Subcontractor_Summary_-_Sheltered_.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- Quote- 26 - 308
- Issued by
- Pinellas County, Florida
About this file
This is a Subcontractor Summary document for a sheltered procurement by the City of St. Petersburg, Florida, related to the procurement of one Flowserve Limitorque Model MXB-40WP460/26 Smart Electric Valve Actuator for the North East Water Reclamation Facility. The procurement seeks to replace an existing EIM brand valve actuator that is beyond economical repair, with the objective of restoring valve actuation functionality without modifications to the installed valve, mounting interface, or control architecture. The City intends to upgrade to a Limitorque electric valve actuator featuring integral motor starter contactors housed within the actuator enclosure. No substitute, alternate manufacturer, or equivalent product will be accepted, indicating a specification-driven procurement for this single replacement unit.
The document appears to track subcontractor participation and involvement in this sheltered procurement process. Given the sheltered designation, the procurement likely prioritizes participation by certified small businesses, minority-owned businesses, women-owned businesses, or other designated business categories. The procurement is for a specific manufactured product with no flexibility for substitutions, which limits vendor competition to authorized distributors or representatives of Flowserve Limitorque. Additional details regarding pricing, set-asides, funding sources, and other financial terms would be contained in the associated procurement documents and bid specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NEWRF_Filter_#4_Drain_Valve_Actuator_-_QTY_One_(1)_Flowserve_Limitorque_Model_MXB-40WP460_26_Smart_Electric_Valve_Actuator_(Addendum_#3_Revision).pdf | ||
| NEWRF_Filter_#4_Drain_Valve_Actuator_-_QTY_One_(1)_Flowserve_Limitorque_Model_MXB-40WP460_26_Smart_Electric_Valve_Actuator.pdf | ||
| Agreement.pdf | ||
| 1000006984.jpg | JPG image | |
| 1000006985.jpg | JPG image | |
| 1000007167.jpg | JPG image | |
| 1000006994.jpg | JPG image | |
| 1000006993.jpg | JPG image | |
| 1000007166.jpg | JPG image | |
| 12345A1_Spec.pdf | ||
| 1000006992.jpg | JPG image | |
| 1000006991.jpg | JPG image | |
| Light_Construction_Agreement.docx | DOCX document | |
| CKS_Quote-Quote++0174459+_.pdf | ||
| Public_Construction_Bond.docx | DOCX document | |
| Performance_&_Payment_Bond_.DOCX | DOCX document | |
| Subcontractor_Utilization_Plan.docx | DOCX document | |
| Subcontractor_Summary_Spreadsheet.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| City of St. Petersburg |
| Subcontractor Summary Instructions |
WORKSHEET MUST BE COMPLETED AND SUBMITTED WITH YOUR BID
1. The Subcontractor Worksheet reflects the percentage of work which may be subcontracted for this project. Refer to Contract Standards, Instructions to Bidders, Article I-13, Subcontractors for applicable rules.
2. Enter the name of your company in the Prime Contractor field.
3. Enter the name and date of Prime Contractor employee completing this form.
4. Provide all information requested on each intended subcontractor. If subcontractors will NOT be used for this project, provide a written statement on the Subcontractor List indicating the same.
5. Subcontractors may not be changed or substituted once a Prime Contractor is awarded the project (and the pre-construction meeting held), except for the following reasons:
A. Subcontractor fails or refuses to execute a written contract for the scope of work as specified at the price specified;
B. Subcontractor is not appropriately licensed to perform the scope of work;
C. Subcontractor becomes bankrupt or insolvent;
D. Subcontractor is ineligible to perform the work on the project;
E. Subcontractor fails or refuses to perform its subcontract;
F. Engineer determines the work performed by the subcontractor is substantially unsatisfactory and not in substantial accordance with the plans and specifications;
G. Subcontractor is substantially delaying or disrupting the progress of the work.
Requests for changes to the Subcontractor List shall be made in writing to the Procurement & Supply Management, Attention: Contracts Compliance Manager at Stephanie.Swinson@stpete.org.
6. SBE subcontractors used to meet the SBE percentage requirement, if replaced, shall be replaced with a SBE subcontractor, unless the Prime Contractor demonstrates that SBE requirements are being met in another way.
7. Restrictions on subcontracting percentage and use of multiple-tier subcontractors do not apply to FDOT LAP or federally funded projects.
Subcontractor Worksheet
| City of St. Petersburg |
| Subcontractor Summary |
| Project Name: |
| Project Number: |
| Percentage of Contract Which May be Subcontracted: 80% for Shelter Bid |
| Name of Prime Contractor: | Cells below will be "hidden" on the worksheet since they are only for Procurement's use. |
| Name/Date of Individual Completing this Form: |
| City of St. Petersburg SBE or MWBE Contractor Yes or No | Subcontractor's Name (Provide complete Legal Name) | Subcontractor's Primary Business Address | Name/Phone Number and Email Address of Subcontractor's Employee Responsible for Project Supervision | First or Second Tier Subcontractor* | Trade Classification(s) Being Subcontracted (List One Trade per Line) | Subcontract Amount ($) | Added (A) Deleted (D) | Reason Code | City Approver/Date | Add (A) and Delete (D) Legend |
| Example: Yes | XYZ Contractors, Inc. | 123 N. Burlington Ave., St. Petersburg, FL 33701 | Joe Jones - 727-555-555 Email - XYXCon@yahoo.com | First | Electrical | 13,234.00 | D | B | Employee XYZ/03-01-19 | A. Subcontractor fails or refuses to execute a written contract for the scope of work as specified at the price specified; |
| B. Subcontractor is not appropriately licensed to perform the scope of work; | ||||||||||
| C. Subcontractor becomes bankrupt or insolvent; | ||||||||||
| D. Subcontractor is ineligible to perform the work on the project; | ||||||||||
| E. Subcontractor fails or refuses to perform its subcontract; | ||||||||||
| F. Engineer determines the work performed by the Subcontractor is substantially unsatisfactory and not in substantial accordance with the Plans and Specifications; |
G. Subcontractor is substantially delaying or disrupting the progress of the work.
Total: 0.00
| *Only first and second tier subcontractors are permitted unless noted otherwise in the Contract Documents. | Contract Amount | |
| 0.00 | Amount Allowed to be Subcontracted |
&8Rev. January 2020 &10Page 1 of &P