submittal register.pdf

PDF 61 KB Posted

Attached to
Replacement Dining Area Lighting at WC100
Solicitation number
N4008526R9061
Issued by

About this file

This is a Submittal Register form used to track contractor submissions and approvals for a federal construction contract. The form provides a comprehensive checklist of required submittals organized by submittal designation codes (SD-01 through SD-11) and specification sections, establishing a control mechanism for managing contractor deliverables throughout the project lifecycle.

Preconstruction submittals (SD-01) include Schedule of Prices, List of Contact Personnel, Construction Schedule, Military Real Property documentation (if applicable), Equipment Delivery Schedule, Crane Work Plan (if applicable), Activity Hazard Analysis, Accident Prevention Plan, Traffic Control Plan (if applicable), Environmental Protection Plan, Preconstruction Survey, MSDS for Class I ODS Waivered Product, and Permit for Storm Water Discharge (if applicable). Product data submittals (SD-03) cover Backflow Preventers and associated certificates. Test reports (SD-06) document Backflow Preventer Tests, and certificates (SD-07) verify Confined Space Entry Permits, Backflow Tester Certification, Backflow Preventer Certificates, Certificate of Compliance, and Third Party Certification of Barge-Mounted Mobile Cranes. Safety-related submittals include Crane Critical Lift Plan, Crane Operators certification, Accident Reports, Monthly Exposure Reports, and Regulatory Citations and Violations. Closeout submittals (SD-11) require Quality Control Plan, Submittal Register, and Complete Submittal Package including Interim DD1354 Transfer & Acceptance documentation. The form tracks submission dates, approval authority routing, material needed dates, and mailing requirements to ensure proper documentation and approvals throughout contract execution.

View the file

Other files

File Type Posted
Amend0004 26R9061.pdf PDF
Amend0003 26R9061.pdf PDF
Amend0002 26R9061.pdf PDF
01 35 26.pdf PDF
Amend0001 26R9061.pdf PDF
N4008523B0031 Dwgs.pdf PDF
23-0031 SOW.pdf PDF
N4008523B0031 Specs.pdf PDF
Revised Contractor_Environmental_Guide.pdf PDF
RFP 23-0031.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11

Crane Reports

SD-07 CERTIFICATES

Confined Space Entry Permit

Approving AuthorityContractor Schedule Dates

SD-11 CLOSEOUT SUBMITTALS

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Submittal Register

Complete Submittal Package

TITLE AND LOCATION

(Enter Contract Title and Locaiton Here)

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

(d)

Contractor Action

DESCRIPTION

ITEM SUBMITTED

(Enter Contractor Name Here)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-06 TEST REPORTS

SD-01 PRECONSTRUCTION SUBMITTALS

(Enter Contract No. Here)

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

SUBMITTAL REGISTER

P A R A G R A P H

N O

S P E C

S E C T

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

Monthly Exposure Reports

Regulatory Citations and Violations

1.14.6

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF _

Third Party Certification of Barge-

Mounted Movile Cranes

SD-11 CLOSEOUT SUBMITTALS

Qaulity Control Plan (QC Plan)

Certificate of Compliance

Backflow Tester Certification (If Applicable)

Backflow Preventer Tests (If Applicable)

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicab

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable)

SD-03 PRODUCT DATA

Backflow Preventers (If Applicable)

Backflow Preventers Certificate (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES

File details come from the government source that posted it. Updated .