1. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100 DRAWINGS - Signed and Sealed.pdf

PDF 9 MB Posted

Attached to
Y1AZ--Renovate SPD Phase IV Project 526-25-100
Solicitation number
36C24226B0013
Issued by

View the file

Other files

File Type Posted
stonkote ht4 product data-1.pdf PDF
6. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ELECTRICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
2. SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT- RENOVATION - STRUCTURE - 100 DRAWINGS - Signed and Sealed.pdf PDF
Stonclad GS.pdf PDF
stonseal-sk6-product-data.pdf PDF
Site Visit Sign In Sheet_Renovate SPD Phase IV_1.6.26.pdf PDF
4. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS - Signed and Sealed.pdf PDF
3. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
36C24226B0013 0002.docx DOCX document
7. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100Specifications.pdf PDF
Stonkote color chart.pdf PDF
5. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100DRAWINGS - Signed and Sealed.pdf PDF
S02 36C24226B0013_2.docx DOCX document
36C24226B0013 0001.docx DOCX document
S02 36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100 DRAWINGS.pdf PDF
013200 Construction Documentation.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS.pdf PDF
S02 WAGE DETERMINATION BRONX COUNTY.pdf PDF
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100DRAWINGS - REV 12-17.pdf PDF
SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100 Specifications 02.pdf PDF
S02 Buy American Certificate blank.pdf PDF
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT - RENOVATION - ELECTRICAL - 100DRAWINGS - REV 12-17.pdf PDF
36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - STRUCTURE - 100DRAWINGS.pdf PDF
SUPPLY CHAIN MANAGEMENT-TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS.pdf PDF
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEDGWICK

AVENUE

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

WALL

W

AL

L

WALL

WALL

WALL

RA

M

P

RAMP

VETERANS AFFAIRS

DEPARTMENT OF

PROJECT No. 526-10-150A

SUPPLY CHAIN MANAGEMENT (SCM) -

TOTAL SUPPLY SUPPORT (TSS) RENOVATION

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

AT THE JAMES J. PETERS VAMC

RENOVATION

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

MATERIALPRODUCTTRADENAMEMODELNUMBER

MATERIALPRODUCTTRADENAMEMODELNUMBER

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

AT THE JAMES J. PETERS VAMC

LEGEND

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot

Revisions Date th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

SUPPLY CHAIN MANAGEMENT (SCM)

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Sht. Of 48

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

TOTAL SUPPLY SUPPORT (TSS)

100% SUBMISSION

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

AT THE JAMES J. PETERS VAMC

RENOVATION

ROOM NUMBERREV

LEGEND

REMARKS/ ADDITIONAL PROVISIONSCEILING

MATERIALWALLBASEFLOORSPACE CEILING

HEIGHT

281726-GI0.01-GI0.01
GI0.01
281726-GI0.02-GI0.02
GI0.02
281726-GI1.01-GI1.01
GI1.01
281726-GI1.01-GI1.02
GI1.02
281726-AD1.01-AD1.01
AD1.01
281726-AD1.02-AD1.02
AD1.02
281726-AS1.01-AS1.01
AS1.01
281726-AS1.02-AS1.02
AS1.02
281726-AS1.03-AS1.03
AS1.03
281726-AS1.04-AS1.04
AS1.04
281726-AS1.05-AS1.05
AS1.05
281726-AS1.06-AS1.06
AS1.06
281726-AE1.01-AE1.01
AE1.01
281726-AE1.02-AE1.02
AE1.02
281726-AE6.01-AE6.01
AE6.01
281726-AE6.02-AE6.02
AE6.02

File details come from the government source that posted it. Updated .