Submittal_List.pdf

PDF 79 KB Posted

Attached to
Repaint & Repair Stucco Federal contract opportunity
Solicitation number
140P6426Q0106
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a Submittal List for a National Park Service Midwest Regional Office (MWRO) construction project using standardized Statements of Work.

The document outlines required submittals organized by specification section and paragraph number. Under Section 11000 (General Requirements), the contractor must submit eight administrative items for action: Preconstruction Conference Submittal, Letter Designating Project Superintendent, Construction Schedule, Schedule of Values, Accident Prevention (Safety) Plan, List of Subcontractors, Statements From Subcontractors regarding compliance, and Quality Control Plan. Section 09 01 25.91 (Portland Cement Stucco Restoration) requires submission of Proposed Procedures for Cutting and Patching as an informational item. Section 09 24 00 (Cement Plastering) requires Product Data and Samples as action items. Section 09 90 00 (Painting and Coating) requires Product Data as an informational item and Samples as an action item. The submittal matrix uses "X" marks to indicate whether each item is informational or requires action, with columns distinguishing between administrative submittals, shop drawings, samples, and manufacturing data/instructions. The document provides a template format for tracking contractor compliance with National Park Service submittal requirements throughout the project execution phase.

View the file

Other files for this federal contract opportunity

Other files attached to Repaint & Repair Stucco, newest first.
File Type Posted
Questions_and_Answers_0001.pdf PDF
Sol_140P6426Q0106_Amd_0001.pdf PDF
Statement_of_Work_-_Revised_0001.pdf PDF
Construction_Prevailing_Wage_Determination.pdf PDF
Attachment_4_-_Historic_Structures_Report.pdf PDF
Attachment_1_-_Stucco_Restoration.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet
Statement_of_Work.pdf PDF
Price_Schedule.pdf PDF
Attachment_3_-_BSD-Cement_Plastering.pdf PDF
Sol_140P6426Q0106.pdf PDF
Attachment_2_-_BSD-Painting_and_Coating.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

ER

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

A dm in is tr at iv e

SH

O

P D

R A

W

IN

G

SA

M

PL

E

M fg

. D A

TA

IN

ST

R U

C

TI

O N

S

11000 9.1C General Requirements Preconstruction Conference Submittal: X

Letter Designating Project Superintendent X

Construction Schedule X

Schedule of Values X

Accident Prevention (Safety) Plan X

List of Subcontractors X

Statements From Subcontractors...compliance... X

Quality Control Plan X

09 01 25.91 Portland Cement Stucco Restoration

1.2 Proposed Procedures for Cutting and Patching X

09 24 00 Cement Plastering

1.4 Product Data X

1.4 Samples X

09 90 00 Painting and Coating

1.4 Product Data X

1.4 Samples X

SUBMITTAL LIST

Spec.

Sec. Par. No. Description

INFORMATIONAL ACTION

National Park Service MWRO Standardized Statements of Work

SUBMITTAL REQUIREMENTS (indicate with an "X")

Submittal List Template

File details come from the government source that posted it. Updated .