Floor Framing Plan LvL 230 240 250.pdf

PDF 2 MB Posted

Attached to
Alaska Aerospace Corporation Corrosion Control Study
Solicitation number
AAC-26-001
Issued by
Ketchikan Gateway Borough, Alaska

About this file

Floor Framing Plan Summary

This is an architectural drawing file related to the Alaska Aerospace Corporation's Corrosion Control Study project at the Pacific Spaceport Complex-Alaska in Kodiak. The Floor Framing Plan document depicts structural framing details for levels 230, 240, and 250 of the Launch Tower at LP-1, which is the primary facility subject to the comprehensive corrosion assessment. The corrosion control study solicitation requires qualified contractors to conduct non-destructive evaluation of all surfaces and structural components, with deliverables including an Initial Site Memo, Draft Corrosion Assessment Report, and Final Corrosion Assessment Report prepared by ASNT Level II or higher certified technicians. The proposal submission deadline is 5:00 PM Alaska Standard Time on May 27, 2026, with written questions due by May 20, 2026. Evaluation is scheduled for completion by June 5, 2026, with a Notice of Intent to Award by June 8, 2026 and contract issuance by June 15, 2026. All work must be completed by September 30, 2026.

Contractors may propose either a Firm Fixed Price or Cost Reimbursable contract structure, with monthly payments following invoice approval or milestone completion. Professional liability insurance with a minimum of $500,000 per claim is required for contracts under $100,000. Evaluation criteria allocate 35 points for experience and qualifications, 20 points for methodology, 15 points for management plan, 10 points for project understanding, and 20 points for cost proposal, with an additional 5 points available for Alaska offeror preference. Contractors must complete at least 60 percent of work internally and obtain prior AAC approval for any subcontractors. All travel costs must comply with Joint Travel Regulations, and cost proposals must detail direct and indirect costs, labor rates at various levels, direct expenses, supplies, overhead, and profit. No specific budget range or award value is disclosed in the RFP documentation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .