This is a set of engineering drawings and specifications for an addendum to VA project #528A7-18-725 at the Syracuse VA Medical Center in New York, involving the relocation of chilled water station CWS-201 and installation of redundant infection control exhaust fans. The drawings detail mechanical, electrical and structural modifications required to relocate CWS-201 within Shaft 2 on the 8th floor and install new duplex exhaust fans EF-77, EF-78 and EF-79 on the roofs of Shafts 1, 2 and 4 respectively.
The plans include demolition details, new work plans, equipment specifications, control sequences, and structural support details for the relocated equipment. Key components include new galvanized steel support frames for the exhaust fans, reconnection of chilled water piping and electrical services for CWS-201, and installation of new variable frequency drives and controls for the exhaust fans. The drawings provide comprehensive mechanical, electrical and structural details necessary for construction, including dimensions, materials, mounting details, and control requirements. All work must comply with VA standards, building codes, and maintain operation of adjacent hospital systems during construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24225B0001 0003.docx | DOCX document | |
| 36C24225B0001 0002.docx | DOCX document | |
| 528A7-18-725 Additional Addendum Specifications.pdf | ||
| 013200 Construction Documentation.docx | DOCX document | |
| 36C24225B0001 0001.docx | DOCX document | |
| 013200 Construction Documentation- autodesk build.pdf | ||
| Syracuse VAMC_Replace AHU 2 7 11 - Bid Drawings.pdf | ||
| 36C24225B0001_1.docx | DOCX document | |
| REVISED Syracuse VAMC_Replace AHU 2 7 11 - Bid Specifications.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf | ||
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWINGS INDEX
SHEET NO. DRAWING TITLE
GENERAL
1. GI-001 COVER SHEET
MECHANICAL
2. MG-001 MECHANICAL ABBREVIATIONS, SYMBOLS & NOTES
3. MD-101 MECHANICAL PIPING DEMOLITION PLAN CWS-201 RELOCATION
4. M-101 MECHANICAL PIPING NEW WORK PLAN CWS-201 RELOCATION
5. M-102 MECHANICAL DUCTWORK & EXHAUST FANS EF-77 & EF-79 PLANS
6. M-103 MECHANICAL DUCTWORK & EXHAUST FAN EF-78 PLANS
7. MG-501 MECHANICAL PIPING DETAILS
8. MG-601 MECHANICAL EQUIPMENT & DUCTWORK DETAILS
9. MI-701 SEQUENCE OF OPERATION & CONTROLS POINTS
STRUCTURAL
10. SG-001 ARCHITECTURAL-STRUCTURAL ABBREVIATIONS, SYMBOLS AND LEGENDS
11. S-101 STRUCTURAL PLANS
12. S-102 STRUCTURAL DETAILS
ELECTRICAL
13. EG-001 ELECTRICAL ABBREVIATIONS, SYMBOLS & NOTES
14. E-101 ELECTRICAL POWER PLAN - CWS-201 RELOCATION
15. E-102 ELECTRICAL POWER PLANS - EXHAUST FANS EF-77 & EF-79
16. E-103 ELECTRICAL POWER PLANS - EXHAUST FAN EF-78
17. EG-501 ELECTRICAL DETAILS
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A7-18-725
VA MEDICAL CENTER
BUILDING NO. 1
800 IRVING AVENUE
SYRACUSE, NEW YORK 13210
SYRACUSE VAMC
REPLACE AHU 02, 07, 11
ADDENDUM:
· RELOCATE CWS-201
· INSTALL REDUNDANT
INFECTION CONTROL EXHAUST
LOCATION
OF WORK
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/03/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-18-725REPLACE AHU 02, 07, 11
ADDENDUM: CHILLED WATER
CWS-201 & EXHAUST FANS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-7
R ep lac e A
HU
, 0 7, \In fec tio n C on tro l E xh au st Fa ns \D ra wi ng s\C
AD
\08
_M ec ha nic al\
8A 7-
-7
-M
EC
H-
CH
W
-A
DD
EN
DU
M.
dw g
DWG. OF 17
GI-001
KW / JDEG
COVER SHEET
N
N
LOCATION
OF WORK
SHAFT 1 SHAFT 2
SHAFT 3
SHAFT 4
SCI
SHAFT 5
CHILLER BLDG
BLDG 2
BLDG 19 - GARAGE
D-WING
A-WING B-WING
C-WING
BLDG 16
LOCATION PLAN
SCALE: NONE1
KEY PLAN
SCALE: NONE2
GENERAL PIPING SYMBOLS
@ AT
℄ CENTERLINE
° DEGREES
Δ DELTA
ɸ ELECTRICAL PHASE
∅ ROUND / DIAMETER
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
AW AIR WASHER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CO CLEAN OUT
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONDENSATE PUMP
CR CEILING REGISTER
CRAC COMPUTER ROOM AIR CONDITIONING
UNIT
CU CONDENSING UNIT
CW COLD WATER (POTABLE)
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DOM DOMESTIC
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DPV DIFFERENTIAL PRESSURE VALVE
DSS DUCTLESS SPLIT-SYSTEM (EVAPORATOR)
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
EJ EXPANSION JOINT
ENT ENTERING
ER EXHAUST REGISTER
(ER) EXISTING TO REMAIN
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
(E) EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLON(S)
GF/CI GOVERNMENT FURNISHED/CONTRACTOR
INSTALLED
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRR GLYCOL-WATER RUN AROUND RETURN
GRS GLYCOL-WATER RUN AROUND SUPPLY
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J (INTENTIONALLY LEFT BLANK)
KPA KILOPASCAL
KW KILOWATT
L/S LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN
(CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MIN MINIMUM
MM MILLIMETER
MOD MOTOR OPERATED DAMPER
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
(N) NEW
NA NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PG PRESSURE GAGE
PHC PREHEAT COIL
PPG POLYPROPYLENE GLYCOL
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSV PRESSURE SAFETY VALVE
REL RELOCATE / RELOCATED
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RCP RADIANT CEILING PANEL
REA RELIEF AIR
RF RETURN FAN
RG RETURN AIR GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATOR DEVICE
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
SVS STEAM VENT SILENCER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP TYPICAL
UC or U/C UNDER CUT
UL UNDERWRITERS LABORATORY
V VALVE
VAMC SYRACUSE VA MEDICAL CENTER
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
W WATTS
WB WET-BULB (TEMPERATURE)
WC WATER COOLED
WCACU WATER-COOLED COMP RM A/C
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOW METER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WHA WATER HAMMER ARRESTOR
GENERAL NOTES AND CONDITIONS
1. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE AVAILABLE
BUILDING DRAWINGS, ARCHITECTURAL BACKGROUNDS PROVIDED AND FIELD SURVEY
INFORMATION COMPILED BY THE VA ENGINEERING DESIGN TEAM FOR THE PURPOSE OF
ENGINEERING DESIGN. EXISTING CONDITIONS ARE SHOWN AS ACCURATELY AS
POSSIBLE. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS
EXISTING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS,
SIZES AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE
ENGINEER PRIOR TO BEGINNING INSTALLATION OR FABRICATION WORK.
1.1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE PLANS AND
SPECIFICATIONS, AS WELL AS ALL RELATED PROJECT PLANS AND SPECIFICATIONS
FROM OTHER DISCIPLINES, TO BECOME FAMILIAR WITH THE FULL PROJECT SCOPE
AND COORDINATED RESPONSIBILITIES.
1.2. SHOULD IT APPEAR THAT THE WORK INTENDED TO BE DESCRIBED OR RELATED
WORK ARE NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THE DRAWINGS, OR IN
THE SPECIFICATIONS, CONSULT THE COR FOR NECESSARY CLARIFICATIONS, AND
CONFORM TO THOSE CLARIFICATIONS INSOFAR AS THEY ARE CONSISTENT WITH
THE ORIGINAL DRAWINGS AND SPECIFICATIONS. IN NO CASE SHALL WORK
PROCEED IN UNCERTAINTY.
1.3. EQUIPMENT ARRANGEMENTS ARE DESIGNED TO SHOW PREFERRED
CONFIGURATIONS TO SUIT KNOWN CONDITIONS. ACTUAL INSTALLATION BY
CONTRACTOR MAY BE ALTERED AS REQUIRED TO SUIT FIELD CONDITIONS
ENCOUNTERED DURING CONSTRUCTION WITHOUT COMPROMISING THE INTENT OF
THE ORIGINAL DESIGN. COORDINATE ANY MODIFICATIONS WITH THE COR PRIOR
TO STARTING WORK IN AREAS AFFECTED.
1.4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
AT SITE PRIOR TO STARTING WORK.
1.5. DO NOT SCALE DRAWINGS.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND
REGULATIONS, INCLUDING THOSE WHICH MAY BE ISSUED BY THE OWNER, ARE BEING
OBSERVED, PARTICULARLY WORKPLACE SAFETY AND THE CONDUCT OF ALL THOSE
EMPLOYED DIRECTLY AND INDIRECTLY ON THE PREMISES, AND THE OWNER'S
EMPLOYEES WHO MAY BE IMPACTED OR AFFECTED BY CONSTRUCTION ACTIVITIES. THE
CONTRACTOR WILL INSTALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE
WARNING AND PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE
COORDINATED WITH THE OWNER AND HIS ONGOING OPERATIONS AND WILL PROMPTLY
BE REVISED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.
2.1. DURING PERFORMANCE OF WORK, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVISION AND MAINTENANCE OF WARNING SIGNS, LIGHT SIGNAL DEVICES,
GUARD LIGHTS, BARRICADES, GUARD RAILS, FENCES AND OTHER DEVICES,
APPROPRIATELY LOCATED ON AND AROUND THE JOB SITE WHICH GIVE PROPER
AND UNDERSTANDABLE WARNING TO PERSONS WITH REGARD TO HAZARDOUS
CONDITIONS, EQUIPMENT AND OPERATIONS BEING PERFORMED IN CONJUNCTION
WITH THE WORK.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH OTHER TRADES FOR
ITEMS IN THEIR SCOPE OF WORK WHICH COULD REQUIRE ADDITIONAL
MECHANICAL/PLUMBING WORK, AND ITEMS THAT ARE NOT INDICATED ON THE
DRAWINGS.
4. THIS INSTALLATION WILL CONFORM TO ALL CODES AND THE REQUIREMENTS OF
FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES HAVING JURISDICTION. IN
PARTICULAR, THE WORK WILL BE IN ACCORDANCE WITH THE CURRENT ADOPTED
EDITION OF THE NEW YORK STATE UNIFORM FIRE PROTECTION AND BUILDING CODE
AND ALL OF ITS APPLICABLE SUBCODES AND AMENDMENTS.
5. ALL WORK WILL BE LAWFULLY EXECUTED IN A NEAT AND WORKMANLIKE MANNER AND
WILL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING CODES (ABOVE),
INDUSTRY STANDARDS, AND IN CONFORMANCE WITH THE MANUFACTURERS
RECOMMENDATIONS AND REQUIREMENTS.
6. WORK UNDER THIS CONTRACT SHALL CONSIST OF THE CONTRACTOR PROVIDING ALL
LABOR, MATERIALS, AND SERVICES, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT
REASONABLY IMPLIED. THIS SHALL INCLUDE CUTTING, PATCHING AND RESTORATION OF
EXISTING SURFACES DAMAGED DURING THE CONSTRUCTION. CONTRACTOR SHALL
ALSO PROVIDE ALL EQUIPMENT SHOWN OR SPECIFIED OR AN APPROVED EQUIVALENT.
SUBSTITUTED EQUIPMENT OR MATERIALS SHALL NOT BE INSTALLED UNTIL GIVEN
WRITTEN APPROVAL BY THE OWNER.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS INCURRED FOR NONCOMPLIANCE
WITH THESE CONTRACT DOCUMENTS. CONTRACTOR WILL NOT BE ALLOWED CHANGE
ORDERS FOR PROBLEMS ARISING FROM NEGLECT OF PROVISIONS INCLUDED IN THESE
CONDITIONS.
8. MAINTAIN ORDERLY HOUSEKEEPING DURING CONSTRUCTION, AND UPON SUBSTANTIAL
COMPLETION PERFORM FINAL CLEANUP. REMOVE CONSTRUCTION RUBBISH,
SCAFFOLDING, EQUIPMENT, TEMPORARY PROTECTION, TEMPORARY FIELD
STRUCTURES, AND OTHER MATERIALS OR EQUIPMENT THAT WAS REQUIRED IN
CONNECTION WITH THE CONSTRUCTION, BUT NOT A PERMANENT PART THEREOF.
9. THOSE PERFORMING WORK AS A CONTRACTOR MUST EXAMINE SUBSTRATES AND
CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY THE
CONTRACTOR IN WRITING, OF CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY
COMPLETION OF THE WORK. COMMENCEMENT OF WORK BY A TRADE ON A SURFACE OR
CONSTRUCTION SHALL IMPLY ACCEPTANCE OF SUCH SURFACE OR CONSTRUCTION. DO
NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED.
10. THE CONTRACTOR SHALL SECURE ALL PERMITS AND APPLICATIONS AND PAY ANY AND
ALL FEES AS REQUIRED. THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES AND
CERTIFICATES OF INSPECTION REQUIRED BY THE AUTHORITIES HAVING JURISDICTION.
DELIVER ALL PERMITS, CERTIFICATES AND APPROVALS TO THE OWNER AGENT PRIOR
TO FINAL ACCEPTANCE OF THE WORK. THE CONTRACTOR MUST FILE NECESSARY
DRAWINGS, PREPARE DOCUMENTS AND MAKE APPLICATIONS FOR EACH REQUIRED
PERMIT AND INSPECTION, PRIOR TO COMMENCING WORK TO AVOID DELAYS DURING
CONSTRUCTION.
11. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND MANUFACTURERS DATA SHEETS ON
ALL EQUIPMENT AND MATERIALS SPECIFIED ON DRAWINGS FOR APPROVAL BY OWNER.
THESE DRAWINGS OR SHEETS SHALL CONTAIN ALL NECESSARY DATA, I.E.,
MANUFACTURER, CATALOG NUMBER, SIZE, DIMENSIONS, CAPACITY, WIRING DETAILS
AND ALL OTHER ENGINEERING DATA AND DETAILS NECESSARY FOR COMPLETE CLARITY
AND INSTALLATION.
12. THE CONTRACTOR SHALL KEEP ONE SET OF THE LATEST ISSUE OF DRAWINGS WHICH
SHALL REFLECT THE ACTUAL INSTALLED CONDITIONS AND CONNECTIONS OF ALL
EQUIPMENT AND DEVICES. THE CONTRACTOR SHALL PROVIDE COPIES OF ALL
MAINTENANCE INFORMATION AND INSTRUCTIONS RECEIVED WITH EQUIPMENT AND
SYSTEMS. ALL "AS-BUILT" DRAWINGS AND MISCELLANEOUS INFORMATION SHALL BE
GIVEN TO THE OWNER AND ENGINEER AT COMPLETION OF WORK. THE CONTRACTOR
SHALL GUARANTEE ALL MATERIAL AND LABOR TO BE FREE FROM DEFECTS FOR A ONE
YEAR PERIOD FROM THE TIME OF OWNER ACCEPTANCE. ANY DEFECTS OCCURRING
DURING THIS PERIOD SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL
COST TO THE OWNER.
13. AS DIRECTED BY THE OWNER, ALL EXISTING EQUIPMENT AND MATERIAL IN USABLE
CONDITION THAT IS REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER, OR
HANDLED AS INSTRUCTED BY THE OWNER, BE DISPOSED OF BY THE CONTRACTOR. ALL
MATERIALS DEEMED FOR REMOVAL SHALL BE RECYCLED WHENEVER POSSIBLE, IN
ACCORDANCE WITH THE REQUIREMENTS SET FORTH WITHIN SPECIFICATION SECTION 01
74 19 (CONSTRUCTION WASTE MANAGEMENT).
14. CONTRACTOR IS TO PROVIDE ALL REQUIRED SCAFFOLDING, LADDERS, RIGGING,
HOISTING AND ALL OTHER EQUIPMENT REQUIRED FOR THE INSTALLATION OF THEIR
WORK.
15. ESTABLISH PASSAGE CLEARANCES REQUIRED TO DELIVER, INSTALL AND ERECT ALL
REQUIRE EQUIPMENT. IF STRUCTURES, EQUIPMENT AND SYSTEMS MUST BE ALTERED
TO PROVIDE PASSAGE OF EQUIPMENT, THE CONTRACTOR SHALL RESTORE
STRUCTURES, EQUIPMENT AND SYSTEMS TO THEIR ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE; INCLUDING REMOVING AND REPLACEMENT OF ALL CEILING
AS REQUIRED TO COMPLETE THE WORK.
HVAC NOTES AND CONDITIONS
1. ALL HVAC EQUIPMENT SHALL MEET THE REQUIREMENTS SET FORTH IN THE
ANSI/ASHRAE/IESNA STANDARD 90.1 ENTITLED "ENERGY STANDARDS FOR BUILDINGS
EXCEPT LOW-RISE RESIDENTIAL BUILDINGS".
2. ALL METALLIC DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE
WITH SMACNA STANDARD "HVAC DUCT CONSTRUCTION STANDARDS-METAL AND
FLEXIBLE" AND NFPA STANDARD 90A TITLED "INSTALLATION OF AIR CONDITIONING AND
VENTILATION SYSTEMS". ALL DUCTWORK SHALL BE DESIGNED AND CONSTRUCTED IN
ACCORDANCE WITH SMACNA 2 IN WG PRESSURE CLASS, SEAL CLASS A, UNLESS
OTHERWISE NOTED.
3. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS. CONTRACTOR SHALL INCREASE THE DUCT SIZE ACCORDINGLY TO
COMPENSATE FOR ACOUSTICAL DUCT LINING THICKNESS (UNLESS OTHERWISE NOTED).
CONTRACTOR MAY ADJUST DUCT SIZES ACCORDINGLY TO SUIT FIELD CONDITIONS AS
LONG AS THE DUCT FREE AREA AND STATIC PRESSURE DROP ARE EQUAL TO THE
PROJECT DOCUMENTS.
4. CONTRACTOR SHALL PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION,
ADJUSTMENT AND MAINTENANCE OF ALL FANS, VALVES, COILS AND MECHANICAL
EQUIPMENT.
5. ADEQUATELY SIZED ACCESS PANELS SHOULD BE PROVIDED ON BOTH SIDES OF THE
SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS,
COILS AND OTHER DEVICES LOCATED IN THE DUCTWORK WHICH REQUIRE INSPECTION
AND/OR MAINTENANCE.
6. CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCT WORK SYSTEMS
(SUPPLY, RETURN, VENTILATION AIR AND EXHAUST) CONNECTED TO ALL AIR HANDLING
UNITS, FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE EQUIPMENT
(UNLESS NOTED OTHERWISE).
7. ALL AIR HANDLING SYSTEMS SHALL BE DESIGNED AND INSTALLED WITH BALANCE
DAMPERS LOCATED IN THE MAIN SUPPLY, EXHAUST AND OUTSIDE AIR DUCTS FOR
PROPER BALANCING OF EACH SYSTEM, AND FOR EACH SUPPLY, RETURN, OR EXHAUST
GRILLE, UNLESS OTHERWISE NOTED.
8. DUCTWORK WILL INCLUDE ALL DUCTS, FITTINGS, TURNING VANES, DAMPERS, SUPPORTS,
AND ALL ACCESSORIES, SUBASSEMBLIES, AND PARTS INCORPORATED THEREIN OR
REQUIRED FOR THE INSTALLATION AND COMPLETION OF SYSTEMS. ALL SUPPLY,
RETURN, AND EXHAUST DUCT BRANCHES SHALL BE DESIGNED AND INSTALLED WITH
BALANCE DAMPERS.
9. UNLESS NOTED OTHERWISE, DUCTWORK SHALL BE CONSTRUCTED TO 2" WG LEAKAGE
CLASS AND SEAL CLASS SHALL BE CLASS A IN ACCORDANCE WITH THE STANDARDS
DESCRIBED IN SMACNA "DUCT CONNECTION STANDARDS METAL AND FLEXIBLE" AND
"SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL".
10. SMOOTH TURN RADIUS DUCTWORK OR TURNING VANES AND 45 DEGREE ENTRY OR
CONICAL DUCT BRANCH CONNECTIONS SHALL BE USED THROUGHOUT.
11. ALL DAMPER SHAFTING, RODS AND LINKAGE WILL HAVE CORROSION RESISTANT FINISH.
ALL VOLUME DAMPERS WILL MOVE FREELY THROUGH FULL TRAVEL WITHOUT BINDINGS
AFTER INSTALLATION OF INSULATION.
12. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
DUCTS, INCLUDING DIVING DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE
PROVIDED AT NO ADDITIONAL COST.
13. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, LIGHTING AND OTHER CEILING ITEMS AND MAKE MINOR DUCT
MODIFICATIONS TO SUIT.
14. INSTALL NEW THERMOSTATS FOR ALL NEW AND EXISTING ZONES UNLESS OTHERWISE
INDICATED.
15. CONTRACTOR SHALL PROPERLY SUPPORT & BRACE ALL DUCTWORK IN ACCORDANCE
WITH SMACNA STANDARDS FROM BUILDING STRUCTURE ONLY. DUCTWORK SUPPORT
MATERIALS, UNLESS OTHERWISE INDICATED, SUPPORTS, FASTENERS, ANCHORS,
STRAPS, TRIM AND ANGLES WILL GENERALLY BE THE SAME MATERIAL AS THE
DUCTWORK, HOT DIPPED GALVANIZED.
16. DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION WILL CONFORM TO
SMACNA STANDARDS AND THE MANUFACTURERS' INSTALLATION REQUIREMENTS WHERE
NOT OTHERWISE SPECIFIED, INDICATED OR REQUIRED.
17. ALL INTERIOR AND EXTERIOR WALL, CEILING AND ROOF OPENINGS AND DUCT AND PIPE
THROUGH WALL PENETRATIONS, FRAMING, SLEEVES, WEATHERPROOFING AND FIRE
SEALING SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED
OTHERWISE.
18. CONTRACTOR SHALL PROVIDE AND INSTALL ALL FIRE DAMPERS IN ACCORDANCE WITH UL
555 AND MANUFACTURER'S REQUIREMENTS WHERE DUCTS PENETRATE FIRE RATED
WALLS OR FLOORS. ALL FIRE DAMPERS SHALL BE UL LISTED AND LABELED CONSISTENT
WITH THE WALLS OR FLOORS THAT ARE PENETRATED. PROVIDE ACCESS DOORS SIZED
AND LOCATED TO FACILITATE TESTING AND RESETTING OF ALL FIRE DAMPERS.
19. INSULATE PER SPECIFICATION SECTION 23 07 11.
20. THE NEW DUCT SYSTEM IS TO BE CLEANED THOROUGHLY OF ALL DEBRIS BEFORE
INSTALLING INLET/OUTLET DEVICES.
21. CONTRACTOR SHALL TEST ADJUST & BALANCE THE COMPLETED SYSTEM. ALL
BALANCING WORK SHALL BE DONE UNDER THE DIRECT SUPERVISION OF AN AABC OR
NEBB-QUALIFIED SUPERVISOR WHO SHALL CERTIFY THE RESULTS.
22. TEST, ADJUST AND BALANCE WORK WILL DEMONSTRATE THAT ALL SYSTEMS OPERATE AS
THEY WERE INTENDED TO. UPON COMPLETION OF THE WORK A WRITTEN TEST AND
BALANCE REPORT WILL BE SUBMITTED TO THE OWNER. FORMS AND PROCEDURES
UTILIZED FOR THIS WORK WILL BE AS PROPOSED BY THE AABC OR OTHER NATIONALLY
RECOGNIZED ORGANIZATION ACCEPTABLE TO THE OWNER.
23. ALL DUCTWORK,PIPING AND EQUIPMENT SHOWN ON NEW WORK PLANS AND DETAILS
SHALL BE CONSIDERED AS NEW UNLESS IDENTIFIED AS EXISTING TO REMAIN.
24. ALL DUCTWORK WITHOUT EXCEPTION, AND ALL PIPING 0" AND LARGER SHALL BE SHOWN
IN DOUBLE LINE.
25. ALL DUCT TO BE CONSTRUCTED TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS,
METAL AND FLEXIBLE DUCT, THIRD EDITION - 2005.
26. ALL DUCTS SHALL BE SEALED PER SMACNA CLASS A REQUIREMENTS. ALL TRAVERSE
JOINTS, LONGITUDINAL SEAMS AND DUCT WALL PENETRATIONS SHALL BE SEALED.
27. ALL BRACING AND HANGING OF DUCT SHALL BE PER SMACNA CHAPTER #5.
PIPING NOTES
1. ALL PIPING MATERIALS AND COMPONENTS INCLUDING FITTINGS, PIPE, FLANGES,
VALVES, ETC. SHALL BE DESIGNED, FABRICATED AND INSTALLED PER
APPROPRIATE SECTIONS OF THE LATEST ANSI AND ASTM CODES AND STANDARDS
AND THE MATERIAL SPECIFICATIONS FOUND IN THE PROJECT DOCUMENTS.
2. CONTRACTOR TO INSTALL HIGH POINT VENTS AT ALL SYSTEM HIGH POINTS AND
LOW POINT DRAINS AT SYSTEM LOW POINTS. VENTS AND DRAINS ARE REQUIRED
TO FACILITATE SYSTEM DRAINING AND VENTING DURING TESTING AND START-UP.
3. SURFACES TO BE SOLDERED SHALL BE CLEANED BRIGHT. THE JOINTS SHALL BE
PROPERLY FLUXED AND MADE WITH APPROVED SOLDER. SOLDER JOINTS FOR
POTABLE WATER SHALL BE MADE WITH A SOLDER CONTAINING NOT MORE THAN
0.2 PERCENT LEAD.
4. UNIONS SHALL BE INSTALLED AT ALL EQUIPMENT. THE USE OF DIELECTRIC
UNIONS MUST BE INSTALLED IN AREAS WHERE JOINING OF DISSIMILAR METALS (ie
CARBON STEEL TO COPPER OR BRONZE, ETC.). THIS IS TO FACILITATE PIPING
REMOVAL AND REASSEMBLY FOR FUTURE MAINTENANCE WORK AND/OR PREVENT
GALVANIC CORROSION.
5. CONTRACTOR SHALL PROPERLY BRACE, ANCHOR, AND SUPPORT ALL PIPING,
VALVES ETC. UNLESS SHOWN OTHERWISE, ALL PIPE HANGERS AND SUPPORTS
SHALL BE DESIGNED, MANUFACTURED AND INSTALLED PER MSS SP-58, MSS SP-69
AND MSS SP-89.
6. ALL ABOVEGROUND PIPING SHALL BE INSULATED AND JACKETED AS NOTED IN THE
SPECIFICATIONS.
7. ALL PIPES THAT PASS THROUGH EXTERIOR WALLS SHALL BE SLEEVED AND MADE
WEATHER TIGHT.
8. ALL PIPING AND VALVES MUST BE PROPERLY IDENTIFIED AND LABELED PER ANSI
13.1, ENTITLED "SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS". ALL
VALVES MUST BE IDENTIFIED AND TAGGED WITH WEATHERPROOF TAGS.
9. ALL PIPES OR TUBING WHICH PASS THROUGH RATED AND NON-RATED WALLS,
FLOORS AND FOUNDATION WALLS, SHALL PASS THROUGH A SCHEDULE 40
CARBON STEEL PIPE SLEEVE. SLEEVES WHICH PASS THROUGH MASONRY SHALL
BE GALVANIZED COATED. ALL SLEEVES SHALL BE INSTALLED FLUSH ON BOTH
SIDES OF WALL PENETRATION.
NON-RATED WALL: THE SLEEVE SHALL BE SIZED TO ALLOW FREE PASSAGE OF
INSULATED AND NON-INSULATED PIPES AND TUBING.
RATED WALL: PIPES WHICH PASS THROUGH FIRE-RATED WALLS & FLOOR SHALL
USE THE APPROPRIATE CODE APPROVED, TESTED AND INSTALLATION METHOD
OF SEALING WHILE MAINTAINING THE INTEGRITY OF THE WALL'S FIRE RATING(S).
EXTENSION WALLS & FOUNDATION WALLS: PIPES WHICH PASS THROUGH
EXTENSION WALLS OR FOUNDATION WALLS SHALL BE SEALED AND MADE
WEATHER TIGHT.
10. INSULATE COLD AND HOT WATER PIPING WITH FIRE RETARDANT VAPOR BARRIER
JACKET. PIPE INSULATION SHALL BE SEALED WITH A FIRE RESISTIVE ADHESIVE.
SEE SPECIFICATIONS.
2 1
1/2 4
MECHANICAL ABBREVIATIONS DUCTWORK SYMBOLS
SYMBOL LIST SHOWN IS FOR GENERAL REFERENCE ONLY. THE PRESENCE OF A SYMBOL DOES NOT
IMPLY ITS USE ON THIS PROJECT. REFER TO THE DRAWINGS FOR SPECIFIC SYMBOLS USED.
(NOTE: NOT ALL ABBREVIATIONS MAY APPEAR ON DRAWINGS)
DRAWING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN); 18" PER FOOT
DIRECTION OF FLOW
PIPE ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING PIPING
ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAGE
FLOW ELEMENT
SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
MAKE-UP WATER
DRAIN LINE
VENT LINE
CHILLED GLYCOL-WATER RETURN
GLYCOL-WATER RUN AROUND SUPPLY
TUBE CLEANER WATER SUPPLY
CHEMICAL FEED
OVERFLOW
COMPRESSED AIR
COLD WATER (CITY WATER)
GLYCOL-WATER RUN AROUND RETURN
SOFTENED WATER
HOT WATER
REVERSE OSMOSIS
EXISTING DUCT OR EQUIPMENT TO BE REMOVED
GATE VALVE - THREADED / FLANGED
GLOBE VALVE - THREADED / FLANGED
GATE VALVE WITH 3 4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE &
HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND
QUICK COUPLE HOSE CONNECTION
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
PRESSURE REDUCING VALVE (PRV)
CONTROL VALVE (CV) - FLOAT-OPERATED
PLUG VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
CIRCUIT SETTER VALVE
WATER BALANCE DEVICE
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE
(WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OR AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOTION
FLEXIBLE CONNECTION, EQUIPMENT VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSION: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO REMOVE
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC
PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE
CLASS "(IN. OF WATER) WHICH WILL ACCOMMODATE
MAXIMUM OPERATING PRESSURE IN THE DUCT
SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT
UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL
APPEARS. A "N" SUPERSCRIPT INDICATED NEGATIVE
PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
STANDARD BRANCH SUPPLY OR RETURN,
NO SPLITTER (45° TAP)
SMOKE DAMPER
1 HR FIRE RATED BARRIER
2 HR FIRE RATED BARRIER
SMOKE BARRIER
AREA OF WORK / CONTRACT LIMIT
SMOKE DETECTOR - DUCT MOUNTED
KEY NOTE SYMBOL
MULTIPLE KEY NOTES APPLYING TO THE SAME ITEM
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION NUMBER
DRAWING NUMBER WHERE DRAWN
AHU THAT SERVES THE EQUIPMENT
EQUIPMENT ABBREVIATION (SUPPLY FAN "SF" SHOWN)
EQUIPMENT NUMBER
PIPING SYMBOLS
VALVE SYMBOLS
AUTOMATIC BALANCING CONTROL VALVE
TYPICAL DRAWING
BLOCK OR DETAIL TITLE
FC
10x8
VD
SUPPLY
RETURN45°
45°
R
D
UP
UP
UP DN
DN
DN
FLOW SWITCH HIGH
FLOW SWITCH LOW
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE) / TRANSMITTER - WALL MOUNT
TEMPERATURE TRANSMITTER
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
VARIABLE SPEED MOTOR CONTROLLER
HVAC CONTROL PANEL
LOCAL TEMPERATURE CONTROL PANEL
OCCUPANCY SENSOR
CARBON MONOXIDE TRANSMITTER
CARBON DIOXIDE TRANSMITTER
PRESSURE SWITCH LOW
PRESSURE SWITCH HIGH
TEMPERATURE SENSING ELEMENT FOR TRANSMITTING
TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER / OR
VALVE
CONTROLS SYMBOLS
MOTORIZED DAMPER
FIRE DAMPER
FIRE/SMOKE DAMPER
FIRE AND SMOKE DETECTOR
2x2 OR 2x4 RADIANT HEATING CEILING PANEL
PIPE CAP OR PLUG
HEATING / COOLING VALVE BOX ASSEMBLY
NOTE:
SYMBOL LIST SHOWN IS FOR GENERAL
REFERENCE ONLY. THE PRESENCE OF A
SYMBOL DOES NOT IMPLY ITS USE ON THIS
PROJECT. REFER TO THE DRAWINGS FOR
SPECIFIC SYMBOLS USED.
DUCT TERMINAL OUTLET INFO TAGDUCT SIZE
CFM TERMINAL TYPE MARK AND NUMBER
(SD-SUPPLY AIR DIFFUSER, RA-RETURN AIR DIFFUSER)
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/03/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-18-725REPLACE AHU 02, 07, 11
ADDENDUM: CHILLED WATER
CWS-201 & EXHAUST FANS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-7
R ep lac e A
HU
, 0 7, \In fec tio n C on tro l E xh au st Fa ns \D ra wi ng s\C
AD
\08
_M ec ha nic al\
8A 7-
-7
-M
EC
H-
CH
W
-A
DD
EN
DU
M.
dw g
DWG. OF 17
MG-001
KW / JDEG
MECHANICAL ABBREVIATIONS,
SYMBOLS & NOTES
FD
MD
SD
FSD
SD
SD
FSD
M
A M-101
1-SF-1
DRAWING TITLE
SCALE: NONE1
Rh M
T
TT
MT
PT
SPS
FT
PDT
PDS
HS
TSL
TSH
LC
LT
PSH
PSL
AT
OC
AT
CO
AT
CO2
FSH
FSL
HVAC
LTCP
VSMC
FE
AVAV
MV
FLEXIBLE HOSE CONNECTION
FLANGE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
EXISTING PIPE TO BE REMOVED
10"
SD1
M-501
CAP
2" GRS & R UP
AHU-07
AHU-06
2" HWS &
HWR
2" GHS &
GHR
4"
4"
2"
2" 4"
2"
2"
2"
HX-07
HX-201
2"
UT
HX-06
HWH
STATION
2"
CWS-201
6"
5"
2"
5"
5"
4"
B823B
SHAFT 2
4"3"
4"
3"
2"
22 GPM
2"
2"
3"
MECHANICAL PIPING DEMOLITION GENERAL NOTES:
1. REMOVE EVERYTHING WITHIN WORK AREA FOR CWS-201 ABOVE AHU-06 AS SHOWN
AND INDICATED; TO INCLUDE BUT NOT LIMITED TO: ELECTRICAL CONDUITS, PIPING,
HANGERS, INSULATION, VALVES AND CONTROLS. WORK SHALL BE PERFORMED
AFTER EXISTING AHU-42 HAS BEEN DEMOLISHED AND REPLACED.
2. ALL ABANDONED PIPING & CONDUITS IN THE WORK AREA SHALL BE REMOVED.
COORDINATE WITH VAMC COR PRIOR TO REMOVAL.
3. SCHEDULE AND COORDINATE CWS-201, CWS AND CWR SHUTDOWNS REQUIRED WITH
VAMC COR AT LEAST 48 HOURS IN ADVANCE. SHUTDOWNS SHALL NOT INTERFERE
WITH ANY FACILITY OPERATIONS. PROVIDE TEMPORARY SYSTEMS DURING
SHUTDOWNS AS REQUIRED.
4. PROVIDE NEW SUPPORTS FOR ANY MECHANICAL UTILITIES TO REMAIN THAT ARE
CURRENTLY SUPPORTED FROM THE EXISTING CEILING SUPPORT CHANNELS TO BE
REMOVED BY OTHERS. COORDINATE WITH VAMC COR.
MECHANICAL PIPING DEMOLITION KEYED NOTES:
DEMO EXISTING CWS-201 WITH ASSOCIATED PIPING AND COMPONENTS LOCATED
OVER AHU-06 AS SHOWN, PER DEMOLITION GENERAL NOTES.
ROTATE 5" CWS AND 5" CWR TEES SO THEY ARE POINTING TO THE SOUTH. INSTALL
TWO (2) NEW 5" SHUTOFF VALVES ON ROTATED TEES AND CAP, SEE M-101.
REMOVE EXISTING 5" CWS AND 5" CWR AS SHOWN AND TEMPORARILY CAP, SEE M-101.
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/03/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-18-725REPLACE AHU 02, 07, 11
ADDENDUM: CHILLED WATER
CWS-201 & EXHAUST FANS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-7
R ep lac e A
HU
, 0 7, \In fec tio n C on tro l E xh au st Fa ns \D ra wi ng s\C
AD
\08
_M ec ha nic al\
8A 7-
-7
-M
EC
H-
CH
W
-A
DD
EN
DU
M.
dw g
DWG. OF 17
MD-101
KW / JDEG
MECHANICAL PIPING DEMOLITION PLAN
CWS-201 RELOCATION
8TH FLOOR SHAFT 2 MECHANICAL PIPING DEMOLITION PLAN - CWS-201 RELOCATION
SCALE: 1/4" = 1'-0"1
N
CHILLED WATER PUMPING STATION
CWS-201 PIPING DEMOLITION DETAIL
SCALE: NONE2
T
C W
R
CWS
CWR
3- WAY FLOW
CONTROL
VALVE
BUTTERFLY
VALVE (TYP)
THERMOMETER
BALANCING
VALVE
BALL VALVE
(TYP)
SEDIMENT
FILTER
PRESSURE
GAUGE (TYP)
PET COCK
VALVE (TYP)
TEMP. SENSOR
BALL VALVE
(TYP)
C W
S
IN-LINE
CIRCULATOR
PUMP (TYP)
STRAINER
CHECK VALVE
(TYP)
NOTE: ALL WORK TO BE PERFORMED AFTER EXISTING AHU-42 HAS BEEN DEMOLISHED AND REPLACED.
TURN TEES 180°
(TO SOUTH);
VALVE & CAP
5"
5"
5" 5"
AutoCAD SHX Text H
CAP
2" GRS & R UP
AHU-07
AHU-06
2" HWS &
HWR
2" GHS &
GHR
4"
4"
2"
2" 4"
2"
2"
2"
HX-07
HX-201
2"
UT
HX-06
HWH
STATION
2"
6"
5"
2"
4"
B823B
SHAFT 2
4"3"
4"
3"
NEW
CWS-201
2"
22 GPM
2"
2"
3"
8TH FLOOR SHAFT 2 MECHANICAL PIPING NEW WORK PLAN- CWS-201 RELOCATION
SCALE: 1/4" = 1'-0"1
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/03/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-18-725REPLACE AHU 02, 07, 11
ADDENDUM: CHILLED WATER
CWS-201 & EXHAUST FANS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-7
R ep lac e A
HU
, 0 7, \In fec tio n C on tro l E xh au st Fa ns \D ra wi ng s\C
AD
\08
_M ec ha nic al\
8A 7-
-7
-M
EC
H-
CH
W
-A
DD
EN
DU
M.
dw g
DWG. OF 17
M-101
KW / JDEG
MECHANICAL PIPING NEW WORK PLAN
CWS-201 RELOCATION
N
MECHANICAL PIPING DRAWING GENERAL NOTES:
1. PROVIDE ALL CONTROL COMPONENTS, CONTROL WIRING, AND CONNECTIONS TO PROPERLY
INTERFACE WITH THE EXISTING JOHNSON CONTROLS META-SYS TEMPERATURE CONTROL
SYSTEM AND CONTROL OPERATING SYSTEMS. ALL NEW CONTROL COMPONENTS, CONTROL
VALVES, THERMOSTATS, SENSORS, ETC. SHALL BE ELECTRIC TYPE. COORDINATE WITH
VAMC OPERATIONS ECC.
2. MAINTAIN THE INTEGRITY OF ALL EXISTING EQUIPMENT AND SYSTEMS LOCATED OUTSIDE
THE WORK AREA AND INTERRUPTED BY THE RENOVATION WORK. PROVIDE ALL ADDITIONAL
PIPING, FITTINGS, DUCTWORK, ACCESSORIES, ETC. REQUIRED TO EXTEND AND RECONNECT
REMAINING EQUIPMENT AND SYSTEMS.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN ADVANCE.
SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS. PROVIDE
TEMPORARY SYSTEMS DURING SHUTDOWNS AS REQUIRED.
4. SYSTEMS INDICATED ON DRAWINGS SHALL BE INSTALLED AS SHOWN. ADJUSTMENT TO
LOCATIONS OF VARIOUS ITEMS MAY BE REQUIRED BY FIELD CONDITIONS. VERIFY AND
COORDINATE WITH COR PRIOR TO INSTALLATION.
5. PROVIDE SERVICE CLEARANCE FOR ALL HVAC EQUIPMENT AS RECOMMENDED BY
MANUFACTURER.
6. INSULATE ALL CHILLED WATER SUPPLY AND RETURN LINES PER SPECIFICATION 230711.
7. INSULATE ALL HOT WATER HEATING SUPPLY AND RETURN LINES PER SPECIFICATION 230711.
8. CONTRACTOR WILL HAVE THE OPTION OF PROVIDING SUPPLY AIR TERMINAL UNITS WITH AN
INTEGRAL HEATING COIL OR A SEPARATE TERMINAL UNIT AND HEATING COIL, IF FIELD
CONDITIONS DICTATE ONE OR THE OTHER. ALL SUBMITTALS AND SHOP DRAWINGS FOR
EITHER OPTION MUST PROVE THAT ORIGINAL DESIGN INTENT IS MET PER DRAWINGS,
SCHEDULES AND SPECIFICATIONS.
9. REUSE EXISTING PENETRATIONS THROUGH FIRE BARRIERS TO EXTENT POSSIBLE. WHERE
NEW PIPING WILL USE THE SAME FIRE BARRIER PENETRATION, TEMPORARILY SEAL WITH A 2
HOUR FIRE-RATED ASSEMBLY UNTIL NEW PIPING IS INSTALLED.
CONCRETE FLOOR METAL GRATE FLOOR
MECHANICAL PIPING DRAWING KEYED NOTES:
CONNECT NEW 5" CWS AND CWR PIPING TO EXISTING VALVED AND CAPPED PIPING
FROM DEMOLITION PHASE, SEE MD-101. RUN PIPING TO NEW LOCATION OF CWS-201
AS SHOWN. REFER TO 2/M-101 AND 3/M-101 FOR NEW CWS-201 PIPING AND CONTROLS.
CONNECT NEW 5" CWS AND CWR PIPING TO EXISTING CAPPED PIPING FROM
DEMOLITION PHASE, SEE MD-101. RUN PIPING TO NEW LOCATION OF CWS-201 AS
SHOWN. REFER TO 2/M-101 AND 3/M-101 FOR NEW CWS-201 PIPING AND CONTROLS.
NEW LOCATION OF CWS-201 ASSEMBLY. REFER TO 2/M-101 AND 3/M-101 FOR NEW
CWS-201 PIPING AND CONTROLS.
RELOCATED CHILLED WATER PUMPING
STATION CWS-201 PIPING DETAIL
SCALE: NONE2
CHILLED WATER CONTROL SCHEMATIC
SCALE: NONE3
CWS
CWR
T
T
TYPICAL DIFFERENTIAL
PRESSURE SENSOR
(INCHES OF WATER)
TYPICAL
TEMPERATURE
SENSOR (DEG F.)
CHILLED WATER
PUMPS
T
C W
R
CWS
CWR
3- WAY FLOW
CONTROL
VALVE
NEW BUTTERFLY
VALVE (TYP); SEE
MD-101, INSTALLED
DURING DEMO THERMOMETER
BALANCING
VALVE
BALL VALVE
(TYP)
SEDIMENT
FILTER
PRESSURE
GAUGE (TYP)
PET COCK
VALVE (TYP)
TEMP. SENSOR
BALL VALVE
(TYP)
C W
S
IN-LINE
CIRCULATOR
PUMP (TYP)
STRAINER
CHECK VALVE
(TYP)
TEES TURNED
180° (TO SOUTH)
DURING DEMO;
SEE MD-101
5"
5"
5" 5"
CHP-201A CHP-201B
TO DPV-201 AT BOTTOM
OF SHAFT 2
CHP-201A CHP-201B
CWS-201 NOTES:
1. FABRICATE AND ASSEMBLE CWS-201 AND HANGER MOUNT OR
SUPPORT FROM FLOOR APPROXIMATELY 5'-0" ABOVE FLOOR.
2. LOCATE CWS-201 IN APPROXIMATE CENTER OF AVAILABLE SPACE IN
SHAFT 2, 8TH FLOOR.
CWS-201 CONTROLS NOTES:
1. SUPPLY NEW (IDENTICAL TO EXISTING) 3-WAY VALVES, SENSORS AND
CONTROLS.
2. LOCATE EXISTING DPV-201 (DIFFERENTIAL PRESSURE VALVE) AND
REPLACE WITH NEW DPV.
3. REUSE EXISTING METASYS BMS CONTROL POINTS, GRAPHICS AND
CONTROLS FOR NEW CWS-201.
4. PROVIDE START-UP AND BALANCE OF NEW CWS-201.
AutoCAD SHX Text H
AutoCAD SHX Text P
P
(E) EF-101
(E) EF-77
EF-77 DUCT
PENETRATION
20"Ø
"Ø
(E) 20"Ø DUCT
NEW EF-77 SUPPORT FRAME;
INSTALL OVER EXIST. BUILDING
STEEL, SEE DWG S-101
1-1
1-4
1-5
1-2 1-3 1-6
(N) EF-77
EXIST. ROOF
FRAMING
BELOW ROOF
DECK (TYP-REF)
(E) EF-79
(E) EF-401
GUY WIRE
(TYP)
16"Ø
"Ø
EXIST. STEEL
FRAME (TYP)
(2) NEW W8x18 x14'-0" LG.;
FIELD VERIFY (TYP FOR 2)2-1
2-5
2-2 2-3
2-6
(N) EF-79
2-4
EF-79 DUCT
PENETRATION
EXIST. ROOF
FRAMING
BELOW ROOF
DECK (TYP-REF)
(E ) 2
0X
MECHANICAL DUCTWORK - EF-77 PLAN (SHAFT 1 ROOF)
SCALE: 1/4" = 1'-0"1
MECHANICAL DRAWING ROOF EXHAUST GENERAL NOTES:
1. PROVIDE ALL CONTROL COMPONENTS, CONTROL WIRING, AND CONNECTIONS TO PROPERLY
INTERFACE WITH THE EXISTING JOHNSON CONTROLS META-SYS TEMPERATURE CONTROL SYSTEM
AND CONTROL OPERATING SYSTEMS. ALL NEW CONTROL COMPONENTS, CONTROL VALVES,
THERMOSTATS, SENSORS, ETC. SHALL BE ELECTRIC TYPE. COORDINATE WITH VAMC OPERATIONS
ECC.
2. MAINTAIN THE INTEGRITY OF ALL EXISTING EQUIPMENT AND SYSTEMS LOCATED OUTSIDE THE
WORK AREA AND INTERRUPTED BY THE RENOVATION WORK. PROVIDE ALL ADDITIONAL PIPING,
FITTINGS, DUCTWORK, ACCESSORIES, ETC. REQUIRED TO EXTEND AND RECONNECT REMAINING
EQUIPMENT AND SYSTEMS.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN ADVANCE.
SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS. PROVIDE TEMPORARY
SYSTEMS DURING SHUTDOWNS AS REQUIRED.
4. SYSTEMS INDICATED ON DRAWINGS SHALL BE INSTALLED AS SHOWN. ADJUSTMENT TO LOCATIONS OF VARIOUS ITEMS MAY BE REQUIRED BY FIELD CONDITIONS. VERIFY AND COORDINATE WITH COR
PRIOR TO INSTALLATION.
5. PROVIDE SERVICE CLEARANCE FOR ALL HVAC EQUIPMENT AS RECOMMENDED BY MANUFACTURER.
6. REUSE EXISTING PENETRATIONS THROUGH FIRE BARRIERS TO EXTENT POSSIBLE. WHERE NEW PIPING WILL USE THE SAME FIRE BARRIER PENETRATION, TEMPORARILY SEAL WITH A 2 HOUR
FIRE-RATED ASSEMBLY UNTIL NEW PIPING IS INSTALLED.
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/03/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-18-725REPLACE AHU 02, 07, 11
ADDENDUM: CHILLED WATER
CWS-201 & EXHAUST FANS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-7
R ep lac e A
HU
, 0 7, \In fec tio n C on tro l E xh au st Fa ns \D ra wi ng s\C
AD
\08
_M ec ha nic al\
8A 7-
-7
-M
EC
H-
CH
W
-A
DD
EN
DU
M.
dw g
DWG. OF 17
M-102
KW / JDEG
MECHANICAL DUCTWORK &
EXHAUST FANS EF-77 & EF-79 PLANS
N MECHANICAL DUCTWORK - EF-79 PLAN (SHAFT 4 ROOF)
SCALE: 1/4" = 1'-0"2
N
1-1
MECHANICAL EF-77 KEYED NOTES:
FABRICATE STEEL SUPPORT FRAME PER DETAILS ON DRAWING S-101. INSTALL ON
EXISTING SHAFT 1 ROOF FRAMING STEEL.
INSTALL NEW DUPLEX FAN SYSTEM EF-77 ON NEW STEEL FRAME.
COMMISSION NEW EF-77 SYSTEM (START UP, BALANCING AND CONTROLS).
INSTALL NEW EF-77 DUCTWORK, DUCTWORK SUPPORTS AND CONTROLS.
DEMO EXISTING FAN EF-77 INCLUDING ALL ASSOCIATED DUCTWORK, CONTROLS
AND ELECTRICAL AFTER NEW EF-77 IS INSTALLED AND OPERATIONAL.
REPAIR EXISTING ROOF TO MATCH EXISTING ROOF.
2-1
MECHANICAL EF-79 KEYED NOTES:
INSTALL NEW W8x18 GALVANIZED BEAMS FOR FAN EF-79 SUPPORT ON EXISTING
STEEL FRAME AS SHOWN. FIELD WELD TO EXISTING FRAME. SEE DRAWING S-101.
INSTALL NEW DUPLEX FAN EF-79 ON NEW W8x18 FRAMING.
COMMISSION NEW EF-79 SYSTEM (START UP, BALANCING AND CONTROLS).
INSTALL NEW EF-79 DUCTWORK, DUCTWORK SUPPORTS AND CONTROLS.
DEMO EXISTING FAN EF-79 INCLUDING ALL ASSOCIATED DUCTWORK UP TO ROOF
PENETRATION AT NEW EF-79 TIE-IN, CONTROLS AND ELECTRICAL AFTER NEW
EF-79 IS INSTALLED AND OPERATIONAL.
REPAIR EXISTING ROOF TO MATCH EXISTING ROOF.
1-2
1-3
1-4
1-5
1-6
2-2
2-3
2-4
2-5
2-6
This is the drawing for USF-79
EF-77 and EF-78 will be about 6" LONGER and 4" WIDER than this skid.
That additional size is because of the USF-15 fans instead of USF-13 fans.
NEW DUPLEX FANS BASIS OF DESIGN INFORMATION
SCALE: 1/4" = 1'-0"3
FC
(E) EF-21C
(E) EF-201
(E) EF-21D
(E) EF-06T
(E) EF-42
(E) EF-78
(E) EF-30
(E) 16"Ø
TEMP 16"Ø
(E) 16"Ø
(E) 16"Ø
EXIST. ROOF
FRAMING
BELOW ROOF
DECK (TYP-REF)
(R) EF-78
RELOCATED
TEMP 16"Ø
1-1
1-1 1-2
1-3
EF-78 DUCT
PENETRATION
(E) EF-21C
(E) EF-201
(E) EF-21D
(E) EF-06T
(E) EF-42
(E) EF-30
(E) 16"Ø
(E) 16"Ø
EXIST. ROOF
FRAMING
BELOW ROOF
DECK (TYP-REF)
N
EW
6"
Ø
(N) EF-78
TEMP 16"Ø
2-2
NEW EF-78 SUPPORT FRAME;
INSTALL OVER EXIST. BUILDING
STEEL, SEE DWG S-101
2-1
EF-78 DUCT
PENETRATION
2-3 2-4
2-5
2-6
MECHANICAL DRAWING ROOF EXHAUST GENERAL NOTES:
1. PROVIDE ALL CONTROL COMPONENTS, CONTROL WIRING, AND CONNECTIONS TO PROPERLY
INTERFACE WITH THE EXISTING JOHNSON CONTROLS META-SYS TEMPERATURE CONTROL SYSTEM
AND CONTROL OPERATING SYSTEMS. ALL NEW CONTROL COMPONENTS, CONTROL VALVES,
THERMOSTATS, SENSORS, ETC. SHALL BE ELECTRIC TYPE. COORDINATE WITH VAMC OPERATIONS
ECC.
2. MAINTAIN THE INTEGRITY OF ALL EXISTING EQUIPMENT AND SYSTEMS LOCATED OUTSIDE THE
WORK AREA AND INTERRUPTED BY THE RENOVATION WORK. PROVIDE ALL ADDITIONAL PIPING,
FITTINGS, DUCTWORK, ACCESSORIES, ETC. REQUIRED TO EXTEND AND RECONNECT REMAINING
EQUIPMENT AND SYSTEMS.
3. SCHEDULE ALL SHUTDOWNS REQUIRED WITH VAMC COR AT LEAST 48 HOURS IN ADVANCE.
SHUTDOWNS SHALL NOT INTERFERE WITH ANY FACILITY OPERATIONS. PROVIDE TEMPORARY
SYSTEMS DURING SHUTDOWNS AS REQUIRED.
4. SYSTEMS INDICATED ON DRAWINGS SHALL BE INSTALLED AS SHOWN. ADJUSTMENT TO LOCATIONS OF VARIOUS ITEMS MAY BE REQUIRED BY FIELD CONDITIONS. VERIFY AND COORDINATE WITH COR
PRIOR TO INSTALLATION.
5. PROVIDE SERVICE CLEARANCE FOR ALL HVAC EQUIPMENT AS RECOMMENDED BY MANUFACTURER.
6. REUSE EXISTING PENETRATIONS THROUGH FIRE BARRIERS TO EXTENT POSSIBLE. WHERE NEW PIPING WILL USE THE SAME FIRE BARRIER PENETRATION, TEMPORARILY SEAL WITH A 2 HOUR
FIRE-RATED ASSEMBLY UNTIL NEW PIPING IS INSTALLED.
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/03/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-18-725REPLACE AHU 02, 07, 11
ADDENDUM: CHILLED WATER
CWS-201 & EXHAUST FANS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-7
R ep lac e A
HU
, 0 7, \In fec tio n C on tro l E xh au st Fa ns \D ra wi ng s\C
AD
\08
_M ec ha nic al\
8A 7-
-7
-M
EC
H-
CH
W
-A
DD
EN
DU
M.
dw g
DWG. OF 17
M-102
KW / JDEG
MECHANICAL DUCTWORK &
EXHAUST FAN EF-78 PLANS
MECHANICAL DUCTWORK - EF-78 TEMPORARY PLAN (SHAFT 2 ROOF)
SCALE: 1/4" = 1'-0"1
N
MECHANICAL DUCTWORK - EF-78 FINAL PLAN (SHAFT 2 ROOF)
SCALE: 1/4" = 1'-0"2
N
1-1
MECHANICAL EF-78 TEMPORARY PLAN KEYED NOTES:
REMOVE AND RELOCATE EXISTING FAN EF-78 TO NEW TEMPORARY LOCATION AS
SHOWN; INCLUDES DUCTWORK, DUCTWORK SUPPORTS, TEMPORARY CURB,
ROOFING, CONTROLS AND ELECTRICAL. EXISTING 12"Ø AUXILIARY DUCT WITH
DAMPER TO BE REMOVED AND CAPPED AT 16"Ø FAN INLET. REUSE EXISTING
MATERIALS TO EXTENT POSSIBLE. COORDINATE WITH VAMC COR.
RE-CONNECT TO EXISTING DUCTWORK AS SHOWN.
RE-COMMISSION RELOCATED FAN EF-78 FOR TEMPORARY USE DURING
INSTALLATION OF NEW FAN EF-78.
1-2
1-3
2-1
MECHANICAL EF-78 FINAL PLAN KEYED NOTES:
FABRICATE STEEL SUPPORT FRAME PER DETAILS ON DRAWING S-101. INSTALL ON
EXISTING SHAFT 2 ROOF FRAMING STEEL.
INSTALL NEW DUPLEX FAN SYSTEM EF-78 ON NEW STEEL FRAME.
COMMISSION NEW EF-78 SYSTEM (START UP, BALANCING AND CONTROLS).
INSTALL NEW EF-78 DUCTWORK, DUCTWORK SUPPORTS AND CONTROLS.
DEMO EXISTING/RELOCATED FAN EF-78 INCLUDING ALL ASSOCIATED DUCTWORK,
CONTROLS AND ELECTRICAL AFTER NEW EF-78 IS INSTALLED AND OPERATIONAL.
REPAIR EXISTING ROOF TO MATCH EXISTING ROOF.
2-2
2-3
2-4
2-5
2-6 on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
DRAWING NUMBER
BUILDING NUMBER
PROJECT NUMBER
REVISION DATE
SYRACUSE
VA MEDICAL
CENTER
ENGINEERING
DEPARTMENT
800 IRVING AVE. SYRACUSE, NY 13210
03/03/2023
GENERAL PROJECT INFORMATION
100% SPRINKLERED
U.S. Department of Veterans Affairs
B
A
C
D
E
F
528A7-18-725REPLACE AHU 02, 07, 11
ADDENDUM: CHILLED WATER
CWS-201 & EXHAUST FANS
S:
\S
YR
-M
S\
MS
-E ng ine er ing \P
RO
JE
CT
S\
AC
TI
VE
P
RO
JE
CT
S\
8A
7-
-7
R ep lac e A
HU
, 0 7, \In fec tio n C on tro l E xh au st Fa ns \D ra wi ng s\C
AD
\08
_M ec ha nic al\
8A 7-
-7
-M
EC
H-
CH
W
-A
DD
EN
DU
M.
dw g
DWG. OF 17
MG-501
KW / JDEG
MECHANICAL PIPING DETAILS
PIPE HANGERS
SCALE: NONE1
RATED WALL PENETRATION-INSULATED PIPE
SCALE: NONE2
PIPE RISER SUPPORT / ANCHOR
SCALE: NONE3
TYPICAL FLOOR PENETRATION DETAIL
SCALE: NONE4
PIPE OR DUCT PENETRATION
OF SMOKE / FIRE BARRIERS
SCALE: NONE6
PIPE / CONDUIT SHARED TRAPEZE RACK DETAIL
SCALE: NONE5
SECURING PIPE OR DUCTWORK HANGER
RODS FROM CONCRETE DECK DETAILS
SCALE: NONE10
TYPICAL PIPE OR DUCTWORK HANGER ROD
CLAMP TO BUILDING STEEL DETAILS
SCALE: NONE9
HORIZONTAL PIPE ANCHOR DETAIL
SCALE: NONE7
PIPE DRAIN INSTALLATION DETAIL
SCALE: NONE8
AutoCAD SHX Text
NOTE: SEE SPECIFICATIONS FOR DETAILED HANGER REQUIREMENTS.
AutoCAD SHX Text
5 FT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2 12
AutoCAD SHX Text 1 12
AutoCAD SHX Text
AutoCAD SHX Text 1 14
AutoCAD SHX Text
THRU 34
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD
AutoCAD SHX Text
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS
AutoCAD SHX Text
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
AutoCAD SHX Text
MAXIMUM PIPE/TUBING SUPPORT SPACING
AutoCAD SHX Text
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
AutoCAD SHX Text
NOM. SIZE (IN)
AutoCAD SHX Text
PIPE (FT)
AutoCAD SHX Text
TUBING (FT)
AutoCAD SHX Text
PIPE INSULATION (2" THICK MAX.)
AutoCAD SHX Text
THROUGH-PENETRANT STEEL PIPE OR COPPER TUBE
AutoCAD SHX Text SEALANT: MIN. " THICK 12" THICK UL-LISTED, FIRE-RATED CAULK APPLIED WITHIN ANNULUS FLUSH WITH FINISHED SURFACE OF WALL ASSEMBLY
AutoCAD SHX Text
2-HR. RATED SHAFT WALL ASSEMBLY
AutoCAD SHX Text
GYPSUM BOARD OR MASONRY WALL
AutoCAD SHX Text
STEEL SLEEVE FLUSH WITH FACE OF WALL (BOTH SIDES)
AutoCAD SHX Text
PACKING MATERIAL - MIN. 3 " 14" WIDE OF MIN. 4 PCF MINERAL WOOL BATT INSULATION
AutoCAD SHX Text WALL STRIP - " TH'K x 1 " WIDE 316" TH'K x 1 " WIDE 34" WIDE INTUMESCENT STRIP WRAPPED TIGHTLY AROUND PIPE COVERING
AutoCAD SHX Text
NOTE: UL SYSTEM W-J-5048
AutoCAD SHX Text
HANGER ROD
AutoCAD SHX Text
INSULATION (VAPOR BARRIER TYPE IS REQUIRED FOR LOW TEMPERATURE PIPE)
AutoCAD SHX Text PROVIDE HIGH COMPRESSIVE STRENGTH INSULATION (9 PSF MIN. DENSITY) UNDER INSULATION SHIELD
AutoCAD SHX Text
INSULATION SHIELD AT HANGER
AutoCAD SHX Text
WELD
AutoCAD SHX Text
SADDLE
AutoCAD SHX Text
12" DIA. HANGER RODS W/36" MAX. SPACING ON EACH CHANNEL
AutoCAD SHX Text
BAND
AutoCAD SHX Text 1 "-12 GA. CHANNEL 58"-12 GA. CHANNEL OR 2"x2"x " ANGLE14" ANGLE
AutoCAD SHX Text
PROVIDE INSULATION SHIELD & INSERT FOR ALL PIPING (8" MIN.)
AutoCAD SHX Text NOTES: 1. PROVIDE ANCHORS ONLY PROVIDE ANCHORS ONLY WHERE SHOWN ON DRAWINGS. 2. EXTEND SLEEVE ABOVE EXTEND SLEEVE ABOVE FLOOR WHERE SPECIFIED.
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text NOTES: 1. DIM "A" - FLAME STOP V DEPTH 2" MIN. FOR " TO 2" PIPE DIM "A" - FLAME STOP V DEPTH 2" MIN. FOR " TO 2" PIPE 34" TO 2" PIPE SIZES & 4" MIN. FOR 2 " TO 6" PIPE SIZES. 12" TO 6" PIPE SIZES. 2. INSTALLATION SHALL BE IN ACCORDANCE WITH THE INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS AND REGULATIONS.
AutoCAD SHX Text
"A" (REFER TO NOTE 1)
AutoCAD SHX Text
14" MIN.
AutoCAD SHX Text
14" MIN.
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
BOLT (TYP)
AutoCAD SHX Text
FLOOR SLAB
AutoCAD SHX Text
RISER CLAMP, BOTTOM CLAMP REQ'D AT ANCHOR POINTS ONLY
AutoCAD SHX Text
PIPE SLEEVE WHERE SPECIFIED
AutoCAD SHX Text
RISER CLAMP
AutoCAD SHX Text
BOLT (TYP)
AutoCAD SHX Text
FIRESTOP MATERIAL
AutoCAD SHX Text
RISER CLAMP
AutoCAD SHX Text
PIPE SLEEVE WHERE SPECIFIED
AutoCAD SHX Text
RISER
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
24 GA. PIPE SLEEVE SHALL FIT SNUG IN DRILLED HOLE IN SLAB
AutoCAD SHX Text
"FLAME STOP V" PUTTY OR CAULK
AutoCAD SHX Text NOTE: APPLICABLE TO PENETRATIONS OF ALL FIRE RATED MEMBRANES,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .