.
2. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,
CONDITIONS, DIMENSIONS, ETC. AT THE PROJECT SITE.
3. MAINTAIN EQUIPMENT CLEARANCES PER THE MANUFACUTURER'S RECOMMENDATIONS.
4. DETERMINE ALL CLEARANCE AND SPACE REQUIREMENTS FOR INSTALLATION OF NEW
AHU-02 AND ASSOCIATED UTILITIES PRIOR TO COMMENCING WITH WORK.
RELOCATE ANY AND ALL OBSTRUCTIONS WHERE NECESSARY.
SHEET KEYNOTES:
1. CONNECT NEW 1" HWS&R TO EXISTING 2" HWS&R. EXTEND AND CONNECT TO
RELOCATED UNIT HEATER.
2. CONNECT NEW 3" MPS TO EXISTING 4" MPS. EXTEND AND CONNECT TO NEW
CONVERTER.
3. CONNECT NEW 1" MPR TO EXISTING.
4. CONNECT NEW 4" CHWS&R TO EXISTING. EXTEND AND CONNECT TO NEW AHU-2.
5. 1" MPS DROP AND CONNECT TO HUMIDIFIER.
6. EXTEND NEW 3" HWS&R AND CONNECT TO (E)HX-2 AS SHOWN.
7. REROUTED STORM DRAIN.
8. RECONNECT REROUTED PIPING TO EXISTING.
ELECTRICAL
ABBREVIATIONS & SYMBOLS
E-001
MJRMJR
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
NOTES
E-002
MJRMJR
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
ELECTRICAL
DEMOLITION PLAN
5TH FLOOR M.E.R.
ED151
MJRMJR
B924
SHAFT 2
B923
PODIATRY
195 SF
B920
NCM ORTHO
126 SF
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
ELECTRICAL
DEMOLITION PLANS
8TH & 9TH FLOORS
ED181
L J I
MECHANICAL
PENTHOUSE
BD-501
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
ELECTRICAL
DEMOLITION PLAN
10TH FLOOR PENTHOUSE
ED191
I.9
K
K
K
STAIR 1
SHAFT 5
SHAFT 8
STAIR 3
LAUNDRY CHUTE
N
F
10"
JLM
IJLM
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
ELECTRICAL
CONDUIT ROUTING PLAN
SUB BASEMENT & BASEMENT
E-101
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
ELECTRICAL
NEW WORK PLAN
5TH FLOOR M.E.R.
E-151
B924
SHAFT 2
B923
PODIATRY
195 SF
B920
NCM ORTHO
126 SF
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
ELECTRICAL
NEW WORK PLANS
8TH & 9TH FLOORS
E-181
L J I
MECHANICAL
PENTHOUSE
BD-501
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0128
ELECTRICAL
NEW WORK PLAN
10TH FLOOR PENTHOUSE
E-191
SCHEDULES AND SINGLE
LINE DIAGRAM
E-701
MJRMJR
REPLACEMENT OF
AHU 2, 7, 11
528A7-18-725
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Revisions Date
Reviewed:
Reviewed:
Drawing Title Project Title
Location
Building Number Checked
Project No.
DRAWING NO.
Drawn
Date
Approved: Project Director
Reviewed: Facility Director
Reviewed: Facility Manager
BID DOCUMENTS
FULLY SPRINKLERED
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE WHATSOEVER
WITHOUT THE SEAL AND SIGNATURE OF THE PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
| 0_General |
| GI001 |
| GI002 |
| 2_Structural |
| S-001 |
| S-001 |
| S-001 |
| SD151 |
| SD151 |
| SD151 |
| SD181 |
| SD181 |
| SD181 |
| SD191 |
| SD191 |
| SD191 |
| SF151 |
| SF151 |
| SF151 |
| SF181 |
| SF181 |
| SF181 |
| SF191 |
| SF191 |
| SF191 |
| S-501 |
| S-501 |
| S-501 |
| S-502 |
| S-502 |
| S-502 |
| 4_Fire Protection |
| FX101 |
| 6_Mechanical |
| M-001 |
| MD151 |
| MD152 |
| MD181 |
| MD182 |
| MD191 |
| MD192 |
| M-161 |
| MH151 |
| MH181 |
| MH191 |
| MP151 |
| MP181 |
| MP191 |
| M-501 |
| M-502 |
| M-503 |
| M-601 |
| M-602 |
| M-603 |
| M-701 |
| M-801 |
| M-802 |
| M-803 |
| M-804 |
| M-805 |
| M-806 |
| 7_Electrical |
| E-001 |
| E-001 |
| E-001 |
| E-002 |
| E-002 |
| E-002 |
| ED151 |
| ED151 |
| ED151 |
| ED181 |
| ED181 |
| ED181 |
| ED191 |
| ED191 |
| ED191 |
| E-101 |
| E-101 |
| E-101 |
| E-151 |
| E-151 |
| E-151 |
| E-181 |
| E-181 |
| E-181 |
| E-191 |
| E-191 |
| E-191 |
| E-701 |
| E-701 |
| E-701 |
File details come from the government source that posted it. Updated .