Substation_Supporting_Images.zip
ZIP file 86 MB Posted
- Attached to
- Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation
- Solicitation number
- 2026/2027/03
- Issued by
- Quay County, New Mexico
About this file
This file contains supporting images for the City of Gallup, New Mexico's solicitation for a turnkey Engineering, Procurement, and Construction (EPC) contract to design and build a new 115 kV to 13.2 kV, 30 MVA electrical substation in the Carbon Coal Road area. The City seeks a qualified EPC firm to serve as the single point of responsibility for all project phases, including engineering and design, permitting and regulatory coordination, equipment procurement, site development, civil and electrical construction, installation, testing, commissioning, startup, project management, training, and project closeout. Proposals are due September 1, 2026, with the contract term running from 2026 through 2027. The City holds an option to renew for an additional three-year period through 2030 at mutually agreeable prices or to continue month-to-month by written mutual consent. Either party may terminate for cause with fifteen days' written notice to cure, or without cause with thirty days' written notice.
The project represents a capital improvement initiative designed to improve electric system reliability, increase system capacity, accommodate future load growth, and support economic development within the City of Gallup and its surrounding service territory. Contractors must comply with New Mexico prevailing wage requirements under the Public Works Minimum Wage Act and submit a Statement of Intent to Pay Prevailing Wages within three days of award and prior to construction commencement. Environmental compliance requirements include EPA Form 3510-13 environmental assessment, EPA Form 3510-9 Notice of Intent for storm water discharges under the NPDES Construction General Permit, and a Public Easement Work Permit from the City of Gallup. An NMDOT Traffic Control/Roadway Work Permit and NMDOT Indemnification and Hold Harmless Agreement are also required. The contractor must obtain and maintain appropriate insurance naming the City as an additional insured with statutory worker's compensation and Commercial General Liability limits. A preliminary substation layout sketch is provided as design reference.
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .