This document is a Summary of Required Solicitation Documents for a federal contract opportunity.

The key details are:

The technical proposal requires the offeror to demonstrate at least 5 years of concrete experience on similar projects, a record of completing projects on time and in compliance, and relevant experience and technical competence in installing concrete pads and bollards. The offeror must provide at least 3 project examples completed in the past 10 years of similar size, scope, and complexity. Key personnel must have minimum experience levels for the Project Manager, Project Superintendent, and Safety Coordinator roles.

The business proposal requires a firm fixed price, a bid guarantee of at least 20% of the proposal price, completion of the Subcontractor Annual Representations & Certifications (SARC) form, and other safety and insurance documents.

The federal contract opportunity is for the installation of two concrete pads to support HVAC systems at Building 412 on the Fermi National Accelerator Laboratory site. Proposals are due by 5pm CT on Monday, December 16, 2024.

View the file

Other files

File Type Posted
QandA_RFP 361749_2024_1203.pdf PDF
Amendment 01 to RFP 361749_2024_1203.pdf PDF
Exhibit J Statement and Acknowledgment (Standard Form 1413) (Rev 42013).pdf PDF
Exhibit M Construction Environmental Safety and Health Certification (CESHC).pdf PDF
Exhibit Q FermiLab_Drawing_MAB_RTU_Replacement_1.pdf PDF
Exhibit T Pictures-front and rear of building.pdf PDF
1.0 Request for Proposal_ISD_361749_DA.pdf PDF
2.0 Price Proposal Form.pdf PDF
Exhibit A SOW_MAB Bldg_412_Install_pads_and_bollards.pdf PDF
Exhibit C 013100_ESH_Requirements_3-2022.pdf PDF
Exhibit E Construction Insurance Requirements 2024.pdf PDF
Exhibit L Subcontractor Annual Representations and Certifications (SARC) Form SARC (Rev. 3).pdf PDF
Exhibit O Sample Subcontract.pdf PDF
Exhibit S FESHM_4195_Special_Toxic_Hazards-Silica-FINAL.pdf PDF
Exhibit U Fermilab Site-Map MAB 412.pdf PDF
Business Visitor Registration Instructions and Directions.pdf PDF
Exhibit F Bid Bond FL-41 (Rev 12.22).pdf PDF
Exhibit R Concrete_Detail.pdf PDF
Exhibit B 010010_General_Requirements_3_2022_31_Installation.pdf PDF
Exhibit D FRA General Terms and Conditions for Construction (03.2024).pdf PDF
Exhibit G Payment Bond FL-42 (Rev 12.22).pdf PDF
Exhibit H Performance Bond FL-40 (Rev 12.22).pdf PDF
Exhibit I Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit K Proposal Certifications- Form PUR-466-Rev 1 (10142021).pdf PDF
Exhibit N Davis Bacon Wage Rates IL20240008 Mod 11 2024_1018.pdf PDF
Exhibit P Director Safety Letter.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF REQUIRED SOLICITATION DOCUMENTS

PART 1: TECHNICAL PROPOSAL (RESPONSES TO TECHNICAL EVALUATION CRITERIA)

Offerors shall respond to the following technical criteria:

1) Offeror shall provide information that clearly demonstrates how each requirement (sub-criterion below) will be met and/or has the following capabilities.

A) Having at least five (5) years of concrete experience on similar projects.

B) Firm has a demonstrated record with Fermilab (if previously worked at Fermilab) or for other owners (if no previous work at Fermilab) of completing projects on time and in compliance with the contract.

C) Firm has demonstrated relevant experience and technical competence in installing concrete pad and bollards, and has been trained to install projects in similar size and scope intended.

2) Current/Past Experience

Offeror shall provide information to facilitate FRA’s consideration of its corporate experience. FRA is most interested in examples of real work with actual results of the offeror in performing requirements similar to those of this solicitation in terms of size, scope, and complexity. Thus, offeror shall provide at least three (3) project experiences completed within the past ten (10) years that are of similar type, size, scope, and complexity as described in the solicitation documents.

3) Personnel Experience

Key Personnel Experience will be evaluated to determine the degree of and relevance of experience the Key Personnel possess related to the subject requirements. Evaluation of experience will factor in the length and degree of experience in the relevant technical areas. Please note that, as a condition of contract award and performance, should the contractor wish to substitute proposed Key Personnel in their proposal (or during performance, if after award), the replacement staff must possess education and/or experience equivalent to or exceeding that of the individual(s) being replaced, subject to the approval of the FRA, prior to performance.

Key Personnel must have, as a minimum, the following experience:

A) Project Manager: Five (5) years of construction industry experience, completed three (3) projects of similar size/scope, and completed the 30-hour OSHA Training Course.

B) Project Superintendent: Five (5) years of construction industry experience, completed five (5) projects of similar size/scope, and completed the 30-hour OSHA Training Course.

C) Safety Coordinator (or company safety officer): Five (5) years of industry experience, with five

(5) projects that encompass a similar scope.

PART 2 – BUSINESS PROPOSAL

1) Price Proposal Form

The proposed pricing shall be a firm fixed price for the work. The Price Proposal Form is required to be completed and signed.

2) Bid Guarantee/Bond

The offeror shall provide a bid guarantee in the amount of not less than 20 percent (not to exceed $3 million) of the proposal price. Failure to furnish a bid guarantee in the proper form and amount, by the time set for the due date of the offers, may be cause for rejection of the offer. The bid guarantee shall be in the form of a firm commitment, such as a bond, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds, or notes of the United States.

3) Subcontractor Annual Representations & Certifications (SARC), Form SARC

The successful Offeror’s submittal of this completed form will be incorporated in the resultant subcontract. If an offering entity is a joint venture, association, consortia, or partnership, each member entity must submit an individual Representations and Certifications Form.

4) Proposal Certifications, Form PUR-466

All appropriate sections are required to be completed and signed by a company official.

5) Other Documents

The following documents are required to be submitted with the proposal:

• Fermilab Subcontractor Injury & Illness Data Questionnaire (completed and signed).

• Construction Environmental, Safety & Health Certification (CESHC) (completed and signed).

• The National Council on Compensation Insurance (NCCI) Workers Compensation

Experience Rating form for the past three years.

• Occupational and Safety Health Administration (OSHA) 300 A Form logs for the past three years.

• Corporate Safety and Health Plan (if your company’s plan has not already been accepted by

FRA).

• Sample Certificate of Insurance.