Submittal Register - VAAAHS Site Prep for D758 and D759.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
Z1DA--Site Prep for D758 & D759 506-CSI-133
Solicitation number
36C25026B0022
Issued by

About this file

This document is a detailed Submittal Register for a VA Ann Arbor Healthcare System project involving site preparation for Nuclear Medicine Rooms D758 and D759 (Project No: 506-CSI-133). The comprehensive register outlines extensive submittal requirements across multiple specification sections, including general requirements, safety documentation, quality control, environmental controls, sustainable construction, and technical specifications for various building systems such as electrical, HVAC, plumbing, communications, and electronic safety systems.

The submittal register specifies detailed documentation requirements for each specification section, including shop drawings, manufacturer's certifications, warranties, test reports, operation and maintenance manuals, training plans, and commissioning documentation. Key submission timelines range from prior to project start to closeout, with specific deadlines for items like safety plans, quality control documents, system readiness checklists, and technical data packages. The project involves comprehensive documentation across disciplines including architectural, mechanical, electrical, communications, and security systems, indicating a complex healthcare facility renovation or construction effort.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Submittals Log
Job Location: VA Ann Arbor Healthcare System11/18/25
Project Name: SITE PREP FOR NUCLEAR MEDICINE ROOMS D758 & D759
Project No: 506-CSI-133
APP = Approved CON = Conditionally Approved REJ = Rejected
Specification SectionStatusDate Expected From SubcontractorDate Submitted to ABGABG Comments Returned to SubcontractorResubmittal to ABGExpected Submittal to FAADate Submitted to GC from SubcontractorDate Submitted to VAMC from GCDate Submitted to AE from gcDate Returned to VAMCDate Returned to SubcontractorComments
Submittal #Submittal DescriptionDate Returned to GC
010000General Requirements
1.6.H.2 Phasing Dates
1.6.L.2 Utility Service Interruption Request
1.7.A Preconstruction Survey Report - Exist. ConditionsBefore any work is started
1.7.C Re-Survey Report of Existing Conditions30 days before Final Inspection
1.14.C As-Built Drawings - Electronic PDFsWithin 15 days after each completed phase
1.15.A Warranty Management Plan30 days before Pre-Warranty Conf.
1.15.F Warranty Tags - Record Copies
1.25.A,B Maintenance and Operating ManualsSee individual spec sections
1.25.C Course Outlines for VA TrainingSee individual spec sections
1.31.F Photographic Documentation
013216.15Project Schedules (Small Projects - D/B/B)
1.3.A Contractor's Consultant QualificationIf scheduling consultant used
1.4.A Monthly Computer-Produced SchedulesTo support payment requests
1.5.A Critical Path Method (CPM) Interim Schedule45 days after NTP, then monthly
1.5.B Critical Path Method (CPM) Final Schedule
1.8.A Application & Certificate of Payment
1.9.C Electronic Schedule UpdateWithin 14 days of regular schedule update
1.11.A Revised Electronic Project ScheduleWithin 30 days of VA approval of updates
013323Shop Drawings, Product Data, and Samples
1.3.A Submittal RegisterPrior to start of work
1.3.E Submittal Register - Monthly Updates10/19/16Monthly
013526Safety Requirements
1.3.B.1 & 1.5 Accident Prevention Plan (APP)15 days prior to Preconstruction Conf.
1.3.C.1 Monthly Contractor HS&E Perf. Report
1.3.C.3 & 1.12.B Mishap ReportsSubmit for information only
1.3.C.4 Near Miss ReportsSubmit for information only
1.3.C.5 & 1.11 Inspection ReportsSubmit for information only
1.3.C.6 & 1.12.C Monthly Exposure Hour ReportsSubmit for information only
1.3.D.1 & 1.22.C Standard Crane Lift Plan
1.3.D.2 & 1.22.C Critical Crane Lift Plan
1.3.D.3 & 1.6 Activity Hazard Analysis (AHA)Prior to each work activity
1.3.D.5 & 1.25 Hot Work PermitSubmit for information only
1.3.D.6 Radiography Operation Planning Wrksht
1.3.D.7 Portable Gauge Operations Planning Wrksht
1.3.E.1 Contractor Safety Self-Evaluation ChecklistSubmit for information only
1.3.E.2 Crane Operators/Riggers Certifications
1.3.E.3 Certificate of ComplianceSubmit for information only
1.3.E.4 Mobile Cranes Inspection CertificateSubmit for information only
1.3.E.5 License CertificatesSubmit for information only
1.3.E.6 Machinery & Mech'd Equipt Certification
1.10.F Training Records15 days prior to preconstruction safety conf.
1.16.A Certification of Tuberculosis ScreeningPrior to onsite placement of employee
1.16.B Certification of influenza VaccinationPrior to onsite placement of employee
1.17.A Fire Safety Plan
1.18.C.1 Hazardout Electrical Energy Control ProcedurePrior to de-energization
014500Quality Control
1.3.1.a Interim Contractor Quality Control PlanWithin 5 days of NTP
1.3.1.b Contractor Quality Control PlanWithin 30 days of NTP
1.3.2.a Test Reports
015719Temporary Environmental Controls
1.4.A Environmental Protection Plan10/19/16Prior to start of work
017419Construction Waste Management
1.5.B Waste Management Plan10/19/16
1.5.C Designated Manager of WM Plan
1.5.D Summary of Debris Diversion & Disposal10/19/16Submit with each application for payment
1.5.F Final Report
018113Sustainable Construction Requirements
1.5.B Sustainability Action PlanWithin 30 days after Preconstruction Conf.
1.5.C Low Pollutant-Emitting Materials TrackingWithin 30 days after Preconstruction Conf.
1.5.D Construction Indoor Air Quality Mgmt PlanWithin 30 days after Preconstruction Conf.
1.5.E Product SubmittalsSubmit with individual specification sections
1.5.F Sustainable Construction Progress ReportsSubmit with each application for payment
1.5.G Closeout Submittals10/19/16Within 14 days after Substantial Completion
055000Metal Fabrications
1.3.B Shop Drawings
1.3.C Manufacturer's Certificates
061000Rough Carpentry
1.3.B Sustainable Construction Submittals
1.3.C Shop Drawings
1.3.D Manufacturer's Literature and Data
1.3.E Mftr's Certificate for unmarked lumber
062000Finish Cabinetry
1.5.B Submittal Drawings
1.5.C Manufacturer's Literature and Data
1.5.D Samples
1.5.E Sustainable Construction Submittals
1.5.F Certificates: products comply with specs
1.5.G Qualifications - Fabricator, Installer
1.9.A Construction Warranty11/25/1512/22/15
072113Thermal Insulation
1.4.B Manufacturer's Literature and Data
1.4.C Sustainable Construction Submittals
1.7 A. Construction Warranty
078400Firestopping
1.3.B Sustainable Design Submittals
1.3.C Installer Qualifications
1.3.D Inspector Qualifications
1.3.E Manufacturer's Literature and Data
1.3.F List of FM/UL/WH Classification Numbers
1.3.G Certified Lab Test Report if not FM/UL/WH
1.3.H Certification: products comply with specs
3.5.B Inspection Reports
079200Joint Sealants
1.4.A & 1.5.D Contractor Certification
1.5.B Sustainable Design Submittals
1.5.C Installer Qualifications
1.5.E Manufacturer's Installation Instructions
1.5.F Cured Samples
1.5.G Manufacturer's Literature and Data
1.9.A Construction Warranty
1.9.B Manufacturer's 5-Year Warranty
3.5.A.10 Test Reports
081113Hollow Metal Doors and Frames
1.4.B Submittal Drawings
1.4.C Manufacturer's Literature and Data
1.4.D Sustainable Submittal - Recycled Content
1.4.E Test Reports
1.4.F Manufacturer Qualifications
1.8.A Construction Warranty
081400Interior Wood Doors
1.4.B Submittal Drawings
1.4.C Manufacturer's Literature and Data
1.4.D Samples
1.4.E Sustainable Construction Submittals
1.4.F Test Reports
1.4.G Operation and Maintenance Data
1.9.A Construction Warranty
1.9.B Manufacturer's Warranty
085659Service and Teller Window Units
1.4.B Submittal Drawings
1.4 C. Manufacturer's Literature and Data
1.4.D Sustainable Construction Submittal
1.4.E Test Reports
1.4.F Certificates: products comply with specs
1.5.A Construction Warranty
087100Door Hardware
1.4.A Warranties
1.5.A Maintenance Manuals
1.6.B Hardware Schedule
1.6.C Samples and Manufacturer's Literature
1.6.D Certificate of Compliance and Test Reports
3.3.A Final Inspection Letter
088000Glazing
1.5.B Sustainable Design Submittals
1.5 C. Manufacturer's Certificate
1.5.D Manufacturer Warranty
1.5.E Manufacturer's Literature and Data
1.8.A Construction Warranty
1.8.B Manufacturer Warranty
090516Subsurface Preparation for Floor Finishes
1.3.B Written approval of product compatibility
1.3.C Product Data
1.3.D Test Data
092216Non-Structural Metal Framing
1.4.B Manufacturer's Literature and Data
1.4.C Shop Drawings
092900Gypsum Board
1.4.B Manufacturer's Literature and Data
1.4.C Shop Drawings
1.4.D Certification: no asbestos in products
095100Acoustical Ceilings
1.5.B Shop Drawings
1.5.C Manufacturer's Literature and Data
1.5.D Samples
1.5.E Sustainable Construction Submittals
1.5.F Certificates: products comply with specs
1.5.G Qualifications - Manufacturer
1.5.H Operation and Maintenance Data
1.10.A Construction Warranty
096516Resilient Sheet Flooring
1.4.B Manufacturer's Literature and Data
1.4.C Samples
1.4.D Sustainable Design Submittals
1.4.E Certificates: products comply with specs
1.4.F Qualifictions - Manufacturer, Installer
1.9.A Construction Warranty
1.9.B Manufacturer's Warranty
099100Painting
1.3.B Sustainable Design Submittals
1.3.C Painter Qualifications
1.3.D Manufacturer's Literature and Data
1.3.E Samples
1.3.F Sample of Identity Markers (if used)
1.3.G Manufacturer's Certificates
102123Cubicle Curtain Tracks
1.3.B Samples
1.3.C Shop Drawings
1.3.D Manufacturer's Literature and Data
1.5.A Construction Warranty
102600Wall and Door Protection
1.4.B Sustainable Design Submittals
1.4.C Shop Drawings
1.4.D Manufacturer's Literature and Data
1.4.E Test Reports
1.4.F Manufacturer's Qualifications
1.4.G Installer's Qualifications
1.6.A Construction Warranty
1.6.B Manufacturer's Warranty
102800Toilet, Bath, and Laundry Accessories
1.4.B Manufacturer's Literature and Data
1.4.C Operating and Maintenance Data
1.8.A Construction Warranty
117300Ceiling Mounted Patient Lift System
1.4.A Shop Drawings
1.4.B Certificate of Compliance from Manufacturer
1.4.C Manufacturer's Literature and Data
1.4.D Individual Room Layouts
1.4.E Manufacturer's Checklist
3.2. Training of Personnel
3.3 Performance Test
3.4 Inspection
123200Manufactured Wood Casework
1.3.B Manufacturer's Literature and Data
1.3.C Samples
1.3.D Shop Drawings
1.3.E Certification of Qualifications for Mfr and Instlaller
1.5.A Construction Warranty
1.5.B Manufacturer Warranty
3.7 Operational and Cleaning Manuals
123600Countertops
1.3.B Shop Drawings
1.3.C Samples
134900Radiation Protection
1.5.B Submittal Drawings
1.5.C Manufacturer's Literature and Data
1.5.D Samples
1.5.E Sustainable Construction Submittals
1.5.F Test Reports
1.5.G Qualifications - Manufacturer
1.5.H Operation and Maintenance Data
1.7.A Construction Warranty
1.7.B Manufacturer's Warranty
3.8.A.1 Lead Radiation Shielding Test
211313Wet-Pipe Sprinkler Systems
1.4.A.1 Installer Qualifications
1.4.A.2 Drawings
1.4.A.3 Manufacturer's Data Sheets
1.4.A.4 Calculation Sheets
1.4.A.5 Valve Charts
1.4.A.6.a As-Built Drawings
1.4.A.6.b Material and Testing Certificate
1.4.A.6.c Operation and Maintenance Manuals
3.2.A Preliminary Testing
3.2.B Final Inspection and Testing
3.3.A Training of VA Personnel
1.4.A.6.c Operations and Maintenance Manuals
3.3.A Training of VA Personnel
220511Common Work Results for Plumbing
1.4.D Documentation for Equivalent Equipment
1.4.E Certification of Manufacturer's Review
1.4.G Manufacturer's Literature and DataSubmit under individual specification sections
1.4.H Coordination/Shop Drawings
1.4.J Rigging Plans
1.4.I Rigging Plan
1.4.J Maintenance Data and Operating Instructions
1.5.B.2 Equipment Service Provider Information
1.5.C Welder Certification
1.5.D Manuracturer's Recommendations
1.5.C Welder Certification
1.5.D Manuracturer's Recommendations
1.5.E.4 Installer Qualifications
1.5.G Warranty of Construction
1.7.A Updated Mfr's Literature and Data @ Closeout
1.7.B Updated O & Ms @ Closeout
1.7.C As-Built Drawings
1.7.E Certification Documentation for Final Inspection
2.5.E Valve Tag Lists and Plans
3.5 Identification Signage
3.7 Operating and Performance Tests
220519Meters and Gauges for Plumbing Piping
1.4.C Manufacturer's Literature and Data
1.4.D Operating and Maintenance Manuals
1.5 As-Built Documentation
220523General Duty Valves for Plumbing Piping
1.4.C Manufacturer's Literature and Data
1.4.D Test and Balance Reports
1.4.E Operating and Maintenance Manuals
1.6 As-Built Documentation
220711Plumbing Insulation
1.4.C Manufacturer's Literature and Data
1.4.D Shop Drawings
1.6.A Updated Mfr's Lit and Data @ Closeout
1.6.B Updated O&Ms @ Closeout
1.6.B Operation and Maintenance Data
221100Facility Water Distribution
1.4.C Manufacturer's Literature and Data
1.4.D Operating and Maintenance Manuals
1.5.A Welder's Certification
1.4.D Operating and Maintenance Manuals
1.5.A Welder's Certification
1.6.A Updated Mfr's Lit and Data @ Closeout
1.6.B Updated O&Ms @ Closeout
3.2.A Testing Plan
221300Facility Sanitary and Vent Piping
1.4.C Manufacturer's Literature and Data
1.4.D Shop Drawings
1.4.E Operating and Maintenance Manuals
1.4.E Operating and Maintenance Manuals
1.6 As-Built Documentation
3.5 Tests
224000Plumbing Fixtures
1.4.C Manufacturer's Literature and Data
1.4.D Operating and Maintenance Manuals
1.4.D Operating and Maintenance Manuals
1.6.A Updated Mfr's Lit and Data @ Closeout
1.6.B Updated O&Ms @ Closeout
1.6.C As-Built Drawings
226200Vacuum Systems for Laboratory and Healthcare Facilities
1.4.C Manufacturer's Literature and Data
1.4.D Station Inlets - Manufacturer's Letter
1.4.E Certification of Completed System
1.4.F Notarized Affidavit from Verifier
1.5.A Affidavit of Compliance with NFPA 99.
1.5.B Equipment Installer Qualifications
1.5.C Equipment Supplier Qualifications
1.5.D/E Medical Gas System Testing Org. Qualifications
1.5.F Testing Procedure
1.5.G Startup Report from Manufacturer's Rep
1.6.A Maintenance Support and Training
1.7.A Updated Mfr's Lit and Data @ Closeout
1.7.B Updated O&Ms @ Closeout
3.2 Notarized Attestation by Installing Contractor
226300Gas Systems for Laboratory and Healthcare Facilities
1.4.B Medical Gas Partnering & QC Plan
1.4.D Manufacturer's Literature and Data
1.4.E Station Outlets Compliance Letter
1.4.F Certification of Completed System
1.4.G Documentation of Conditions, Reports
1.5.B Equipment Installer Qualifications
1.5.C Equipment Supplier Qualifications
1.5.D/E Lab & HC System Testing Org. Qualifications
1.5.F Testing Procedure
1.5.G Test Documentation Prior to Final Inspection
1.6.A Updated Mfr's Lit and Data @ Closeout
1.6.B Updated O&Ms @ Closeout
1.6.C As-Built Drawings
3.4 Commissioning Documentation
230511Common Work Results for HVAC
1.4.C Phasing Plan/Schedule
1.4.E Documentation for Equivalent Equipment
1.4 F Certification of Manufacturer's Review
1.4.H Coordination/Shop Drawings
1.4.I Manufacturer's Literature and Data
1.4.J Rigging Plans
1.4.K Maintenance Data and Operating Instructions
1.4.M Completed System Readiness Checklist
1.4.N Training Plan & Instructor Qualifications
1.5.E Equipment Service Provider Information
1.5.F Welders Certification
1.5.F Welders Certification
1.5.G Manufacturer's Recommendations
1.5.H.3 Coordination/Shop Drawings
1.5.J Warranty of Construction
1.7.A Updated Mfr's Lit and Data @ Closeout
1.7.B Updated O&Ms @ Closeout
1.7.C As-Built Drawings
1.7.E Certification Documentation
3.8.A Identification Signage
3.9 Startup, Temporary Operation and Testing
3.10 Operating and Performance Tests
3.11.A Commissioning DocumentationSubmit under 230800 Cx of HVAC Systems
3.12.B Training Plans and Instructor QualificationsSubmit under 230800 Cx of HVAC Systems
230541Noise and Vibration Control for HVAC
1.4.C Manufacturer's Literature and Data
1.4.D Isolator Load Calculations
1.6.A As-Built Documentation
230593Testing, Adjusting, and Balancing for HVAC
1.4.C Names & Qualifications of TAB agency
1.4.D Complete set of AABC, NEBB or TABB pubs
1.4.E.1 Design Review Report by TAB Specialist
1.4.E.2 Systems Inspection Report
1.4.E.3 Duct Air Leakage Test Report
1.4.E.3 Duct Air Leakage Test Report
1.4.E.4 System Readiness Report
1.4.E.5 TAB Reports
3.13.A Critical Flow Path Documentation
3.14.A Commissioning DocumentationSubmit under 230800 Cx of HVAC Systems
230711HVAC and Boiler Plant Insulation
1.4.B Shop Drawings - Materials
1.4.C Samples
1.4.C Samples
3.7.A Commissioning DocumentationSubmit under 230800 Cx of HVAC Systems
230800Commissioning of HVAC Systems
3.1.A HVAC System Inspections
3.2.A Pre-Functional Checklists
3.3.A Documentation of Contractor Tests
3.4.A Systems Functional Performance Testing
3.5.A Training Plans and Instructor Qualifications
230923Direct-Digital Control System for HVAC
1.4.A DDC Contractor Qualifications
1.6.A Warranty
1.7.A Shop Drawings
1.7.C Manufacturer's Literature and Data
1.7.D Product Certificates for Compliance
1.7.E Validation Test Plan
1.7.F Software Licenses
1.7.F Software Licenses
1.7.G As-Built Control Drawings
1.7.H Operation and Maintenance Manuals
1.7.I Performance Report
2.5.A BACnet Device PICS
3.2.C.3.h Graphed Trends @ Control Loops
3.3 Startup and Testing
3.4 A Commissioning DocumentationSubmit under 230800 Cx of HVAC Systems
3.5.B Training Plans and Instructor QualificationsSubmit under 230800 Cx of HVAC Systems
232113Hydronic Piping
1.4.C Manufacturer's Literature and Data
1.4.D Welder's Qualifications
1.4.D Coordination Drawings
1.4.E As-Built Piping Diagrams
1.4.F Operating and Maintenance Manuals
1.4.G Completed System Readiness ChecklistSubmit under 230800 Cx of HVAC Systems
1.4.H Training Plan & Instructor QualificationsSubmit under 230800 Cx of HVAC Systems
1.7 Spare Parts
3.7 Startup and Testing
233100HVAC Ducts and Casings
1.4.C Manufacturer's Literature and Data
1.4.D Coordination Drawings
1.4.E Operating and Maintenance Manuals
1.6.A As-Built Documentation
3.2.E Duct Leakage Test Report
3.5 Operating and Performance Tests
233400HVAC Fans
1.4.C Manufacturer's Literature and Data
1.4.D Certified Sound Power Levels
1.4.E Motor Ratings
1.4.F Certified Fan Performance Curves
1.4.G Maintenance and Operating Manuals
1.4.H Completed System Readiness Checklist
1.4.I Training Plan & Instructor Qualifications
1.6.A As-Built Documentation
1.7.A Extra Materials
3.3 Commissioning Documentation
233600Air Terminal Units
1.4.C Manufacturer's Literature and Data
1.4.D Operation and Maintenance Manuals
1.4.E Completed System Readiness ChecklistSubmit under 230800 Cx of HVAC Systems
1.4.F Training Plans and Instructor QualificationsSubmit under 230800 Cx of HVAC Systems
1.6.A As-Built Documentation
233700Air Outlets and Inlets
1.4.C Manufacturer's Literature and Data
1.4.D Operation and Maintenance Manuals
1.6.A As-Built Documentation
3.3 Testing, Adjusting, and BalancingRefer to 23 05 93 TAB specification
3.4 Startup and Testing
237413Packaged, Outdoor, Central-Station Air-Handling Units
1.4.C Manufacturer's Literature and Data
1.4.D Maintenance and Operating Manuals
1.4.E Factory Test Procedures and Results
1.4.E Written Test Procedures
1.4.F Shipping Information
1.4.G Completed System Readiness Checklist
1.4.H Training Plans and Instructor Qualifications
1.6.A As-Built Documentation
3.3 Commissioning Documentation
3.4.B Training Plans and Instructor Qualifications11/30/15
238200Convection Heating and Cooling Units
1.4.C Manufacturer's Literature and Data
1.4.D Certificates of Compliance
1.4.E Operation and Maintenance Manuals
1.4.F Completed System Readiness Checklist
1.4.G Training Plans and Instructor Qualifications
1.6.A As-Built Documentation
3.3.A Commissioning Documentation
3.4.B Training Plans and Instructor Qualifications
238216Air Coils
1.4.C Manufacturer's Literature and Data11/30/15
1.4.D Installation Instructions
1.4.E Certificate of Compliance
1.4.G Operation and Maintenance Manuals
1.4.H Completed System Readiness ChecklistSubmit under 230800 Cx of HVAC Systems
1.4.I Training Plan & Instructor QualificationsSubmit under 230800 Cx of HVAC Systems
1.6.A As-Built Documentation
3.2 Startup and Testing
3.4.A Commissioning DocumentationSubmit under 230800 Cx of HVAC Systems
260511Requirements for Electrical Installations
1.4.C Equipment Service Provider Information
1.12.F Maintenance and Operating Manuals
1.12.H Samples
1.14 Acceptance Checks and Tests
1.15 Warranty
1.16.C Training Schedule
260519Low Voltage Electrical Power Conductors and Cables
1.4.A.1 Shop Drawings and Product Data
1.4.A.2.a Manufacturer's Certification
1.4.A.2.b Contractor's Certification
3.8 Acceptance Checks and Tests
260526Grounding and Bonding for Electrical Systems
1.4.A.1 Shop Drawings
1.4.A.2 Test Reports
1.4.A.3.a Contractor's Certifications
260533Raceway and Boxes for Electrical Systems
1.4.A.1 Shop Drawings and Product Data
1.4.A.2.a Manufacturer's Certification
1.4.A.2.b Contractor's Certification
260536.26Wireways for Radiology Equipment
1.4.A.1.a Manufacturer's Cut Sheets
1.4.A.1.b Shop Drawings
1.4.A.2 Certifications
260800Commissioning of Electrical Systems
3.1.A Electrical System Inspections
3.2 Pre-Functional Checklists
3.3.A Documentation of Contractor Tests
3.4.A Systems Functional Performance Testing
3.5 Training Agenda and Trainer Resumes
260923Lighting Controls
1.4.A.1 Shop Drawings and Product Data
1.4.A.2 Maintenance and Operating Manuals
1.4.A.3 Contractor's Certification
3.4.B Written Instructions for Training and Maintenance
262416Panelboards
1.4.A.1 Shop Drawings and Product Data
1.4.A.1.c Manufacturer's Certification - Seismic Testing
1.4.A.2 Maintenance and Operating Manuals
1.4.A.3.a Manufacturer's Certification
1.4.A.3.b Contractor's Certification
3.2 Acceptance Checks and Tests
3.3 Follow-up Verification
262600Power Distribution Units for Static Uniterruptible Power Systems
1.4.A.1 Shop Drawings and Product Data
1.4.A.1.c Manufacturer's Certification - Seismic Testing
1.4.A.2 Maintenance and Operating Manuals
1.4.A.3.a Manufacturer's Certification
1.4.A.3.b Contractor's Certification
3.2 Acceptance Checks and Tests
3.3 Follow-up Verification
3.4.A Instruction
262726Wiring Devices
1.4.A.1 Shop Drawings and Product Data
1.4.A.2 Maintenance and Operating Manuals
1.4.A.3.a Manufacturer's Certification
1.4.A.3.b Contractor's Certification
3.2 Acceptance Checks and Tests9/29/16
262911Motor Controllers
1.4.A.1 Shop Drawings and Product Data
1.4.A.1.c Manufacturer's Certification - Seismic Testing
1.4.A.2 Maintenance and Operating Manuals
1.4.A.3.a Manufacturer's Certification
1.4.A.3.b Contractor's Certification
3.2 Acceptance Checks and Tests
3.3 Follow-up Verification
3.4.A Spare Fuses
3.5.A Instruction
262921Enclosed Switches and Circuit Breakers
1.4.A.1 Shop Drawings and Product Data
1.4.A.1.c Manufacturer's Certification - Seismic Testing
1.4.A.2 Maintenance and Operating Manuals
1.4.A.3.a Manufacturer's Certification11/30/15
1.4.A.3.b Contractor's Certification11/30/15
3.2 Acceptance Checks and Tests
3.3.A Spare Fuses
265100Interior Lighting
1.4.A.1 Shop Drawings and Product Data
1.4.A.2 Maintenance and Operating Manuals
1.4.A.3 Contractor's Certification
3.2 Acceptance Checks and Tests
3.3 Follow-up Verification
270511Requirements for Communications Installations
1.7.B Parts List
1.7.C Manufacturer's Product Information
1.7.D Source Quality Control Submittal
1.7.E Installer Qualifications
1.7.F Delegated Design Submittals
1.7.G Equipment Anchor and Support Submittals
1.7.H.2 Test Equipment List
1.7.H.4 Sample Test and Evaluation Reports
1.7.I Submittal Drawings and Schedules
1.7.J Sustainable Design Submittals
1.7.K Certified Test Reports
1.8.A.1 Warranty
1.8.A.2 Written Notice of Compliance
1.8.A.3 Project Record Documents
1.8.A.4 Instruction Manuals and Software
1.8.B Maintenance and Operating Manuals
1.8.C Record Wiring Diagrams
1.8.D Service Organization Qualifications
1.9 Maintenance Material Submittals
1.10.C Trade Contractor Qualifications
1.10.D System Supplier Qualifications
1.10.E OEM Certifications of Installers
3.4.A Identification Signage
3.6.G.1 Interim Inspection
3.6.G.11 Interim Inspection Reports
3.6.H.3 Pre-Acceptance Certification
3.6.I Acceptance Test
3.6.M.1 Proof of Performance Certification
3.8.C Training Schedule
270533Raceways and Boxes for Comm. Systems
1.3.A.1 Size and Location of Equipment
1.3.A.2 Layout of Conduit Penetrations
1.3.A.3 Catalog Cuts
1.3.B Contractor's Certification
3.2 Testing
271500Communications Structured Cabling
1.3.A.1 Pictoral Layouts
1.3.A.2 List of Test Equipment
1.3.B.1 OEM Certifications for Installer & Maintenance
1.3.B.2/3 Pre-Acceptance Certification
1.3.C Closeout Submittals
1.4 Warranty of Construction
3.2.A.6 Interim Inspection Reports
3.2.B Pretesting
3.2.C Acceptance Test
3.2.D Verification Tests
3.2.E Performance Testing
3.2.F Totally System Performance Test
3.2.A.6 Interim Inspection Reports
3.3.A.4 Deficiency Report SampleAt beginning of total system acceptance test
280500Common Work Results for Electronic Safety and Security
1.4.A Manufacturers Qualifications
1.4.B Product Qualifications
1.4.C Contractor Qualifications
1.4.D Service Qualifications
1.6.F Group I Technical Data Package
1.6.G Group II Technical Data Package
1.6.H Group III Technical Data Package
1.6.I Group IV Technical Data Package
1.6.J Group V Technical Data Package
1.6.L Samples
1.6.M Completed System Readiness Checklists
1.9.H Maintenance and Service Records & Logs
1.20.A Warranty
3.3.A Commissioning Documentation
3.4.E Training Plans and Instructor Qualifications
3.7.A.1 Testing and Acceptance
3.7.A.2 Test Reports
280513Conductors and Cables for Elec. Safety & Sec.
1.5.A.1 Manufacturer's Literature and Data
1.5.A.2 Contractor's Certification - Materials
1.5.A.3 Shop Drawings
1.5.A.4 Wiring Diagrams
1.5.A.5 Cable Administrative Drawings
1.5.A.6 Project Planning Documents
1.5.A.7 Maintenance Data
3.6 Wire Markers and Brass Tags
3.7.C Tests and Inspections
3.7.F Test and Inspection Reports
280526Grounding and Bonding for Electronic Safety and Security
1.3 B Shop Drawings
1.3 C Test Reports
1.3 D Certifications
3.9.A Labeling
3.10 B Test and Inspections
3.10 D Test and Inspection Reports
280528.33Conduits and Backboxes for Elec. Safety & Sec.
1.5.B Shop Drawings
1.5.C Certification that Materials Comply
1.5.D Completed System Readiness Checklist
1.5.D Product Data
1.5.E Shop Drawings for Raceway Components
1.5.F Coordination Drawings
1.5.G Source Quality Control Test Reports
3.9.A Commissioning Documentation
280800Commissioning of Electronic Safety and Security Systems
3.2.A Pre-Functional Checklists
3.3.A Contractor Tests
3.4.A Systems Functional Performance Testing
3.5.A Training
281300Physical Access Control System
1.3.C Manufacturer's Qualifications
1.3.D Product Qualifications
1.3.E Contractor Qualifications
1.3.F Service Organization Qualifications
1.4.B Certificates of Compliance
1.4.D Pre-installation Package
1.4.D As-built Design Package
1.4.F Manufacturer's Product Cut Sheets
1.4.G Manufacturer's UL Certification
1.4.H Completed System Readiness Checklist
1.4.J Group 1 Technical Data Package
1.4.K Group II Technical Data Package
1.4.L Group III Technical Data Package
1.4.M Group IV Technical Data Package
1.4.N Group V Technical Data Package
1.4.O FIPS 201 Compliance Certificates
1.8.G Maintenance Records and Logs
1.11 Warranty of Construction
3.10.C Field Tests & Inspection Reports
3.12.A Commissioning Documentation
3.13.B Training Plans and Instructor Qualifications
281600Intrusion Detection System
1.5.B Certificate of Compliance
1.5.C Pre-installtion Package
1.5.C As-Built Package
1.5 F Manufacturer Cut Sheets
1.5 G Manufacture's UL Certification
1.5.H Completed System Readiness Checklists
1.9 A Warranty of Construction
3.4 Startup and Testing
3.5.A Commissioning Documentation
3.6 C Training plans and Instructor Qualification
282300Video Surveillance
1.4.D Manufacturers Qualifications
1.4.E Product Qualifications
1.4.F Contractor Qualifications
1.4.G Service Qualifications
1.5.C Pre-installation Package
1.5.C As-Built Package
1.5.F Manufacturer Cut Sheets
1.5 G Manufacture's UL Certification
1.5.H Completed System Readiness Checklists
1.8 Warranty of Construction
3.3 System Start-Up
3.5.A Commissioning Documentation
3.5 C Training plans and Instructor Qualification
283100Fire Detection and Alarm
1.4.B.2 Floor Plans
1.4.B.3 Riser Diagrams
1.4.B.4 Wiring Diagrams
1.4.B.5 As-Built Drawings
1.4.C.1 Maintenance and Operating Manuals
1.4.C.2 Final Maintenance & Operating Manuals
1.4.D Certifications
1.5 Warranty
2.10 Spare Parts
2.11 Instruction Chart
3.5.A Instruction and Training
3.5.B Sequence of Operation

Sheet2

Sheet3