2. SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT- RENOVATION - STRUCTURE - 100 DRAWINGS - Signed and Sealed.pdf

PDF 454 KB Posted

Attached to
Y1AZ--Renovate SPD Phase IV Project 526-25-100
Solicitation number
36C24226B0013
Issued by

About this file

This is an architectural drawing for a renovation project at the James J. Peters Veterans Affairs Medical Center (VAMC) located at 130 W. Kingsbridge Road, Bronx, New York. The drawing, dated November 7, 2025, and designated as Drawing No. 526-10-150A, Sheet 1 of 48, depicts the First Floor Interstitial Framing Plan and Demolition Plan for the Supply Chain Management (SCM) renovation project. The document is prepared by the Department of Veterans Affairs, Office of Facilities, and includes architectural details and specifications for new interstitial framing work.

The drawing presents two floor plan views showing the proposed interstitial framing layout and corresponding demolition plan, accompanied by detailed section drawings labeled as Section S1 and Section S2. These sections provide vertical construction details for the framing system implementation. The document includes general notes and specifications outlining construction requirements, material specifications, and demolition procedures. This technical drawing serves as part of the construction documentation package and is intended for contractor implementation during the renovation of the Supply Chain Management facility at the James J. Peters VAMC.

View the file

Other files

File Type Posted
stonkote ht4 product data-1.pdf PDF
6. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ELECTRICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
Stonclad GS.pdf PDF
stonseal-sk6-product-data.pdf PDF
Site Visit Sign In Sheet_Renovate SPD Phase IV_1.6.26.pdf PDF
4. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS - Signed and Sealed.pdf PDF
3. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS - Signed and Sealed.pdf PDF
36C24226B0013 0002.docx DOCX document
7. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100Specifications.pdf PDF
Stonkote color chart.pdf PDF
1. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100 DRAWINGS - Signed and Sealed.pdf PDF
5. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100DRAWINGS - Signed and Sealed.pdf PDF
S02 36C24226B0013_2.docx DOCX document
36C24226B0013 0001.docx DOCX document
S02 36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100 DRAWINGS.pdf PDF
013200 Construction Documentation.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS.pdf PDF
S02 WAGE DETERMINATION BRONX COUNTY.pdf PDF
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100DRAWINGS - REV 12-17.pdf PDF
SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100 Specifications 02.pdf PDF
S02 Buy American Certificate blank.pdf PDF
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT - RENOVATION - ELECTRICAL - 100DRAWINGS - REV 12-17.pdf PDF
36C24226B0013_2.docx DOCX document
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - STRUCTURE - 100DRAWINGS.pdf PDF
SUPPLY CHAIN MANAGEMENT-TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS.pdf PDF
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o n e -q u a rt e r in c h o n e f o o t o n e

-e ig h th i n c h o n e f o o t

Revisions Date th re e -e ig h th s i n c h o n e f o o t

F o n e -h a lf i n c h o n e f o o t

E

2 3 4 o n e a n d o n e -h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e

-q u a rt e rs i n c h o n e f o o t

D

C

B th re e i n c h e s o n e f o o t

A

1 2 3 4

TOTAL SUPPLY SUPPORT (TSS)

130 W. KINGSBRIDGE RD, BRONX, NY

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D e p a rt m e n t o f

O ff ic e of F ac ili tie s

Sht. Of 48

Drawn

526-10-150A

Drawing No.

NOVEMBER 7, 2025

Project No.

Date

V e te ra n s A ff a ir s

F E

5 6 7 8

D C

B

A

RENOVATION

REVISION NO. 1 04-20-18

REVISION NO. 5 01-22-21

SUPPLY CHAIN MANAGEMENT (SCM)

AT THE JAMES J. PETERS VAMC

NEW INTERSTITIAL FRAMING

PLAN & DETAILS

F.H. J.D.H.

S1.01