SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100DRAWINGS - REV 12-17.pdf

PDF 8 MB Posted

Attached to
Y1AZ--Renovate SPD Phase IV Project 526-25-100
Solicitation number
36C24226B0013
Issued by

About this file

These documents are architectural drawings for a Supply Chain Management (SCM) - Total Supply Support (TSS) Renovation project at the James J. Peters VA Medical Center located at 130 Kingsbridge Road in Bronx, New York. The project number is 526-10-150A and involves a comprehensive renovation of the facility's supply support area.

The drawing set includes multiple detailed plans such as demolition plans, floor plans, ceiling plans, equipment layout, interior elevations, and technical details for wall types, flooring, ceiling, door frames, and penetration details. The drawings are prepared by Mott MacDonald and PCS Engineering, and represent a 100% submission set for the VA's Office of Facilities. The plans show a complex renovation involving precise architectural specifications, including detailed drawings for fire extinguisher cabinets, wall types, suspended ceilings, flooring finishes, and specific room configuration changes.

View the file

Other files

File Type Posted
stonkote ht4 product data-1.pdf PDF
6. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ELECTRICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
2. SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT- RENOVATION - STRUCTURE - 100 DRAWINGS - Signed and Sealed.pdf PDF
Stonclad GS.pdf PDF
stonseal-sk6-product-data.pdf PDF
Site Visit Sign In Sheet_Renovate SPD Phase IV_1.6.26.pdf PDF
4. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS - Signed and Sealed.pdf PDF
3. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
36C24226B0013 0002.docx DOCX document
7. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100Specifications.pdf PDF
Stonkote color chart.pdf PDF
1. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100 DRAWINGS - Signed and Sealed.pdf PDF
5. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100DRAWINGS - Signed and Sealed.pdf PDF
S02 36C24226B0013_2.docx DOCX document
36C24226B0013 0001.docx DOCX document
S02 36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100 DRAWINGS.pdf PDF
013200 Construction Documentation.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS.pdf PDF
S02 WAGE DETERMINATION BRONX COUNTY.pdf PDF
SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100 Specifications 02.pdf PDF
S02 Buy American Certificate blank.pdf PDF
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT - RENOVATION - ELECTRICAL - 100DRAWINGS - REV 12-17.pdf PDF
36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - STRUCTURE - 100DRAWINGS.pdf PDF
SUPPLY CHAIN MANAGEMENT-TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS.pdf PDF
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEDGWICK

AVENUE

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

WALL

W

AL

L

WALL

WALL

WALL

RA

M

P

RAMP

VETERANS AFFAIRS

DEPARTMENT OF

PROJECT No. 526-10-150A

SUPPLY CHAIN MANAGEMENT (SCM) -

TOTAL SUPPLY SUPPORT (TSS) RENOVATION

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

AT THE JAMES J. PETERS VAMC

RENOVATION

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

MATERIALPRODUCTTRADENAMEMODELNUMBER

MATERIALPRODUCTTRADENAMEMODELNUMBER

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

AT THE JAMES J. PETERS VAMC

LEGEND

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

AT THE JAMES J. PETERS VAMC

RENOVATION

ROOM NUMBERREV

LEGEND

REMARKS/ ADDITIONAL PROVISIONSCEILING

MATERIALWALLBASEFLOORSPACE CEILING

HEIGHT

281726-GI0.01-GI0.01
GI0.01
281726-GI0.02-GI0.02
GI0.02
281726-GI1.01-GI1.01
GI1.01
281726-GI1.01-GI1.02
GI1.02
281726-AD1.01-AD1.01
AD1.01
281726-AD1.02-AD1.02
AD1.02
281726-AS1.01-AS1.01
AS1.01
281726-AS1.02-AS1.02
AS1.02
281726-AS1.03-AS1.03
AS1.03
281726-AS1.04-AS1.04
AS1.04
281726-AS1.05-AS1.05
AS1.05
281726-AS1.06-AS1.06
AS1.06
281726-AE1.01-AE1.01
AE1.01
281726-AE1.02-AE1.02
AE1.02
281726-AE6.01-AE6.01
AE6.01
281726-AE6.02-AE6.02
AE6.02

File details come from the government source that posted it. Updated .