5. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100DRAWINGS - Signed and Sealed.pdf

PDF 2 MB Posted

Attached to
Y1AZ--Renovate SPD Phase IV Project 526-25-100
Solicitation number
36C24226B0013
Issued by

About this file

This document set comprises technical design drawings for a sprinkler system renovation project at the James J. Peters Veterans Affairs Medical Center (VAMC). The drawings are prepared by PCS Engineering and include multiple sheets detailing sprinkler infrastructure modifications across the facility.

The project, titled "Supply Chain Management (SCM) Total Supply Support (TSS) at the James J. Peters VAMC Renovation," encompasses zone valve location planning, interstitial sprinkler piping designs, and detailed installation specifications. Key drawing sheets include a sprinkler zone valve location plan for the service tunnel floor, ground floor interstitial sprinkler piping plans showing both demolition and new work areas, and comprehensive sprinkler details. The technical specifications incorporate piping symbols, abbreviations, accessory symbols, hazard symbols, and general symbols as referenced in the legend on the first sheet. Specific installation details cover sprinkler head relocation with concealed heads, typical sprinkler head installation procedures, rosenbeck sprinkler line details, beam pipe hangers, and stud-type pipe hangers with associated load ratings. The drawings are stamped as 100% submission documents and bear the professional seal of Stephen T. Peel, P.E. (License No. 095292). The renovation work includes identification of areas requiring demolition and areas designated for new construction, with all specifications aligned to federal VA facility standards and requirements.

View the file

Other files

File Type Posted
stonkote ht4 product data-1.pdf PDF
6. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ELECTRICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
2. SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT- RENOVATION - STRUCTURE - 100 DRAWINGS - Signed and Sealed.pdf PDF
Stonclad GS.pdf PDF
stonseal-sk6-product-data.pdf PDF
Site Visit Sign In Sheet_Renovate SPD Phase IV_1.6.26.pdf PDF
4. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS - Signed and Sealed.pdf PDF
3. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
36C24226B0013 0002.docx DOCX document
7. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100Specifications.pdf PDF
Stonkote color chart.pdf PDF
1. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100 DRAWINGS - Signed and Sealed.pdf PDF
S02 36C24226B0013_2.docx DOCX document
36C24226B0013 0001.docx DOCX document
S02 36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100 DRAWINGS.pdf PDF
013200 Construction Documentation.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS.pdf PDF
S02 WAGE DETERMINATION BRONX COUNTY.pdf PDF
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100DRAWINGS - REV 12-17.pdf PDF
SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100 Specifications 02.pdf PDF
S02 Buy American Certificate blank.pdf PDF
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT - RENOVATION - ELECTRICAL - 100DRAWINGS - REV 12-17.pdf PDF
36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - STRUCTURE - 100DRAWINGS.pdf PDF
SUPPLY CHAIN MANAGEMENT-TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS.pdf PDF
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRINKLER GENERAL NOTES,

LEGEND, ABBREVIATIONS, AND

o n e q u a r t e r i n c h o n e f o o t o n e e i g h t i e f o o t

Revisions Date t h r e e e i g h t h s i n e f o o t

F o n e h a l f i n e f o o t

E

2 3 4 o n e a n d o n e h a l f i n c h e s e f o o t o n e i n e f o o t t h r e e q u a r t e r s i n e f o o t

D

C

B t h r e c h e f o t

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D e p a r t m e n t o f

O f f i

F a c i l i t i e s

Sht. Of

Drawn

Drawing No.

Project No.

Date

V e t e r a n s

A f f a i r s

F E

5 6 7 8

D C

B

A

STEPHEN T. PEEL, P.E.

Professional Lic. No: 095292

31 PARK AVENUE,

ORELAND, PA 19075

PHONE: 215-572-6600

FAX: 215-572-6800

WWW.PCSENGINEERING.NET

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

SUPPLY CHAIN MANAGEMENT (SCM)

TOTAL SUPPLY SUPPORT (TSS)

AT THE JAMES J. PETERS VAMC

RENOVATION

ZONE VALVE LOCATION PLAN

100% SUBMISSION

GROUND FLOOR INTERSTITIAL

SPRINKLER PIPING PLAN - DEMOLITION

o n e q u a r t e r i n e f o o t o n e e i g h e f o o t

Revisions Date t h r e e e i g h t h s i n e f o o t

F o n e h a l f i n e f o o t

E

2 3 4 o n e a n d o n e h a l f i n c h e e f o o t o n e i n e f o o t t h r e e q u a r t e r s i n e f o o t

D

C

B t h r c h e o t

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D e p a r t m e n t o f

O f f i c i l i t i e s

Sht. Of

Drawn

Drawing No.

Project No.

Date

V e t e r a n s

A f f a i r s

F E

5 6 7 8

D C

B

A

STEPHEN T. PEEL, P.E.

Professional Lic. No: 095292

31 PARK AVENUE,

ORELAND, PA 19075

PHONE: 215-572-6600

FAX: 215-572-6800

WWW.PCSENGINEERING.NET

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

SUPPLY CHAIN MANAGEMENT (SCM)

TOTAL SUPPLY SUPPORT (TSS)

AT THE JAMES J. PETERS VAMC

RENOVATION

AND NEW WORK

SPRINKLER DETAILS

n e q u a r t e r i n e f o o t o n e e i g h e f o o t

Revisions Date t h r e e e i g h t h s i n e f o o t

F o n e h a l f i n e f o o t

E

2 3 4 o n e a n d o n e h a l f i n c h e o t o n e i n e f o o t t h r e e q u a r t e r e f o o t

D

C

B t h r e e i n c h o t

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D e p a r t m e n t o f

O f f i c i l i t i e s

Sht. Of

Drawn

Drawing No.

Project No.

Date

V e t e r a n s

A f f a i r s

F E

5 6 7 8

D C

B

A

STEPHEN T. PEEL, P.E.

Professional Lic. No: 095292

31 PARK AVENUE,

ORELAND, PA 19075

PHONE: 215-572-6600

FAX: 215-572-6800

WWW.PCSENGINEERING.NET

SUITE 102, ISELIN, NJ 08830

111 WOOD AVE SOUTH

SUPPLY CHAIN MANAGEMENT (SCM)

TOTAL SUPPLY SUPPORT (TSS)

AT THE JAMES J. PETERS VAMC

RENOVATION

Sheets and Views
Sprinkler Progress 09-11-2025-FP0.01
Sprinkler Progress 09-11-2025-FP1.01
Sprinkler Progress 09-11-2025-FP5.01

File details come from the government source that posted it. Updated .