Stokes Plaza AWARD ALLOCATION FORM IRA .xlsx

XLSX spreadsheet 175 KB Posted

Attached to
Carl B. Stokes U. S. Courthouse Plaza Replacement Design Build Services Federal contract opportunity
Solicitation number
47PF0024R0073
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This document appears to be a Post Award Allocation Form for the Stokes Plaza Design-Build project. It provides details on the project, including the building name, address, and period of performance. The scope of work includes replacing the failing waterproofing system, refinishing and reinforcing structural steel, repairing fireproofing, and completing an unconstructed plaza area. The project aims to improve pedestrian accessibility, incorporate renewable energy sources, and implement a water reclamation system.

The federal contract opportunity, solicitation number 47PF0024R0073, is for Design-Build services for the Carl B. Stokes U.S. Courthouse Plaza Replacement project. The procurement will be full and open, with a virtual pre-proposal meeting scheduled for September 30, 2024, and proposals due by October 28, 2024. The project is funded under the Inflation Reduction Act and is being managed by the General Services Administration, Public Buildings Service, Region 5.

View the file

Other files for this federal contract opportunity

Other files attached to Carl B. Stokes U. S. Courthouse Plaza Replacement Design Build Services, newest first.
File Type Posted
47PF0024R0073 Amendment 002.pdf PDF
Stokes PreProposal Agenda.pdf PDF
47PF0024R0073 Amendment 001.pdf PDF
Stokes DB Preproposal Invite.pdf PDF
Stokes_Sol_DB_2_Phase_Part_I.pdf PDF
Stokes Plaza IRA Project Submittal_ Reporting Form.xlsx XLSX spreadsheet
Stokes Plaza DRAFT Agr_DB_MAY 2024.pdf PDF
Stokes Plaza Reps and Certs GC May 2024.pdf PDF
PBS_Past_Performance_Form_Rev_6_12_15 .docx DOCX document
47PF0024R0073 Form.pdf PDF
Instructions for Questionnaire.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information

POST AWARD ALLOCATION FORM IRA

PROJECT NAME
BUILDING NAME
BUILDING ADDRESSBUILDING NUMBER
ESTIMATED
START DATEPERIOD OF PERFORMANCE DAYS
SOLICITATION #DELIVERY METHODDesign Bid Build
OWNER INFORMATIONCONTRACTOR INFORMATION
OWNER
COMPANY NAMECONTRACTOR COMPANY NAME
OWNER
CONTACT NAMECONTRACTOR CONTACT NAME
ADDRESSADDRESS
OWNER
PHONECONTRACTOR PHONE
OWNER
EMAILCONTRACTOR EMAIL
SCOPE OF WORK
TEXT
MATERIALS AND SERVICES NOT INCLUDED
TEXT
ASSUMPTIONS
TEXT
NET ZERO CONTRIBUTIONS
TEXT

Masterformat CSI

PBS MASTERFORMAT CSI

Masterformat
CSISystem Elements (Trade Work)Self Performed/
Subcontracted?Amount
Div. 00Design Services - for Design Build
Div. 00AHigh Performing Green Buildings
Div. 00BEmerging and Sustainable Technologies
Div. 01General Requirements (Please Include Jobsite Overhead)
Div. 02Existing Conditions
Div. 03Concrete0
Div. 03ALow Embodied Carbon Concrete
Div 03.BNon LEC Concrete
Div. 04Masonry
Div. 05Metals0
Div. 05ALow Embodied Carbon Steel
Div 05.BNon LEC Metals
Div. 06Wood, Plastics, Composites
Div. 07Thermal and Moisture Protection
Div. 08Openings0
Div. 08ALow Embodied Carbon Glass
Div 05.BNon LEC Openings
Div. 09Finishes
Div. 10Specialties
Div. 11Equipment
Div. 12Furnishings
Div. 13Special Construction
Div. 14Conveying Equipment
Div. 21Fire Suppression
Div. 22Plumbing
Div. 23Heating, Ventilating, and Air Conditioning (HVAC)
Div. 26.1Electrical
Div. 26.2Lighting
Div. 27Communications
Div. 28.1Electronic Safety
Div. 28.2Electronic Security (TI - Non-BSAC)
Div. 31Earthwork
Div. 32Exterior Improvements0
Div. 32.ALEC Asphalt
Div. 32.BRest of Exterior Improvements
Div. 33Utilities
Div. 34Transportation
Div. 35Waterway and Marine Construction
Div. 40Process Integration
Div. 41Material Processing and Handling Equipment
Div. 42Process Heating, Cooling and Drying Equipment
Div. 43Process Gas and Liquid Handling, Purification and Storage Equipment
Div. 44Pollution and Waste Control Equipment
Div. 45Industry Specific Manufacturing Equipment
Div. 46Water and Wastewater Equipment
Div. 48Electrical Power Generation
SubtotalTrade Cost$0.00
General Conditions
Insurances (General Liability, Subcontractor Performance, Builders Risk Program)
Payment and Performance Bond
SubtotalEstimated Cost of Work$0.00
Overhead
Profit
ERROR:#NAME?$0.00

Bid Tabulation

PBS BID TABULATION FORM
Company Name:Project No.:
Project Name:
Location:
Architect:Independent Government Estimate (IGE)0CONTRATOR BCONTRACTOR CCONTRACTOR D
Bid Date:
BID QUANTITIESUNIT AMOUNTBIDUNIT AMOUNTBIDUNIT AMOUNTBIDUNIT AMOUNTBIDUNIT AMOUNTBID
Ref #Item DescriptionQty.UNIT
Div. 00Design Services - for Design Build500$500.00500$500.00$ -$ -$ -
Div. 01General Requirements (Please Include Jobsite Overhead)900$900.001000$1,000.00$ -$ -$ -
Div. 02Existing Conditions600$600.00600$600.00$ -$ -$ -
Div. 03Concrete210$210.00200$200.00$ -$ -$ -
Div. 03ALow Embodied Carbon Concrete200$200.00200$200.00$ -$ -$ -
Div 03.BNon LEC Concrete4.5$45.005$50.00$ -$ -$ -
Div. 04Masonry5$50.006$60.00$ -$ -$ -
Div. 05Metals6$60.005$50.00$ -$ -$ -
Div. 05ALow Embodied Carbon Steel1.4$280.001.5$300.00$ -$ -$ -
Div 05.BNon LEC Metals500$500.00500$500.00$ -$ -$ -
Div. 06Wood, Plastics, Composites1.25$250.001.25$250.00$ -$ -$ -
Div. 07Thermal and Moisture Protection590$590.00600$600.00$ -$ -$ -
Div. 08Openings$ -$ -$ -$ -$ -
Div. 05ALow Embodied Carbon Glass$ -$ -$ -$ -$ -
Div 05.BNon LEC Openings$ -$ -$ -$ -$ -
Div. 09Finishes$ -$ -$ -$ -$ -
Div. 10Specialties$ -$ -$ -$ -$ -
Div. 11Equipment$ -$ -$ -$ -$ -
Div. 12Furnishings$ -$ -$ -$ -$ -
Div. 13Special Construction$ -$ -$ -$ -$ -
Div. 14Conveying Equipment$ -$ -$ -$ -$ -
Div. 21Fire Suppression$ -$ -$ -$ -$ -
Div. 22Plumbing$ -$ -$ -$ -$ -
Div. 23Heating, Ventilating, and Air Conditioning (HVAC)$ -$ -$ -$ -$ -
Div. 26.1Electrical$ -$ -$ -$ -$ -
Div. 26.2Lighting$ -$ -$ -$ -$ -
Div. 27Communications$ -$ -$ -$ -$ -
Div. 28.1Electronic Safety$ -$ -$ -$ -$ -
Div. 28.2Electronic Security (TI - Non-BSAC)$ -$ -$ -$ -$ -
Div. 31Earthwork$ -$ -$ -$ -$ -
Div. 32Exterior Improvements$ -$ -$ -$ -$ -
Div. 32.ALEC Asphalt$ -$ -$ -$ -$ -
Div. 32.BRest of Exterior Improvements$ -$ -$ -$ -$ -
Div. 33Utilities$ -$ -$ -$ -$ -
Div. 34Transportation$ -$ -$ -$ -$ -
Div. 35Waterway and Marine Construction$ -$ -$ -$ -$ -
Div. 40Process Integration$ -$ -$ -$ -$ -
Div. 41Material Processing and Handling Equipment$ -$ -
Div. 42Process Heating, Cooling and Drying Equipment$ -$ -$ -$ -$ -
Div. 43Process Gas and Liquid Handling, Purification and Storage Equipment$ -$ -
Div. 44Pollution and Waste Control Equipment$ -$ -
Div. 45Industry Specific Manufacturing Equipment$ -$ -
Div. 46Water and Wastewater Equipment$ -$ -
Div. 48Electrical Power Generation$ -$ -
$4,185.00$4,310.00
$426.69$426.69
$4,611.69$4,736.69

image1.png

File details come from the government source that posted it. Updated .