SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100DRAWINGS - REV 12-17.pdf
PDF 8 MB Posted
- Attached to
- Y1AZ--Renovate SPD Phase IV Project 526-25-100
- Solicitation number
- 36C24226B0013
About this file
These documents are architectural drawings for a Supply Chain Management (SCM) - Total Supply Support (TSS) Renovation project at the James J. Peters VA Medical Center located at 130 Kingsbridge Road in Bronx, New York. The project number is 526-10-150A and involves a comprehensive renovation of the facility's supply support area.
The drawing set includes multiple detailed plans such as demolition plans, floor plans, ceiling plans, equipment layout, interior elevations, and technical details for wall types, flooring, ceiling, door frames, and penetration details. The drawings are prepared by Mott MacDonald and PCS Engineering, and represent a 100% submission set for the VA's Office of Facilities. The plans show a complex renovation involving precise architectural specifications, including detailed drawings for fire extinguisher cabinets, wall types, suspended ceilings, flooring finishes, and specific room configuration changes.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEDGWICK
AVENUE
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
WALL
W
AL
L
WALL
WALL
WALL
RA
M
P
RAMP
VETERANS AFFAIRS
DEPARTMENT OF
PROJECT No. 526-10-150A
SUPPLY CHAIN MANAGEMENT (SCM) -
TOTAL SUPPLY SUPPORT (TSS) RENOVATION
on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
AT THE JAMES J. PETERS VAMC
RENOVATION
on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
MATERIALPRODUCTTRADENAMEMODELNUMBER
MATERIALPRODUCTTRADENAMEMODELNUMBER
on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
AT THE JAMES J. PETERS VAMC
LEGEND
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot
Revisions Date th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
SUPPLY CHAIN MANAGEMENT (SCM)
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Sht. Of 48
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
TOTAL SUPPLY SUPPORT (TSS)
100% SUBMISSION
SUITE 102, ISELIN, NJ 08830
111 WOOD AVE SOUTH
AT THE JAMES J. PETERS VAMC
RENOVATION
ROOM NUMBERREV
LEGEND
REMARKS/ ADDITIONAL PROVISIONSCEILING
MATERIALWALLBASEFLOORSPACE CEILING
HEIGHT
| 281726-GI0.01-GI0.01 |
| GI0.01 |
| 281726-GI0.02-GI0.02 |
| GI0.02 |
| 281726-GI1.01-GI1.01 |
| GI1.01 |
| 281726-GI1.01-GI1.02 |
| GI1.02 |
| 281726-AD1.01-AD1.01 |
| AD1.01 |
| 281726-AD1.02-AD1.02 |
| AD1.02 |
| 281726-AS1.01-AS1.01 |
| AS1.01 |
| 281726-AS1.02-AS1.02 |
| AS1.02 |
| 281726-AS1.03-AS1.03 |
| AS1.03 |
| 281726-AS1.04-AS1.04 |
| AS1.04 |
| 281726-AS1.05-AS1.05 |
| AS1.05 |
| 281726-AS1.06-AS1.06 |
| AS1.06 |
| 281726-AE1.01-AE1.01 |
| AE1.01 |
| 281726-AE1.02-AE1.02 |
| AE1.02 |
| 281726-AE6.01-AE6.01 |
| AE6.01 |
| 281726-AE6.02-AE6.02 |
| AE6.02 |
File details come from the government source that posted it. Updated .