Amend0002 26R9061.pdf
PDF 70 KB Posted
- Attached to
- Replacement Dining Area Lighting at WC100
- Solicitation number
- N4008526R9061
About this file
Amendment of Solicitation/Modification of Contract
This is a Standard Form 30 amendment to a federal solicitation. Amendment No. 0002, effective July 27, 2026, modifies Solicitation N40085-26-R-9061 dated July 9, 2026, for Project 23-0031, "Replacement Dining Area Lighting at WC100." The solicitation is issued and administered by NAVFAC Mid-Atlantic, Resident Officer in Charge of Construction, located at 1107A Birch Street, Camp Lejeune, NC 28547-2521 (Code N40085).
The amendment adds a Site Visit Sign-in Sheet as a required attachment to the solicitation. The original receipt deadline for proposals remains unchanged, and offerors must acknowledge receipt of this amendment prior to proposal submission. Failure to acknowledge the amendment may result in rejection of a proposal. The sign-in sheet documents attendance at the mandatory site visit held on July 23, 2026, at 0100 hours PM at the loading clock (rear of building) and captures attendee names, companies/organizations, phone numbers, and email addresses. Five individuals representing various organizations attended the site visit, including Kimberley Koleski from NAVFAC and representatives from construction and engineering firms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend0004 26R9061.pdf | ||
| Amend0003 26R9061.pdf | ||
| 01 35 26.pdf | ||
| Amend0001 26R9061.pdf | ||
| N4008523B0031 Dwgs.pdf | ||
| 23-0031 SOW.pdf | ||
| N4008523B0031 Specs.pdf | ||
| Revised Contractor_Environmental_Guide.pdf | ||
| submittal register.pdf | ||
| RFP 23-0031.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PAG
OF PAGES
I 2
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REO. NO.
5. PROJECT NO. (If applicble)
AMENDMENT NO. 0002 23-0031
6. ISSUED BY CODE
07/27/26
N40085 7. ADMINISTERED BY (If other than Item 6) CODE I
NAVFAC Mid-Atlantic See Item 6 Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICIATION NO.
,c N40085-26-R-9061
9B. DA TED (SEE ITEM 11)
07/09/26
10A. MODIFICATION OF CONTRACT/ORDER NO.
1 OB. DA TED (SEE ITEM 11)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[RI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended, [RI is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 1 OA.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43. 103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor D is not, D is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
23-0031, Replacement Dining Area Lighting at WCl00 Amendment 0002, Site Visit Sign-in Sheet
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted.
the amendment may constitute grounds for rejection of a proposal.
Failure to acknowledge
See Continuation Page(s)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1 OA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
1 5B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
NSN 7540-01-152-8070
Previous edition unusable
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .