Drawings -506-CSI-133 Site Prep For Nuclear Med Rooms D758 and D759_10 12302025.pdf
PDF 32 MB Posted
- Attached to
- Z1DA--Site Prep for D758 & D759 506-CSI-133
- Solicitation number
- 36C25026B0022
About this file
This document is a comprehensive set of architectural and engineering drawings for a site preparation project for Nuclear Medicine Rooms D758 and D759 at the Veterans Affairs Healthcare System located at 11549 Clara Barton Dr, Fairfax, Virginia. The project involves a phased renovation of the seventh floor, with specific focus on reconfiguring imaging rooms, control rooms, and associated spaces for SPECT/CT and PET/CT equipment installation. The drawings detail demolition and new construction work across multiple floors (sixth, seventh, and eighth), including comprehensive plans for mechanical, electrical, plumbing, and fire protection systems.
The project is divided into two main phases, Phase 1 and Phase 2, each with specific renovation objectives. Phase 1 involves renovating areas around the D731 office and preparing for SPECT/CT imaging equipment installation, while Phase 2 focuses on the PET/CT imaging room and surrounding spaces. Critical considerations include maintaining operational continuity for adjacent spaces, implementing infection control measures, coordinating equipment vendor installations, and ensuring minimal disruption to patient care services. The project includes lead shielding, new wall configurations, updated MEP systems, and specialized room finishes tailored to nuclear medicine imaging requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.: 506-CSI-133
PROJECT TEAM
PROJECT LEADER / ARCHITECT
PENN CONSTRUCTION GROUP
VETERANS AFFAIRS HEALTHCARE SYSTEM
2215 FULLER ROAD
ANN ARBOR, MI 48105
CAMPUS MAP SHEET INDEX
IN THE CASE OF CONFLICTS OR DISCREPANCIES
WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS
OR GREATER QUANTITY OF WORK, AS DETERMINED
BY THE GOVERNMENT, SHALL BE PROVIDED.
MECHANICAL
PENN CONSTRUCTION GROUP
PLUMBING
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
SHEET NUMBER SHEET NAME
PENN CONSTRUCTION GROUP
GENERAL INFORMATION
GI001 TITLE SHEET
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
GI001
KAB
TITLE SHEET
HFB
ISSUED FOR
65% DD
08/25/2025
ISSUED FOR
95% CD
11/19/2025
11549 Clara Barton Dr Fairfax, VA 22039
ELECTRICAL
PENN CONSTRUCTION GROUP
NORTH
SITE PLAN
ARCHITECTURAL
A001 LEGENDS, ABBREVIATIONS, AND NOTES
A002 SEVENTH FLOOR OVERALL EXISTING PLAN
PHASE 1 PLANS
AD101
SEVENTH FLOOR PLAN - NEW WORK
PROJECT
LOCATION
11549 Clara Barton Dr Fairfax, VA 22039
11549 Clara Barton Dr Fairfax, VA 22039
11549 Clara Barton Dr Fairfax, VA 22039
MECHANICAL
ELECTRICAL
E001 LEGEND, ABBREVIATIONS, AND NOTES
ED101 SEVENTH FLOOR PLAN - DEMOLITION
FIRE PROTECTION
F001 LEGENDS, ABBREVIATIONS, AND NOTES
FD101 SEVENTH FLOOR PLAN - DEMOLITION
M001 LEGEND AND ABBREVIATIONS
MD101 SEVENTH FLOOR PLAN - DEMOLITION
M501
M601
DETAILS
SCHEDULES
PLUMBING
P001 LEGEND, ABBREVIATIONS, AND SCHEDULES
PD101 SIXTH FLOOR PLAN - DEMOLITION
GC101
E501 DETAILS AND DIAGRAMS
EP101 SEVENTH FLOOR PLAN - POWER
FIRE PROTECTION
PENN CONSTRUCTION GROUP
11549 Clara Barton Dr Fairfax, VA 22039
NORTH
LOCATION MAP
ISSUED FOR
35% SD
05/21/2025
ISSUED FOR
100% BID DOCS
12/23/2025
AD102 SEVENTH FLOOR REFLECTED CEILING PLAN - DEMOLITION
X
X X
X
SEVENTH FLOOR PLAN - LEAD SHIELDING
GC102
X
MD102 EIGHTH FLOOR PLAN - DEMOLITION
X X
X
X X X
X
X
E401 SEVENTH FLOOR ENLARGED PLANS
X X
X X
PD102 SEVENTH FLOOR PLAN - DEMOLITION X
PD103 EIGHTH FLOOR PLAN - DEMOLITION
PP101 SIXTH FLOOR PLAN - NEW WORK
PP102 SEVENTH FLOOR PLAN - NEW WORK
PP103 EIGHTH FLOOR PLAN - NEW WORK
X X X X X X X
MH101 SEVENTH FLOOR PLAN - NEW WORK
MH102 EIGHTH FLOOR PLAN - NEW WORK
MH103 ROOF PLAN - NEW WORK
X X X
X
X
X X X
FX101 SEVENTH FLOOR PLAN - NEW WORK
X
X
X X
M502 DETAILS X
EL101
E502 DETAILS AND DIAGRAMS
E601 SCHEDULES AND ONE-LINE DIAGRAM
SEVENTH FLOOR PLAN - LIGHTING
X X
X X X
X
X X
GC103
GC104
GC105
PHASE 2 PLANS
INFECTION CONTROL GENERAL NOTES AND DETAILS
INFECTION CONTROL PLANS
X
X
X X X X
A101
AC101 SEVENTH FLOOR REFLECTED CEILING PLAN - NEW WORK
AE101 SEVENTH FLOOR EQUIPMENT PLAN
AE102 SEVENTH FLOOR EQUIPMENT SCHEDULE
A501 DETAILS
AF101 SEVENTH FLOOR FINISHES PLAN
A601 SCHEDULES AND DETAILS
A701 INTERIOR ELEVATIONS
SEVENTH FLOOR PLAN - DEMOLITION
X X X X X X X X X X X X
X
XFL101 SEVENTH FLOOR LIFE SAFETY PLAN
X
P401 ISOMETRICS X
MD103 ROOF PLAN - DEMOLITION X
ISSUED FOR
65% RESUBMIT
09/26/2025
X X X X X X X
X X X
X
X
X X X
X
X X
X
X X
X X X
X
X X
X
X
X X X X
X X X X X X X X X X X X
X
X
X
EP102 PARTIAL SEVENTH FLOOR RACEWAY PLAN X
X X
X X X
X
X X
X X X X X X X
X X X
X
X
X X X
X
X X
X
X
X
X X X X
X X X X X X X X X X X X
X
X
X
X
X
X X X X
X
X X
X X X
X
X X
X X X X X X X
X X X
X
X
X X X
X
X X
X
X X X X X X X X X X X X
X
X
X
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
January 2, 2026
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
GC101
KABHFB
GENERAL
PHASE 1 PLANS
1 1/8" = 1'-0"
SIXTH FLOOR PLAN - PHASE 1 2 1/8" = 1'-0"
SEVENTH FLOOR PLAN - PHASE 1 3 1/8" = 1'-0"
EIGHTH FLOOR PLAN - PHASE 1
AutoCAD SHX Text
OAV
AutoCAD SHX Text
BRKT
AutoCAD SHX Text
TOILET
AutoCAD SHX Text D745
AutoCAD SHX Text
TOILET
AutoCAD SHX Text D746
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE
AutoCAD SHX Text D756
AutoCAD SHX Text
MECH.
AutoCAD SHX Text D756A
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D742
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D740
AutoCAD SHX Text
DOSE
AutoCAD SHX Text
ADMINISTRATION
AutoCAD SHX Text D738
AutoCAD SHX Text
RADIOACTIVE
AutoCAD SHX Text
WASTE STOR.
AutoCAD SHX Text D736
AutoCAD SHX Text
RADIOCHEM
AutoCAD SHX Text
LAB
AutoCAD SHX Text D734
AutoCAD SHX Text
HOT LAB
AutoCAD SHX Text D764
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE
AutoCAD SHX Text D768
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE 2
AutoCAD SHX Text D766
AutoCAD SHX Text
UNISEX
AutoCAD SHX Text
CHANGING
AutoCAD SHX Text D761
AutoCAD SHX Text
IMAGING
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D763
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-19
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text D744
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text D743
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text D741
AutoCAD SHX Text
BIOASSAY
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D739
AutoCAD SHX Text
BONE
AutoCAD SHX Text
DENSITOMETRY
AutoCAD SHX Text D737
AutoCAD SHX Text
SCAN
AutoCAD SHX Text
READING
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D733
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
PROCEDURE
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-26
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-22
AutoCAD SHX Text
IMAGING
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D762
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-25
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
TLT
AutoCAD SHX Text D771
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
TLT
AutoCAD SHX Text D765
AutoCAD SHX Text
PROCEDURE
AutoCAD SHX Text
DECON.
AutoCAD SHX Text D720B
AutoCAD SHX Text
HOT
AutoCAD SHX Text
WAITING
AutoCAD SHX Text D767
AutoCAD SHX Text
COLD
AutoCAD SHX Text
WAITING
AutoCAD SHX Text D730
AutoCAD SHX Text
HAC
AutoCAD SHX Text
TOILET
AutoCAD SHX Text D703A
AutoCAD SHX Text
CARDIOLOGY
AutoCAD SHX Text
PRE/POST
AutoCAD SHX Text
RECOVERY
AutoCAD SHX Text D703
AutoCAD SHX Text
CORR.
AutoCAD SHX Text C7-11
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-6
AutoCAD SHX Text
PROGRAM
AutoCAD SHX Text
ANALYST
AutoCAD SHX Text D754
AutoCAD SHX Text
IMAGING
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D758
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D760
AutoCAD SHX Text
SPECT/CT
AutoCAD SHX Text
IMAGING RM.
AutoCAD SHX Text
400 SF
AutoCAD SHX Text D759
AutoCAD SHX Text
CONTROL RM.
AutoCAD SHX Text
124 SF
AutoCAD SHX Text D759A
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE
AutoCAD SHX Text
161 SF
AutoCAD SHX Text D732
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
263 SF
AutoCAD SHX Text D731
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
CDE-6
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
CDE-8
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. DO NOT PROCEED TO ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. DO NOT PROCEED TO NEXT PHASE UNTIL APPROVED BY VA COR. 2. REFER TO GC103 AND GC104 FOR INFECTION CONTROL NOTES AND PLANS. REFER TO GC103 AND GC104 FOR INFECTION CONTROL NOTES AND PLANS. 3. COORDINATE WITH COR A MINIMUM OF TWO WEEKS IN ADVANCE FOR ANY SHUT DOWN OR COORDINATE WITH COR A MINIMUM OF TWO WEEKS IN ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT ONE FLOOR/WING OR SERVICE/DEPARTMENT AT A TIME. OUTAGE MUST BE SUBMITTED IN WRITING TO THE COR AND APPROVED IN WRITING. 4. COORDINATE WITH COR A MINIMUM OF FOUR WEEKS IN ADVANCE FOR ANY SHUT DOWN OR COORDINATE WITH COR A MINIMUM OF FOUR WEEKS IN ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT MULTIPLE FLOORS WITHIN THE BUILDING. OUTAGE MUST BE SUBMITTED IN WRITING TO THE COR AND APPROVED IN WRITING. 5. WORKING HOURS ARE 7:00 AM TO 3:30 PM UNLESS OTHERWISE STATED OR PRE-APPROVED. WORKING HOURS ARE 7:00 AM TO 3:30 PM UNLESS OTHERWISE STATED OR PRE-APPROVED. 6. LOUD CONSTRUCTION RELATED ACTIVITIES MUST BE COORDINATED WITH THE PROJECT COR LOUD CONSTRUCTION RELATED ACTIVITIES MUST BE COORDINATED WITH THE PROJECT COR AND CCR SO THERE ARE MINIMAL DEPARTMENT DISRUPTIONS WITH PATIENT CARE.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text
PHASE 1A NOTES - SEVENTH FLOOR
AutoCAD SHX Text
PHASE 1 NOTES - EIGHTH FLOOR
AutoCAD SHX Text
PHASE 1 NOTES - SIXTH FLOOR
AutoCAD SHX Text
COMPLETE PLUMBING WORK RELATED TO SEVENTH FLOOR PHASE 1 RENOVATIONS.
AutoCAD SHX Text PRE-FINAL INSPECTION PUNCH LIST FINAL INSPECTION REMOVE CONSTRUCTION/DUST/ICRA CONTROL BARRIERS. ACTIVATION OF PHASE 1A SPACES BY VA SCRIPT SERVICE.
AutoCAD SHX Text PATIENT CHECK-IN FUNCTION OF D731 OFFICE TO REMAIN OPERATIONAL THROUGHOUT DURATION OF PHASE 1A. INSTALL TEMPORARY CONSTRUCTION/DUST/ICRA CONTROL BARRIERS FOR NEW CORRIDOR DOOR AT D731 OFFICE. COMPLETE DEMO WORK AT COUNTERTOP AND WALL. INSTALL NEW CORRIDOR DOOR AT D731 OFFICE. PATCH FINISHES AND HANDRAIL AT CORRIDOR C7-6 TO MATCH EXISTING.
AutoCAD SHX Text
COMPLETE MECHANICAL WORK RELATED TO SEVENTH FLOOR PHASE 1 RENOVATIONS.
AutoCAD SHX Text
PHASE 1B NOTES - SEVENTH FLOOR
AutoCAD SHX Text COMPLETE NEW CONSTRUCTION WORK WITHIN PHASE 1B AREA. PRE-FINAL INSPECTION PUNCH LIST FINAL INSPECTION REMOVE CONSTRUCTION/DUST/ICRA CONTROL BARRIERS. DELIVERY AND INSTALLMENT OF SPECT/CT IMAGING EQUIPMENT AT D759 IMAGING ROOM BY VENDOR. ACTIVATION OF PHASE 1B SPACES BY VA SCRIPT SERVICE
AutoCAD SHX Text D758 IMAGING ROOM, D760 CONTROL ROOM, D754 PROGRAM ANALYST, AND PATIENT CHECK-IN FUNCTION OF D731 OFFICE TO REMAIN OPERATIONAL THROUGHOUT PHASE 1B. VENDOR TO REMOVE EXISTING IMAGING EQUIPMENT IN D759 IMAGING ROOM. INSTALL TEMPORARY CONSTRUCTION/DUST CONTROL BARRIERS. REMOVE EXISTING WALLS, FINISHES, FIXTURES, AND MEP COMPONENTS WITHIN PHASE 1B AREA AS SHOWN IN DEMOLITION DRAWINGS.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 1A WORK AREA
AutoCAD SHX Text
PHASE 1B WORK AREA
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
January 2, 2026
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
GC102
KABHFB
GENERAL
PHASE 2 PLANS
1 1/8" = 1'-0"
SIXTH FLOOR PLAN - PHASE 2 2 1/8" = 1'-0"
SEVENTH FLOOR PLAN - PHASE 2 3 1/8" = 1'-0"
EIGHTH FLOOR PLAN - PHASE 2 4 1/8" = 1'-0"
ROOF PLAN - PHASE 2
AutoCAD SHX Text
OAV
AutoCAD SHX Text
BRKT
AutoCAD SHX Text
TOILET
AutoCAD SHX Text D745
AutoCAD SHX Text
TOILET
AutoCAD SHX Text D746
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE
AutoCAD SHX Text D756
AutoCAD SHX Text
MECH.
AutoCAD SHX Text D756A
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D742
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D740
AutoCAD SHX Text
DOSE
AutoCAD SHX Text
ADMINISTRATION
AutoCAD SHX Text D738
AutoCAD SHX Text
RADIOACTIVE
AutoCAD SHX Text
WASTE STOR.
AutoCAD SHX Text D736
AutoCAD SHX Text
RADIOCHEM
AutoCAD SHX Text
LAB
AutoCAD SHX Text D734
AutoCAD SHX Text
HOT LAB
AutoCAD SHX Text D764
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE
AutoCAD SHX Text D768
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE 2
AutoCAD SHX Text D766
AutoCAD SHX Text
UNISEX
AutoCAD SHX Text
CHANGING
AutoCAD SHX Text D761
AutoCAD SHX Text
IMAGING
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D763
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-19
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-26
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-22
AutoCAD SHX Text
IMAGING
AutoCAD SHX Text
ROOM
AutoCAD SHX Text D762
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C7-25
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
TLT
AutoCAD SHX Text D771
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
TLT
AutoCAD SHX Text D765
AutoCAD SHX Text
HOT
AutoCAD SHX Text
WAITING
AutoCAD SHX Text D767
AutoCAD SHX Text
COLD
AutoCAD SHX Text
WAITING
AutoCAD SHX Text D730
AutoCAD SHX Text
TOILET
AutoCAD SHX Text D703A
AutoCAD SHX Text
CARDIOLOGY
AutoCAD SHX Text
PRE/POST
AutoCAD SHX Text
RECOVERY
AutoCAD SHX Text D703
AutoCAD SHX Text
CORR.
AutoCAD SHX Text C7-11
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
SPECT/CT
AutoCAD SHX Text
IMAGING RM.
AutoCAD SHX Text
400 SF
AutoCAD SHX Text D759
AutoCAD SHX Text
CONTROL RM.
AutoCAD SHX Text
124 SF
AutoCAD SHX Text D759A
AutoCAD SHX Text
PATIENT
AutoCAD SHX Text
UPTAKE
AutoCAD SHX Text
161 SF
AutoCAD SHX Text D732
AutoCAD SHX Text
PET/CT
AutoCAD SHX Text
IMAGING RM.
AutoCAD SHX Text
406 SF
AutoCAD SHX Text D758
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
RM.
AutoCAD SHX Text
153 SF
AutoCAD SHX Text D760
AutoCAD SHX Text
SPECT/CT
AutoCAD SHX Text
EQUIP. RM.
AutoCAD SHX Text
155 SF
AutoCAD SHX Text D754
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
CDE-6
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
CDE-8
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. DO NOT PROCEED TO ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. DO NOT PROCEED TO NEXT PHASE UNTIL APPROVED BY VA COR. 2. REFER TO GC103 AND GC104 FOR INFECTION CONTROL NOTES AND PLANS. REFER TO GC103 AND GC104 FOR INFECTION CONTROL NOTES AND PLANS. 3. COORDINATE WITH COR A MINIMUM OF TWO WEEKS IN ADVANCE FOR ANY SHUT DOWN OR COORDINATE WITH COR A MINIMUM OF TWO WEEKS IN ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT ONE FLOOR/WING OR SERVICE/DEPARTMENT AT A TIME. OUTAGE MUST BE SUBMITTED IN WRITING TO THE COR AND APPROVED IN WRITING. 4. COORDINATE WITH COR A MINIMUM OF FOUR WEEKS IN ADVANCE FOR ANY SHUT DOWN OR COORDINATE WITH COR A MINIMUM OF FOUR WEEKS IN ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT MULTIPLE FLOORS WITHIN THE BUILDING. OUTAGE MUST BE SUBMITTED IN WRITING TO THE COR AND APPROVED IN WRITING. 5. WORKING HOURS ARE 7:00 AM TO 3:30 PM UNLESS OTHERWISE STATED OR PRE-APPROVED. WORKING HOURS ARE 7:00 AM TO 3:30 PM UNLESS OTHERWISE STATED OR PRE-APPROVED. 6. LOUD CONSTRUCTION RELATED ACTIVITIES MUST BE COORDINATED WITH THE PROJECT COR LOUD CONSTRUCTION RELATED ACTIVITIES MUST BE COORDINATED WITH THE PROJECT COR AND CCR SO THERE ARE MINIMAL DEPARTMENT DISRUPTIONS WITH PATIENT CARE.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text
PHASE 2 NOTES - SEVENTH FLOOR
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 2 WORK AREA
AutoCAD SHX Text
PHASE 2 NOTES - EIGHTH FLOOR
AutoCAD SHX Text
PHASE 2 NOTES - SIXTH FLOOR
AutoCAD SHX Text
PHASE 2 NOTES - ROOF
AutoCAD SHX Text
COMPLETE PLUMBING WORK RELATED TO SEVENTH FLOOR PHASE 2 RENOVATIONS.
AutoCAD SHX Text ALL ROOMS WITHIN THE PROJECT AREA, EXCEPT D758 IMAGING ROOM, EXCEPT D758 IMAGING ROOM, D758 IMAGING ROOM, D754 PROGRAM ANALYST, AND THE NORTH HALF OF D760 CONTROL ROOM, ARE TO REMAIN OPERATIONAL THROUGHOUT DURATION OF PHASE 2. VENDOR TO REMOVE EXISTING IMAGING EQUIPMENT IN D758 IMAGING ROOM. INSTALL TEMPORARY CONSTRUCTION/DUST/ICRA CONTROL BARRIERS. REMOVE EXISTING WALLS, FINISHES, FIXTURES, AND MEP COMPONENTS WITHIN PHASE 2 AREA AS SHOWN IN DEMOLITION DRAWINGS. COMPLETE NEW CONSTRUCTION WORK WITHIN PHASE 2 AREA. PRE-FINAL INSPECTION PUNCH LIST FINAL INSPECTION REMOVE CONSTRUCTION/DUST/ICRA CONTROL BARRIERS. DELIVERY AND INSTALLMENT OF PET/CT IMAGING EQUIPMENT AT D758 IMAGING ROOM BY VENDOR. ACTIVATION OF PHASE 2 SPACES BY VA SCRIPT SERVICE.
AutoCAD SHX Text COMPLETE PLUMBING AND MECHANICAL WORK RELATED TO SEVENTH FLOOR PHASE 2 RENOVATIONS.
AutoCAD SHX Text REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED PIPING, CONDUIT, AND LIGHTNING PROTECTION. INSTALL NEW EQUIPMENT RAILS, CONDENSING UNIT, PIPING, CONDUIT, AND LIGHTNING PROTECTION.
GC103
KAB
INFECTION CONTROL
GENERAL NOTES AND
DETAILS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
1/2" = 1'-0"
1 HOUR CONSTRUCTION (UL #465) & INFECTION CONTROL BARRIER1
ICB-1
1/2" = 1'-0"2
ICB-2
6 MIL. POLY CRITICAL BARRIER
INFECTION CONTROL GENERAL NOTES:
CONSTRUCTION, RENOVATION, AND/OR MAINTENANCE ACTIVITY CATEGORY
PATIENT RISK CATEGORY
LEVEL OF INFECTION PREVENTION AND CONTROL PRECAUTIONS
INFECTION CONTROL RISK ASSESSMENT:
ALTERNATIVE TO OUTDOOR EXHAUST REQUIREMENTS
ALTERNATIVE TO OUTDOOR EXHAUST REQUIREMENTS
REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS
MIN. NFECTION PREVENTION AND CONTROL MEASURES REQ'D UPON COMPLETION OF THE ACTIVITY
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
GC104
KABHFB
GENERAL
INFECTION CONTROL PLANS
1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN - PHASE 1
NORTH
3 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN -PHASE 2
NORTH
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN - PHASE 1
NORTH
GC105
KABHFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
GENERAL
SEVENTH FLOOR PLAN -
LEAD SHIELDING
1 1/8" = 1'-0"
SEVENTH FLOOR PLAN - EXISTING SHIELDING
NORTH
2 1/8" = 1'-0"
SEVENTH FLOOR PLAN - NEW SHIELDING
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
KAB
ARCHITECTURAL
LEGENDS, ABBREVIATIONS,
AND NOTES
HFB
A001
AD101
AD102
A101
AC101
AF101
AE101
AD101
AD102
A101
AC101
AF101
AE101
A002
KABHFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
ARCHITECTURAL
SEVENTH FLOOR
OVERALL EXISTING PLAN
1 1/8" = 1'-0"
SEVENTH FLOOR PLAN
AD101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
ARCHITECTURAL
SEVENTH FLOOR PLAN -
DEMOLITION
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
AD102
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
ARCHITECTURAL
SEVENTH FLOOR REFLECTED
CEILING PLAN - DEMOLITION
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN1 1/4" = 1'-0"
NORTH NORTH
A101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
ARCHITECTURAL
SEVENTH FLOOR ENLARGED
PLANS - NEW WORK
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
1 1/4" = 1'-0"
AC101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
ARCHITECTURAL
SEVENTH FLOOR REFLECTED
CEILING PLAN - NEW WORK
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN1 1/4" = 1'-0"
NORTH NORTH
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
AE101
KABHFB
ARCHITECTURAL
SEVENTH FLOOR
EQUIPMENT PLAN
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
1 1/4" = 1'-0"
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
AE102
KABHFB
ARCHITECTURAL
SEVENTH FLOOR
EQUIPMENT SCHEDULE
AF101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
ARCHITECTURAL
SEVENTH FLOOR
FINISHES PLAN
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
1 1/4" = 1'-0"
DRAWER
ADJ. SHELF
A501
KABHFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
ARCHITECTURAL
DETAILS
1 1" = 1'-0"
PARTITION TYPES
2 1-1/2" = 1'-0"
TYPICAL CABINETRY SECTION 3 1-1/2" = 1'-0"
CABINETRY SECTION @ SINK 4 1-1/2" = 1'-0"
OFFICE AREA CABINETRY SECTION 5 1-1/2" = 1'-0"
CONTROL ROOM DESK SECTION
DOOR SCHEDULE
DOOR
GLASS
TYPEDOOR NO. ROOM NO. ROOM NAME TYPE MATERIAL FINISH
WIDTH HEIGHT
SIZE
TYPE MATERIAL FINISH
FRAME
SEVENTH FLOOR
D731.1 D731.2
OFFICE 3'-6"
DOOR SCHEDULE NOTES:
1. NEW DOOR WITH LEAD SHIELDING, AS NOTED. SHIELDING MATCHES SHIELDING OF ADJACENT WALL, PER PHYSICIST'S REPORT.
2. DOOR TO RECEIVE CARD READER WITH SCRAMBLE PAD.
HW SET
(SEE SPEC
08 71 00)
ASSEMBLY
RATING
DETAILS
JAMB HEAD LEAD
SHIELDING
LEGEND:
ACT ACOUSTICAL CEILING TILE
GWB GYPSUM WALL BOARD
P PAINT
PLAM PLASTIC LAMINATE
SS SOLID SURFACE
WSF WELDED SEAM SHEET FLOORING
FINISH SCHEDULE NOTES:
1. PROVIDE PLAM-1 AT CASEWORK.
2. PROVIDE SS-1 AT COUNTERTOPS.
3. PROVIDE SS-2 AT COUNTERTOPS.
4. PATCH EXISTING PAINT FINISHES AT NEW / INFILLED WALL OPENINGS TO MATCH EXISTING.
5. CUT / INFILL / PATCH EXISTING RESILIENT WALL BASE FINISHES AT NEW / INFILLED WALL OPENINGS TO MATCH EXISTING.
6. CUT / INFILL / PATCH EXISTING HANDRAIL AND BUMPER RAIL AT NEW AND / OR INFILLED WALL OPENINGS TO MATCH
EXISTING. PROVIDE NEW ENDCAPS, RETURNS, AND BRACKETS AS REQUIRED FOR COMPLETE REINSTALLATION.
7. CUT AND FINISH EXISTING WAINSCOT AT NEW WALL OPENING TO MATCH EXISTING.
ROOM FINISH SCHEDULE
ROOM NO. ROOM NAME NOTES
SEVENTH FLOOR
FLOOR
NORTH
WALLS
EAST SOUTH WEST
CEILINGBASE
FINISH MATERIALS SCHEDULE
CODE MATERIAL COLORSIZEDESCRIPTION MANUFACTURER PRODUCT
NAME / NUMBER FINISH
NOTES
D731 D731
D732 D732 D754 D754 D758 D758 D759 D759
D759A D759A
OFFICE
PATIENT UPTAKE
EQUIPMENT RM
PET/CT IMAGING RM
SPECT/CT IMAGING RM
CONTROL RM
7'-0" A ST-1 - 1 HM PAINT P-3 5/A601 6/A601 - -
7'-0" 7'-0" 7'-0" 7'-0" 7'-0"
3'-6" 4'-0" 3'-6" 4'-0" 4'-0"
HM
HM
HM
HM
WD
A WD 1
A 1WD HM -
A 1
A WD
A WD
7'-0"3'-0" A WD 1 HM
- 1, 2
1/8"
1/16" 1/16"7/A601 6/A601 1/16"
WSF-1
WSF-1
WSF-1
EXIST
ACT-1
EXIST
P-1
EXIST
1, 2
EXIST EXIST EXIST
SOLID SURFACE COUNTERTOPSSS-1
ACT-1 ACOUSTICAL CLG TILE
RESILIENT SHEET FLOORING - SEE SPECIFICATION 09 65 16
WSF-1 WELDED SEAM FLOORING
PAINT - SEE SPECIFICATION 09 91 00
P-1 PAINT
P-2 PAINT
P-4 PAINT
P-5 PAINT
P-3 PAINT
ACOUSTICAL CEILING SYSTEM w/ 15/16" GRID
WELDED SEAM FLOORING W/ 4" HIGH
INTEGRAL FLASH COVE BASE
TYPICAL WALL COLOR
TOUCH UP PAINT AT NM DEPARTMENT CORRIDORS
HOLLOW METAL FRAMES
CORIAN NATURAL GRAY
USG MARS HEALTHCARE
#86152
24" x 24" x 7/8"
SQUARE EDGE WHITE WASHABLE, SOIL
RESISTANT
SHAW 4"H INTEGRAL
COVE BASE4376V VITALITY HUES
SHERWIN WILLIAMS - - SW 7029 AGREEABLE GRAY LEVEL 4 - SATIN
GENERAL NOTES:
- PAINT HOLLOW METAL DOOR FRAMES P-2 TO MATCH EXISTING.
- PAINT SOFFITS AND BULKHEADS TO MATCH ADJACENT WALLCOLOR,
UNLESS OTHERWISE NOTED.
- PAINT LOUVERS, VENTS AND GRILLES TO MATCH ADJACENT WALL COLOR.
- SEE AF101 FINISHES PLAN FOR CORNER GUARD LOCATIONS.
- SEE A701 INTERIOR ELEVATIONS FOR EXISTING FINISHES TO BE PATCHED.
- VERIFY ALL COLOR SELECTIONS WITH VAAAHS INTERIOR DESIGN
DEPARTMENT.
WD
7/A601 6/A601 7/A601 6/A601
5/A601 6/A601
COUNTERTOPS - SEE SPECIFICATION 12 36 00
7/A601 6/A601 5/A601 6/A601
1, 2 1, 2
3, 4, 5
1/2"
1/8"
1/16"
OFFICED731
D732 D754 D758 D759
D759A
PATIENT UPTAKE
EQUIPMENT RM
PET/CT IMAGING RM
SPECT/CT IMAGING RM
CONTROL RM
EXIST
WSF - 4"H
WSF - 4"H
WSF - 4"H
WSF - 4"H
WSF - 4"H
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
EXIST
ACT-1
ACT-1
ACT-1
ST-1 STAIN
TOUCH UP PAINT AT C7-6 MAIN CORRIDOR
WOOD DOORS
TOUCH UP PAINT AT D731/D733 OFFICE
MATCH EXISTING
-D760.1 D760
CONTROL RM 7'-0"3'-0" A WD
1 HM 1, 21/8"5/A601 6/A601 1/16"
PAINT P-3
PAINT P-3
PAINT P-3
PAINT P-3
PAINT P-3
PAINT P-3
PAINT P-3
PAINT P-3HM1-
ST-1
ST-1
ST-1
ST-1
ST-1
ST-1
ST-1
ST-1 1/8" 1/16"D760.2 D760
CONTROL RM 7'-0"3'-0" A WD
HW-4K
HW-3E
HW-3E
HW-4K
HW-SH-3A
HW-SH-3A
HW-SH-3B
HW-SH-3C
HW-SH-3A
17/A601 6/A601
WALL PROTECTION - SEE SPECIFICATION 10 26 00
CG-1 CORNER GUARD SURFACE MOUNTED, 3" WINGS INPRO 150BN FULL HEIGHT #0387, PEBBLE GRAY
TS-1 TRANSITION STRIP USE BETWEEN SAME HEIGHT FLOOR MATERIALS SCHLUTER RENO-T - ATGB BRUSHED NICKEL -
HR HANDRAIL EXISTING @ CORRIDORS
MATCH EXISTING
- -BR BUMPER RAIL EXISTING @ CORRIDORS MATCH EXISTING
SOLID SURFACE COUNTERTOPSSS-2 CORIAN NEUTRAL CONCRETE
-00105 PRODUCE
WSF-1
WSF-1
C7-6 CORRIDOR (MAIN)
CORRIDOR (OUTSIDE D754)
CORRIDOR (OUTSIDE D758)
CORRIDOR (OUTSIDE D732)
C7-19 C7-22 C7-25
C7-26 CORRIDOR (OUTSIDE D732)
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST MATCH EXIST EXIST EXIST EXIST EXIST 4, 5, 6, 7
EXIST 4, 5MATCH EXISTEXISTEXIST EXIST EXIST
MATCH EXIST EXIST
EXIST
EXIST
EXIST EXISTEXISTEXIST 4, 5. 6
MATCH EXIST EXIST EXIST EXISTEXIST 4, 5. 6
MATCH EXISTEXISTEXIST EXIST EXIST 4, 5
PLAM-1 PLASTIC LAMINATE
WOOD CASEWORK - SEE SPECIFICATION 12 32 00
CABINETRY WILSONART 8213K-28 PHANTOM COCOA
ACOUSTICAL CEILING - SEE SPECIFICATION 09 51 00
LEVEL 5 - SEMI-GLOSS
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING
A601
KABHFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
ARCHITECTURAL
SCHEDULES AND DETAILS
1 1/2" = 1'-0"
DOOR TYPES 2 1/2" = 1'-0"
FRAME TYPES
4 1/2" = 1'-0"
WINDOW TYPES
5 3" = 1'-0"
TYP. DOOR JAMB DETAIL 6 3" = 1'-0"
TYP. DOOR HEAD DETAIL 7 3" = 1'-0"
LEAD-LINED DOOR FRAME DETAIL
8 1-1/2" = 1'-0"
CONTROL ROOM WINDOW DETAIL
3 1/2" = 1'-0"
TYP. ROOM DOOR LAYOUT
A701
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
ARCHITECTURAL
INTERIOR ELEVATIONS
1 1/4" = 1'-0"
PATIENT UPTAKE - D732 2 1/4" = 1'-0"
CONTROL ROOM - D759A
5 1/4" = 1'-0"
PET/CT IMAGING ROOM - D758
4 1/4" = 1'-0"
SPECT/CT IMAGING ROOM D759
3 1/4" = 1'-0"
OFFICE - D731
6 1/4" = 1'-0"
CORRIDOR - C7-25 7 1/4" = 1'-0"
CORRIDOR - C7-22 8 1/4" = 1'-0"
CORRIDOR - C7-6
F001
DGAHFB
FIRE PROTECTION
LEGENDS, ABBREVIATIONS,
AND NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
FL101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
FIRE PROTECTION
SEVENTH FLOOR
LIFE SAFETY PLAN
1 1/8" = 1'-0"
FD101
JMD
FIRE PROTECTION
SEVENTH FLOOR PLAN -
DEMOLITION
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
FX101
JMD
FIRE PROTECTION
SEVENTH FLOOR PLAN -
NEW WORK
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
WITH PIPE INSULATION WITHOUT PIPE INSULATION
WITH PIPE INSULATION WITHOUT PIPE INSULATION
P001
MLJMD
PLUMBING
LEGEND, ABBREVIATIONS,
AND SCHEDULES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
PD101
JMDHFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
PLUMBING
SIXTH FLOOR PLAN -
DEMOLITION
1 1/4" = 1'-0"
PARTIAL SIXTH FLOOR PLAN
NORTHNORTH
2 1/4" = 1'-0"
PARTIAL SIXTH FLOOR PLAN
NORTHNORTH
PD102
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
PLUMBING
SEVENTH FLOOR PLAN -
DEMOLITION
1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
PD103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
PLUMBING
EIGHTH FLOOR PLAN -
DEMOLITION
1 1/4" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
PP101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
PLUMBING
SIXTH FLOOR PLAN -
NEW WORK
1 1/4" = 1'-0"
PARTIAL SIXTH FLOOR PLAN
NORTHNORTH
2 1/4" = 1'-0"
PARTIAL SIXTH FLOOR PLAN
PP102
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
PLUMBING
SEVENTH FLOOR PLAN -
NEW WORK
1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
PP103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
PLUMBING
EIGHTH FLOOR PLAN -
NEW WORK
1 1/4" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
P401
JMDJMD
PLUMBING
ISOMETRICS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
1 NTS
SANITARY AND VENT ISOMETRIC DIAGRAM
SIXTH FLOOR - DEMOLITION
2 NTS
MEDICAL GASES ISOMETRIC DIAGRAM
SEVENTH AND EIGHTH FLOORS - DEMOLITION
3 NTS
UPTAKE ROOM ISOMETRIC DIAGRAM
EIGHTH FLOOR - DEMOLITION
4 NTS
SANITARY AND VENT ISOMETRIC DIAGRAM
SIXTH FLOOR - NEW WORK
5 NTS
MEDICAL GASES ISOMETRIC DIAGRAM
SEVENTH AND EIGHTH FLOORS - NEW WORK
6 NTS
UPTAKE ROOM ISOMETRIC DIAGRAM
EIGHTH FLOOR - NEW WORK
M001
DGAHFB
MECHANICAL
LEGEND AND
ABBREVIATIONS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
MD101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
MECHANICAL
SEVENTH FLOOR PLAN -
DEMOLITION
1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
MD102
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
MECHANICAL
EIGHTH FLOOR PLAN -
DEMOLITION
1 1/4" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
MD103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
MECHANICAL
ROOF PLAN -
DEMOLITION
1 1/8" = 1'-0"
ROOF PLAN
NORTH
2 1/4" = 1'-0"
ENLARGED ROOF PLAN
MH101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
MECHANICAL
SEVENTH FLOOR PLAN -
NEW WORK
1 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
PARTIAL SEVENTH FLOOR PLAN
NORTH
3 1/4" = 1'-0"
PARTIAL SIXTH FLOOR PLAN
NORTH
4 1/32" = 1'-0"
MH102
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
MECHANICAL
EIGHTH FLOOR PLAN -
NEW WORK
1 1/4" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
NORTH
2 1/4" = 1'-0"
PARTIAL EIGHTH FLOOR PLAN
NORTH
3 1/4" = 1'-0"
EIGHTH FLOOR PLAN
MH103
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
MECHANICAL
ROOF PLAN -
NEW WORK
1 1/8" = 1'-0"
ROOF PLAN
NORTH
2 1/4" = 1'-0"
ENLARGED ROOF PLAN
W
W1
W
R
2/3W 1/ 3W
W W
1/2W 1/ 3W
1/6W
30°
15°
15°
1/2" 1/2" 1 1/2"
1 NTS
DUCT ELBOWS DETAIL 2 NTS
CONNECTION DETAIL 3 NTS
VAV TERMINAL UNIT CONNECTION 4 NTS
FLEX DUCT CONNECTION DETAIL
6 NTS
SUPPLY DUCT TAKE OFF DETAIL 7 NTS
DUCT TAKE OFF DETAIL
RETURN/EXHAUST
8 NTS
VOLUME DAMPER DETAIL 9 NTS
ROUND DUCT HANGER DETAIL
11 NTS
DUCT RISER SUPPORT DETAIL 12 NTS
FLEXIBLE CONNECTION DETAIL
DUCT MOUNTED EQUIPMENT
W
W
SE
E
N O
TE
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
13 NTS
RECTANGULAR DUCT HANGER DETAIL
5 NTS
TERMINAL UNIT PIPING DIAGRAM
14 NTS
TYPICAL MANUAL AIR VENT
10 NTS
TYPICAL PIPE HANGERS DETAIL
M501
JMD
MECHANICAL
DETAILS AND DIAGRAMS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
1 NTS
ROOF PIPE PENETRATION DETAIL 2 NTS
EQUIPMENT ROOF RAIL DETAIL 3 NTS
ROOF CURB DETAIL 4 NTS
HANGING PIPE SUPPORT DETAIL 5 NTS
PIPE SUPPORT FOR ROOF DETAIL
6 NTS
SIEMENS OUTDOOR COOLING UNIT MOUNTING DETAIL
7 NTS
SIEMENS WATER/AIR SPLIT COOLING DIAGRAM 8 NTS
SIEMENS OUTDOOR COOLING UNIT EXAMPLE
9 NTS
SIEMENS HEAT EXCHANGER DETAIL 10 NTS
SIEMENS SECONDARY CIRCUIT DETAIL 11 NTS
SIEMENS PRIMARY CIRCUIT DETAIL
M502
JMD
MECHANICAL
DETAILS AND DIAGRAMS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
M601
JMDHFB
MECHANICAL
SCHEDULES
N
N
NCS
NCT
WAP
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
1 East
E001
SS
ELECTRICAL
LEGEND, ABBREVIATIONS,
AND NOTES
HFB
7 7
ED101
SS
ELECTRICAL
SEVENTH FLOOR PLAN-
DEMOLITION
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
E401
E401
EP101
SS
ELECTRICAL
SEVENTH FLOOR PLAN-
POWER
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1 East
4 4
1 1/4" = 1'-0"
SEVENTH FLOOR PLAN
PARTIAL SEVENTH FLOOR
RACEWAY PLAN
EP102
HFB SJS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
EL101
SS
ELECTRICAL
SEVENTH FLOOR PLAN-
LIGHTING
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
VAAAHS Ann Arbor, MI
506-CSI-133 Office of Facilities
Management
December 23, 2025
CONSULTANTS:
2215 FULLER ROAD
ANN ARBOR, MI 48105
HEALTHCARE SERVICES
VETERANS AFFAIRS
FULLY SPRINKLERED
SITE PREP FOR NUCLEAR
MEDICINE ROOMS D758 & D759
11549 Clara Barton Dr Fairfax, Virginia 22039
E
F
100% BID DOCUMENTS
KEY PLAN
NORTH
PROJECT
LOCATION
1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .