Structural.pdf
PDF 27 MB Posted
- Solicitation number
- AAC-26-001
- Issued by
- Ketchikan Gateway Borough, Alaska
About this file
This is a structural assessment document supporting a Request for Proposals issued by Alaska Aerospace Corporation (AAC) for a comprehensive Corrosion Control Study of the Launch Tower at LP-1 and associated support equipment at the Pacific Spaceport Complex-Alaska in Kodiak. The project requires contractors to conduct non-destructive evaluation (NDE) assessments to identify material degradation and surface corrosion on large-scale aerospace structural components in a maritime environment. Key deliverables include an Initial Site Memo, Draft Corrosion Assessment Report, and Final Corrosion Assessment Report, all prepared by ASNT Level II or higher certified technicians using ASTM D610 and NACE/AMPP maritime standards. The proposal submission deadline is May 27, 2026, at 5:00 PM Alaska Standard Time, with written questions due by May 20, 2026. Proposal evaluation is expected to conclude by June 5, 2026, with a Notice of Intent to Award by June 8, 2026, contract issuance by June 15, 2026, and all work completion required by September 30, 2026.
Contractors may propose either Firm Fixed Price or Cost Reimbursable contract structures with monthly payments following invoice approval or milestone completion. No specific budget range or award value is disclosed in the RFP documentation. The evaluation criteria allocate 35 points for experience and qualifications, 20 points for methodology, 15 points for management plan, 10 points for project understanding, and 20 points for cost proposal, with an additional 5 points available for Alaska offeror preference. Qualified contractors must demonstrate prior experience with large-scale structural corrosion assessments in maritime or high-salinity aerospace environments, possess the capability to provide comprehensive engineering reports with remediation recommendations and remaining useful life estimates, and maintain a valid Alaska business license. Contractors must complete at least 60 percent of work internally and may utilize subcontractors with prior AAC approval. Professional liability insurance of at least $500,000 per claim is required for contracts under $100,000. No set-aside designations for disadvantaged or minority-owned enterprises are mentioned, and all travel costs must comply with the Joint Travel Regulations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .