Supplemental_Letter_bid_form_executed.pdf

PDF 162 KB Posted

Attached to
#256075 Marion Parkade Revitalization
Solicitation number
S-KS0043-00015301
Issued by
Oregon

About this file

This is a Supplemental Information Letter No. 2 from the City of Salem Public Works Department Contracts and Procurement Division addressing bidder questions regarding the Marion Parkade Revitalization project (Project Number 682118; Bid Number 256075). Issued on December 10, 2025, the letter clarifies how bidders should assess costs for scopes of work previously listed as allowance bid items in earlier versions of the bid form. The clarification requires bidders to evaluate and incorporate costs for these items into corresponding lump sum divisions of work, affecting multiple project components across Division 2 (Existing Conditions), Division 4 (Masonry), Division 5 (Metals), Division 9 (Finishes), and Division 10 (Specialties). The affected scopes include erosion control measures, elevator adjustments, slab crack repair, CMU cell grouting, scaffolding and hoisting services, exterior concrete painting, signage wall preparation, installation/hoisting services, engineering, and permitting.

The successful bidder will be required to substantiate all costs for the previously allowanced scopes of work and all lump sum bid items through a detailed Schedule of Values submittal, which must be reviewed and approved by the City before use as the basis for payment applications and processing. The letter notes that any changes in conditions not reasonably inferred from the contract documents at the time of bid will be negotiated separately as contract Change Orders. The letter was issued by Shawna Self, CPPB, Manager of Contracts and Procurement, and distributed to key City engineering and management personnel involved in project oversight.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Salem

Contracts and Procurement Division

Public Works Department

Supplemental Information Letter No. 2

Marion Parkade Revitalization

PROJECT NUMBER 682118; BID NUMBER 256075

December 10, 2025

To whom it may concern:

The following question and clarifying answer is intended to address a bidder question regarding how bidders should assess scopes of work that were listed as allowance bid items on the previous versions of the bid form.

Question: How should bidders assess costs for scopes of work that were listed as allowance bid items on previous versions of the bid form?

Answer: Bidders shall evaluate and include costs for scopes of work that were listed as allowance bid items on previous versions of the bid form and include those costs to complete the scopes of work in the corresponding lump sum Divisions of work.

These items include:

DIVISION 2 – EXISTING CONDITIONS

• Erosion Control Measures

• Adjustments and Service to Existing Elevators

• Second and Third Floor Slab Crack Repair and Cleaning (per S0.01)

DIVISION 4 – MASONRY

• Grout CMU Cells as Needed (Stair Towers)

DIVISION 5 – METALS

• Scaffolding, Hoisting and Rigging

DIVISION 9 – FINISHES

• Paint Exterior Concrete

• Clean and Prep Interior Signage Walls for Signage

DIVISION 10 – SPECIALTIES

• Installation/Hoisting

• Engineering

• Permitting

682118 Marion Parkade Revitalization

The successful bidder will be required to substantiate costs for these scopes of work and all lump sum bid items with a Schedule of Values submittal that shall be reviewed and approved for use as a basis of payment applications and for payment processing. Any change in conditions that is not reasonably inferred from the contract documents at the time of bid will be negotiated as a contract Change Order.

Sincerely, Shawna Self, CPPB, Manager

Contracts and Procurement

RH/MK:\\FILESHARE2\PWFiles\Group\Engineering\Projects\CIP\682118 Marion Parkade Revitalization\11 Ad Bid Award_eB\OregonBuys\Supplemental

Letter_bid form.docx cc: Allen Dannen, PE, City Engineer

Rick Barnes, PE, Assistant City Engineer

Luke Gmazel, PE, Engineering Program Manager

Aaron Kimsey, PE, Assistant City Engineer

Mary Kopp, Management Analyst II

James Winslow, PE, Assistant City Engineer

File: PN 682118, Ad/Bid/Award

2025-12-10T14:43:23-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .