This is Amendment 0003 to solicitation 36C25026B0022 for Site Prep D758 & D759 506-CSI-133 at the Ann Arbor, Michigan VAMC, issued by the Department of Veterans Affairs Network Contracting Office on February 9, 2026. The amendment provides responses to Requests for Information (RFI) and clarifications to drawing notes. In response to an RFI question regarding conduit specifications for chilled water pipe installation, the government specifies that 3" Schedule 10 PVC conduits are acceptable, with the Mechanical Contractor responsible for procurement and coordination as noted on plumbing plans. Additionally, the amendment includes two drawing clarifications: Drawing MH101 (Mechanical Seventh Floor Plan - New Work) requires changing Keyed Note 16 from 6" diameter to 3" diameter, and Drawing MH102 (Mechanical Eighth Floor Plan - New Work, Partial Eighth Floor Plan) requires changing Keyed Note 1 to Keyed Note 9, with reference to the correct note shown on the Partial Eighth Floor Plan serving room D732 below.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25026B0022 – 0002 – Site Prep D758 & D759 – 506-CSI-133 – Ann Arbor, MI VAMC
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-09-2026 506-26-2-586-0008
506-CSI-133
36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Drive Suite M-2200 Ann Arbor MI 48105 Y Same as Block 6
To all Offerors/Bidders
36C25026B0022 01-15-2026
X X X The purpose of this Amendment is:
1. Issue response to RFI received.
2. Provide two (2) clarifications to drawing notes.
End of Amendment 0003
SCOTT BRENNAN
Senior Contract Specialist
NCO1015L3-0962
SF 30 CONTINUATION PAGE 36C25026B0022 AMENDMENT 0003
THE FOLLOWING ANSWERS TO REQUESTS FOR INFORMATION QUESTIONS ARE HEREBY PROVIDED TO CLARIFY, UPDATE, REVISE, OR CORRECT CONTRACT SPECIFICATIONS AND/OR DRAWINGS.
QUESTIONS AND ANSWERS
1. Question: Drawing PP101 shows a "Conduit" to install the chilled water pipe in. What is the size and material required for this conduit material?
Answer 1: The conduits for carrying the chilled water pipes may be 3” Schedule 10 PVC. Mechanical Contractor is responsible for the conduits and is noted on plumbing plans for coordination purposes.
*** Additional Drawings clarifications.
1. DRAWING MH101 - MECHANICAL SEVENTH FLOOR PLAN – NEW WORK; Keyed Note 16. CHANGE 6” DIA to 3” DIA.
1. DRAWING MH102 – MECHANICAL EIGHTH FLOOR PLAN – NEW WORK; 2 - PARTIAL EIGHTH FLOOR PLAN; CHANGE Keyed Note 1 to Keyed Note 9. (Keyed Note 1 is correctly shown on; 1 - PARTIAL EIGHTH FLOOR PLAN serving room D732 below).