AS653A_SKETCH.pdf

PDF 2 MB Posted

Attached to
Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation
Solicitation number
2026/2027/03
Issued by
Quay County, New Mexico

About this file

This is a sketch document for the City of Gallup, New Mexico, related to the turnkey Engineering, Procurement and Construction (EPC) project for a new 115 kV to 13.2 kV, 30 MVA electrical substation. The sketch illustrates the proposed substation layout and electrical configuration in the Carbon Coal Road area, providing a visual representation of the facility design that will support the project's objective to improve electric system reliability, increase system capacity, and accommodate future load growth in the City of Gallup's service territory. The document serves as a technical reference for qualified EPC contractors responding to the solicitation, establishing baseline design parameters and spatial requirements that bidders must accommodate in their proposal responses.

The sketch provides essential engineering and design guidance that bidders must incorporate into their turnkey delivery approach, which encompasses all project phases from initial engineering through final commissioning and startup. This visual documentation ensures consistency in substation design standards and helps establish clear expectations regarding the physical footprint, equipment arrangement, and integration requirements that the selected EPC contractor must meet while maintaining responsibility for quality, budget, schedule, safety, and successful project execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

S

U R

V E Y S \2

.0

.0

C

O G

C a rb o n

C o a l S u b S ta ti o n

\D W

G \A

S A

.d w g , 6

/2 /2

:0

:3

A

M

100 1000

1"=100''

AS653A
Layout2

File details come from the government source that posted it. Updated .